GLEN_18-1107_SOW_Addendum_2.pdf
PDF 111 KB Posted
- Attached to
- Solicitation_GLEN_18-1101
- Solicitation number
- FA255019RA010
About this file
This Statement of Work Addendum modifies an existing contract to repair electrical and HVAC systems at an emergency power plant on Schriever Air Force Base in Colorado. The addendum incorporates additional requirements into the original contract scope, including removing an existing concrete walkway and reuse of the pads to ease replacement of underground conduit and a grounding ring. Above-ground conduit may also be reused unless damaged or undersized. The contractor shall provide all labor, tools, and materials to complete the added work, in addition to adhering to the original Statement of Work and specifications. The contractor remains responsible for complete construction and warranty of the project, including the revised requirements.
Sow Addendum #2
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Addendum 2
Project Number: GLEN 18-1101
Repair Electrical-HVAC at Emergency
Power Plant, B600
Schriever AFB, Colorado
23 SEPTEMBER 2019
GLEN 18-1101 Page 2
1.0 BACKGROUND:
A Statement of Work Addendum is necessary due to requirement development deficiencies with the subject project. The following changes are hereby incorporated into the original contract scope.
2.0 SCOPE OF WORK:
The Contractor shall provide all labor, tools, and materials to complete all work represented by these changes. The Contractor shall still adhere to the original contract documents, including the original Statement of Work and Specifications. All material and testing requirements from the original contract scope remain unchanged. The Contractor shall provide the Government with complete construction, and warranty for this project, to include the revised requirements.
3.0 MODIFIED REQUIREMENTS:
2.3.3.e. Drawings CD-101, and CP-101 show that the concrete walkway should be removed and the pads reused. Pads shall also be removed in order to ease replacement of the conduit and grounding ring. Above ground conduit may be reused unless damaged or undersized.