GLEN_18-1107_SOW_Addendum_2.pdf

PDF 111 KB Posted

Attached to
Solicitation_GLEN_18-1101
Solicitation number
FA255019RA010
Issued by

About this file

This Statement of Work Addendum modifies an existing contract to repair electrical and HVAC systems at an emergency power plant on Schriever Air Force Base in Colorado. The addendum incorporates additional requirements into the original contract scope, including removing an existing concrete walkway and reuse of the pads to ease replacement of underground conduit and a grounding ring. Above-ground conduit may also be reused unless damaged or undersized. The contractor shall provide all labor, tools, and materials to complete the added work, in addition to adhering to the original Statement of Work and specifications. The contractor remains responsible for complete construction and warranty of the project, including the revised requirements.

Sow Addendum #2

View the file

Other files

Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Addendum 2

Project Number: GLEN 18-1101

Repair Electrical-HVAC at Emergency

Power Plant, B600

Schriever AFB, Colorado

23 SEPTEMBER 2019

GLEN 18-1101 Page 2

1.0 BACKGROUND:

A Statement of Work Addendum is necessary due to requirement development deficiencies with the subject project. The following changes are hereby incorporated into the original contract scope.

2.0 SCOPE OF WORK:

The Contractor shall provide all labor, tools, and materials to complete all work represented by these changes. The Contractor shall still adhere to the original contract documents, including the original Statement of Work and Specifications. All material and testing requirements from the original contract scope remain unchanged. The Contractor shall provide the Government with complete construction, and warranty for this project, to include the revised requirements.

3.0 MODIFIED REQUIREMENTS:

2.3.3.e. Drawings CD-101, and CP-101 show that the concrete walkway should be removed and the pads reused. Pads shall also be removed in order to ease replacement of the conduit and grounding ring. Above ground conduit may be reused unless damaged or undersized.