This document contains a request for information and response regarding a solicitation to replace aging electrical infrastructure at a Air Force facility. The solicitation seeks proposals to replace six transformers, a common generator grounding resistor, interconnecting lines, and grounding system in the transformer yard. It also includes replacing eight roof mounted exhaust fans, seven wall louvers, and obsolete generator control equipment including synchronizers, load controllers, a custom PLC based generator controller and the generator operator HMI computer and programming. The response clarifies that due to critical missions, there must always be a primary and secondary electrical system available and any transformers taken offline must have backup power provided. It acknowledges this will significantly increase project costs but safety and mission needs take priority over cost considerations.

RFI 002

View the file

Other files

File Type Posted
5 WD_CO20200002_ 01-03-2020.pdf PDF
4 B600 Upgrade drawing.pdf PDF
1 Solicitation Amendment - FA255019RA0100001.pdf PDF
2 GLEN18-1101_SOW_06Jan2020.pdf PDF
3 18-1101 RFI 005.pdf PDF
RFI_004.pdf PDF
3_-_Design_Drawings_PDF_Exhaust_Fans_AE_Comments.pdf PDF
RFI_003.pdf PDF
MCC-1_AE_Comments.pdf PDF
GLEN_18-1107_SOW_Addendum_2.pdf PDF
Site_Visit_MFR.pdf PDF
Transfer_to_commercial_(with_load)_in_Manual_Mode_B600_2019.pdf PDF
GLEN_18-1107_SOW_Addendum.pdf PDF
RFI_001_18-1101_Answered.pdf PDF
Transformer_Pad.pdf PDF
Sign_In_Sheet.pdf PDF
Binder1RS1.pdf PDF
Exhaust_Fans_Electrical_One_Line.pdf PDF
Transfer_to_emergency_(with_load)_in_Manual_Mode_B600_2019.pdf PDF
1_-_01_55_04_-_SAFB_Security_Requirements.pdf PDF
2_-_Design_Analysis_Exhaust_Fans_Redacted(RS).pdf PDF
8_-_SOW_Environmental_Supplement.pdf PDF
7_-_GLEN18-1101_AF_66_Form.xls XLS spreadsheet
3_-_Design_Drawings_PDF_Exhaust_Fans.pdf PDF
4_-_Design_Drawings_PDF_Transformers_Replacement(RS).pdf PDF
5_-_Design_Guide_Version_March_2017.pdf PDF
00_Solicitation_-_FA255019RA010.pdf PDF
0_-_GLEN18-1101_SOW_10July19.pdf PDF
9_Wage_Determination.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GLEN 18-1101 B600 Upgrade RFI 002

1. Phasing of Work - In reply to Question 33. From the RFI Responses dated 9/18/19

How many transformers can we have down at a time and for how long?

Initial Government Response: Transformers out of service require backup transformers on site and in service to maintain mission. No transformers can be removed from service unless backup transformers are on-site and replace the transformers being replaced.

Completing the work in this manner will make the job extremely difficult and expensive. The partial single line diagram on E-102 and discussions at the site visit have led us to believe that there is a tie-breaker that allows the loads to be transferred between the transformers. It would be much more efficient and cost effective to utilize the tie-breaker to allow the load to be carried by 3 (1,4,7, or 2,5,8) transformers, while the work is being completed, then transferred to the new transformers while the work on the remaining 3 transformers is completed.

Please advise.

a. Government Response: Due to missions on SAFB there must always be a primary and secondary. It is understood that this will have a large cost impact to the project. If any of these transformers are out of service a backup must be provided. If all transformers are replaced at one time all transformers will need a backup.