WICS_Questions_from_Industry_Day_and_Draft_RFP_20140731.pdf
PDF 134 KB Posted
- Attached to
- 8(a) set-aside
- Solicitation number
- FA2550-13-R-8001
About this file
Questions (with government responses) from Industry recieved during first DRAFT RFP release and Industry Day.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WICS Questions from Industry
Draft RFP and Industry Day
31July 2014
Question Document Page, Section, Paragraph #
Comment
Question
Recommendation
Response
Draft RFP 99, M, 3.3.1 Will the bidder’s library contain historical data to help prospective bidders gain a quantitative understanding of information identified in the
PWS? For example: number of service desk trouble tickets, number of database updates and the complexity of the update, number of Mission
Impact Reports, number of UDLM/EDLM requested and processed, number of DRs, number of regression tests performed, number of Form-19’s processed, number of technical orders reviewed, number of minor mods performed, etc.
Yes, we will provide such data in the bidders library.
Draft RFP 82, K, Clause
52.203-2
Would the Government please provide historical data detailing material purchases the Government required the Contractor to purchase?
Yes, we will provide such data in the bidders library.
Draft PWS 17, 3.1 What specific mission systems are supported by the
Mission Operations Center? Do all assigned MOC duties and responsibilities apply to all stated mission areas?
All 50 SW mission systems are required to report to the MOC. These missions include AFSCN, GPS, MILSATCOM, and other minor programs on
SAFB. We will be posting historical MOC call volume data in the bidders library.
Draft PWS 30, 5.0 Is the Configuration Management scope of work for all 50SW organizations, tenant units, and GSUs supporting Schriever AFB? How many total mission system require CM support?
In order to facilitate contractors with estimating scope of work. The government will provide detailed workload data in the bidders library.
Draft PWS 33, 6.0 How many total mission system computers will require TCNO and IAVA-type updates?
For the purposes of WICS, the only mission system computers of concern are within the
GBSOC, as stated in para. 6.2.1.2, functional system administrator.
Draft PWS Locations Are there any other locations where physical contractor support will be needed other than
Schriever AFB, OKC, and MECC? Is physical contractor support needed at any 50 SW GSU?
Physical support is only provided at SAFB with on call maintenance support for OKC and MECH.
Draft PWS Locations Please list any SAFB tenant units that will require contractor support.
A list of applicable tenant organizations is provided as an appendix to the PWS and has been posted on FBO.
Draft PWS 8, 1.7.1 Quality Assurance - Although the Government does not require a Quality Assurance Manager (QAM) to be assigned to each location identified in the PWS, are there specific locations where the Government expects QAMs to be assigned?
The quality program approach will be unique to each contractor proposal.
Draft PWS Various Will all documents referenced in the Draft PWS be made available in the bidder’s library?
Yes, depending on classification and availability of electronic copy
31July 2014
Question Document Page, Section, Paragraph #
Comment
Question
Recommendation
Response
Draft PWS 27, 4.1.2.4.2 The contractor is expected to provide the tools required for GBS maintenance. Does the
Government have a list of expected tools for the contractor to provide?
No list. The required tools are standard hand tools like screwdrivers, pliers, etc. Technical orders and manuals for equipment can be reviewed in the bidder's library to help determine required tools.
Draft PWS 29, 4.2.5 Will current warranty expirations be provided to the bidders?
Current warranty information will be provided in the equipment list in the bidders library. However, these warranty updates will be paid for via a CR
CLIN on the contract
Section B Supplies or
Services and
Prices
CLIN 2013
DRFP states: The contractor shall submit the deliverables listed in the PWS and in accordance with Section J, Exhibit A, Contract Data
Requirements List (CDRL). Section J, Exhibit A is the DD254.
Does the Government intend to provide the CDRL
List?
Yes
Section B Transition, CLIN
This CLIN only covers Phase-In, PWS 1.10.1.
Should it also include phase-out, PWS 1.10.2?
CLIN A014 is for the phase-in transition. Phase-out will be performance during the last 30 days of the contract. A separate CLIN is not necessary.
Section I 52.222-42
Statement of
Equivalent Rates for Federal Hires
This contract clause is not included in Section J.
Will the government please provide this contract clause?
The clause is included in Section I referencing
Section J attachment for the NECA - IBEW agreement.
Section I 252.237-7023
Continuation of
Essential
Contractor
Services (b)
DRFP states: These services are listed in attachment --, Mission- Essential Contractor
Services, dated -----.
Will the government please provide the above attachment?
Yes, Mission Essential Contractor Services has been posted on FBO.
Section L, page
252.237-7023
CONTINUATION
OF ESSENTIAL
CONTRACTOR
SERVICES (OCT
2010)
DRFP states: (c)(1) The Mission-Essential
Contractor Services Plan submitted by the
Contractor, is incorporated in this contract.
Does the Government intend for offeror’s to provide the Mission Essential Contractor Services
Plan in their proposal. Is so, in which volume should it be included?
No, the first submission will be stated in the
CDRL at the time of RFP.
Section L, 3.14 Table of Contents, Indexing and
Glossary
Each volume shall contain a glossary of all abbreviations and acronyms used, with an explanation for each. The glossary shall also contain definitions in a separate section, as applicable.
What is meant by “the glossary will also contain definitions in a separate section?”
Corrected language to read "Each volume shall contain a glossary of all definitions as applicable, and abbreviations and acronyms used with an explanation for each."
Section L, 3.14 Table of Contents, Indexing and
Glossary
The table of contents, index, and glossary are excluded from volume page limitations. Are tabs also excluded from page count?
Yes, we have added tabs to the sentence in paragraph 3.14.
31July 2014
Question Document Page, Section, Paragraph #
Comment
Question
Recommendation
Response
Section L, 3.14, 4.1.2
Table of Contents, Indexing, and
Glossary
The PWS states: Tab indexing shall be used to identify sections.
Will the government confirm that Tabs are to be used to separate and identify sections?
Yes, we have added 'separate' to the sentence.
Section L, 3.3.2 Bidder’s Library Is the Government going to make a Bidder’s
Library available on FBO or through other means
(e.g., CD)?
Yes, the bidder's library has already been established on FBO. Classified documents will be made available to bidders as stated in section L.
Section L, 4.1.3.1e
FACTOR 1 -
Program
Management
Which CBAs are associated with the WICS program?
There is current agreement between the
International Brotherhood of Electrical Workers
(IBEW) and the National Electrical Contractors
Association, Inc., (NECA) in affect for SAFB.
This agreement is posted in the bidder's library and will be an attachment to the proposal.
Section L, 4.1.3.1e;
Section M, 4.2.1; PWS
2.3.1.6
Training and
Certification
Approach
Section L states: The proposal shall describe the offeror’s overall training and certification approach.
The PWS only makes reference to trained and certified operators in paragraph 2.3.1.6 which is specific to GBSOC. This training requirement does not appear to be explicitly evaluated in Section M, paragraph 4.2.1. Does the Government intend to add this requirement?
Verbiage added to Factor 1, Program Management, stating that training certification approach will be evaluated.
Section L, 4.1.3.3, 4.1.4
FACTOR 3 –
Database
Management
Tab 4 Scenario
Responses
PWS states: This factor shall also include responses to the government provided scenario(s) IAW paragraph 4.1.4.
Will the government please confirm under which
Tab in proposals the Scenario Responses should be included?
As stated in attachment L-1, the scenario responses are to be included in tab 4.
Section L, Attachment L-1
Proposal
Organization
Attachment L-1: Proposal Organization (pg 107 0f
123) describes Tabs 1 through 4 and then has a section titled “Cover Sheet, and Staffing
Table”. Under which Tab should the Cover Sheet and Staffing Plan (Attachment L-3 and L-3A) be listed?
Attachment L-1 has been corrected to include cover sheet 1 Page of Tab I, Staffing Table attached to Tab 3 under PM Staffing Plan and limited to numerical data only.
Section L, Attachment L-5
CLIN Pricing
Schedule
Would the Government consider aligning its CLIN structure more closely with the PWS requirements?
Mapping entire PWS chapters to multiple CLINs complicates the work breakdown structure.
Currently, five CLINs specify multiple or overlapping PWS chapters.
The CLIN structure in the final RFP is constructed to meet the government's needs.
PWS, Pages 3-4 Global Broadcast
Service
NAS Sigonella is not listed with GBS resources for which operations and maintenance shall be performed; however, it is listed in other sections of the PWS. Should NAS Sigonella be included as well?
NAS Sigonella is remotely operated only from
SAFB.
31July 2014
Question Document Page, Section, Paragraph #
Comment
Question
Recommendation
Response
PWS 1.2 Contract
Performance
Measurements
Will the Government provide the Services
Summary to clearly define the WICS Performance
Standards?
The mature Service Summary in the final RFP will clearly outline performance standards
PWS 1.5 Contingencies and
Emergency
Support
Does the Government intend to add DODI 1100.22 to the Bidder’s Library?
Yes, the bidder's library for all unclass and non
FOUO documents will list the document and current date only.
PWS 2.2 Milstar Air Force
Command Post
Terminal
Operations
Line 3: What are the “threshold and performance objectives?” Will the Joint Operational
Requirements Document-Milstar Communications
System be provided in the Bidder’s Library?
Yes, excerpts from the JORD containing all threshold and performance objectives will be provided in the bidders library.
PWS 2.3.1.5 GBSOC
Configuration
Management
Will the contractor be responsible for supporting transmission of IAVA, software updates, and hotfixes of fielded RBMs?
See PWS paragraph 2.3.1.1 o, p, q.
PWS 2.3.1.5b GBSOC
Configuration
Management
Does the Government intend to require a GBSOC
CM Plan as a CDRL?
The requirement has been removed from the PWS.
PWS Table 3-1 Information and
Communication
Systems Listing
NAS Sigonella is not mentioned in Table 3-1. PWS paragraph 2.3.1.4 and 2.3.1.5 identifies System
Administration responsibilities and IAVA/hotfixes at that location yet it appears there are no maintenance requirements? How are MUE systems maintained and will this be a responsibility of the
GBSOC?
NAS Sigonella PIP is maintained by another contractor and is not the responsibility of the
WICS contractor. The WICS contractor remotely performs system administration only.
PWS 3.2 –
3.2.3
Standard
Maintenance, Corrosion Control
The DPWS states: The contractor shall perform organizational level corrosion control on all 50 SW equipment . . .
Could the Government provide specific equipment requiring standard maintenance including corrosion control?
An equipment list will be attached to the final
PWS and has been posted to FBO.
PWS 3.2.11 Uninterruptible
Power Supplies
(UPS)
Will a copy of HQ AFSPC/A7CO Policy P060010 be provided in the Bidder’s Library?
Yes
PWS 3.3.1.1 Master Station Log Is there a follow-on to DISA Circular 800-70-1, which was rescinded as of 6 Mar 14? If so, will it be provided in the Bidder’s Library?
The PWS has been reworded and the correct document will be provided in the bidder's library.
PWS 3.4.2 Mission Support
Database
Maintenance
Which databases are included on the 50 SW
Database Listing as it applies to this offering?
The PWS has been updated to include all applicable databases.
PWS 3.5.2 -
3.5.2.5.2
Modification
Support
Did the Government intend to craft these paragraphs specifically for Software/Database applications only or does this requirement extend to
GBSOC as well?
These do not apply to GBSOC or GBS. Please see
PWS Table 3-3.
31July 2014
Question Document Page, Section, Paragraph #
Comment
Question
Recommendation
Response
PWS 4.0 Supply and
Logistics Support
The DPWS states: The contractor shall manage and provide supply support for all 50 SW locations and associated equipment listed in the PWS.
Could the Government specify which 50 SW locations and associated equipment require supply and logistics support?
Supply support will be provided at work centers identified in the WICS PWS where the WICS contractor is responsible for operations and maintenance. Additionally, the WICS MOC will be responsible to coordinate and track supply request approvals by the COM for all 50 SW mission systems.
PWS 4.1.2.3.1 Equipment Listing
CDRL 4001
(shows
4002 now)
Recommend Government change CDRL 4002 –
Equipment Listing to CDRL 4001
The CDRL is now numbered A401
PWS 4.1.4 Vehicles and
Special Purpose
Vehicles
Can the Government provide a list of the vehicles required to support WICS?
The government makes no assumptions about what vehicles are necessary except that government vehicles shall not be provided. IAW PWS
Paragraph 3.2.4 the contractor shall transport
TMDE between the work center and the PMEL facility. No other contractor vehicles should be necessary.
PWS 4.1.4 Vehicles and
Special Purpose
Vehicles
Is the Offeror to price vehicles to support this contract or will Vehicles and Special Purpose vehicles be leased as needed and approved as directed by the government?
Will leased vehicle costs be handled on a cost reimbursable basis?
If vehicles and special purpose vehicles are not cost reimbursable, will the government provide the number of vehicles purchased to support this contract historically?
The government will not provide vehicles for use in the performance of this contract. General purpose vehicles shall be provided by the contractor for its use in the performance of the contract. Only special purpose vehicles may be cost reimbursable for rental/lease for a particular use, and as required, when approved by the government. There is no historical data available.
PWS 4.2.3.3 Depot Level
Maintenance
(DLM)
Requirement states that the Contractor shall provide parts and consumable materials required and identified by the depot to perform on-site depot maintenance.
Will these costs be handled on a cost reimbursable basis?
If not cost reimbursable, will the government provide the history of such costs incurred?
Yes. All parts and consumable materials required and identified by the depot to perform depot on-site maintenance will be provided by the government, either as a cost reimbursable, bench stock, DLR or other.
PWS 4.2.7.1 Material Are shipping costs associated with government property shipments going to be handled on a cost reimbursable basis?
If not cost reimbursable, will the government provide the historical cost experienced for shipping government property on this contract?
Yes. Shipping expenses for government property will be paid on a cost reimbursable basis.
PWS
Chapter 5
50SW
Configuration
Management
Are all areas requiring Configuration Management provided in 50 SWI 33-133?
The workload data that will be provided in the bidders library will clarify which areas require configuration management.
31July 2014
Question Document Page, Section, Paragraph #
Comment
Question
Recommendation
Response
PWS Table 6-1 Computer Systems
Support and IA
Responsibilities
NAS Sigonella is not mentioned in Table 6-1. Are there IA responsibilities at the Sigonella site as well? PWS paragraph 2.3.1.5 indicates a requirement to distribute IAVA to the Sigonella
DECC-PIP. Please clarify if NAS Sigonella should be listed in Table 6-1 as an IA responsibility?
NAS Sigonella is remote operations only. PWS table 6.1 is correct as published.
Section L Attachment L-1 Attachment L-1 states there is a 1 page per citation limit for Past Performance. With 6 Factors of technical to evaluate, this limitation does not allow appropriate space to fully address all requirements of WICS adequately to showcase capability, performance, relevance, and risks/lessons learned.
Recommend Govt change the PP citation limitation to 3 pages per citation to allow appropriate space for information.
Past Performance has been eliminated as a
Technical Factor. The government will not be evaluating past performance.
Section L 4.2.1.1 In order to ensure the 8(a) certified small business meets limitations on subcontracting rules and to avoid future ostensible subcontractor protests, recommend that the 3 citations required from the prime contractor (L.4.2.1.1) be from the prime bidding entity as defined by its CAGE code and
DUNS number and not from affiliates, subsidiaries, and inter-company transfers which should be treated as subcontractors.
Past Performance has been eliminated as a
Technical Factor. The government will not be evaluating past performance.
General GBSOC Will all current Standard Operating Procedures
(SOPs) for GBSOC that Lockheed Martin has developed be made available in the Bidder’s
Library?
Yes, GBSOC documentation is being posted in the bidders library with restricted access.
PWS GBSOC The PWS lists “Lockheed Martin SBM software” as present in the GBSOC. Will all bidders receive training on this software during transition? Will training be provided for all bidders on the
Mechanicsburg DECC backup systems?
Bidders will not be trained. The winning contractor will be provided the opportunity during the 30 day Phase-In period to gain operational understanding of the SBM software and DECC hardware.
General GBSOC Will GBSOC Level II sustainment support be supported at the Ogden ALC or will it stay with
Lockheed Martin in Gaithersburg?
The WICS contractor will interact with whatever agency is responsible for Level II support.
Government or contractor.
General GBSOC Currently 50 SW has a “fee for service” agreement with DISA in place for some on-site GBSOC Level
II support with Lockheed Martin. Will this “fee for service” agreement go away with WICS award?
The fee for service support is not part of the WICS program.
31July 2014
Question Document Page, Section, Paragraph #
Comment
Question
Recommendation
Response
General GBSOC Since Lockheed Martin is the Level II sustainment and development contractor for GBSOC, how does the Government intend to maintain an OCI free environment with GBSOC should Lockheed Martin bid on WICS? They have access to proprietary systems, software, and information
To mitigate such a possibility, the government will provide all necessary operational hardware and software data within the GBSOC program in the bidders library. All bidders therefore will have equal access to all GBSOC data. The government has determined that no OCI exists for the WICS contractor.
General GBSOC Could remote administration of GBS database and applications be performed from OKC or MECH?
No, the GBSOC functions will be performed at
SAFB.
General GBSOC Could Service desk functions be performed from
OKC or MECH?
No, the GBSOC functions will be performed at
SAFB.
General GBSOC Chapter 3, Paragraph 3.0 of the PWS states the contractor will perform Corrective and Preventive
Maintenance on all equipment in table 3.1 which includes the GBS DECC MUE at OKC and MECH.
Maintenance on all equipment in table 3.1 which includes the GBS DECC MUE at OKC and MECH.
Can the Government please clarify what Corrective and Preventative Mx efforts will look like for hands-on support at these locations?
The maintenance efforts at the MECC sites is
'remove and replace' activity only.
General GBSOC Will the Government provide GBS workload data that allows non-incumbents to at OKC and
Mechanicsburg DECCs? estimate labor requirements
The estimated number of incidents that would require contractor assistance at the DECC facilities is 1 incident per quarter per site.
General GBSOC Can the Government tell us who is providing Tier 2
GBS support at Schriever AFB?
Tier 2 GBS support will be provided by
SMC/MCL.
General GBSOC Will the WICS contractor be responsible for the
DISA OKC DECC “fee for service” Help Desk for their related GBS work? If so, will the Bidder’s
Library contain data to allow proper estimation?
No
General Potential OCI Since FAR 9.5 prohibits contractors from testing and verifying their own equipment, solutions, and products and the WICS PWS entails operational testing and validation of GBS solutions (Service and Help Desk), we recommend that the
Government preclude the unavoidable OCI present with the development/sustainment contractor participating on WICS by prohibiting any company involved in GBS development or sustainment from bidding on WICS.
The language of the PWS states that the WICS contractor will operationally assist ONLY in the conduct of test. The WICS contractor will act only as the operator and will not be building test plans, conducting tests, analysis, validation, evaluation, or any such activity that would place them in an impaired objectivity situation. There is no OCI.
General Past Performance With a large PWS to cover for size, scope and complexity (over 8 Factors including PM), we recommend the Government allow up to 3 pages for past performance citations.
Past Performance will not be a factor in the WICS source selection.
31July 2014
Question Document Page, Section, Paragraph #
Comment
Question
Recommendation
Response
General Past Performance To ensure the Government receives quality prime management support, we recommend the PP criteria require the Prime Bidding Entity (8a certified prime contractor and not a subsidiary) submit 3 prime citations showing that they have the ability to manage this effort and meet the 51% rule.
Past Performance will not be a factor in the WICS source selection. As for the 51% rule, each offeror will address its management approach in the
Program Management factor of the proposal.
General GBSOC Can the government please clarify which GBS requirements are 24/7 requirements and which are only daystaff (M-F, days only)?
The GBS Operations Center is 365 days, 24/7.
The workload data that will be provided in the bidders library will identify all tasks and government frequency estimates.