WICS_Industry_Day_Final_25_Jun_14_redacted(2).pdf
PDF 653 KB Posted
- Attached to
- 8(a) set-aside
- Solicitation number
- FA2550-13-R-8001
About this file
WICS Industry Day Briefing redacted. Please ignore previous version posted 25 June 2014.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Industry Day
50 SW
Wing Information and
Communications
Support (WICS)
Ms. Nancy Anderson
25 June 2014
Briefing and Tour Schedule
1230 - 1315 WICS Briefing
1315 - 1330 Break
1330 - 1400 Round-up, organize into 3 groups and transition to designated location
Time Group 1 Group 2 Group 3
1400 – 1430 DSCS GBSOC GBSOC
1430 – 1445 Transition Transition Transition
1445 – 1515 GBSOC DSCS Stand by
1515 – 1530 Transition Transition Transition
1530 – 1600 Depart RA Depart RA DSCS
Depart RA
Overview
• Administrative Information
• Bathrooms (ESCORT REQUIRED)
• Please follow instructions from Government Designated Escort Official
(DEO)
• Fire Alarm
• Lock Down
• Transition from bldg. 300 to bldg. 400 and/or DSCS facility
– Door timing/alarms are a concern
• These slides will be posted on FBO. All FOUO slides will be removed prior to posting.
Overview
• Rules of Engagement
• Clarification questions only today
• Examples of clarification questions:
• “Can you repeat what you just said?”
• “What does <acronym> stand for?”
• Hold all technical and acquisition strategy questions
• Submit written questions NLT 1600 hours 30 June
• Examples of questions to ask via submission:
• “Can you describe how <technical process> works?”
• “Can you clarify <specific> maintenance process?”
• Responses will be posted to FBO as soon as practicable, but before RFP release
Agenda
• Roadmap to WICS & Requirements Nancy Anderson
• Contracting Marco Carlos
• Configuration Management Gary Curtis
• Database Maintenance Bob Fowler
• Information Assurance Deb Turner
• Maintenance Operations Center Joe Prebish
• Safety Peter Urschel
• GBSOC Frank Misaege
• Tour of DSCS Facility Doyle Chambers
Requirements Roadmap
WICS
SAFB IA, CM, Safety, Database, MOC, DSCS, Milstar
GBSOC & DECC
CAMMO - SMC/RN
AFSCN Level 1 Maintenance and Operations
NBSS – 50 SW
New Boston Air Force Station Security
GCS - SMC/GPL
COOLSS – SMC/MCL
STEC – SMC/SD
Network and Space Operations
& Maintenance
GBS
Operations Center &
Defense Enterprise Computing Center (DECC)
Requirements
• The WICS requirement includes:
• Operations, maintenance, and logistics support for:
• Global Broadcast Service (GBS) Operations Center (GBSOC)
• Defense Satellite Communications System (DSCS) and Milstar
• Additional support for 50 SW:
• Configuration Management (CM)
• Database Maintenance
• Information Assurance (IA)
• Maintenance Operations Center (MOC)
• Safety WICS Locations
Schriever AFB, CO (SAFB)
Tinker AFB, OK (GBS DECC on-call support)
Mechanicsburg, PA (GBS DECC COOP on-call support)
CONTRACTING
Mr. Marco Carlos
Contract Parameters
• Award:
• Single Contract Award
• Duration:
• Notional base period & all option periods to include phase-in
• Phase-In 1 Jun 15 – 30 Jun 15
• Base Period 1 Jul 15 – 30 Jun 16
• All Options: 1 Jul 16 – 30 Jun 20
• Pricing arrangement:
• Firm Fixed-Price with cost reimbursable CLINs
Acquisition Schedule
Milestone Date
Post Final RFP on FBO Aug 14
Proposal evaluation & review process Oct – Nov 14
Contract award 15 May 15
Transition 1 – 30 Jun 15
Contract start 1 Jul 15
Acquisition
• Source Selection Procedures
• Lowest Price Technically Acceptable (LPTA)
• Evaluation Criteria: (Acceptable / Unacceptable)
• Volume I
• FACTOR 1: Program Management including transition
• FACTOR 2: MILSATCOM (Operations, Maintenance, & Logistics)
– Subfactor 1 – DSCS
– Subfactor 2 – Milstar
– Subfactor 3 – GBS
• FACTOR 3: Database Management
• FACTOR 4: Configuration Management
• FACTOR 5: Information Assurance
• FACTOR 6: System Safety
• Volume II
• FACTOR 1: Past Performance
• Volume III
• FACTOR 1: Price (Reasonableness, Affordability, Total Evaluated Price)
CLIN Structure
CLIN Description PWS Chapter X001 Program Management (FFP) 1
X002 DSCS & Milstar (FFP) 2, 3, 4
X003 GBS (FFP) 2, 3, 4
X004 Maintenance Operations Center (FFP) 3
X005 Database Management (FFP) 3
X006 Logistics (FFP) 4
X007 Configuration Management (FFP) 5
X008 Information Assurance (FFP) 6
X009 Safety (FFP) 7
X010 Other Support Requirements (FFP) 8
X011 Local Purchase (CR) All
X012 Travel (CR) All
X013 Contract Data Requirement List (NSP) All
0014 Transition (FFP) All
Questions from Industry
Question Response
When will the bidder’s library be available? The bidder's library will be made available on FBO NLT
Final RFP release. The library will be gradually populated as documents become available.
Will either bidder’s library contain historical data on personnel resources? This data will improve competition, by providing context for the requirements for non-incumbent offerors.
• Two bidders library –
Classified and UNCLASS
• We will provide workload data in the bidders library.
Will either bidder’s library contain an inventory of the equipment the Government expects the Prime contractor to accept at award?
Yes
Would the Government please provide historical data detailing material purchases the Government required the
Contractor to purchase?
Yes, we will provide such data in the bidders library
Is the Mission Operations Center scope of work for all
50SW organizations, tenant units, and Geographically
Separate Units (GSU) supporting Schriever AFB?
Answers for this will be clarified within the Industry Day
Briefing
Questions (cont.)
Is the Configuration Management scope of work for all
50SW organizations, tenant units, and GSUs supporting
Schriever AFB? How many total mission system require
CM support?
Answers for this will be clarified within the Industry Day
Briefing
Are there any other locations where physical contractor support will be needed other than Schriever AFB, OKC, and MECC? Is physical contractor support needed at any 50
SW GSU?
Answers for this will be clarified within the Industry Day
Briefing
Please list any SAFB tenant units that will require contractor support.
Answers for this will be clarified within the Industry Day
Briefing
Will all documents referenced in the Draft PWS be made available in the bidder’s library?
Yes, depending on classification and availability of electronic copy
DRFP states: The contractor shall submit the deliverables listed in the PWS and in accordance with Section J, Exhibit
A, Contract Data Requirements List (CDRL). Section J, Exhibit A is the DD254.
Does the Government intend to provide the CDRL List?
Yes
Is the Government going to make a Bidder’s Library available on FBO or through other means (e.g., CD)?
FBO as clarified above
Would the Government consider aligning its CLIN structure more closely with the PWS requirements? Mapping entire
PWS chapters to multiple CLINs complicates the work breakdown structure. Currently, five CLINs specify multiple or overlapping PWS chapters.
The CLIN structure presented in this briefing has changed slightly from the DRFP and is the final CLIN structure
NAS Sigonella is not listed with GBS resources for which operations and maintenance shall be performed; however, it is listed in other sections of the PWS. Should NAS
Sigonella be included as well?
Answers for this will be clarified within the Industry Day
Briefing
Will the Government provide the Services Summary to clearly define the WICS Performance Standards?
SS will be provided in final RFP
Which databases are included on the 50 SW Database
Listing as it applies to this offering?
Answers for this will be clarified within the Industry Day
Briefing
Did the Government intend to craft these paragraphs specifically for Software/Database applications only or does this requirement extend to GBSOC as well?
These apply to GBSOC as well
Are all areas requiring Configuration Management provided in 50 SWI 33-133? (50 SWI 33-113)
Answers for this will be clarified within the Industry Day
Briefing
NAS Sigonella is not mentioned in Table 6-1. Are there IA responsibilities at the Sigonella site as well? PWS paragraph 2.3.1.5 indicates a requirement to distribute IAVA to the Sigonella DECC-PIP. Please clarify if NAS Sigonella should be listed in Table 6-1 as an IA responsibility?
Answers for this will be clarified within the Industry Day
Briefing
Will all current Standard Operating Procedures (SOPs) for
GBSOC that Lockheed Martin has developed be made available in the Bidder’s Library?
Yes
CONFIGURATION MANAGEMENT
Mr. Gary Curtis
Installation/Modification Authorization Request
• Installation/Modification Authorization Request (I/MAR) program
• Administer the I/MAR Program (Form 19 Process)
• Review all I/MARs for compliance
• Maintain the I/MAR database
• Observe modifications and installations
• Document all findings in I/MAR package
• Technical Area Integration Drawings (TAIDs)
• Develop, maintain and deliver in electronic format (CDRL)
• Administer floor space and Communications Baseline
Infrastructure Rack (CBIR) space reservation process
Cable Management
• Cable Management
• Utilize Cable Management System Database:
• Assign and track cable numbers
• Maintain the current status of signal cables
• Update configuration changes (weekly, as a minimum)
• Provide access control for communications cable chase, utilidor, and manhole/handhole systems
• Power Utilization Management
• Perform power quality testing of all circuits (e.g. harmonic, load balancing and load testing)
• Identify problems and provide recommendations
• Administer the Power Circuit reservation process
• Update power panels with current information
Technical Support Center
• Non-Mission Scheduling
• Administer the scheduling of non-operational activities
• E.g., Downtime, freezes, installs, maintenance, etc.
• De-conflict schedule to avoid operational disruptions
• Process utility outage requests
• Process requests for AFSCN downtime IAW 50SWI 10-1208
• Technical Support Center (TSC)
• Maintain and store all technical data of systems and equipment installed in configuration managed areas
• Catalog new and updated entries
• Review data for currency, applicability and content
• Make recommendations for updates or deletions
• Central repository for all completed 50SW Form 19s
Configuration Management
• Areas Covered
• Bldg. 210 Room 108
• Bldg. 400 All Three Floors and Roof Area
• Bldg. 700 (MILSATCOM, DSCS and Milstar CPT)
• Bldg. 612 (DOMSAT)
• Bldg. 6015 (USNO Satellite Terminal)
• Base Manhole/Handhole System
• Bldgs. 3001, 3005, 3006, 3007, & 3008 (Utilidor)
DATABASE MAINTENANCE
Mr. Robert Fowler
Database Maintenance
• For communications, mission, and mission support system databases identified in the 50 SW Database Listing the contractor shall provide database management & support
• Current Databases supported:
• 3 SOPS Web Application (3 SOPS Web App)
• Event Tracker (ETRK)
• Temporary Access Records System (TARS)
• Consolidated Analysis Support Environment (CASE)
• MILSATCOM Automated Planning System (MAPS)
• MILSATCOM Automated Support Scheduler (MASS)
• Mission Problem Report (MPR)
• Phoenix Project Support (PHOENIX)
• Current Databases supported (cont):
• RTS Online Activity DB System (ROADS)
• Thruster Efficiency (THE)
• Visitor Access Request (VAR)
• MILSTAR Incident Summary (MIS)
• MILSATCOM Integrated Log Entry System (MILES)
• Accept requests for database application and software tool modifications and updates
• Regression Testing
• The contractor shall perform regression testing in a government provided facility for the 50 SW Database Listing.
• The contractor shall create the regression test plan for each database resource modification/enhancement
• Regression Test Plan
• Regression Test Report
• Installation/De-installation Plan
• The contractor shall prepare and forward an installation/de-installation plan, to include a recovery plan, to the installation team
• Technical Support
• The contractor shall provide technical support for 50 SW information and communication systems and support systems, as identified in this
PWS
• The contractor shall provide technical analysis, modification support, testing, verification and validation support, integration support, meeting support and documentation support to the 50 SW
• The contractor shall be required to interface with various organizations or agencies as needed to support these requirements
50 SW
INFORMATION ASSURANCE
Ms. Deb Turner
50 SW COMPUSEC
• 50 Space Wing Information Assurance Office (IAO)
• Provide Computer Security (COMPUSEC) Program Support
• Manage/Implement the 50 SW COMPUSEC program
• Assist all units on Schriever AFB and 50 SW GSUs to establish a COMPUSEC program
• GSU’s include:
Guam Tracking Station (Det 2, 21 SOPS)
Vandenberg Tracking Station (21 SOPS)
Diego Garcia Tracking Station (Det 1, 21 SOPS)
Kaena Point (Det 3, 21 SOPS)
New Boston (23 SOPS)
Eastern Vehicle Checkout Facility (EVCF)
Thule Tracking Station (Det 1, 23 SOPS)
Oakhanger (23 SOPS-OLA)
GPS Kwajalein (Det 2, 21 SOPS)
GPS Diego Garcia (Det 1, 21 SOPS)
GPS Cape Canaveral (23 SOPS)
50 SW COMPUSEC
• 50 Space Wing Information Assurance Office (IAO)
• Provide Computer Security (COMPUSEC) Program Support
• Provide technical expertise and conduct assessments to ensure compliance with established directives
• Assist with the development of policies and procedures
• Provide organizational IAO training
• Prepare and disseminate awareness material for SAFB and 50 SW units
• Assist with and review certification and accreditation packages
• Perform Information Assurance Assessment and Assistance Program (IAAP) assessments
• Participate in System Security Tests & Evaluation as necessary
• Verify annual security reviews on Wing owned and operated information systems
• Includes SAFB NIPRNet LAN, SAFB SIPRNet LAN, New Boston NIPRNet LAN, New Boston
SIPRNet LAN, Oakhanger NIPRNet LAN, Oakhanger SIPRNet terminal, Kaena Point NIPRNet
LAN, Kaena Point SIPRNet LAN, and Guam NIPRNet LAN
50 SW EMSEC
• Provide Emissions Security (EMSEC) Program Support
• Manage/Implement the 50 SW EMSEC Program
• Provide guidance to all units, including designated GSUs, with systems that process, or will process, classified information.
• Conduct EMSEC assessments on SAFB only and process documentation
• Maintain and archive EMSEC documentation for 106 classified systems
• Provide program support and process documentation to 5 GSU’s:
• Oakhanger, UK, 23 SOPS OL-A
• New Boston AFS, 23 SOPS
• Diego Garcia (DGS), Det 1, 21 SOPS
• GPS Diego Garcia (DGO)
• GPS Kwajalein
50 SW COMSEC
• Communications Security (COMSEC) Accountant
• In support of the SAFB COMSEC Manager, perform duties IAW
AFKAG 1, 2 and AFI 33-201 at SAFB for units with COMSEC
Accounts (totally 32 accounts)
• All 50 SW Units on SAFB
• SAFB Tenant Units
• 310 SW at SAFB
• Manage the Local Console Management System (LCMS) which accounts for all COMSEC material*
* To be added to the PWS
MAINTENANCE OPERATIONS
CENTER (MOC)
Mr. Joe Prebish
MOC Overview
• The Maintenance Operations Center (MOC) is the central point of contact for 50 SW
Operations and Maintenance
• The MOC is located on SAFB in Bldg. 400, MOD 3/4
• As a minimum, the contractor shall provide on-site support from 0600-2300
M-F. For all other times, the contractor shall provide on-call support
• The contractor shall operate the 50 SW
MOC IAW Air Force Space Command
Instruction (AFSPCI) 21-108, Chapter 4
MOC Duties and Responsibilities
• Document and report system or equipment status according to
AFI 21-103, Chapter 6
• Up-channel incident and status reporting as directed by the
Government
• Transfer problem resolution responsibility between maintenance agencies and tracking resolution status
• Receive Mission Impact Reports (MIR), notify maintenance personnel as required, and document equipment status/malfunctions via the Mission Problem Report (MPR) government provided database
• Enter maintenance data into the Integrated Maintenance Data
System (IMDS) for IMDS reportable systems
• Assign Job Control Numbers (JCNs), document and track status
• Track equipment and maintenance status
• Request assistance from supporting agencies, e.g., SMC, SBSS
• Coordinate maintenance and supply requests and disseminate information
• Monitor Utility Outage and Freeze Schedules impacting mission operations and equipment
• Process Urgent Depot Level Maintenance (UDLM) and
Emergency Depot Level Maintenance (EDLM) requests
• Review and update open outage data in applicable maintenance information system daily for all assigned 50 SW mission systems
MOC Duties and Responsibilities (cont.)
SAFETY
Mr. Peter Urschel
Safety
• System Safety Support
• Manage the System Safety Program for 50 SW “Mission-Critical” Facility and
Facility Systems
• USAF 50 SW System Safety Program based on MIL-STD-882E, AFI 91-202, AFI 91-217, and 50 SWI 91-205
• Monitor and Inspect Facility and Facility Systems
• Monitor 50 SW identified “mission-critical” facility systems construction, operations and maintenance
• For SAFB:
• Conduct facility inspections annually and for unique instances
• Identify and investigate hazards; recommend corrective action/procedures
• Inspect facilities after modification, renovation or new construction; identify hazards and recommend acceptance/non-acceptance
• Deliver a System Safety Assessment Report (CDRL) for each inspection
• Review and utilize existing checklists; recommend necessary changes/additions/deletions
Safety
• For 50 SW Geographically Separated Units (GSUs)
• Analyze reports received, identify hazards and recommend corrective actions
• Provide system safety status to 50 SW/SE
• Mishap Prevention
• Track and report status of all system safety hazards utilizing a government provided database
• Technical Support
• Provide technical support during safety related meetings i.e. Utility Outage
Board, Modification Control Board, Civil Engineering Construction Project
Meetings
GLOBAL BROADCAST SERVICE (GBS)
OPERATIONS AND MAINTENANCE (O&M)
Mr. Frank Misaege
GBS O&M Overview
• Provide GBS Operations Center
(GBSOC) centralized GBS broadcast operations, end user receive suite support, and organizational-level (O-level) maintenance assuring continuous service to global GBS users
• GBS portion of the WICS contract has two primary components, GBSOC, and (O-level) maintenance on GBSOC equipment and GBS mission unique equipment (MUE) at the
DISA Defense Enterprise
Computing Centers (DECC) supporting GBS
• Maintenance is a lesser portion of the level of effort
GBSOC Equipment
• Perform O-level maintenance on the
GBS receive suites (RSs) and antenna
• Maintain RSs IAW applicable T.O.s --replacements ordered via base supply
• Maintain fixed 1.2M KA-Band COTs antenna IAW commercial manual
• SIPRNet and NIPRNet workstations are standard ITE from the base equipment control office on an ITE account
GBSOC does not perform maintenance on the workstations. They are not on the
GBS sustainment baseline
GBS DECC MUE Equipment
• Perform O-level maintenance on GBS
MUE COTS equipment (OKC and
MECH) IAW applicable manuals and operating procedures
• OKC is the primary GBS Satellite
Broadcast Manager (SBM) location and has warm spare MUE. MECH SBM is a
Continuity of Operations (COOP) site and does not have warm spare equipment
• The MUE equipment is on the GBS sustainment baseline
• On-call maintenance personnel will respond on-site to initiate corrective maintenance actions within 2 hours
OKC GBS MUE EQUIPMENT
Unclassified Enclave
Reflection Router 1 (Cisco)
Reflection Router 2 (Cisco)
Reflection Router 3 (Cisco)
Reflection Router (3 ea spares)
Bluecoat PacketShaper
Bluecoat PacketShaper (1 ea spare)
Harris Ripcode Video Transcoder
Harris Video Transcoder (1 ea spare)
Irdeto Conditional Access System (CAS) Flex
SMS
Irdeto CAS PiSYS
Irdeto CAS IP Scrambler (4 ea)
Irdeto CAS Encryptor (2 ea)
Avocent CAS KVM
APC Automatic Transfer Switch (ATS)
APC Automatic Transfer Switch (ATS) (1 ea spare)
APC Power Distribution Unit (PDU) (2 ea)
Cisco Digital Content Manager
Eaton EPDU 2 ea)
Eaton EPDU 2 ea)
Classified Enclave
Cisco Reflection Router
Cisco Reflection Router (1 ea spare)
Bluecoat PacketShaper
Bluecoast Packet Shaper (1 ea spare)
Harris Video Transcoder
Harris Video Transcoder (1 ea spare)
APC Automatic Transfer Switch (ATS)
APC Power Distribution Unit
MECH GBS MUE EQUIPMENT
Unclassified Enclave
Cisco Reflection Router 1
Cisco Reflection Router 2
Cisco Reflection Router 3
Bluecoat PacketShaper
Harris Video Transcoder
Irdeto CAS Flex SMS
Irdeto CAS PiSys
Irdeto CAS IP Scrambler (4 ea)
Irdeto CAS Encryptor (2 ea)
Avocent CAS KVM
APC Automatic Transfer Switch (2 ea)
APC PDU (2 ea)
Cisco Digital Content Manager
Classified Enclave
Cisco Reflection Router
Bluecoat PacketShaper
Harris Video Transcoder
APC Automatic Transfer Switch
APC PDU
GBS Operations Center
• GBSOC is responsible for monitoring, managing, and reporting on the end-to-end broadcast from the ingest of source-provided products to end-user receipt of them
• The most significant organizational interfaces include:
• 50 SCS (part of SCP flight)
• Combatant Command (CCMD) GBS Theater Information Managers
(TIMs) the validating authority for end-user mission requests and are responsible for certain broadcast management functions
• DISA OKC DECC organization providing (fee-for-service) service desk support, SBM virtual operating environment (VOE) GBS dedicated equipment, and system administration and engineering support
• Regional SATCOM Support Centers (RSSCs) managing MILSATCOM resources supporting GBS
• DISA Teleport Gateway ground stations supporting GBS MILSATCOM
• GBS receive suite end-users
• Perform Broadcast Management
• Manage the broadcast, its content and schedules via the GBS SBM operator graphical user interface (GUI)
• Perform product delivery and management activities to ensure specified products are broadcast via satellite uplink facilities IAW CCMD dissemination priorities
• Assist RSSC’s and CCMD TIMs with satellite coverage coordination, broadcast issues, and resolve resource conflicts
• Support CCMD GBS TIMs to maintain accuracy of the Electronic Program Guide, Tuning
Guide, and Product Catalog
• Maintain situational awareness of satellite beam pointing and bandwidth allocation for GBS operations
• Verify broadcast web crawls are successful and represent requested data
• Develop and distribute beam plan schedules based on TIM beam pointing plans
• Monitor SBM functions and status of products queued and sent
• Prepare and distribute Mission Data Sheets to support end-user RS configuration
• Set and monitor prioritized flow control for dynamically allocated bandwidth
• Perform over-the-air broadcasting of hot fixes and software updates to Receive Broadcast
Managers (RBMs)
• End User Support
• Provide 24/7 end user support from the GBSOC
• Provide receive suite (RS) physical and operational subject matter expert technical support to users with GBS program provisioned receive suites
• Respond to GBS end-user support requests for RS configuration and reception issues
• Provide RS Smart Card management to include inventory control, end-user authorization verification, distribution, and entitlement
• Service Desk
• Provide 24/7 service desk support from the GBSOC
• Perform event and incident management, tracking, notification, and reporting for systems, circuits, equipment, and broadcast operations
• Report GBS operational health and status through proper channels
• Assist with resolution of source provider issues
• Engage Tier II sustaining engineering support to identify and resolve system deficiencies
• Manage SBM portal content and use capabilities for posting system status information requiring wide dissemination
• Schedule, track, report and execute Authorized Service Interruptions
(ASI) request under the GBSOC area of responsibility
• Collect and report operational metrics on the SBM and GBSOC
• System Administration
• Remotely administer GBS databases and applications on the OKC and MECH SBMs and the Sigonella, Italy DECC-Primary Injection Point (PIP) at Sigonella, Italy
• Perform Functional System Administration for the GBSOC workstations
• Manage SBM user accounts and source provider user accounts
• GBS DECC and GBSOC COOP Support
• Implement, exercise and maintain a GBS SBM COOP capability to COOP from the OKC Primary SBM to the MECH COOP SBM
• Implement, exercise and maintain a GBSOC disaster recovery and COOP capability location TBD
• GBS Information Assurance (IA) Support
• Provide GBSOC system IA officer
• Provide FSA IA support for GBSOC workstations
• Support IA Vulnerability Management (IAVM) processes to include hot fixes and system updates
• Maintain and review audit logs for security vulnerabilities
File details come from the government source that posted it. Updated .