1._FA2550-13-R-8001_Amendment_0001.pdf
PDF 101 KB Posted
- Attached to
- Wing Information & Communications Support
- Solicitation number
- FA2550-13-R-8001
About this file
Amended Solicitation
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Add Wage Determination to Section J
2. Incorporate revised PWS dated 2 October 2014
3. Various changes to Section L, to include CO name change and correction to Attachment L-1
4. Extend proposal due date to 11:00 AM local on 6 November 2014
1. CONTRACT ID CODE PAGE OF PAGES
S 1 16
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA2550-13-R-8001
X 9B. DATED (SEE ITEM 11)
10-Sep-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0001
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Oct-2014
CODE
50TH CONTRACTING SQD MARCO CARLOS
210 FALCON PKWY STE 2116
SCHRIEVER AFB CO 80912-2116
FA2550 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA2550-13-R-8001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 22-Oct-2014 12:00 AM to 06-Nov-2014 11:00 AM.
SECTION I - CONTRACT CLAUSES
The following have been modified:
52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 1989)
In compliance with the Service Contract Act of 1965, as amended, and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.
THIS STATEMENT IS FOR INFORMATION ONLY: IT IS NOT A WAGE DETERMINATION
Employee Class Monetary Wage-Fringe Benefits
See Section J, Attachment 3 & 4
(End of clause)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A WICS CDRLs Combined 18 11-AUG-2014 Exhibit B WICS DD254 13 11-AUG-2014 Attachment 1 Performance Work
Statement
63 10-SEP-2014
Attachment 2 Mission Essential Contractor Services
1 01-AUG-2014
Attachment 3 Agreement by and between NECA and
IBEW
37 25-JAN-2013
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A WICS CDRLs Combined 18 11-AUG-2014 Exhibit B WICS DD254 13 11-AUG-2014 Attachment 1 Performance Work
Statement
63 02-OCT-2014
Attachment 2 Mission Essential Contractor Services
1 01-AUG-2014
Attachment 3 Agreement by and between NECA and
IBEW
37 25-JAN-2013
Attachment 4 Wage Determination 05- 2079 Rev 15
9 25-JUL-2014
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
SECTION L
1.0 Budget/Funding Information. The government budget includes de-escalation in future option periods.
The government budget assumes at least 1% progressive de-escalation in each fiscal year.
FISCAL YEAR FY15 FY16 FY17 FY18 FY19 FY20 6 Month Extension TOTAL
BUDGET TOTALS $4.7M $14.9M $14.7M $14.6M $14.4M $10.7M $7.1M $81.1M
2.0 General Instructions. This section provides general guidance for preparing proposals, as well as specific instructions on the format and content of the proposal. Throughout this section, the term “offeror” includes subcontractors, teammates, and/or joint venture partners. The offeror’s proposal must include all data and information requested, and must be submitted in accordance with (IAW) these instructions. The offeror shall be compliant with the requirements as stated in the solicitation and shall describe how the offer will satisfy the requirements stated in the performance work statement (PWS) and contract data requirements list (CDRL). A proposal that is sufficiently documented to support performance in a complete, orderly, and detailed manner will enable the government to perform a thorough and fair evaluation. Non-compliance with the instructions and solicitation may result in an unfavorable proposal evaluation and may be grounds for eliminating the proposal from consideration for contract award.
2.1 Proposal Clarity. The proposal shall be clear, concise, and include sufficient detail for effective evaluation of the offeror’s capabilities and for substantiating the validity of stated claims. The offeror’s proposal shall not simply rephrase, reiterate, or restate the government’s requirements, but rather shall provide convincing rationale to describe the requirements and address how the offeror intends to meet the requirements. The offeror shall assume that the government has no prior knowledge of its capabilities, facilities and experience, and will base its evaluation on the information presented in the offeror’s proposal.
2.2 Proposal Depth. The offeror is advised that its proposal is presumed to represent its best efforts and most complete responses to this solicitation. The offeror is advised not to provide simple cursory responses which merely reiterate the PWS. Alternate proposals will not be accepted. The offeror is reminded that the government intends to evaluate proposals and award a contract without discussions, but reserves the right to conduct discussions if the contracting officer (CO) later determines that it is necessary. By submission of a proposal, the offeror represents that its team is capable of performing all requirements specified in the solicitation.
2.3 Proposal Detail. Elaborate brochures, binding, detailed artwork, or other embellishments are unnecessary and not desired.
2.4 Proposal Acceptance Period. The offeror shall specify the proposal acceptance period, in Section A block 12 of the solicitation, for a minimum of 300 days from proposal submission. The offeror shall make a clear statement of the date for which the proposal is valid in Section A of the proposal documentation volume.
2.5 Proposal Retention. IAW the Federal Acquisition Regulation (FAR) 4.8 (government contract files), the government will retain one copy of all proposals IAW the Federal Records Disposition Schedule, and unless otherwise requested will destroy all other copies at the end of the source selection process.
2.6 Size Standard. This acquisition is set aside for 8(a) Small Business under NAICS code 517410, Satellite Telecommunications; Size Standard: $32.5M.
2.7 Acquisition Strategy. This acquisition will utilize a lowest price technically acceptable (LPTA) source selection strategy IAW the FAR 15.101-2, as supplemented by the Defense FAR Supplement (DFARS) 215.3, the DOD Source Selection Procedures, the Air Force FAR Supplement (AFFARS) 5315.3, and Air Force Mandatory Procedure (MP) MP5315.3. Offers will be evaluated using the factors and subfactors under Section M, Evaluation Factors for Award. Technical proposals will be evaluated on an acceptable/unacceptable basis. If an offeror receives an “unacceptable” rating in any subfactor or scenario, the factor will receive an “unacceptable” rating. If an offeror receives an “unacceptable” rating in any factor, the technical proposal will receive an “unacceptable” rating and the offeror will not be eligible for award.
3.0 General Information.
3.1 Points of Contact (POCs). The POCs for this acquisition are the CO, Marco Carlos, and alternate POC, Brad York. Address any questions or concerns to the following contact information:
Marco Carlos (marco.carlos@us.af.mil)
50 CONS/LGCZB
210 Falcon Parkway, Suite 2116 Schriever AFB, CO 80912-2116 Phone: 719- 567-3444
Brad York (dale.york@us.af.mil)
50 CONS/LGCZB
210 Falcon Parkway, Suite 2116 Schriever AFB, CO 80912-2116 Phone: 719- 567-3436
3.2 Debriefings. IAW FAR 15.505 or 15.506, an unsuccessful offeror will have three days from the date of government notice of exclusion from the competition, or contract award to submit a written request for debriefing.
The offeror will receive only one debriefing.
3.3 Reference Documents. Unclassified documents and documents designated for official use only (FOUO) necessary for performance of the contract will be made available on FedBizOpps.gov (FBO).
3.3.1 Bidders Library. Classified documents necessary for performance of the contract will be made available for viewing by appointment only in the 50 SW bidders library.
3.3.2 Bidders Library Access and Location The bidder’s library is located in building 210, Room 111 (Bidders Library). Offerors should contact the 50 SW/PMD, Ms. Nancy Anderson 719-567-3083, nancy.anderson.2@us.af.mil, or Mr. Glenn Harraway 719- 567-2721, glenn.harraway@us.af.mil to request an appointment, and to coordinate sending required security visit request information.
3.4 Revisions and Amendments. The government reserves the right to revise or amend the specifications or the solicitation. Such revisions or amendments will be communicated by formal amendment (Standard Form 30) to this solicitation. If such amendments require material changes in quantities or price, the solicitation closing date may be extended to enable an offeror to revise its proposal. In such cases, the amendment will include an announcement of the new solicitation closing date and time. The offeror shall provide acknowledgement in block 14 of the SF 33 of any solicitation amendments issued by the government.
3.5 Discrepancies and Ambiguities. If an offeror believes that the solicitation contains errors, omissions, or is otherwise unsound, the offeror shall immediately notify the CO in writing with supporting rationale no later than seven (7) calendar days after the solicitation release.
3.6 Mistakes. Mistakes in contractor’s proposal shall be handled IAW FAR 15.508.
3.7 Final Proposal Revisions (FPR). Once discussions (if conducted) have been concluded with an offeror, the CO will request that the offeror provide an FPR. The offeror is advised that any changes to the proposal in the FPR must be fully addressed, explained, and reflected in the proposed price. Failure to comply with this requirement can adversely influence the evaluation of the proposal. The CO will establish a common due date and time for submission of the FPR. The number of copies required for the FPR are the same as the basic proposal as identified in Proposal Organization Table (Attachment L-1).
3.8 Proposal Preparation and Format Instructions. This section provides general guidance for preparing proposals, as well as specific instructions on the format and content of the proposal. Each volume shall be complete in itself.
3.9 Organization/Number of Copies/Page Limits. The offeror’s proposal shall consist of three (3) proposal volumes: a Technical Proposal volume, a Price volume, and a Contract Documentation volume. The offeror shall prepare the proposal volumes as set forth in the Proposal Organization Table (Attachment L-1). The titles and contents of the volumes shall be as defined in this table, all of which shall be with the number of copies and within the required page limitations as specified in attachment L-1. The contents of each proposal volume are described in the paragraph as noted in the attachment L-1.
3.10 Binding and Labeling. Copy one (original) of each volume shall be printed double sided with two-hole punches at the top, center of each page. Dimension between hole-centers must be 2.75 inches. This is for government filing purposes. This copy should not need to be bound in a three-ring loose-leaf binder with holes punched on the edge. For other copies, each volume of the proposal shall be separately bound in a three-ring, loose-leaf binder which shall permit the volume to lie flat when open. Do not use staples. All binders shall allow for easy removal and replacement of pages. A cover sheet shall be bound in each book, clearly marked with the offeror’s name, volume number and title, solicitation number and title, and the copy number (e.g. copy 2 of 3); (e.g., Company A, Volume I Technical Proposal, solicitation FA2550-13-R-8001, WICS, copy 2 of 3). The same identifying data shall be placed on the spine and front of each binder. Be sure to apply all appropriate markings including those prescribed IAW FAR 52.215-1(e), Restriction on Disclosure and Use of Data, and FAR 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal Information and Source Selection Information.
3.11 Electronic Copies. The offeror shall submit a complete copy of the proposal, including all proposal volumes and attachments, in electronic format, using non-re-writable CD-ROM. The content and page size of electronic copies shall be identical to the hard copies. If there is a variance, the printed document will take precedence. Indicate on each CD-ROM the volume number and title. Use separate files and folders and ensure the file-naming convention is simple and straightforward to permit rapid location of all portions, to include subfactors, exhibits, annexes, and attachments, if any. Each volume shall be on a separate CD-ROM. All files must be uncompressed. Ensure the electronic documents stored on CD-ROMs can be opened by government personnel and that all information is accessible on government computers. Offerors shall ensure that the CD-ROMs submitted to the government are finalized such that no changes can be made to the information. The electronic copies of the proposal shall be submitted in a format readable by MS Office 2010® applications (e.g. Microsoft (MS) Word 2010®, MS Excel 2010®, and MS-Power Point 2010®) and/or Adobe Acrobat®). The proposal may be submitted in portable document format (PDF) format, but if used must be formatted to allow the text to be selected (i.e. not as an image). Electronic copies of price tables and spreadsheets shall be provided in MS Excel® to allow government evaluation and review of equations. In the technical proposal volume, simple list tables can be included in the volume file (i.e. as part of the MS Word® or Adobe Acrobat® file) and need not be separately included in MS Excel. Ensure formulas and clarifying notes used to calculate price are reflected in the spreadsheets. If files contain links, the links shall be maintained in all revisions. Electronic submissions for each file must be accessible on stand-alone computers.
3.12 Page Limitations. Page limitations shall be treated as maximums (reference attachment L-1). Total page count will be based on the printed proposal submission. For the technical volume, if page limitations are exceeded, excess pages will not be read, nor considered in the evaluation of the proposal. Page limitations may be placed on responses to evaluation notices (EN) if required. The specified page limits for EN responses will be identified in the letters forwarding the ENs to the offeror.
3.13 Page Size and Format. Page size will be 8.5 x 11 inches, not including foldouts, with 1- inch margins around the page perimeter. Pages will be single-spaced. Pages shall be printed as double-sided where possible (i.e., do not print on both sides if the next page would be a foldout, tab break, etc.). Each printed side of information on a page of paper shall count as one page (single-sided pages count as one page, double-sided count as two pages).
Foldout pages will be counted as a single page for each 8.5 x 11 section. The paper color of the original proposal submission shall be white only. Use Times New Roman, with a font no smaller than 11 point with normal proportional spacing. Text embedded in graphics can vary from the font style and size requirement.
3.14 Table of Contents, Indexing and Glossary. Each volume shall contain a detailed table of contents to delineate the tabs and subparagraphs within that volume. Tab indexing shall be used to separate and identify sections. A separate table of contents shall identify sections/tabs, figures, and tables. Each volume shall contain a glossary of all definitions as applicable, and abbreviations and acronyms used with an explanation for each. The table of contents, tabs, index, and glossary are excluded from volume page limitations.
3.15 Stand Alone Volumes. Each volume shall be written on a stand-alone basis so that its contents may be evaluated with a minimum of cross-referencing to other volumes of the proposal.
3.16 Change Pages after Initial Proposal Submission. If the government opens discussions and requests the offeror submit proposal revisions, during or after discussions, any changed pages that are submitted shall have changed information clearly marked by a vertical line in the right margin of the page identifying the changed content. The date of the revision and revision number shall be reflected on each changed page (preferably on, or next to, the vertical change line). Additionally, a different color paper shall be used for each round of revisions.
Make spreadsheet revisions obvious by highlighting cells that change.
3.17 Pricing Information. All pricing information shall be addressed only in the Price Proposal and Contract Documentation volumes.
3.18 Classified Information. Proposals shall not include any classified data in any Proposal volume.
3.19 Proposal Delivery. Paper and electronic copies shall be delivered directly to the CO or CS at 50 CONS/LGCZB, 210 Falcon Parkway, Suite 2116, Schriever AFB, CO 80912-2116. If using a courier, submit the name of the individual hand carrying these volumes 24 hours in advance to the CO or CS. The courier will be required to provide identification at the time of delivery. The delivered package(s) shall be labeled “To Be Opened by Addressee Only.” These volumes must be received no later than the date and time specified in the final solicitation FBO posting.
Due to Schriever Air Force Base’s mail security processes, the Contracting Officer cannot guarantee that mailed proposals will be processed and received by the proposal deadline. Therefore, the government strongly encourages the offeror to hand-carry the required documents and information. Please call the CO or CS at least two hours prior to your anticipated arrival time to ensure there will be personnel available to receive your proposal. Offerors should speak personally with the CO or CS, and not rely on voice mail. Contractor personnel delivering proposals are advised that they may be unable to access SAFB without a valid U.S. Uniformed Services Identification Card or DOD Force Common Access Card (CAC). Be advised also that vehicles may be subjected to random vehicle searches, and/or you may encounter unexpected delays at the gates and plan accordingly.
3.20 Safeguarding Information. Proprietary information submitted in response to this solicitation is restricted from unauthorized disclosure as required by Subsection 27 of the Office of Federal Procurement Policy Act.
4.0 Specific Proposal Instructions and Format:
4.1 Volume I – Technical Proposal. The offeror’s responses will be evaluated against the Technical Proposal subfactors defined in Section M, Evaluation Factors for Award. The volume shall be prepared in an orderly format and in sufficient detail to enable the government to make a thorough evaluation of the offeror’s technical competence and ability to comply with the PWS, CDRLs, and services summary (SS) requirements. Address as specifically as possible the actual methodology the offeror would use for meeting the requirements of each technical proposal factor. All requirements specified in this solicitation are mandatory. The offeror shall format its technical proposal volume as follows:
4.1.1 Tab 1: Executive Summary. The offeror shall provide a concise narrative Executive Summary of the entire proposal, excluding the price information, while including technical aspects of the proposal. The summary shall also list all subcontract team members, a brief description of the team, and each team member’s major area of responsibility. Any summary material presented here shall not be considered as meeting the requirements for any other portions of the proposal.
4.1.2 Tab 2: Table of Contents, Index, and Glossary.
4.1.3 Tab 3: Technical Proposal and Technical Factors. The technical proposal volume will encompass the offeror’s technical approach. The offeror shall address the proposed approach to meeting the requirements. An acceptable proposal will address each of the factors with sufficient detail to demonstrate both an understanding of and an effective approach toward requirement fulfillment.
The proposal shall include a discussion of the following items to allow evaluation of the offeror’s approach IAW Section M:
4.1.3.1 FACTOR 1 - Program Management (including Phase-In).
a. Staffing. The proposal shall provide and demonstrate a sound approach to staffing to fulfill the contract requirements. The proposal shall address any aspect of the staffing proposal that will cross-utilize personnel to perform different functions. Offerors shall provide a complete staffing plan table (provided at attachment L-3). The table shall include the proposed labor category, PWS paragraph, the teammate, joint venture partner or subcontractor responsible for performing the task, the hours, and the number of full time equivalents (FTE) proposed (by Labor CLIN) to satisfy each of the PWS paragraph requirements, including personnel on shift (i.e., 24/7 work centers) or on-call schedules. The staffing table shall demonstrate that the proposed number of hours and FTEs result in sufficient man-hours to accomplish all required tasks. The contractor shall provide and demonstrate a sound approach for handling non-normal duty hour requirements found within the PWS.
b. Key Program Management Personnel The proposal shall provide an approach for staffing key program management positions, including at a minimum, the senior contractor Program Manager and senior POCs for all areas of the PWS. The offeror shall demonstrate how this approach is sound and appropriate to the effort. The proposal shall provide a staffing table of the proposed number of hours and FTEs to accomplish all required tasks.
The contractor shall provide a sound approach for handling non-normal duty hour requirements found within the
PWS.
c. Security Requirements. The proposal shall provide a plan to meet the security requirements identified to fulfill the contract requirements, including obtaining/managing security clearances for personnel, applicable training, monitoring security processes, and handling classified material and documents. The proposal shall describe its approach to ensure all contractor personnel, both prime and sub-contractor, hold appropriate security clearances with at least two personnel cleared at the top-secret (TS) level with a current single scope background investigation (SSBI) at contract start. Identification of these personnel shall be provided at contract start. These two TS cleared personnel will be supporting WICS PWS Chapter 5. The proposal shall include the company’s security management office (SMO) code, or evidence of a TS facility clearance (FCL), as well as the company’s commercial and government entity (CAGE) code. A TS FCL is required to process TS SSBI. See DoD 5220.22-M, chapter 2, section 1.
d. Program Management Strategy and Practices. The proposal shall describe the offeror’s proposed approach, strategy, and practices to managing the overall contract effort, including maintaining insight and visibility into contract activities and managing these efforts and the team in a comprehensive and cohesive manner. The proposal shall provide a sound approach for accurately estimating and managing the contract effort to ensure performance objectives are met. The proposal shall demonstrate a thorough understanding of the government’s requirements for management of the overall effort and the required oversight given the complexity of the effort. The proposal shall provide a sound program management plan and approach to managing subcontractors. The proposal shall describe a sound approach for maintaining program visibility, quality, and control over all levels of the program. The proposal shall provide a sound and comprehensive approach for communicating contract status, activities, and issues to the government. The proposal shall include a sound approach for providing flexibility for managing new requirements. The proposal shall demonstrate a management philosophy and strategy to identify and implement efficiencies and performance improvement actions, and how this philosophy is propagated and promoted throughout the proposed organization.
e. Qualifying and Retaining Personnel. The proposal shall provide an approach for obtaining, training, retaining, and certifying as applicable, qualified personnel to fulfill proposed technical positions as well as administrative and management personnel for overall contract management. The offeror shall demonstrate how this approach is sound and appropriate to the effort. The proposal shall describe the offeror’s overall training and certification approach. The proposal shall include a sound approach for replacing personnel with qualified/certified personnel in a timely manner, especially for technically challenging positions, and without degradation to mission performance. The proposal shall present a sound recruiting and retention strategy for mitigating impacts due to employee turnover and retention issues. The proposal shall describe any initiatives proposed to recruit and retain employees, keeping in mind any Service Contract Labor Standards (SCLS) or Collective Bargaining Agreement (CBA) constraints. The proposal shall present a sound training strategy that ensures the contractor workforce is and will be technically qualified.
f. Quality Assurance. The proposal shall provide an approach for meeting the quality assurance functions and contract requirements. The offeror shall demonstrate how this approach is sound and appropriate to the effort.
The proposal shall demonstrate how the quality plan and process are reviewed, approved, continuously improved, trained, and consistently applied. The proposal shall state how relevant capabilities in successfully managing a quality program on a contract of this scope (price, number of people, and complexity) will be leveraged by the proposed leadership team to successfully execute the quality program. The proposal shall describe how the proposed process will satisfy the government’s need for consistent quality and how the proposed approach is flexible to handle the changing needs of an operational environment. The proposal shall provide a thorough understanding and sound approach for managing the effort considering the different systems, and procedures required.
g. Phase-In. The proposal shall provide an approach to the contract phase-in. There will be two phase-in periods priced under CLIN 6001: initial phase-in for the majority of the contract effort, and a second phase-in for GBS Operations Center and DECC facilities after contract start. The offeror shall demonstrate how this approach is sound and appropriate to the effort. The proposal shall describe the management methodology, processes, and implementation team structure and demonstrate the knowledge and understanding to effectively and efficiently manage contract phase-in. The proposal shall specifically address how the contractor will phase-in/transition resources and personnel; establish viable management processes and structures, including property and quality control; retain critical knowledge, skill sets and expertise; ensure no disruption of services during phase-in, and ensure mission continuity on the required start date.
4.1.3.2 FACTOR 2 Operations, Maintenance, and Logistics.
a. Subfactor 1 - Maintenance Operations Center. The proposal shall provide a detailed approach to successful operation of the maintenance operations center (MOC). The offeror shall demonstrate how this approach is sound and appropriate to the effort and reflects a thorough understanding of the requirements. The proposal shall describe how the contractor’s approach is flexible to handle the changing needs of an operational environment.
b. Subfactor 2 - DSCS. The proposal shall provide an approach to successfully operate and maintain DSCS earth terminals and associated sub-systems and components. The offeror shall demonstrate how this approach is sound and appropriate to the effort and reflects a thorough understanding of the requirements. The proposal shall demonstrate that DSCS operations and maintenance processes are reviewed, approved, continuously improved, and consistently applied. The proposal shall describe how the proposed process(es) will satisfy the government’s need for consistent quality and how the proposed approach is sufficiently flexible to handle the changing needs of an operational environment. This subfactor shall also include responses to the government provided scenario(s) IAW paragraph 4.1.4. See attachment L-2, when released.
c. Subfactor 3 - Milstar. The proposal shall provide an approach to successfully operate and maintain Milstar Air Force Ground Command Post Terminal and associated sub-systems and components. The offeror shall demonstrate how this approach is sound and appropriate to the effort and reflects a thorough understanding of the requirements. The proposal shall demonstrate that Milstar operations and maintenance processes are reviewed, approved, continuously improved, and consistently applied. The proposal shall describe how the proposed process(es) will satisfy the government’s need for consistent quality and how the proposed approach is flexible to handle the changing needs of an operational environment. This subfactor shall also include responses to the government provided scenario(s) IAW paragraph 4.1.4. See attachment L-2, when released.
d. Subfactor 4 - GBS. The proposal shall provide an approach to successfully operate and maintain the GBS.
The offeror shall demonstrate how this approach is sound and appropriate to the effort and reflects a thorough understanding of the requirements. The proposal shall demonstrate that GBS operations and maintenance processes are reviewed, approved, continuously improved, and consistently applied. The proposal shall describe how the proposed process(es) will satisfy the government’s need for consistent quality and how the proposed approach is flexible to handle the changing needs of an operational environment. This subfactor shall also include responses to the government provided scenario(s) IAW paragraph 4.1.4. See attachment L-2, when released. The base period for this effort is anticipated to be less than 12 months. Monthly price and extended price shall be for the quantities stated in the CLIN pricing schedule at attachment L4.
4.1.3.3 FACTOR 3 – Database Management. The proposal shall provide an approach for providing database management support to the 50 SW database management office. The offeror shall demonstrate how this approach is sound and appropriate to the effort. The proposal shall demonstrate that database management processes are reviewed, approved, continuously improved, and consistently applied. The proposal shall describe how the proposed process(es) will satisfy the government’s need for consistent quality and how the proposed approach is flexible to handle the changing needs of an operational environment. This factor shall also include responses to the government provided scenario(s) IAW paragraph 4.1.4. See attachment L-2, when released.
4.1.3.4 FACTOR 4 – Configuration Management. The proposal shall provide an approach to successfully manage and perform configuration management functions. The offeror shall demonstrate how this approach is sound and appropriate to the effort and reflects a thorough understanding of the requirements. The proposal shall demonstrate that configuration management processes are reviewed, approved, continuously improved, and consistently applied. The proposal shall describe how the proposed process(es) will satisfy the government’s need for consistent quality and how the proposed approach is flexible to handle the changing needs of an operational environment.
4.1.3.5 FACTOR 5 – Information Assurance. The proposal shall provide an approach for providing Information Assurance support to the 50 SW Information Assurance Office. The offeror shall demonstrate how this approach is sound and appropriate to the effort. The proposal shall demonstrate that information assurance processes are reviewed, approved, continuously improved, and consistently applied. The proposal shall describe how the proposed process(es) will satisfy the government’s need for consistent quality and how the proposed approach is flexible to handle the changing needs of an operational environment.
4.1.3.6 FACTOR 6 – System Safety. The proposal shall provide an approach for providing system safety services for 50 SW systems and support the 50 SW Safety Office. The offeror shall demonstrate how this approach is sound and appropriate to the effort. The proposal shall demonstrate that system safety processes are reviewed, approved, continuously improved, and consistently applied. The proposal shall describe how the proposed process(es) will satisfy the government’s need for consistent quality and how the proposed approach is flexible to handle the changing needs of an operational environment.
4.1.4 Tab 4 Scenario Responses. An acceptable response to each scenario will include sufficient detail to demonstrate both an understanding of, and an effective approach toward requirement fulfillment. The offeror shall include all assumptions used within responses to the scenarios. The scenarios will be evaluated in combination with the associated factor or sub-factor. The scenarios, attachment L-2, will be made available on FBO in a second release 10 days prior to the proposal submission deadline in order to create the semblance of a near real-time environment. Scenario responses will be included in Volume I, Tab 4, Technical Proposal.
4.2 Volume II – Price.
4.2.1 Price. This portion of the evaluation will consider the offeror's proposed price for the proposed support.
4.2.1.1 FACTOR 7 - Price. All activities associated with the processes described in the offeror’s proposal to perform the required services must be priced within this volume. The offeror shall ensure the information presented in the volume is consistent with the information contained in the other parts of the proposal. The offeror shall provide a price proposal that reflects the offeror's planned approach and labor mix. The offeror's price proposal may vary from but shall not exceed the government's budget. The government will use the prices proposed in attachment L-4 to populate section B - Supplies or Services and Prices.
4.2.1.2 Price Information Requirements. IAW FAR 15.403-1(b) and 15.403-3(a), information other than cost or pricing data may be required to support price reasonableness. Information shall be provided IAW FAR 15.403-5.
If, after receipt of proposals, the CO determines that there is insufficient information available to determine price reasonableness, and none of the exceptions in FAR 15.403-1 apply, the offeror shall be required to submit cost or pricing data. Information beyond that required by this instruction shall not be submitted, unless the offeror considers it essential to document or support its price position.
4.2.1.3 Price Reasonableness and Affordability. These instructions are to assist the offeror in submitting information, other than cost or pricing data, which is required to evaluate the reasonableness and affordability of the offeror’s proposed price. Compliance with these instructions is mandatory and failure to comply may result in rejection of the proposal. The burden of proof for credibility of proposed price rests with the offeror.
4.2.1.4 Rounding. All dollar amounts provided shall be rounded to the nearest whole dollar.
4.2.1.5 Government Established Travel, Equipment, Supplies, and Incidentals CLINs. The government will provide an estimated amount for materials and travel in attachment L-4. No additional cost breakout is required.
The established baseline amounts include allowances for reimbursement of applicable contractor burdens. No profit is allowed for these costs.
4.2.1.6 Tab 1: CLIN Pricing Schedule – Attachment L-4. The proposal volume shall use attachment L-4 as the preferred format.
4.3 Volume III - Contract Documentation. This volume shall contain the offeror’s contractually related documentation. All documentation shall be clearly identified for each member of the offeror’s team. The offeror shall format its Contract Documentation volume as follows:
4.3.1 Tab 1: Completed Standard Form 33 (Solicitation, Offer, and Award). Complete Section A of the SF33, as applicable. Signature by the offeror on the SF 33 constitutes an offer, which the government may accept.
In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation Sections A through J unless specific exception is taken. These sections constitute the model contract.
4.3.2 Tab 2: Completed Section I - Contract Clauses. IAW FAR 52.219-14 Limitations on Subcontracting, primes shall submit certification and demonstrate how it is performing at least 50% of the effort and file this information within Tab 5. Information for this certification is limited to 2 pages.
4.3.3 Tab 3: Completed Section K – Representations and certifications
4.3.4 Tab 4: Other Representations of bidders. Complete other statements or representations required by the solicitation, or which the offeror chooses to bring to the attention of the CO. Additionally, submit a copy of any teaming arrangements.
4.3.4.1 Joint Venture Agreements - Joint Ventures are allowable on competitive 8(a) set-asides, however, the joint venture agreement must be received by SBA prior to proposal due date and approved before award of any resulting contract. If you are contemplating a joint venture on this project, you must advise, in writing, your assigned SBA Business Opportunity Specialist (BOS) as soon as possible. It is also recommended that the agreement be submitted as soon as practicable to ensure compliance with established regulations. Any corrections and/or changes needed can be made only when your BOS has adequate time for a thorough review before the proposal due date. NO
CORRECTIONS AND/OR CHANGES ARE ALLOWED AFTER TIME OF SUBMISSION OF PROPOSAL OR
BIDS.
4.3.5 Tab 5: Other Information Required.
4.3.5.1 Authorized Offeror Personnel. Provide the name, title, and telephone number of the company/division point of contact regarding decisions made with respect to the proposal and who has authority to obligate the offeror’s company contractually. Also, identify those individuals authorized to negotiate with the government.
4.3.5.2 Company/Division Address, Identifying Codes, and Applicable Designations. Provide company/division's street address, and facility code; CAGE code; data universal numbering system (DUNS) code;
size of business (large or small); and labor surplus area designation.
4.3.6 Tab 6: Financial Documentation.
4.3.6.1 Financial Resources. The proposal shall describe adequate financial resources to perform the prospective contract or demonstrate an ability to obtain adequate financial resources, through cash flow statements as required by FAR 9.104-1(a) and DFARS 232.072.
5.0 Section L Attachments
Attachment L-1 Proposal Organization
Attachment L-2 Scenarios (to be released separately)
Attachment L-3 Staffing Plan
Attachment L-4 CLIN Pricing Schedule
Attachment L-1: Proposal Organization
Volume Section L
Paragraph Number
Volume Title
Number of Hard
Copies/ Electronic
Copies
Tab Page
Limitation
I 4.1 Technical Proposal three / two
Tab 1 Executive Summary
Three
Tab 2 Table of
Contents, Index, and Glossary
Unlimited
Tab 3 Technical
Proposal and Technical Factors
Tab 4 Scenario
Responses
1 page per scenario response
Cover Sheet 1 page
Staffing Table Unlimited, numerical data only
II 4.2 Price three / one Tab 1 Unlimited
III 4.3
Contract
Documentation one / one Tabs 1 through 6 Unlimited
Attachment L-3, Staffing Plan
ELEMENT &
CLIN
PWS
Para
BASE
PERIOD
OPTION 1 OPTION 2 OPTION 3 OPTION 4
6 Month
Extension
TOTAL
Hrs FTE Hrs FTE Hrs FTE Hrs FTE Hrs FTE Hrs FTE Hrs FTE Program Management (CLIN x001) Labor Category 1 - Title Company Name Labor Category 2 - Title Company Name
CLIN
PWS
Para
BASE
PERIOD
OPTION 1 OPTION 2 OPTION 3 OPTION 4
6 Month
Extension
TOTAL
Hrs FTE Hrs FTE Hrs FTE Hrs FTE Hrs FTE Hrs FTE Hrs FTE Etc.
Total DSCS & Milstar (CLIN x002) Labor Category 1 - Title Company Name Labor Category 2 - Title Company Name Etc.
Total GBS (CLIN x003) Labor Category 1 - Title Company Name Labor Category 2 - Title Company Name Etc.
Total MOC (CLIN x004) Labor Category 1 - Title Company Name Labor Category 2 - Title Company Name Etc.
Total Logistics (CLIN x005) Labor Category 1 - Title Company Name Labor Category 2 - Title Company Name Etc.
Total Database Management (CLIN x006) Labor Category 1 - Title Company Name Labor Category 2 - Title Company Name Etc.
Total Configuration Management (CLIN x007) Labor Category 1 - Title Company Name Labor Category 2 - Title Company Name Etc.
Total Wing IA (CLIN x008) Labor Category 1 - Title Company Name Labor Category 2 - Title Company Name Etc.
Total System Safety (CLIN x009) Labor Category 1 - Title Company Name Labor Category 2 - Title Company Name Etc.
Total Other Support Requirements (CLIN x010) Labor Category 1 - Title Company Name
CLIN
PWS
Para
BASE
PERIOD
OPTION 1 OPTION 2 OPTION 3 OPTION 4
6 Month
Extension
TOTAL
Hrs FTE Hrs FTE Hrs FTE Hrs FTE Hrs FTE Hrs FTE Hrs FTE Labor Category 2 - Title Company Name Etc.
Total
Attachment L-4: CLIN Pricing Schedule
Base Period (1 July 15 – 30 June 16)
CLIN Description
PWS
Chapter Unit QTY Unit Price
Extended Price
0001 Program Management (FFP) 1 Month 12 $ $ 0002 DSCS & Milstar (FFP) 2,3,4 Month 12 $ $ 0003 GBS (FFP) 2,3,4 Month 8 $ $ 0004 Maintenance Operations Center (MOC) (FFP) 3 Month 12 $ $ 0005 Logistics (FFP) 4 Month 12 $ $ 0006 Database Management (FFP) 3 Month 12 $ $ 0007 Configuration Management (FFP) 5 Month 12 $ $ 0008 Wing Information Assurance (FFP) 6 Month 12 $ $ 0009 System Safety (FFP) 7 Month 12 $ $ 0010 Other Support Requirements (FFP) 8 Month 12 $ $ 0011 Local Purchase (CR) All Cost 1 $100,000 $100,000 0012 Travel (CR) All Cost 1 $50,000 $50,000 0013 Contract Data Requirement List (NSP) All
Total $$ $$
Option period ________________________________ Repeat for each option period (1,2,3,4)
CLIN Description
PWS
Chapter Unit QTY
Unit Price
Extended Price x001 Program Management (FFP) 1 Month 12 $ $ x002 DSCS & Milstar (FFP) 2,3,4 Month 12 $ $ x003 GBS (FFP) 2,3,4 Month 12 $ $ x004 Maintenance Operations Center (MOC) (FFP) 3 Month 12 $ $ x005 Logistics (FFP) 4 Month 12 $ $ x006 Database Management (FFP) 3 Month 12 $ $ x007 Configuration Management (FFP) 5 Month 12 $ $ x008 Wing Information Assurance (FFP) 6 Month 12 $ $ x009 System Safety (FFP) 7 Month 12 $ $ x010 Other Support Requirements (FFP) 8 Month 12 $ $ x011 Local Purchase (CR) All Cost 1 $100,000 $100,000 x012 Travel (CR) All Cost 1 $50,000 $50,000 x013 Contract Data Requirement List (NSP) All
Total $$ $$
6 Month Extension of Services
CLIN Description
PWS
Chapter Unit QTY
Unit Price
Extended Price
5001 Program Management (FFP) 1 Month 6 $ $ 5002 DSCS & Milstar (FFP) 2,3,4 Month 6 $ $ 5003 GBS (FFP) 2,3,4 Month 6 $ $ 5004 Maintenance Operations Center (MOC) (FFP) 3 Month 6 $ $ 5005 Logistics (FFP) 4 Month 6 $ $ 5006 Database Management (FFP) 3 Month 6 $ $ 5007 Configuration Management (FFP) 5 Month 6 $ $ 5008 Wing Information Assurance (FFP) 6 Month 6 $ $ 5009 System Safety (FFP) 7 Month 6 $ $ 5010 Other Support Requirements (FFP) 8 Month 6 $ $ 5011 Local Purchase (CR) All Cost 1 $50,000 $50,000 5012 Travel (CR) All Cost 1 $50,000 $50,000 5013 Contract Data Requirement List (NSP) All
(End of Summary of Changes)
Phase-In Option (1 – 30 Jun 15) – GBSOC and DECC (1 – 31 Oct 15)
CLIN Description
PWS
Chapter Unit QTY
Unit Price
Extended Price
6001 Phase-In Transition (FFP) 1 Lot 1 $ $
File details come from the government source that posted it. Updated .