PDF 1 MB Posted

Attached to
Cape Canaveral Space Force Station - 10 Miler Marathon Services
Solicitation number
FA252125QB095
Issued by

About this file

This Statement of Work (SOW) details support services for the Space Force T-Minus 10-Miler Marathon at Cape Canaveral Space Force Station (CCSFS), Florida. The contractor is required to provide comprehensive event infrastructure support, including fencing, bus transportation, and audio/visual services for the marathon, which will occur on the second Saturday of December starting in 2025.

Specific requirements include: delivering and setting up 3,500 linear feet of 4' x 10' fence panel barricades on the Friday before the event, with installation and teardown following strict timelines; providing fifteen 56-passenger buses for pre-race and post-race transportation with specific staging and shuttle service instructions; and supplying complete audio/visual coverage at start and finish lines, including speakers, wireless microphones, portable generators, and screens. All contractors must be U.S. citizens, possess REAL ID-compliant identification, and pass background screening to access the Cape Canaveral Space Force Station.

View the file

Other files

File Type Posted
Question and Answer Final.pdf PDF
SOW 10 Miler Marathon.pdf PDF
FA252125QB095 CSS revised.pdf PDF
FA252125QB095 CSS.pdf PDF
SOW 10 Miler Marathon 22Jul25.pdf PDF
FA252125QB095 CSS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Support Services for Space Force T-Minus 10-Miler Marathon Statement of Work

22 Jul 2025

1. Scope The contractor shall provide labor, equipment, materials, and logistical support for the Space Force T-Minus 10-Miler Marathon, including fencing, bus transportation, and audio/visual systems. Services encompass delivery, installation, operation, teardown, and removal of event infrastructure per government-provided specifications.

1.1 Performance Period: The 10-Miler Marathon will be the second Saturday of each

December starting 2025.

1.2 Location: Cape Canaveral Space Force Station (CCSFS), FL

2. Requirements

2.1 Fencing Support

• Provide 3,500 linear feet of 4’ x 10’ fence panel barricades in good working and cosmetic condition.

• Delivery and Set-up - Friday prior to the event at 1000 at Hangar C, 3845 Lighthouse Road, CCSFS.

o The contractor shall initiate fence panel setup in the parking area of Hangar C, followed by placement along the designated course per provided maps. Fence installation at Hangar C and along Lighthouse Road may commence on the Friday prior to the event at 1000 hours to allow AFM staff and volunteers to attach scrim materials.

o Delivery locations throughout the remaining course are to be placed on the road shoulders out of the flow of traffic at the respective course locations.

o AFM logistics staff and volunteers will be responsible for final movement and set up of fence panels in any other designated areas along the course.

• Teardown – Saturday; the day of the event o Contractor is to be in place at 0600 at the contractor staging area near the start line to begin teardown immediately following the race start.

o Teardown will begin at approximately 0800 and follow the participants through the course.

o Fence panel removal from all course locations shall be completed no later than 1200 hours, with full teardown of the finish line area finalized by 1500 hours.

• Additional Fencing Information

• Contractor will provide labor and equipment necessary to perform all setup and teardown tasks to include tools and forklifts if applicable.

• All fence panels are to be in good working condition. Legs should not be bent broken or missing.

Overall appearance of barricades/fence should be cosmetically appealing.

*Maps will be provided for fencing set-up locations upon contract award.

2.2 Bus Transportation – Contractor to provide fifteen (15) total buses

• Pre-Race o Deliver fifteen (15) 56 PAX buses for pre-race transportation by 0400 on event day to the CCSFS Skid Strip 641 E Skid Strip Rd, Bldg 50211, CCSFS o Provide continuous shuttle service between the security area and the finish line and start line until 800.

• Post Race o The same fifteen (15) 56-passenger buses used for pre-race transportation shall be retained for post-race service. These buses will be staged no later than 0730 at Hangar C, 3845 Lighthouse Road, CCSFS o Buses will run a continuous shuttle service from the finish line of the race to the parking lot where cars will be parked.

• Drivers must complete dry-run route tests no later than the day before the event. Start time will be confirmed after contract award.

• The buses are to stay within the outlined route below unless instructed by event staff.

Maps are subject to change due to a change in parking location.

2.4 Audio/Visual Services

• Contractors must be on site (no subcontractors permitted).

• Provide complete A/V coverage at start and finish lines:

o Speaker sets with crowd projection, MP3 playlist, wireless mics, portable generators, and screens.

o Set up between 1400–1700 the day before the event; operational NLT 0500 on race morning.

o Music starts at 0545; emcee begins at 0710; National Anthem queued for 0720.

o Finish line and awards stage active by 0730, with music adjusted when announcing begins at 0810.

• Audio engineer must ensure crowd audibility and manage onsite equipment.

Starting Line Audio Requirements

2 Speakers with stands -project through the crowd of 2,000 participants, up to 2,000 feet in distance.

1 MP-3 player with a playlist appropriate for the Space Force running event

2 UHF wireless microphone system

1 Portable generator to provide power for audio

2 96 inch screens

Finish Line/Stage Area Audio Requirements

-project through the crowd of 2,000 participants, up to 2,000 feet in distance.

1 MP-3 player with a playlist appropriate for the Space Force running event

2 UHF wireless microphone system

Awards Stage Audio Requirements 1 UHF wireless microphone system

3. Applicable Standards o All equipment setups shall follow manufacturer specifications and safety requirements for crowd control and audio operation.

o All contractors, drivers, technicians, and delivery personnel accessing Cape Canaveral Space Force Station (CCSFS) must be U.S. citizens, possess REAL ID-compliant identification, and have no felony convictions.

o Access will be coordinated through official base entry procedures. Contractors must comply with base pass requirements, provide advance identification documentation for background screening, and check in at designated entry control points.

o Non-compliant ID, expired credentials, or criminal background may result in denial of base access and disqualification from the event contract.

4. Deliverables

• Installation and removal of fencing, staging, and A/V equipment per timeline.

• Operational bus transport pre- and post-race.

• Walkthrough and acceptance reviews with designated government POCs.

Appendix A – PAX Bus

Pre-Race

Post Race

Appendix B

Audio