This Statement of Work (SOW) details the procurement of a TruGolf Golf Simulator for the Patrick Space Force Base Shark Lanes Bowling Alley. The contract requires the contractor to deliver, install, and configure a multi-sport virtual simulator system, including the TG APOGEE MAX Simulator with a two-camera high-speed overhead system, APEX High Speed Gaming Computer, 1080p laser projector, 21" touch monitor, range mats, and comprehensive software packages. The system includes E6 CONNECT licenses for 27 golf courses, an expanded subscription with 80+ additional courses, and packages for Pebble Beach, Oakmont, and St. Andrew Links, along with a Multisport Arcade by TruGolf.

The project has a 60-day performance period, with installation to occur in a 17'-2" x 10' x 12' space at the bowling alley. The contractor must provide system training for six personnel, offer 24-month warranty coverage, and provide remote technical support. Payment terms are net 30 days, and the contractor must submit personnel information for background checks at least one week prior to installation. Acceptance criteria include proper installation, system training, functionality verification, and documentation delivery. The technical specifications and installation requirements are detailed, including electrical outlets, internet access, and flooring considerations.

View the file

Other files for this federal contract opportunity

Other files attached to TruGolf - Golf Simulator, newest first.
File Type Posted
25QB046 Q and A Rev1.docx DOCX document
Pre-construction Floor.pdf PDF
25QB046 Q and A.docx DOCX document
Ceiling Picture.jpg JPG image
Patrick SFB_Shark Lanes_Floorplan.pdf PDF
Unfinished wall unit for GOLF SIM.jpg JPG image
25QB046 CSS Final.pdf PDF
Nonappropriated Fund Standard Clauses.pdf PDF
NAF Invoice Instructions.pdf PDF
24QB046 SOW - Golf Simulator Final.pdf PDF
JA Brand Name Golf Sim.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GOLF SIM/MULTI SPORT SIMULATOR

STATEMENT OF WORK

Apr 2025

1. SCOPE OF WORK

The contractor will:

a. Delivery and installation of the virtual simulator system, including all necessary hardware and software components

b. Configuration and testing of the system to ensure proper functionality

c. Provide system training for six 45th FSS NAF personnel immediately following the completion of installation. This includes basic operation of the system, launching of software, and basic overview of components installed.

d. Provide on-call technical support

• While the system is under warranty the Vendor shall maintain a free remote service (via telephone, modem, fax, or internet connection) through which Customer may contact the Vendor for detailed service advice.

• Telephone support shall be available by calling Vendor's USA office between the hours of 9 a.m. and 5 p.m. MST, Monday-Friday.

• When system falls outside of the warranty period, Vendor will provide unlimited telephone support to Customer for a single simulator.

2. PERIOD OF PERFORMANCE

The period of performance for this contract will commence on the date of the contract award and continue for a period of 60 days. Request to extend beyond the 60 days must be provided in writing and must be acceptable to the government.

3. PHYSICAL LOCATION

The work will be performed at the Patrick SFB Shark Lanes Bowling Alley, located at 782 Omalley Rd. Building 732 Patrick SFB, FL 32925. The contractor will ensure that all work is completed in a safe and efficient manner, with minimal disruption to the normal operations of the bowling alley.

4. SUPPLIES AND EQUIPMENT

The contractor will provide all necessary supplies and equipment to complete the installation, set-up, and training, including:

a. The multi-sport virtual simulator system, including all hardware and software components

b. Installation and testing equipment

c. Training materials and documentation

d. Any other supplies or equipment necessary to complete the work

e. Contractor Responsibility: The Contractor is solely responsible for the removal and disposal of all packaging materials, construction debris, and trash generated during the installation of the golf simulator. This includes, but is not limited to, boxes, packing peanuts, cut-offs, fasteners, and any other waste products.

f. Client Premises: The Contractor will ensure that the client's premises are left clean and free of debris upon completion of the installation.

g. Disposal Compliance: The Contractor will dispose of all waste materials in accordance with all applicable local and federal regulations.

h. Additional Costs: Any costs incurred due to improper disposal of waste by the Contractor will be the sole responsibility of the Contractor.

5. PAYMENT TERMS

The payment terms for this contract will be net 30 days. The contractor will submit invoices IAW contract terms and payment will be made within 30 days of receipt of the invoice.

6. ACCEPTANCE CRITERIA

The acceptance criteria for this contract will include:

a. Proper installation and set-up of the virtual simulator system

b. Completion of system training for Patrick SFB Shark Lanes Bowling Alley staff

c. Verification that the system is functioning properly and meeting all specified requirements

d. Receipt of all necessary documentation, to include user manuals, warranty, and technical support contact information.

7. SPECIAL REQUIREMENTS

The following special requirements will apply to this contract:

a. The contractor will ensure that all work is completed in compliance with all relevant safety and regulatory requirements.

b. The contractor will provide a warranty for the virtual simulator system, for a minimum of covering parts and labor for a period of at least 24 months from the date of shipment.

c. Contractor will follow diagram installation requirements per regulation safety standards.

8. TECHNICAL SPECIFICATIONS

a. TG APOGEE MAX Simulator

b. Apogee Delta Model- (2 Camera) High Speed Overhead Camera System, Voice

Recognition, APOGEE Intelligent Dashboard, Instant Play Back Video etc

c. Computer, APEX High Speed Gaming Computer

d. Projector Laser 1080p

e. 21" Touch Monitor

f. Tee Box Range Mat 5' X 5'

g. Tee Box Range Mat 2' X 5'

h. E6 CONNECT - TruGolf Standard License (PC) OWNED CONTENT- 27 Golf Courses, All Practice Areas and All The Modes of Play

i. TruGolf E6 Expanded Subscription, including E6 APEX Enjoy features 80+ Additional

Golf Courses, Updates, New Features, Tournaments, Games and Online Play

j. E6 CONNECT - Pebble Beach Resort Package- OWNED CONTENT Pebble Beach, Spyglass and Spanish Bay

k. Oakmont

l. St. Andrew Links – Old

m. Multisport Arcade by TruGolf

n. Multisport Arcade Sports Equipment Package

9. Dimensions/Room Details

a. Room Dimensions (height, width, depth)

• Allocated space is located in south east corner 17'-2" X 10' X 12' HIGH, Room space is 3665.7 SQ FT

b. Ceiling Height

• 12 high in allocated space, see “ceiling picture” attachment

c. Wall Materials

• No wall, barrier wall around the allocated space

d. Flooring Type

• Refurbished (see attached “Pre-construction Floor”) Bowling lanes wood flooring with astro short layer turf flooring. ARTIFICIAL TURF FLOOR THROUGHOUT

OVER 3/4" PLY WD

e. Electrical Outlets

• (see attached “Patrick SFB_Shark Lanes_Floorplan”) location of outlets in “New entertainment area” marked by ‘o’ on floor plan PDF where outlets are located and attachment “Unfinished wall unit for GOLF SIM”

f. Internet Access Availability

• (see attached “Patrick SFB_Shark Lanes_Floorplan”) location of outlets in “New entertainment area” marked by ‘o’ on floor plan PDF where outlets are located and attachment “Unfinished wall unit for GOLF SIM”

10. INSTALLATION ACCESS: The Contractor must submit a consolidated list of names, date of birth, and Florida State driver’s license numbers to The FSS POC no less than 1 week prior to requiring access to the installation. Personnel who do not have a Florida issued driver’s license must submit their social security number. The FSS POC will submit the list to 45 Security Forces, who will process a local background check on all individuals prior to granting authorization to access the installation. Contactor shall ensure personnel have a current state issued identification card.

a. Personnel Information Submission: The Contractor shall provide the Contract Point of Contact (POC) with a comprehensive list of all personnel requiring access to the installation for the purpose of golf simulator installation. This list must be submitted no less than one (1) week prior to the anticipated access date.

b. Required Information: The list must include the following for everyone:

c. Full Legal Name

d. Date of Birth

e. Florida Driver's License Number (if applicable)

f. Social Security Number (only if individual does not possess a Florida Driver's License)

g. Background Check: The Contract POC will submit the provided information to 45th

Security Forces, who will conduct local background checks on all listed individuals. Access to the installation will be contingent upon successful clearance of these background checks.

h. Identification Requirement: All Contractor personnel granted access to the installation must carry a current, valid, government-issued photo identification card (e.g., driver's license, state ID) at all times while on the premises.

i. Access Approval:

j. Notification of Approval: The FSS POC will notify the Contractor of the approval status for each individual.

k. Denied Access: If access is denied for any individual, the Contractor is responsible for providing a suitable replacement who meets the clearance requirements within a reasonable timeframe to prevent project delays. The Contractor remains solely responsible for any additional costs incurred due to personnel access issues.

1. SCOPE OF WORK
2. PERIOD OF PERFORMANCE
3. PHYSICAL LOCATION
4. SUPPLIES AND EQUIPMENT
5. PAYMENT TERMS
6. ACCEPTANCE CRITERIA
7. SPECIAL REQUIREMENTS
8. TECHNICAL SPECIFICATIONS
i. Access Approval:

File details come from the government source that posted it. Updated .