This is a solicitation for a simplified acquisition base engineering requirements contract to provide minor construction, maintenance, and repair projects at Patrick Space Force Base, Cape Canaveral Space Force Station, and other locations. The contract will have a one-year base period and four one-year options. Services include standard work hours for secure and non-secure facilities at these locations. Proposals are due by 10:00 AM EST on March 18, 2024. Pricing will be firm fixed price determined by coefficients applied to pre-priced line items. The solicitation is set aside for small businesses and requires performance and payment bonds for awards over $35,000. The Department of the Air Force Space Command is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 7 - Questions and Answers.pdf | ||
| Solicitation Amendment FA252124R00080001 SF 30.pdf | ||
| Attachment 9 - Section L Addendum Rev 1.pdf | ||
| Attachment 2 - Technical Specs - Patrick Space Force Base .pdf | ||
| Attachment 7 - Question_and_Answer_Template.docx | DOCX document | |
| Attachment 8 - Fact Sheet.pdf | ||
| Attachment 5 - Past Performance Questionnaire Final.pdf | ||
| Attachment 9 - Section L Addendum.pdf | ||
| Attachment 10 - Section M Addendum.pdf | ||
| Attachment 6 - Sample_Consent Form.docx | DOCX document | |
| Attachment 1 - SABER 2023 SOW July 23.pdf | ||
| Attachment 4 - Price Schedule .xlsx | XLSX spreadsheet | |
| Solicitation - FA252124R0008.pdf | ||
| Attachment 3 - Wage Determination FL20240001-02Feb2024.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
Created On: 06 Mar 2024, 09:29 AM Central Standard Time
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Section A - Solicitation/Contract Form
Simplified Acquisition for Base Engineering Requirements (SABER)
FA252124R00080001
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Estimated Quantity
Unit Unit Price Amount
PSFB - Standard Work Hours / Non Secure Facility. Furnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period: Base Year***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:_______________
Pricing Arrangement: Firm Fixed Price
1,324,000 Each
PSFB - Standard Work Hours / Secure FacilityFurnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period:
Base Year***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
216,000 Each
CCSFS/Geographically Separated Units (GSU) - Standard Work Hours / Non Secure FacilityFurnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period: Base Year***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
136,000 Each
CCSFS/GSU - Standard Work Hours / Secure FacilityFurnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period: Base Year***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
24,000 Each
Option Line Item
PSFB - Standard Work Hours / Non Secure Facility. Furnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period: Option Year One***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
1,324,000 Each
Option Line Item
PSFB - Standard Work Hours / Secure FacilityFurnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period:
Option Year One***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
216,000 Each
Option Line Item
CCSFS/GSU - Standard Work Hours / Non Secure FacilityFurnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period: Option Year One***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
136,000 Each
CCSFS/GSU - Standard Work Hours /
Option Line Item
Secure FacilityFurnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period: Option Year One***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________FOB:
Destination
Pricing Arrangement: Firm Fixed Price
24,000 Each
Option Line Item
PSFB - Standard Work Hours / Non Secure Facility. Furnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period: Option Year Two***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
1,324,000 Each
Option Line Item
PSFB - Standard Work Hours / Secure FacilityFurnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period:
Option Year Two***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
216,000 Each
Option Line Item
CCSFS/GSU - Standard Work Hours / Non Secure FacilityFurnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period: Option Year Two***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
136,000 Each
Pricing Arrangement: Firm Fixed Price
Option Line Item
CCSFS/GSU - Standard Work Hours / Secure FacilityFurnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period: Option Year Two***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
24,000 Each
Option Line Item
PSFB - Standard Work Hours / Non Secure Facility. Furnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period: Option Year Three***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
1,324,000 Each
Option Line Item
PSFB - Standard Work Hours / Secure FacilityFurnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period:
Option Year Three***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
216,000 Each
Option Line Item
CCSFS/GSU - Standard Work Hours / Non Secure FacilityFurnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period: Option Year Three***CLIN Value represents an
136,000 Each estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
Option Line Item
CCSFS/GSU - Standard Work Hours / Secure FacilityFurnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period: Option Year Three***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
24,000 Each
Option Line Item
PSFB - Standard Work Hours / Non Secure Facility. Furnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period: Option Year Four***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
1,324,000 Each
Option Line Item
PSFB - Standard Work Hours / Secure FacilityFurnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period:
Option Year Four***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
216,000 Each
Option Line Item
CCSFS/GSU - Standard Work Hours / Non Secure FacilityFurnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued 136,000 Each throughout the contract period.Ordering Period: Option Year Four***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
Option Line Item
CCSFS/GSU - Standard Work Hours / Secure FacilityFurnish all materials, labor, equipment and perform all work required per the attached Specifications, Statement of Work (SOW), and within the established construction task catalog, to provide the Government with complete projects issued throughout the contract period.Ordering Period: Option Year Four***CLIN Value represents an estimated amount.Coefficient/Adjustment Factor:________________
Pricing Arrangement: Firm Fixed Price
24,000 Each
Section C - Description/Specifications/Statement of Work
Requirements Simplified Acquisition for Base Engineering Requirements (SABER). The SABER program is a tool in which the 45th Civil Engineering Squadron utilizes to expedite design efforts and accomplish minor construction, maintenance and repair projects in support the mission of Space Launch Delta 45 (SLD 45) at Patrick Space Force Base (PSFB), Cape Canaveral Space Force Station (CCSFS), and other Geographically Separated Units
(GSU).
Section D - Packaging and Marking
Section E - Inspection and Acceptance
CLINs
0001-0004 - Base Year
1001-1004 - Option Year One
2001-2004 - Option Year Two
3001-3004 - Option Year Three
4001-4004 - Option Year Four
INSPECT and ACCEPTANCE
Government
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.246-12 Inspection of Construction. Aug 1996 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements. Aug 1996
Section F - Deliveries or Performance
ALL CLINs
0001-0004 - Base Year
1001-1004 - Option Year One
2001-2004 - Option Year Two
3001-3004 - Option Year Three
4001-4004 - Option Year Four
DoDAAC
TBD Per Task Order
DELIVERY LOCATION FOR ALL
TBD Per Task Order
Overall Contract Delivery Period
From date of lead time event to beginning of performance 30 Calendar Days Date of Notice to Proceed Receipt
From date of lead time event to completion of performance 1825 Calendar Days Date of Notice to Proceed Receipt
Section G - Contract Administration Data
TASK ORDER PROCEDURES
I.GENERAL
General Construction IDIQ Task Order Procedures:
a. For performance under the terms of this contract, the Contracting Officer or authorized representative will notify the Contractor of the task order.
b. shall have permanent, full-time representation to receive such The Contractor notification.
c. Contractor shall respond to the needs of the Government within 5 working days by reviewing Upon receipt of this notification, the the request documents and visit the proposed work site. ln accordance with FAR 52.216-19, Order Limitations, if the Contractor does not wish to provide the services requested on a task order, which are below the minimum order amount or above the maximum order amount as specified herein they must submit in writing within 3 days of receipt of notification an explanation of non-intent.
d. scope of the individual requirement, the Contractor shall then prepare their proposal for accomplishment of Upon establishment of the the task. It is the Contractor's responsibility to ensure the proposal includes all costs associated with meeting the requirements of federal, state, and local laws or enforcing codes, as well as the requirements of the Technical Specifications. It shall be the responsibility of the Contractor to ensure that all the requirements of the statement of work have been included in their proposal. No adjustment will be made after the issuance of a task order to account for items left out of the Contractor's proposal.
e. Proposal with supporting cost breakdown data will serve as the basis for establishing the value of the work to be performed The Submitted on a total price basis. The rates negotiated in Section B shall be utilized for each task order.
f. in the delivery order and shall be presented by the Contractor in a separate category, showing Subcontracting cost will be included itemized material, labor, and equipment costs. The Contractor shall provide at least three (3) price quotes, if possible, to substantiate the proposed price(FAR 52.244-5). In the instance that three quotes cannot be obtained, the Contractor shall notify Contracting Officer to this effect with written explanation. More than one quote may be required if, in the Contracting Officer's discretion it is determined necessary. These quotes shall be made available to the contracting officer upon request.
g. time frame for submittal of Contractor's proposal for each individual requirement will The normal be:
(I) for routine task orders. Ten (10) calendar days
(2) Five ( 5) calendar days for mission critical/emergency task orders.
h. Contractor's proposal, the Government will, within a reasonable time, review the proposal for completeness. The Upon receipt of the
Government will negotiate submitted proposals based on but not limited to items, quantities, labor mixes and performance times with the Contractor.
1.Task Orders will be issued using Defense Department (DD) 1155 or agency equivalent form.
2. Each task order will include the following information:
a. Date of order.
b. Contract number and order number.
c. Contract item number and description, quantity and unit price.
d. Performance schedule.
e. Place of performance.
f. Accounting and appropriation data.
3. If conditions arise where a task order needs to be modified, the Contractor shall inform the Contracting Officer as soon as possible. Modifications to task orders can only be issued by the Contracting Officer.
Modifications to a task order will be subject to the same rates as the original task order, regardless of the contract year in which the modification is awarded.
II. CLIN X001 - X004
1. Task Order requirements will be developed by 45 CES and coordinated with the Contractor via the Contracting Officer who will issue a request for proposal. If necessary, a site visit will be held to determine the scope of the requirement.
2. The Contractor's proposal must be supported by the adequate documentation in support of the requirement.
3. Task Order pricing will be established based guidance provided in Attachment 1 SABER2023 SOW July 23.
4. All Non-Pre-Priced Line items included in the proposal shall itemize all material, labor, and equipment costs by quantity and unit price from three independent quotes.
5. Upon receipt of the Contractor's proposal, the Government will, within a reasonable time, review the proposal for price and technical acceptability. The Government will negotiate as necessary all non-priced items and performance times with the Contractor.
6. Upon completion of negotiations, the Contracting Officer will issue a task order for the negotiated work. The task order will be bilateral and signed by the Contracting Officer and an official designated by the Contractor representative.
ADMINISTRATIVE DATA
CONTRACT ADMINISTRATIVE DATA
1.ADMINISTRATIVE MATTERS
The address and telephone number for Construction Flight:
45thContracting Squadron
45CONS/PKAA
1201Edward H. White II Street - Bldg. 423
Patrick SFB FL 32925-2206
(321) 494-6136
(a) Following award, this contract will be administered by the 45th Contracting Squadron. The name, address, telephone number, and fax number of the Contracting Officer and Administrator are as follows:
CO: Patricia A. Bates
Phone:321-494-7121
E-mail:patricia.bates@us.af.mil
Admin: John Porter
Phone:321-494-9941
E-mail:john.porter.23@us.af.mil
(b) The Contracting Officer (CO), is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the CO. In the event the Contractor effects any such change at the direction of any person other than the CO, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.
(c) The Base Civil Engineer or his authorized representative is designated as the technical representative of the contracting officer for the purpose of technical surveillance of workmanship and inspection of materials for work being performed under this contract.
1.2 CONTRACTOR'S CONTRACT ADMINISTRATION
To Be Completed By The Contractor:
Name and Title: _____________________________________
Responsible Office: __________________________________
Address:___________________________________________
Telephone Number ___________________________________
Email:_____________________________________________
Cage Code: _________________________________________
Duns Number: _______________________________________
Tax Identification Number: _____________________________
1.3 INDIVIDUAL(S) AUTHORIZED TO NEGOTIATE OR DISCUSS PROPOSAL
Name of Primary:_____________________ Name of Alternate: __________________
Address:____________________________ Address: __________________________
Telephone#: _________________________ Telephone #: _______________________
Alternate#:__________________________ Alternate #: ________________________
Fax No: ____________________________ Fax No: ___________________________
Email:______________________________ Email:____________________________
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.204-7006 Billing Instructions. Oct 2005 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Tailored) (Jan 2023)
As prescribed in 232.7004(b), use the following clause:
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.
WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Construction and Facilities Management Invoice
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Inspection: F3K3DD Acceptance: FA2521
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in Document routing.
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC TBD Per Task Order
Issue By DoDAAC FA2521
Admin DoDAAC FA2521
Inspect By DoDAAC F3K3DD
Ship To Code N/A
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) FA2521
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) FA2521
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
gage.belyeu.2@spaceforce.mil patricia.bates@us.af.mil john.porter.23@us.af.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
Section I - Contract Clauses
52.228-1 Bid Guarantee.
As prescribed in , insert a provision or clause : 28.101-2 substantially as follows
Bid Guarantee (Sept 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, be cause for rejection of the bid. may
(b) The bidder furnish a bid guarantee in the form of a firm commitment, bid bond supported by good and sufficient or shall e.g., surety sureties acceptable to the Government, postal money order, certified check, cashier's check, , or, under Treasury Department irrevocable letter of credit regulations, certain bonds or notes of the . The will return bid guarantees, other than bid bonds- United States Contracting Officer
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee be percent of the bid price or , whichever is less.shall 20 $3 million
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the terminate the contract for Contracting Officer may default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of clause)
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.202-1 Definitions. Jun 2020 52.203-3 Gratuities. Apr 1984 52.203-5 Covenant Against Contingent Fees. May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government. Jun 2020 52.203-7 Anti-Kickback Procedures. Jun 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. May 2014 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. May 2014 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. Jun 2020 52.203-13 Contractor Code of Business Ethics and Conduct. Nov 2021 52.203-16 Preventing Personal Conflicts of Interest. Jun 2020 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-2 Security Requirements. (Alternate II) Mar 2021 Alternate II 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. May 2011 52.204-9 Personal Identity Verification of Contractor Personnel. Jan 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. Jun 2020 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014 52.204-21 Basic Safeguarding of Covered Contractor Information Systems. Nov 2021
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.
Nov 2021
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
Nov 2021
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment.
Nov 2021
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. Oct 2018 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015
FA252124R00080001
https://www.acquisition.gov/far/part-28#FAR_28_101_2
52.210-1 Market Research. Nov 2021 52.211-13 Time Extensions. Sep 2000 52.215-2 Audit and Records-Negotiation. Jun 2020 52.215-8 Order of Precedence-Uniform Contract Format. Oct 1997 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data. Aug 2011 52.215-12 Subcontractor Certified Cost or Pricing Data. Jun 2020 52.215-15 Pension Adjustments and Asset Reversions. Oct 2010 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other Than Pensions. Jul 2005 52.215-19 Notification of Ownership Changes. Oct 1997 52.215-23 Limitations on Pass-Through Charges. Jun 2020 52.215-23 Limitations on Pass-Through Charges. - (Alternate I) Jun 2020 Alternate I 52.219-8 Utilization of Small Business Concerns. Oct 2022 52.222-1 Notice to the Government of Labor Disputes. Feb 1997 52.222-3 Convict Labor. Jun 2003 52.222-4 Contract Work Hours and Safety Standards -Overtime Compensation. May 2018 52.222-6 Construction Wage Rate Requirements. Aug 2018 52.222-7 Withholding of Funds. May 2014 52.222-8 Payrolls and Basic Records. Jul 2021 52.222-9 Apprentices and Trainees. Jul 2005 52.222-10 Compliance with Copeland Act Requirements. Feb 1988 52.222-11 Subcontracts (Labor Standards). May 2014 52.222-12 Contract Termination-Debarment. May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. May 2014 52.222-14 Disputes Concerning Labor Standards. Feb 1988 52.222-15 Certification of Eligibility. May 2014 52.222-21 Prohibition of Segregated Facilities. Apr 2015 52.222-26 Equal Opportunity. Sep 2016 52.222-27 Affirmative Action Compliance Requirements for Construction. Apr 2015
52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Method).
Aug 2018
52.222-32 Construction Wage Rate Requirements-Price Adjustment (Actual Method). Aug 2018 52.222-35 Equal Opportunity for Veterans. Jun 2020 52.222-36 Equal Opportunity for Workers with Disabilities. Jun 2020 52.222-37 Employment Reports on Veterans. Jun 2020 52.222-50 Combating Trafficking in Persons. Nov 2021 52.222-54 Employment Eligibility Verification. May 2022 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. Jan 2022 52.222-62 Paid Sick Leave Under Executive Order 13706. Jan 2022 52.223-5 Pollution Prevention and Right-to-Know Information. May 2011 52.223-6 Drug-Free Workplace. May 2001
52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners.
Jun 2016
52.223-15 Energy Efficiency in Energy-Consuming Products. May 2020 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. Jun 2020 52.223-19 Compliance with Environmental Management Systems. May 2011 52.223-20 Aerosols. Jun 2016 52.223-21 Foams. Jun 2016 52.225-1 Buy American-Supplies Oct 2022 52.225-11 Buy American-Construction Materials under Trade Agreements. (Alternate I) Nov 2021 Alternate I 52.225-13 Restrictions on Certain Foreign Purchases. Feb 2021 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. Jun 2020 52.227-4 Patent Indemnity-Construction Contracts. Dec 2007 52.228-2 Additional Bond Security. Oct 1997 52.228-5 Insurance-Work on a Government Installation. Jan 1997 52.228-11 Individual Surety-Pledge of Assets. Feb 2021 52.228-12 Prospective Subcontractor Requests for Bonds. May 2014 52.228-14 Irrevocable Letter of Credit. Nov 2014 52.229-3 Federal, State, and Local Taxes. Feb 2013 52.229-12 Tax on Certain Foreign Procurements. Feb 2021 52.232-17 Interest. May 2014 52.232-18 Availability of Funds. Apr 1984 52.232-23 Assignment of Claims. May 2014 52.232-29 Terms for Financing of Purchases of Commercial Products and Commercial Services. Nov 2021 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Nov 2021 52.233-1 Disputes. May 2014 52.233-3 Protest after Award. Aug 1996 52.233-4 Applicable Law for Breach of Contract Claim. Oct 2004 52.236-2 Differing Site Conditions. Apr 1984 52.236-3 Site Investigation and Conditions Affecting the Work. Apr 1984 52.236-5 Material and Workmanship. Apr 1984
52.236-6 Superintendence by the Contractor. Apr 1984 52.236-7 Permits and Responsibilities. Nov 1991 52.236-8 Other Contracts. Apr 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. Apr 1984 52.236-10 Operations and Storage Areas. Apr 1984 52.236-11 Use and Possession Prior to Completion. Apr 1984 52.236-12 Cleaning Up. Apr 1984 52.236-13 Accident Prevention. Nov 1991 52.236-14 Availability and Use of Utility Services. Apr 1984 52.236-15 Schedules for Construction Contracts. Apr 1984 52.236-16 Quantity Surveys. Apr 1984 52.236-17 Layout of Work. Apr 1984 52.236-21 Specifications and Drawings for Construction. Feb 1997 52.242-5 Payments to Small Business Subcontractors. Jan 2017 52.242-13 Bankruptcy. Jul 1995 52.242-14 Suspension of Work. Apr 1984 52.243-4 Changes. Jun 2007 52.244-5 Competition in Subcontracting. Dec 1996 52.244-6 Subcontracts for Commercial Products and Commercial Services. Oct 2022 52.245-9 Use and Charges. Apr 2012 52.249-2 Termination for Convenience of the Government (Fixed-Price). Apr 2012 52.249-2 Termination for Convenience of the Government (Fixed-Price). - (Alternate I) Apr 2012 Alternate I 52.249-10 Default (Fixed-Price Construction). Apr 1984 52.253-1 Computer Generated Forms. Jan 1991
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7001 Prohibition on Persons Convicted of Fraud or Other Defense-Contract-Related Felonies. Dec 2008 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Sep 2013 252.203-7003 Agency Office of the Inspector General. Aug 2019 252.203-7004 Display of Hotline Posters. Aug 2019 252.204-7000 Disclosure of Information. Oct 2016 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. Dec 2019 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. May 2016
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
Jan 2021
252.205-7000 Provision of Information to Cooperative Agreement Holders. Dec 1991
252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism.
May 2019
252.215-7002 Cost Estimating System Requirements. Dec 2012 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements. Dec 2010 252.223-7004 Drug-Free Work Force. Sep 1988 252.223-7008 Prohibition of Hexavalent Chromium. Jun 2013 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. May 2022
252.225-7058 Postaward Disclosure of Employment of Individuals Who Work in the People's Republic of China.
Aug 2022
252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns.
Apr 2019
252.232-7010 Levies on Contract Payments. Dec 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jun 2013 252.242-7006 Accounting System Administration. Feb 2012 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.243-7002 Requests for Equitable Adjustment. Dec 2012 252.244-7000 Subcontracts for Commercial Items. Jan 2021
FAR Clauses Incorporated by Full Text
52.204-1 Approval of Contract. (Dec 1989)
As prescribed in , insert the following clause:4.103
Approval of Contract (Dec 1989)
This contract is subject to the written approval of and shall not be binding until so approved.45 CONS Contracting Officer
(End of clause)
52.211-10 Commencement, Prosecution, and Completion of Work. (Apr 1984)
As prescribed in , insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated. The 11.404(b) clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction.
Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within calendar days after the date the Contractor receives the notice to 30 proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than period of performance of task order completion date. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 Liquidated Damages-Construction. (Sep 2000)
As prescribed in , insert the following clause in solicitations and contracts:11.503(b)
Liquidated Damages-Construction (Sept 2000)
If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the (a) Government in the amount of for each $462.25 for the first day and $375.41 for each day thereafter for Task Orders more than $750,000 calendar day of delay until the work is completed or accepted.
If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These (b) liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.216-18 Ordering. (Aug 2020)
As prescribed in , insert the following clause:16.506(a)
Ordering (Aug 2020)
Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals (a) or activities designated in the Schedule. Such orders may be issued from through .contract award date contract expiration date
All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or (b) task order and this contract, the contract shall control.
A delivery order or task order is considered "issued" when-(c)
If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;(1)
If sent by fax, the Government transmits the order to the Contractor's fax number; or(2)
If sent electronically, the Government either-(3)
Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or(i)
Distributes the delivery order or task order via email to the Contractor's email address.(ii)
Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.(d)
(End of clause)
52.216-19 Order Limitations. (Oct 1995)
As prescribed in , insert a clause substantially the same as follows:16.506(b)
Order Limitations (Oct 1995)
. When the Government requires supplies or services covered by this contract in an amount of less than , the (a) Minimum order $2,000.00 Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
. The Contractor is not obligated to honor-(b) Maximum order
Any order for a single item in excess of ;(1) Minor Construction: $1,000,000.00 Repair or Alterations: $2,000,000.00
Any order for a combination of items in excess of ; or(2) $9,500,000.00
A series of orders from the same ordering office within days that together call for quantities exceeding the limitation in paragraph (b)(1) (3) 10 or (2) of this section.
If this is a requirements contract ( includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), (c) i.e., the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in (d) paragraph (b), unless that order (or orders) is returned to the ordering office within days after issuance, with written notice stating the Contractor's 7 intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of clause)
52.216-22 Indefinite Quantity. (Oct 1995)
As prescribed in , insert the following clause:16.506(e)
Indefinite Quantity (Oct 1995)
This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities (a) of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall (b) furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."
Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may (c) be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within (d) the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; , that the Contractor shall not be required to make any provided deliveries under this contract after .contract completion date
(End of clause)
52.217-9 Option to Extend the Term of the Contract. (Mar 2000)
As prescribed in , insert a clause substantially the same as the following:17.208(g)
Option to Extend the Term of the Contract (Mar 2000)
The Government may extend the term of this contract by written notice to the Contractor within ; provided that the Government gives (a) 60 days the Contractor a preliminary written notice of its intent to extend at least days before the contract expires. The preliminary notice does not commit 15 the Government to an extension.
If the Government exercises this option, the extended contract shall be considered to include this option clause.(b)
The total duration of this contract, including the exercise of any options under this clause, shall not exceed (c) 5 years.
(End of clause)
52.219-14 Limitations on Subcontracting. (Oct 2022)
As prescribed in , insert the following clause:19.507(e)
Limitations on Subcontracting (Oct 2022)
This clause does not apply to the unrestricted portion of a partial set-aside.(a)
, as used in this clause, means a first-tier subcontractor, including an independent contractor, that-(b) Definition. Similarly situated entity
Has the same small business program status as that which qualified the prime contractor for the award ( , for a small business set-aside (1) e.g.
contract, any small business concern, without regard to its socioeconomic status); and
Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor (2) assigned to the subcontract.
This clause applies only to-(c) Applicability.
Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);(1)
Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);(2)
Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;(3)
Orders expected to exceed the simplified acquisition threshold and that are-(4)
Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or(i)
Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);(ii)
Orders, regardless of dollar value, that are-(5)
Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(i) (2)(i)(F); or
Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award (ii) contracts, as described in 19.504(c)(1)(ii); and
Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the (6) evaluation preference.
An independent contractor shall be considered a subcontractor.(d) Independent contractors.
By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract (e) Limitations on subcontracting.
assigned a North American Industry Classification System (NAICS) code for-
Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to (1) subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;
Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the (2) Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded.