This document contains a set of Questions and Answers related to the federal contract opportunity FA252124QB037 for the Flight Simulator Access Control System installation project at the Air Force Reserve Command facility in PSFB, FL.

The key details are:

  • This is a new contract, with no incumbent currently performing these services.
  • The project involves the installation of an Intrusion Detection System (IDS) and Access Control System (ACS) at the Flight Simulator building, which is a controlled area under the Air Force Security Police.
  • Contractors must be U.S. citizens and able to obtain base access badges.
  • Equipment and components must meet specific security standards outlined in the DODM 5200.01.
  • There are questions regarding the availability of site drawings, existing cabling/wiring, power requirements, approved equipment, and contractor work hours.
  • The contract is funded but the project budget will not be disclosed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA252124QB037 Q&A

1. We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services? If not brand new, could you please provide the current / previous contract number?

a. This is a new contract, no incumbent is performing these services.

2. Are Scaled Drawings available, if so please post.

a. Attached.

3. Are Ceilings Suspended? Or Hard Lid?

a. Both. Depends on the area.

4. Are there existing Cable Trays for wiring above ceilings?

a. Yes. Cable routing must meet DODM 5200.01 and Non-Nuclear CMD list standards.

5. Can Existing Wiring be utilized?

a. There is no existing wiring.

6. Is a “UPS” required? If so, What Time/Power Duration is required?

a. Unknown. System must meet DODM 5200.01 standards for the appropriate classification level.

7. Are “Or Equal” Equipment substitutions allowed?

a. IDS system must be Honeywell Vindicator. All other components must be on the

Non-Nuclear CMD list.

8. Is “Plenum Wire” acceptable?

a. Yes. Must meet DODM 5200.01 v3 standards for appropriate classification level.

9. Is “After Hours Access” for said work, available to contractor at no add’l cost to the Gov’t?

a. Not at this time. Standard base duty hours are 0730-1630.

10. What is the height of Exterior Cameras? (If any)

a. Depends on the location but most are 15 ft agl. Specifics can be answered in the drawings.

11. Please provide/post other Q & A's requests.

a. N/A

12. Please provide a list of equipment to be installed

a. Per the SOW this is an ‘as built’ project.

13. Are there pipe chases between floors?

a. The building is only floor with elevated ceilings in some areas. Electrical conduit has been run for various IDS/ACS locations. See electrical drawings.

14. What is the range of the budget for this project, and is it already appropriated?

a. This project is funded, budget will not be posted.

15. Because of the high cost of the parts can we bill when parts arrive on site, or in the alternative are progress payments allowed?

a. No

16. How many feet of new wire will have to be run?

a. Per the SOW this is an ‘as built’ project. However much will be needed to provide the govt with a fully operational IDS/ACS that meets the requirements.

17. What kind of cipher lock and quantities are required e.g. X-10

a. 1x X-10 is required on the Secure area door.