14. YXTK 13-1806 DWG E-409 (RevA).pdf

PDF 445 KB Posted

Attached to
Repair Electrical Distribution Lines, Feeder 5, Ascension Auxiliary Airfield (AAAF), South Atlantic Ocean
Solicitation number
FA252123B0008
Issued by

About this file

This document package includes engineering drawings and specifications for a federal construction contract opportunity. The scope of work involves repairing electrical distribution lines, Feeder 5, on Ascension Island in the South Atlantic Ocean. Services required include removing existing overhead electrical lines, poles, hardware, and equipment; installing new overhead open wire and triplex circuits with poles, hardware, anchors, and electrical equipment; terminating and installing new primary feeder wires and cable; and installing a new load break switch, manholes, and underground duct bank at Hogan's Bypass. The work must be performed according to the project specification and drawings listed in Section J. The solicitation was issued by the Department of the Air Force Space Command for repairing electrical infrastructure supporting operations at Ascension Auxiliary Airfield.

View the file

Other files

File Type Posted
FA252123B0008 A0006 (Cancel IFB).pdf PDF
23B0008 SF1409 Abstract.pdf PDF
FA252123B0008 A0005.pdf PDF
13. YXTK 13-1806 Jade Creek (20231115) Govt Responses.pdf PDF
20. Fiber Wall Mount Dist Cabinets Photos.pdf PDF
FA252123B0008 A0004.pdf PDF
17. MH 42 Photos.pdf PDF
12. YXTK 13-1806 DeLaHoz (20231114) Govt Responses.pdf PDF
11. YXTK 13-1806 Togiak (20231115) Govt Responses.pdf PDF
19. Ascension Island PSD.pdf PDF
16. Enivronmental Final Governing Standards.pdf PDF
18. Catherine Point PSD (Services Distribution).pdf PDF
15. Concrete Mix Design (Local Aggregate).pdf PDF
21. Facility 800 Photos.pdf PDF
10. YXTK 13-1806 TDX Services (20231115) Govt Responses.pdf PDF
FA252123B0008 A0003.pdf PDF
FA252123B0008 A0002.pdf PDF
FA252123B0008 A0001.pdf PDF
FA252123B0008 (RPR Feeder 5 AAAF).pdf PDF
6. Site Visit Procedures.pdf PDF
2. YXTK 13-1806 Drawings.pdf PDF
4. 2023-2024 AAAF Vessel Schedule.pdf PDF
1. YXTK 13-1806 Specifications.pdf PDF
3. YXTK 13-1806 GPP.pdf PDF
7. Contractor Travel Request Form.docx DOCX document
8. QA Template.docx DOCX document
5. 2023-2024 AAAF Flight Schedule.pdf PDF
9. CECC Form 3052 Template.xls XLS spreadsheet
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U G

E U

G E

UGEUGEUGEUGEUGEUGEUGEUGE

UGE

UGE

UGE UG

E

UGEUGEUGEUGEUGEUGEUGEUGE

U G

E

UG

E

UG

E

U G

E

UGE

UGE

UGE

UGEUGE

UGE

UGE

X X

X

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E

O

HE

O H

E O

H E

O H

E

XF

M

R

XF

M R

SDS

UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC

O

HE

O H

C O

H E

O H

C O

H E

O H

C O

H E

U G

E U

G E

U G

E

UG

E

UG

E

U G

C U

G C

U G

C U

G C

O H

E O

H C

O H

E

UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC

U G

E U

G E

UGEUGEUGEUGEUGEUGEUGEUGE

UGE

UGE

UGE UG

E

UGEUGEUGEUGEUGEUGEUGEUGE

U G

E

UG

E

UG

E

U G

E

UGE

UGE

UGE

UGEUGE

UGE

UGE

X X

X

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E

O

HE

O H

E O

H E

O H

E

XF

M

R

XF

M R

SDS

UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC

SPECIFIC NOTES:

GRAPHIC SCALE

A

B

2 3

C

D

1 2 3

4 5 6

AS

B

U

IL

T D

AT

E:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

R

EV

IE

W

ED

B

Y:

D

AT

E:

4 5

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

SHEET

IDENTIFICATION

C

D

A

B

U

SS

F

TH

C

IV

IL

E N

G

IN

EE

R

S Q

U

AD

R O

N , P

SF

B, F L

C O

N

TR

AC

T

N O

FA

-1 8-

D -0

TR

AC

ES

TE

C H

N

IC

AL

R

AN

G

E

AR

C H

IT

EC

T

EN

G

IN

EE

R

IN

G

SE

R

VI

C

ES

D

EL

IV

ER

Y N

O

Ne ls on En gi ne er in gCo rh od es b rit o

A

R

C

H

I T

E

T

S

AA

/0

3/

M . J

O H

N

SO

N

YX

TK

3-

YX

TK

3-

AS

C

EN

SI

O N

IS

LA

N D

R

EP

AI

R E

LE

C

TR

IC

AL

D

IS

TR

IB

U

TI

O

N L

IN

ES

FE

ED

ER

N

EL

SO

N

EN

G

IN

EE

R

IN

G

E-409

TR

AN

SM

IT

TE

R

S

- E

N

LA

R G

ED

E

LE

C

TR

IC

AL

P

LA

N

FLAG NOTES: #

EXISTING HH-12

SCALE:

TRANSMITTERS - ENLARGED ELECTRICAL PLAN

1" = 40' L

E-409

MH-573 (ETR)

EXISTING OVERHEAD

ELECTRICAL

1 POLE F5/C42

UNDERGROUND ELECTRICAL

(ETR)

POLE-F5/D1

SDS-9 (ETR)

FACILITY

41011

XFMR PM 5/10 (ETR)

XFMR PM 5/9 (ETR)

POLE F5/C41

KEY MAP

GEN

500KW GENERATOR

(ETR)

TRANSMITTER ROAD

PY

R

AM

ID

P O

IN

T

R O

AD

TO UTILITY POLE F5/D16 AND F5/D17 ON SHEET E-410

TO UTILITY POLES F5/C38 AND F5/C39 ON SHEET E-408

1. REFERENCE:

· MV SINGLE LINE DIAGRAM ON SHEET E-002 FOR FINAL CONFIGURATION

AND FOR LOCATION OF CUTOUT SWITCHES WITHIN FINAL

CONFIGURATION.

· MV INSTALLATION CABLE SCHEDULE ON SHEET E-002 FOR CABLE SIZES

AND ESTIMATED LENGTHS.

· COMMUNICATION SINGLE LINE DIAGRAM ON SHEET E-003 FOR FINAL

CONFIGURATION.

· COMMUNICATION INSTALLATION CABLE SCHEDULE ON SHEET E-003 FOR

NUMBER OF PAIRS/STRANDS AND ESTIMATED LENGTHS.

· CIVIL SHEETS FOR DEMOLITION OF EXISTING FEEDER 5 ELECTRICAL

POLES AND INSTALLATION OF DUCT BANKS, HAND HOLES, MANHOLES,

AND POLE LOCATIONS.

· INSTALLATION DETAILS ON SHEETS C-501 AND C-502 FOR DUCT BANKS,

CONCRETE POLES, AND HAND HOLES.

· INSTALLATION DETAILS ON SHEET E-501 AND E-502 FOR NEW

EQUIPMENT CONNECTIONS, OVERHEAD LINES, AND PAD GROUNDING

INFORMATION.

· GROUNDING NOTES ON SHEET E-001 FOR ADDITIONAL GROUNDING

INFORMATION.

· GROUNDING INSTALLATION DETAILS ON SHEET E-501 FOR INFORMATION

ON MANHOLE GROUND SYSTEM AND GROUNDING OF THE SOLID

DIELECTRIC SWITCHES.

· DEMOLITION NOTES ON SHEET E-101 FOR DEMOLITION OF MV

OVERHEAD LINES, COMMUNICATION CABLES, AND ASSOCIATED POLE

MOUNTED ELECTRICAL EQUIPMENT.

2. REFER TO CIVIL SHEETS C-401 THROUGH C-430 FOR ADDITIONAL INFORMATION

SHOWN OUTSIDE OF ENLARGE PLAN.

3. CONTRACTOR IS RESPONSIBLE FOR VERIFYING TYPE OF TERMINATION TO ALL

EXISTING EQUIPMENT PRIOR TO ORDERING AND SHIPPING MATERIALS.

C22F22 C23 F23

X25

X26

C21F21

E-408 L

THE FOLLOWING SEQUENCE OF CONSTRUCTION ALSO APPLIES TO FACILITY 16545

ON SHEET E-410.

RECONFIGURE FACILITIES 16545 AND 41011 FROM EXISTING FEEDER 5 TO NEW

FEEDER 5.

1. INSTALL NEW MV DUCT BANKS FROM NEW POLE F5/D32 TO MH-627 AND FROM

NEW POLE F5/C42 TO MH-573.

2. PROVIDE TEMPORARY POWER TO FACILITIES 16545 AND 41011 THROUGH

EXISTING PAD-MOUNTED GENERATORS LOCATED AT EACH FACILITY.

3. OPEN AND LOCKOUT/TAG OUT SDS-9 TO DE-ENERGIZE TRANSFORMERS PM

5/09 AND PM 5/11.

4. ENSURE NEW FUSED CUTOUT SWITCHES ON POLE F5/D32 ARE OPEN AND

LOCKOUT/TAG OUT IS APPLIED.

5. INSTALL AND ROUTE NEW FEEDER 5 MV CONDUCTORS FROM F5/D32 TO

MH-627. CUT AND SPLICE EXISTING FEEDER 5 MV CONDUCTORS TO NEW

FEEDER 5 MV CONDUCTORS IN MH-627.

6. DEMOLISH EXISTING MV CONDUCTORS FROM SDS-9/V2 TO EXISTING POLE 72.

INSTALL NEW MV DUCT BANK FROM MH-573 TO SDS-9 AND FROM SDS-9 TO NEW

POLE F5/D1. ROUTE AND TERMINATE NEW MV CONDUCTORS FROM NEW POLE

F5/C42 TO SDS-9/V2 AND FROM F5/D1 TO SDS-9/V3.

7. PERFORM NETA TESTING ON ALL MV CONDUCTORS, SPLICES, AND

TERMINATIONS.

8. REMOVE LOCKOUT/TAG OUT AT SDS-9 AND POLE F5/D32 TO ENERGIZE NEW

FEEDER 5 MV CONDUCTORS. TRANSFER FACILITIES 41011 AND 16545 FROM

GENERATOR POWER TO SDS-9.

FACILITY 41011 AND FACILITY 16545 POWER SEQUENCE OF CONSTRUCTION:

0 20 40 80

1"=40'

SCALE IN FEET

U G

N

(TYP)

1. TRANSITION MV CONDUCTORS FROM OVERHEAD TO UNDERGROUND AT POLE

F5/C42. ROUTE FROM POLE F5/C42 TO EXISTING SDS-9/V2 THROUGH NEW

DUCT BANK AND EXISTING MH-573.

2. ROUTE NEW MV CONDUCTORS FROM EXISTING SDS-9/S3 TO NEW POLE F5/B1

THROUGH EXISTING AND NEW DUCT BANK AND EXISTING MH-573. TRANSITION

AT POLE F5/D1 FROM UNDERGROUND TO OVERHEAD AND CONTINUE

ROUTING ON NEW CONCRETE POLES TO NEW POLE F5/D16 NEAR RADAR. SEE

SHEET E-410 FOR LOCATION.

3. TRANSITION NEW 72 STRAND FIBER OPTIC CABLE AND NEW 300 PAIR COPPER

CABLE FROM OVERHEAD TO UNDERGROUND AT POLE F5/C42. ROUTE FROM

POLE F5/C42 TO EXISTING HH-12 THROUGH NEW DUCT BANK.

4. SPLICE INCOMING 300 COPPER PAIR CABLE IN HH-12 USING SPLICE

CONNECTORS IN NEW PLP MODEL ARMADILLO SST SPLICE CASE, OR

APPROVED EQUIVALENT. SEAL AND PROTECT ALL SPARE PAIRS WITHIN THE

CABLE AND AT THE ARMADILLO SST SPLICE CASE. REFER TO HH-12 COPPER

SPLICE DIAGRAM ON THIS SHEET.

5. SPLICE INCOMING 72 STRAND FIBER OPTIC CABLE IN HH-12 USING FUSION

SPLICE CONNECTORS IN NEW PLP MODEL COYOTE HI-COUNT SST SPLICE

CASE, OR APPROVED EQUIVALENT. SEAL AND PROTECT ALL SPARE FIBERS

WITHIN THE CABLE AND AT THE COYOTE HI-COUNT SST SPLICE CASE. REFER

TO HH-12 FIBER SPLICE DIAGRAM ON THIS SHEET.

6. ROUTE NEW 24 STRAND FIBER OPTIC CABLE AND NEW 100 PAIR COPPER

CABLE FROM EXISTING HH-12 TO FACILITY 41011 THROUGH DIRECT BURIAL

CONDUIT AND NEW HH-C19.

7. ROUTE NEW 48 STRAND FIBER OPTIC CABLE AND NEW 200 PAIR COPPER

CABLE FROM EXISTING HH-12 TO NEW POLE F5/D1 THROUGH DUCT BANK.

TRANSITION BOTH SETS OF CABLES FROM UNDERGROUND TO OVERHEAD AT

POLE F5/D1 AND CONTINUE ROUTING OVERHEAD UNTIL NEW POLE F5/D32 AT

RADAR. SEE SHEET E-410 FOR LOCATION.

8. INSTALL NEW WALL-MOUNTED COMMUNICATION RACK IN FACILITY 41011 TO

HOUSE NEW BUILDING ENTRANCE PROTECTORS.

9. INSTALL NEW BUILDING ENTRANCE PROTECTOR TERMINAL, TII

TECHNOLOGIES MODEL 1581P2, OR APPROVED EQUAL, TO NEW FACILITY

41011 RACK.

10. CONNECT NEW FIBER OPTIC CABLES TO EXISTING PATCH PANEL AND

COPPER CABLES TO NEW BUILDING ENTRANCE PROTECTORS LOCATED IN

FACILITY 41011.

11. RETAIN EXISTING SEAGROUND SYSTEM ROUTED BENEATH EXISTING FEEDER

5 PATH.

12. CORE DRILL EXISTING CONCRETE BLOCK WALL FOR NEW FOUR (4)-INCH

COMMUNICATION CONDUIT. REFERENCE CONDUIT WALL PENETRATION

DETAIL ON SHEET C-502.

13. INSTALL NEW PRECAST COMMUNICATION HANHOLE PER MANUFACTURER'S

INSTRUCTIONS AND IN ACCORDANCE WITH TYPICAL HANDHOLE DETAIL ON

SHEET C-502.

COYOTE

SPLICE

CASE

48 STRAND CABLE

ACTIVE: 48

SPARE: 0

72 STRAND CABLE

ACTIVE: 72

SPARE: 0

24 STRAND CABLE

ACTIVE: 24

SPARE: 0

TO UTILITY POLE F5/D16 AND F5/D17 SHEET E-410

TO

FAC

ILITY 41011 O

N

TH

IS SH

EET

TO UTILITY POLES F5/C38 AND F5/C39 ON SHEET E-406

SCALE:

HH-12 FIBER SPLICE DIAGRAM

N.T.S.

N

SCALE:

HH-12 COPPER SPLICE DIAGRAM

N.T.S.

N

HH-12

ARMADILLO

SPLICE

CASE

200 PAIR CABLE

ACTIVE: 200

SPARE: 0

300 PAIR CABLE

ACTIVE: 300

SPARE: 0

100 PAIR CABLE

ACTIVE: 100

SPARE: 0

TO UTILITY POLE F5/D16 AND F5/D17 ON SHEET E-410

TO

FAC

ILITY 41011 O

N

TH

IS SH

EET

TO UTILITY POLES F5/C38 AND F5/C39 ON SHEET E-406

HH-12

EXISTING POLE 72

M .S

M

IT

H

B.

KO

LA

K

NEW HH-C1913

1. INSTALL NEW HH-C19 AND UNDERGROUND CONDUITS BETWEEN HH-12 AND

FACILITY 41011. NEW UNDERGROUND CONDUITS WILL TRANSITION TO ABOVE

GRADE OUTSIDE FACILITY 41011 AND PENETRATE THROUGH THE EXTERIOR

WALL OF FACILITY 41011.

2. INSTALL NEW COMMUNICATION RACK WITH BUILDING ENTRANCE PROTECTORS

IN FACILITY 41011.

3. INSTALL AND ROUTE NEW COMMUNICATION CABLES FROM HH-12 TO NEW

BUILDING ENTRANCE PROTECTOR AND EXISTING FIBER OPTIC PATCH PANEL IN

FACILITY 41011 THROUGH NEW HH-C19, NEW UNDERGROUND CONDUITS, AND

EXISTING FACILITY 41011 CABLE VAULT.

4. TEST NEW COMMUNICATION CABLES FOR ANY DAMAGES PRIOR TO

TERMINATING CABLES TO BUILDING ENTRANCE PROTECTOR AND FIBER OPTIC

PATCH PANEL.

5. CONNECT NEW COPPER COMMUNICATION CABLES TO NEW BUILDING

ENTRANCE PROTECTOR AND REMOVE EXISTING COPPER COMMUNICATION

CABLES. RETAIN EXISTING BUILDING ENTRANCE PROTECTORS FOR FUTURE

USAGE.

6. REMOVE EXISTING FIBER OPTIC CABLE FROM EXISTING FIBER OPTIC PATCH

PANEL AND TERMINATE NEW 24 STRAND FIBER OPTIC CABLE.

7. TRANSFER FACILITY 41011 TO NEW COMMUNICATION CABLES AND REMOVE

DISCONNECTED COMMUNICATION CABLES FROM FACILITY 41011 TO EXISTING

HH-12. CUT AND CAP EXISTING CONDUIT IN FACILITY 41011.

FACILITY 41011 COMMUNICATION SEQUENCE OF CONSTRUCTION:

A M

IS

SI

N G

B

AC

KG

R

O U

N D

R

EF

ER

EN

C E

/2

7/

BK

Sheets and Views
E-402

File details come from the government source that posted it. Updated .