9. CECC Form 3052 Template.xls

XLS spreadsheet 101 KB Posted

Attached to
Repair Electrical Distribution Lines, Feeder 5, Ascension Auxiliary Airfield (AAAF), South Atlantic Ocean
Solicitation number
FA252123B0008
Issued by

About this file

This document contains a construction cost estimate template and instructions for its completion to be submitted in response to Solicitation Number FA252123B0008 issued by the Department of the Air Force Space Command. The template requires itemizing estimated material, labor, and other direct costs to repair electrical distribution lines for Feeder 5 at the Ascension Auxiliary Airfield in the South Atlantic Ocean. Contractors must provide a detailed cost breakdown by line item including quantities, unit rates, labor hours, and totals for materials, labor, equipment, and overall costs. The completed template and any supporting documentation will enable the government to conduct a comprehensive cost analysis of proposals received.

View the file

Other files

File Type Posted
FA252123B0008 A0006 (Cancel IFB).pdf PDF
23B0008 SF1409 Abstract.pdf PDF
FA252123B0008 A0005.pdf PDF
13. YXTK 13-1806 Jade Creek (20231115) Govt Responses.pdf PDF
20. Fiber Wall Mount Dist Cabinets Photos.pdf PDF
FA252123B0008 A0004.pdf PDF
17. MH 42 Photos.pdf PDF
12. YXTK 13-1806 DeLaHoz (20231114) Govt Responses.pdf PDF
11. YXTK 13-1806 Togiak (20231115) Govt Responses.pdf PDF
19. Ascension Island PSD.pdf PDF
16. Enivronmental Final Governing Standards.pdf PDF
18. Catherine Point PSD (Services Distribution).pdf PDF
15. Concrete Mix Design (Local Aggregate).pdf PDF
21. Facility 800 Photos.pdf PDF
14. YXTK 13-1806 DWG E-409 (RevA).pdf PDF
10. YXTK 13-1806 TDX Services (20231115) Govt Responses.pdf PDF
FA252123B0008 A0003.pdf PDF
FA252123B0008 A0002.pdf PDF
FA252123B0008 A0001.pdf PDF
FA252123B0008 (RPR Feeder 5 AAAF).pdf PDF
6. Site Visit Procedures.pdf PDF
2. YXTK 13-1806 Drawings.pdf PDF
4. 2023-2024 AAAF Vessel Schedule.pdf PDF
1. YXTK 13-1806 Specifications.pdf PDF
3. YXTK 13-1806 GPP.pdf PDF
7. Contractor Travel Request Form.docx DOCX document
8. QA Template.docx DOCX document
5. 2023-2024 AAAF Flight Schedule.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF3052 CLIN 001

CONSTRUCTION COST ESTIMATE BREAKDOWNSolicitation #FA252123B0008
CONTRACTORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST FORMPROJECT NUMBERWORK LOCATION
YXTK 13-1806
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQUANTITYMANHOURSAVERAGETOTALDIRECTLINE
NO.MEASUREUNITTOTALMANDAYSRATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1General requirements0.000.000.00
Administrative requirements0.000.00
EXAMPLE: Project Manager
Temporary facilities and controls
Execution requirements
Facility operations
2Sitework
Site preparation
3Concrete
Formwork
EXAMPLE: Isolated Beam Side Forms
Concrete reinforcing0.000.00
Cast in place concrete0.00
4Metals0.000.00
Basic metal materials and methods0.000.00
Structural framing0.000.00
Metal restoration and cleaning0.00
6Wood and plastics0.00
Basic wood and plastic materials and methods0.000.00
Subtotals for Col 5, 8, 9 and 100.000.000.000.00
CECC FORM 3052PAGE 1
INSTRUCTIONS FOR COMPLETING CECC FORM 3052
Col (Column) 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient
detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples--square yards--SY, cubic yards--
CY, square feet--SF, linear feet--LF, board feet--BF, each--EA, pound--LB).
Col 3 Quantity. Constractor's estimate of quantity required in terms of unit of measure (Col 2). Items and units of measure may
be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price
contract will be issued. Otherwise, the contractor is responsible for determining all quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total costs (Col 5) for items listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in column 6 the estimated number of manhours or mandays needed to perform the work listed in
column 1. Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the
contract and of significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on
the last page as follows.
TOTAL MATERIAL COSTS$
TOTAL LABOR COSTS$
TOTAL OTHER DIRECT COSTS$
TOAL DIRECT COSTS$
OVERHEAD (RATE: __________________%)$
SUBTOTAL$
PROFIT (RATE: __________________%)$
SUBTOTAL$
BOND (RATE: __________________%)$
TOTAL PRICE$
DATEFIRM NAME
TITLEBY
(Signature)
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of
incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award
of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a
certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3.807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit
with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an
appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that
there be a clear understanding of
a. The existing, verifiable data
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticalbe, the data will be described (with schdules as
appropriate), and made available to the contracting officer or his authorized representative on request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine,
for the purpose of verifying the cost or pricing data submitted, those books, records, documents, and other supporting data which
will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right
may be exercised in connection with any negotiations prior to contract award.
(Reverse of CECC Form 3052, Jul 17)

Page &P of &N

AF3052 CLIN 001 (2)

CONSTRUCTION COST ESTIMATE BREAKDOWNSolicitation #
CONTRACTORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST FORMPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQUANTITYMANHOURSAVERAGETOTALDIRECTLINE
NO.MEASUREUNITTOTALMANDAYSRATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
7Doors and windows0.000.000.00
Basic door and window materials and methods0.000.00
Entrances and storefronts0.000.00
Windows0.000.00
Hardware0.000.00
Glazing0.000.00
8Finishes0.00
Basic finish materials and methods0.00
Ceilings00.00
Paints and coatings0.000.00
Specialties0.000.00
Fire protection devices0.000.00
Furnishings0.00
Furnishings0.000.00
Fabrics0.000.00
9Special construction0.000.00
Hazardous material remediation0.00
Detection and alarms0.00
10Mechanical0.000.00
Subtotals for Col 5, 8, 9 and 100.000.000.000.00
AF FORM 3052PAGE 1
INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col (Column) 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient
detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples--square yards--SY, cubic yards--
CY, square feet--SF, linear feet--LF, board feet--BF, each--EA, pound--LB).
Col 3 Quantity. Constractor's estimate of quantity required in terms of unit of measure (Col 2). Items and units of measure may
be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price
contract will be issued. Otherwise, the contractor is responsible for determining all quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total costs (Col 5) for items listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in column 6 the estimated number of manhours or mandays needed to perform the work listed in
column 1. Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the
contract and of significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on
the last page as follows.
TOTAL MATERIAL COSTS$
TOTAL LABOR COSTS$
TOTAL OTHER DIRECT COSTS$
TOAL DIRECT COSTS$
OVERHEAD (RATE: __________________%)$
SUBTOTAL$
PROFIT (RATE: __________________%)$
SUBTOTAL$
BOND (RATE: __________________%)$
TOTAL PRICE$
DATEFIRM NAME
TITLEBY
(Signature)
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of
incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award
of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a
certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3.807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit
with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an
appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that
there be a clear understanding of
a. The existing, verifiable data
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticalbe, the data will be described (with schdules as
appropriate), and made available to the contracting officer or his authorized representative on request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine,
for the purpose of verifying the cost or pricing data submitted, those books, records, documents, and other supporting data which
will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right
may be exercised in connection with any negotiations prior to contract award.
(Reverse of AF Form 3052, Jan 88)
*U.S. GOVERNMENT PRINTING OFFICE: 1988-24D-979:51319

Page &P of &N

AF3052 CLIN 001 (3)

CONSTRUCTION COST ESTIMATE BREAKDOWNSolicitation #
CONTRACTORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST FORMPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COST
UNITOTHER
LINEITEMOFQUANTITYMANHOURSAVERAGETOTALDIRECTLINE
NO.MEASUREUNITTOTALMANDAYSRATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Mechanical0.000.000.00
11Electrical0.000.00
0.000.00
0.000.00
0.000.00
0.000.00
0.00
0.00
00.00
0.000.00
0.000.00
0.000.00
0.00
0.000.00
0.000.00
0.000.00
0.00
0.00
0.000.00
Subtotals for Col 5, 8, 9 and 100.000.000.000.00
AF FORM 3052PAGE 1
INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col (Column) 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient
detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples--square yards--SY, cubic yards--
CY, square feet--SF, linear feet--LF, board feet--BF, each--EA, pound--LB).
Col 3 Quantity. Constractor's estimate of quantity required in terms of unit of measure (Col 2). Items and units of measure may
be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price
contract will be issued. Otherwise, the contractor is responsible for determining all quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total costs (Col 5) for items listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in column 6 the estimated number of manhours or mandays needed to perform the work listed in
column 1. Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the
contract and of significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on
the last page as follows.
TOTAL MATERIAL COSTS$
TOTAL LABOR COSTS$
TOTAL OTHER DIRECT COSTS$
TOAL DIRECT COSTS$
OVERHEAD (RATE: __________________%)$
SUBTOTAL$
PROFIT (RATE: __________________%)$
SUBTOTAL$
BOND (RATE: __________________%)$
TOTAL PRICE$
DATEFIRM NAME
TITLEBY
(Signature)
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of
incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award
of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a
certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3.807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit
with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an
appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that
there be a clear understanding of
a. The existing, verifiable data
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticalbe, the data will be described (with schdules as
appropriate), and made available to the contracting officer or his authorized representative on request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine,
for the purpose of verifying the cost or pricing data submitted, those books, records, documents, and other supporting data which
will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right
may be exercised in connection with any negotiations prior to contract award.
(Reverse of AF Form 3052, Jan 88)
*U.S. GOVERNMENT PRINTING OFFICE: 1988-24D-979:51319

Page &P of &N