Amend 03 Atch 2A Revised Drawings AD-101 and G-002 (17 Sep 21).pdf

PDF 2 MB Posted

Attached to
Post Amendment 0004 to Cancel Solicitation in its entirety.
Solicitation number
FA252121B0007
Issued by

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 654

A

B

A.3

A.6

A4

AD-101

1 1 1 1

1 1 1 1

IM

G

.-1

2 2

B

GROUND FLOOR

0"

B

REMOVE METAL PANEL ROOF

SYSTEM AND ASSOCIATED

FLASHING

REMOVE METAL GUTTER

SYSTEM

REMOVE METAL

DOWNSPOUT SYSTEM

REMOVE METAL SOFFIT PANEL

SYSTEM AND ASSOCIATED

FLASHING

CLEAN AND PREP EXTERIOR

FOR PAINT

1 2 3 654

A

B

A.3

A.6

A4

AD-101

IM

G

A4

AD-101

1. THIS SET OF DRAWINGS AND SPECIFICATIONS DEFINE PROJECT SCOPE AND

CONTRACT REQUIREMENTS. INDIVIDUAL SHEETS SEPARATED FROM THIS

SET MAY NOT ADEQUATELY REFLECT ALL INFORMATION NEEDED TO

SUITABLY ACCOUNT FOR ALL REQUIRED WORK. DO NOT SEPARATE THIS

DRAWING SET INTO INDIVIDUAL SHEETS.

2. CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT

EXISTING TO REMAIN ITEMS DURING DEMOLITION AND CONSTRUCTION.

3. CONTRACTOR TO INVESTIGATE STRUCTURAL CAPACITY OF ALL EXISTING

BUILDING CONDITIONS AFFECTED BY THESE RENOVATIONS AND TO NOTIFY

CONTRACTING OFFICER OF FINDINGS WHEN UNFORSEEABLE CONDITIONS

HAVE BEEN UNCOVERED.

4. WHERE APPURTENANCES (SUCH AS WALL PENETRATIONS) ARE INDICATED

FOR REMOVAL OR NEW PENETRATION FROM WALLS DESIGNATED TO

REMAIN, THE CONTRACTOR SHALL PATCH/REPAIR EXISTING WALL PANEL

BASED ON MANUFACTURE STANDARDS.

5. CONTRACTOR SHALL LAWFULLY DISPOSE OF ALL MATERIALS REMOVED

FROM THE BUILDING.

EXISTING CONSTRUCTION &

OTHER CONDITIONS TO REMAIN

EXISTING CONSTRUCTION & OTHER

CONDTIONS TO BE REMOVED

EXISTING WALLS TO REMAIN

DEMOLITION LEGEND

EXISTING DOORS TO REMAIN

EXISTING DOORS TO BE REMOVED

IMG.-? PHOTOGRAPH NUMBER AND DIRECTION

SLAB AREA TO BE REMOVED

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N O

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

A A rh o d e s b ri to

C

H

I T

E

S

T H

S P

A C

E W

IN

G

C C

A F

S F

L

A s i n d ic a te d

/1

/2

:1

:1

A

M

R E

N O

V A

T

IO

N S

T O

S T

O R

M A

G A

G

F A

C

IL

IT

Y

B

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

AD-101

D E

M O

L

IT

IO

N

P L A

N

D B

E H

-1

A D

-1

F A

-1

-F

A

S E

P T

E M

B E

R

F A

F A

F A

-1

-F A

G M

G M

G M

K C

1/8" = 1'-0"AD-101

C1 DEMOLITION PLAN

1/2" = 1'-0"AD-101

A4 Section 6

1/8" = 1'-0"AD-101

A1 DEMO ROOF PLAN

KEYNOTES LEGEND

1 REMOVE EXISTING GUTTER AND DOWNSPOUT.

2 SAW CUT CONCRETE SLAB AS REQUIRED. COORDINATE WITH PROPOSED.

3 REMOVE EXISTING METAL PANEL ROOF SYSTEM AND ASSOCIATED FLASHING.

4 REMOVE EXISTING FLOOR SEALER. REFER TO SPEC SECTION 09 67 23.14 CHEMICAL

RESISTANT RESINOUS FLOORING. PREP FOR NEW INSTALLATION.

DEMOLITION GENERAL NOTES

IMG -1 SOFFIT PANEL SYSTEM, GUTTER AND DOWNSPOUT TO BE

REMOVED

IMG -2 METAL ROOFING PANEL SYSTEM AND ASSOCIATED

FLASHING TO BE REMOVED.

MARK DESCRIPTION DATE APPR

A

B

REMOVAL OF CLIN #2

RESPONSE TO REQUEST FOR CLARIFICATIONS

5/24/2021

9/16/2021

DW

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N O

D

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

A A rh o d e s b ri to

H

I

E

S

T H

S P

A C

E W

IN

G

C C

A F

S F

L

/1

/2

:2

:2

A

M

R E

N O

V A

T

IO

N S

T O

S T

O R

M A

G A

G

F A

C

IL

IT

Y

B

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

G-002

S H

E E

T I N

D E

X

D B

E H

-1

G -0

F A

-1

-F

A

S E

P T

E M

B E

R

F A

F A

F A

-1

-F A

D W

G M

D W

K C

GENERAL

Current

Revision

Sheet

Number Sheet Name

G-001 COVER SHEET

B G-002 SHEET INDEX

G-003 PROJECT DATA

G-101 LIFE SAFETY PLAN

CIVIL

C-001 CIVIL GENERAL NOTES I

C-002 CIVIL GENERAL NOTES II

C-003 CIVIL LEGEND AND ABBREVIATIONS

CD-101 EXISTING CONDITIONS AND DEMOLITION PLAN

A C-102 CIVIL SITE PLAN

A C-103 CIVIL PAVING, GRADING AND DRAINAGE PLAN

A C-501 CIVIL DETAILS I

A C-502 CIVIL DETAILS II

ARCHITECTURAL

B AD-101 DEMOLITION PLAN

A A-101 ARCHITECTURAL SITE PLAN

A-201 CLIN 0002 - CARPORT PLAN / ELEVATIONS / SECTIONS

A-202 WAREHOUSE GROUND FLOOR PLAN

A-203 ROOF PLAN / EXTERIOR DETAILS / SECTION

A-301 SECTIONS/ INTERIOR ELEVATIONS/ INTERIOR DETAILS

A-302 ENLARGED PLANS / INTERIOR ELEVATIONS

A-401 INTERIOR DETAILS

A-402 PLAN DETAILS

A-601 DOOR SCHEDULE / FINISH PLAN

A-701 SIGNAGE

STRUCTURAL

S-001 ABBREVIATIONS AND NOTES

S-101 MEZZANINE PLANS

S-102 CANOPY PLAN AND NOTES

S-200 SECTIONS

S-501 DETAILS

S-502 DETAILS

FIRE PROTECTION

FP-001 FIRE PROTECTION GENERAL NOTES, ABBREVIATIONS

& LEGEND

FP-101 WAREHOUSE FIRE PROTECTION INSTALLATION PLAN

FP-102 OFFICE FIRE PROTECTION INSTALLATION PLAN

FP-301 FIRE PROTECTION SECTIONS I

FP-302 FIRE PROTECTION SECTIONS II

FP-501 FIRE PROTECTION DETAILS

MECHANICAL

M-001 MECHANICAL GENERAL NOTES

M-002 MECHANICAL ABBREVIATIONS

M-003 MECHANICAL LEGEND

M-102 MECHANICAL INSTALLATION PLAN

M-501 MECHANICAL DETAILS

M-701 MECHANICAL SCHEDULES

PLUMBING

P-001 PLUMBING GENERAL NOTES, ABBREVIATIONS &

LEGEND

P-102 PLUMBING GRAVITY INSTALLATION PLAN

P-103 PLUMBING PRESSURE INSTALLATION PLAN

P-501 PLUMBING DETAILS

P-701 PLUMBING SCHEDULES

P-901 PLUMBING GRAVITY ISOMETRIC

P-902 PLUMBING PRESSURE ISOMETRIC

ELECTRICAL

B E-001 ELECTRICAL GENERAL NOTES, LEGEND AND

ABBREVIATIONS

ED-101 ELECTRICAL DEMOLITION PLAN

B E-102 EQUIPMENT PLAN

B E-103 POWER PLAN

A E-104 LIGHTNING PROTECTION AND GROUNDING PLAN

A E-201 LIGHTING PLAN

E-501 ELECTRICAL DETAILS

A E-701 PANEL SCHEDULES

FIRE ALARM

FA-001 FIRE ALARM GENERAL NOTES, LEGEND AND

ABBREVIATIONS

FAD-101 FIRE ALARM DEMOLITION PLAN

B FA-102 FIRE ALARM PLAN

B FA-601 FIRE ALARM RISER DIAGRAM

MARK DESCRIPTION DATE APPR

A

B

REMOVAL OF CLIN #2

RESPONSE TO REQUEST FOR CLARIFICATIONS

5/24/2021

9/16/2021

DBEH-20-1501 BLDG 35420_ARCH_G-002
Sheets
G-002 - SHEET INDEX
DBEH-20-1501 BLDG 35420_ARCH_AD-101
Sheets
AD-101 - DEMOLITION PLAN
DBEH-20-1501 BLDG 35420_ARCH_A-101
Sheets
A-101 - ARCHITECTURAL SITE PLAN

File details come from the government source that posted it. Updated .