Attach_3_SXHT_12-1060_Revised_Drawings.pdf
PDF 14 MB Posted
- Attached to
- Repair Airfield Markings and Rubber Deposits
- Solicitation number
- FA252119BA006
About this file
The purpose of this amendment is to change the proposal date, the bid-opening location, and incorporate revised drawings attachment #3 in section J. The proposal date has changed from 14 May 2019 at 8:00am (EST) to 4 June 2019 at 8:00am (EST) and bid opening date has changed from 14 May 2019 at 10:00am (EST) to 4 June 2019 at 10:00am (EST) as stated in section L of the solicitation. The location of the bid-opening location has changed from the Shark Center 815 Harrier Avenue, Satellite Beach, FL 32937 to.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
C
1 I 2
GENERAL NOTES:
1. HAUL ROUTES - LOCATION OF HAUL ROUTES ON PATRICK AIR FORCE BASE (PAFB) SHALL BE AS SPECIFIED AS APPROVED BY THE CONTRACTING OFFICER. HAUL ROUTES FOR EACH PHASE WILL BE DETERMINED BY THE CONTRACTOR PRIOR TO EACH PHASE AND AUTHORIZED BY THE CONTRACTING
OFFICER. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE OFF-SITE HAUL
ROUTES (STATE HIGHWAYS, COUNTY ROADS OR CITY STREETS) WITH THE APPROPRIATE OWNER
WHO HAS JURISDICTION OVER THE AFFECTED ROUTE. ON-SITE HAUL ROUTES SHALL BE
CONSTRUCTED AND MAINTAINED BY THE CONTRACTOR AND SHALL BE RESTORED UPON
COMPLETION OF BEING USED AS A HAUL ROUTE. A CONDITION REPORT OF THE BEFORE AND AFTER CONDITIONS OF ON-SITE HAUL ROUTES SHALL BE PREPARED JOINTLY BY THE CONTRACTOR AND
THE CONTRACTING OFFICER. FENCING, DRAINAGE, GRADING AND HAUL ROUTES OR ACCESS
POINTS ON PAFB WILL BE THE CONTRACTOR'S TOTAL RESPONSIBILITY AND SHALL BE APPROVED BY
THE CONTRACTING OFFICER PRIOR TO THE WORK. ALL ON-SITE PAFB ACCESS ROADS TO PAFB
FACILITIES SHALL REMAIN OPEN AND BE MAINTAINED AT ALL TIMES.
2. STAGING AREA - THE CONTRACTOR'S STAGING AREA IS TO BE COORDINATED WITH THE
CONTRACTING OFFICER PRIOR TO CONSTRUCTION OR DELIVERY OF CONSTRUCTION MATERIALS.
SPECIAL PROVISIONS FOR ANY REQUIRED UTILITIES SHALL BE COORDINATED AND PROVIDED BY
THE CONTRACTOR IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
3. PROTECTION AND REPAIR OF DAMAGE TO EXISTING UNDERGROUND LIGHTING CABLES - ALL
UNDERGROUND CABLES SHALL BE PROTECTED AND ANY DAMAGES CAUSED BY CONSTRUCTION
SHALL BE REPAIRED BY THE CONTRACTOR.
4. CONSTRUCTION LIMITS - ALL CONTRACTOR VEHICLES AND TRAFFIC SHALL REMAIN WITHIN THE
DESIGNATED CONSTRUCTION AREAS, STAGING AREAS OR HAUL ROUTES.
5. ALL TESTING THAT THE CONTRACTOR INITIATES FOR HIS/HER OWN INTERNAL QUALITY CONTROL
SHALL BE CONSIDERED INCIDENTAL TO THE COST OF THE RELEVANT WORK ITEM.
6. ALL BARRICADE LIGHTING SHALL BE VERIFIED BY THE CONTRACTOR FOR PROPER OPERATION AT
THE END OF EACH DAY OR NIGHT BEFORE CONTRACTOR CEASES OPERATION.
7. CONTRACTOR SHALL ALSO REVIEW ALL AIRFIELD UTILITIES WITH THE PAFB CIVIL ENGINEERING
STAFF PRIOR TO BEGINNING WORK.
8. ALL ACTIVE RUNWAYS AND TAXIWAYS SHALL HAVE NEW OR EXISTING LIGHTING CIRCUITS
CONNECTED TO EXISTING CIRCUITS AND ENERGIZED. ANY LIGHTING CIRCUITS TO CLOSED
RUNWAYS OR TAXIWAYS SHALL REMAIN DE-ENERGIZED UNTIL SUCH PAVEMENT IS FULLY CAPABLE
OF AIRCRAFT TRAFFIC.
9. CONTRACTOR SHALL NOTIFY THE LOCAL UTILITY SERVICE FOR EXISTING SITE UTILITY STAKEOUT AND OBTAIN AN APPROVED AF FORM 103 WORK CLEARANCE REQUEST PRIOR TO BEGINNING WORK.
10. RUNWAYS SHALL REMAIN OPERATIONAL FROM 0800 TO 0000, UNLESS OTHERWISE APPROVED BY CONTRACTING OFFICER. IF WORK ADJACENT TO ANY RUNWAY IS ANTICIPATED TO BE PERFORMED AT NIGHT, ADEQUATE LIGHTING SHALL BE PROVIDED BY THE CONTRACTOR IN ACCORDANCE WITH
THE SPECIFICATION REQUIREMENTS FOR ANY WORK PERFORMED AT NIGHT. THE CONTRACTOR
WILL BE ALLOWED TO WORK ON A CONTINUOUSLY CLOSED RUNWAY OR TAXIWAY.
11. IF NIGHT WORK IS REQUIRED FROM 1 MAY TO 31 OCTOBER BETWEEN 2100 TO 0600 HOURS, A LIGHT
MANAGEMENT PLAN MUST BE REVIEWED AND APPROVED THROUGH THE CONTRACTING OFFICER
AND 45 CES ENVIRONMENTAL (45 CES/CEIE) AT LEAST 45 DAYS PRIOR TO NIGHT WORK
COMMENCEMENT.
12. IF ANIMAL BURROWS MAY BE IMPACTED BY THIS WORK, THEY MUST BE AVOIDED. IF IMPACT IS UNAVOIDABLE, THE 45 CES ENVIRONMENTAL SHALL BE CONTRACTED THROUGH THE CONTRACTING OFFICER AT LEAST 30 DAYS PRIOR TO WORK TO DETERMINE A WORK AROUND OR RELOCATE THE
ANIMAL.
13. IF A STORAGE TANK IS UTILIZED FOR FUELING CONSTRUCTION VEHICLES, THE TANK MUST HAVE
ADEQUATE SECONDARY CONTAINMENT AND IF THE TANK IS 55 GALS OR GREATER, MONTHLY
INSPECTIONS ARE TO BE PERFORMED AND DOCUMENTED. CONTRACTOR IS RESPONSIBLE TO
OPERATE FUEL STORAGE TANK WITH APPROPRIATE BMPs IN PLACE.
CONSTRUCTION NOTES:
1. PRIOR TO REPAINTING THE PAVEMENT MARKINGS, THE CONTRACTOR SHALL REMOVE THE EXCESS
BUILD UP OF PAINT ON THE PAVEMENT AND DISPOSE OF THE MATERIAL IN ACCORDANCE WITH
APPROPRIATE LAWS AND REGULATIONS. PROTECT ALL EXISTING JOINTS FROM WATER BLASTING OR
OTHER REMOVAL OPTION. STANDARD GRINDING IS NOT PERMITTED. MICRO-MILLING OF PAINT
MARKINGS UTILIZING A FLAT TOOTH FITTED CUTTING MANDREL IS PREFERRED; APPLY GSB-88, OR APPROVED EQUAL SEAL COAT MEETING PROJECT SPECIFICATION SECTION 32 01 13.63 TO ASPHALTIC
PAVEMENT THAT HAS BEEN MICRO-MILLED OR HAD PAINT OR RUBBER REMOVAL PERFORMED.
2. WHEN PAINT MARKINGS ARE REMOVED FROM PORTLAND CEMENT CONCRETE PAVEMENTS, PRIOR TO REPAINTING THE PAVEMENT MARKINGS, THE CONTRACTOR SHALL REMOVE DAMAGED PORTIONS OF JOINT SEALANT AND APPLY DOW CORNING 888 SILICONE SEALANT, OR APPROVED EQUAL JET-FUEL RESISTANT SEALANT MEETING PROJECT SPECIFICATIONS SECTION 32 01 19.61 AND COMPATIBLE
WITH PAINT TYPE FOR NEW MARKINGS.
3. IMMEDIATELY BEFORE APPLICATION OF THE PAINT, THE SURFACE SHALL BE DRY AND FREE FROM DIRT, GREASE, OIL, LAITANCE OR OTHER FOREIGN MATERIAL WHICH WOULD REDUCE THE BOND
BETWEEN THE NEW AND EXISTING PAINT. THE AREA TO BE PAINTED SHALL BE CLEANED BY
SWEEPING AND BLOWING OR BY OTHER METHODS AS REQUIRED TO REMOVE ALL DIRT, LAITANCE
AND OTHER LOOSE MATERIALS.
4. REMOVAL OF PAINT AND RUBBER FROM AIRFIELD PAVEMENTS SHALL BE IN ACCORDANCE WITH AN
APPROVED METHOD INCLUDED IN THE PROJECT SPECIFICATIONS SECTION 32 01 11.51.
5. REFER TO HAZARDOUS MATERIAL PLAN SHEETS FOR TREATMENT OF LEAD AND OTHER
REGULATED METALS FOUND IN THE VARIOUS PAINT MARKINGS ON THE AIRFIELD, AND
ASSOCIATED REPORTS AND TESTING REQUIREMENTS.
3 I 4
AIRFIELD SAFETY NOTES:
1. PAFB OPERATIONS - THE CONTRACTOR SHALL ACQUAINT HIS/HER SUPERVISORS AND
EMPLOYEES WITH THE PAFB ACTIVITIES AND OPERATIONS THAT ARE INHERENT AT THIS
AIRPORT AND SHALL CONDUCT HIS/HER CONSTRUCTION ACTIVITIES TO CONFORM TO ALL
ROUTINE AND EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON SAFETY. PRIOR
TO INITIAL CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL COORDINATE ANTICIPATED
PROJECT ACTIVITIES WITH AIRFIELD MANAGEMENT (321-494-2222) AND PROVIDE AN
ANTICIPATED SCHEDULE OF WORK. THE CONTRACTOR SHALL COORDINATE ALL DAILY
CONSTRUCTION ACTIVITIES AND LIMITS WITH AIRFIELD MANAGEMENT PRIOR TO INITIATING
CONSTRUCTION ACTIVITIES EACH DAY.
2. AIRFIELD ACCESS - CONTRACTOR VEHICLE DRIVERS SHALL RECEIVE AIRFIELD DRIVER
TRAINING. ALL CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO CROSS OR OPERATE ON A
RUNWAY, TAXIWAY, OR APRON PAVEMENT SHALL BE ISSUED A PASS BY AIRFIELD
MANAGEMENT AND SHALL STAY IN CONTINUOUS RADIO CONTACT WITH THE BASE TOWER
GROUND CONTROL AT ALL TIMES WHILE OPERATING ON THE AIRFIELD. THE CONTRACTOR
SHALL SUBMIT A REQUEST FOR VEHICLE PASS AUTHORIZATION TO THE CONTRACTING OFFICER
AT LEAST 72 HOURS PRIOR TO ACCESSING THE AIRFIELD. MAGNETIC PLACARDS SHALL BE
PROHIBITED FROM VEHICLES OPERATING ON THE AIRFIELD. THE CONTRACTOR SHALL
UNDERSTAND THAT AIRCRAFT TRAFFIC ON RUNWAYS, TAXIWAYS, AND APRONS SHALL HAVE
PRIORITY OVER CONTRACTOR'S TRAFFIC AT ALL TIMES.
3. PAVEMENT CLOSURES - NO RUNWAY, TAXIWAY, APRON OR AIRFIELD ROADWAY SHALL BE
CLOSED WITHOUT APPROVAL OF AIRFIELD MANAGEMENT, TO ENABLE NECESSARY NOTICES OR
ADVISORIES AS REQUIRED. A MINIMUM OF 72 HOURS NOTICE OF REQUESTED CLOSING SHALL
BE DIRECTED TO THE CONTRACTING OFFICER, WHO WILL COORDINATE THE REQUEST WITH
AIRFIELD MANAGEMENT.
4. OPEN FLAME - OPEN FLAME, WELDING OR TORCH-CUTTING OPERATIONS ARE PROHIBITED
UNLESS ADEQUATE FIRE AND SAFETY PRECAUTIONS HAVE BEEN TAKEN AND THE PROPER
APPROVED PERMIT OBTAINED FROM BASE FIRE DEPARTMENT ( 321) 494-7642.
5. STOCKPILE EROSION AND DUST CONTROL - STOCKPILED MATERIAL AND OPEN EXCAVATIONS
SHALL BE TREATED IN SUCH A MANNER AS TO PREVENT MOVEMENT RES UL TING FROM
AIRCRAFT BLAST OR WIND CONDITIONS (SEE PROJECT SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS).
6. DEBRIS CONTROL - DEBRIS WASTE AND LOOSE MATERIAL SHALL NOT BE ALLOWED ON ACTIVE
AIRCRAFT MOVEMENT AREAS. IF OBSERVED TO BE ON ACTIVE AIRCRAFT MOVEMENT AREAS,
THE MATERIAL WILL BE REMOVED IMMEDIATELY BY THE CONTRACTOR. THE CONTRACTOR
SHALL PROVIDE VACUUM-TYPE SWEEPING EQUIPMENT ON SITE AT ALL TIMES FOR SUCH
PURPOSES. THE CONTRACTING OFFICER MAY DIRECT THAT DEBRIS PROBLEMS DURING
CONSTRUCTION NOT CORRECTED BY THE CONTRACTOR BE CORRECTED BY OTHERS AT THE
EXPENSE OF THE CONTRACTOR. THE RUNWAY AND TAXIWAYS SHALL REMAIN FREE OF ALL
DEBRIS.
7. INSPECTION BY MANAGEMENT - PRIOR TO OPENING FOR AIRCRAFT USE, THE CONTRACTING
OFFICER WILL ARRANGE FOR INSPECTION BY AIRFIELD MANAGEMENT OF ANY RUNWAY,
TAXIWAY, OR APRON THAT HAS BEEN CLOSED FOR WORK, OR THAT HAS BEEN USED FOR A
CROSSING POINT OR HAUL ROUTE BY THE CONTRACTOR.
8. CONTRACTOR APPROVED VEHICLES - ONLY AUTHORIZED VEHICLES APPROVED BY AIRFIELD
MANAGEMENT ARE PERMITTED ON THE AIRFIELD, SEE SECURITY NOTES AT THE RIGHT. ALL
AUTHORIZED CONSTRUCTION VEHICLES SHALL BEAR A VISIBLE COMPANY IDENTIFICATION SIGN
WHEN ACCESSING THE AIRFIELD.
GENERAL PAINT STRIPING AND MARKING NOTES:
1. ALL MARKING DIMENSIONS SHOWN ON THESE PLANS AND DETAILS ARE TYPICAL, UNLESS INDICATED OTHERWISE IN NOTES. ALL AIRFIELD MARKINGS SHALL BE IN FULL COMPLIANCE WITH UFC 3-260-04
"AIRFIELD AND HELIPORT MARKING" LATEST EDITION.
2. REFER TO SPECIFICATIONS FOUND IN UFC 3-260-04.
3. CONTRACTOR SHALL REPAIR ALL AIRFIELD MARKINGS THAT ARE SOILED OR DISTURBED AS A RESULT
OF CONSTRUCTION ACTIVITIES.
4. CONTRACTOR SHALL VERIFY ALL QUANTITIES OF AREAS TO BE PAINTED PRIOR TO START OF PROJECT.
QUANTITIES PROVIDED ON SHEET G-003 ARE FOR INFORMATION ONLY.
5. USE LEAD-FREE WATERBORNE PAINT FOR ALL AIRFIELD MARKINGS THAT MEETS PROJECT
SPECIFICATIONS SECTION 32 17 23 AND SHALL COMPLY WITH FEDERAL SPECIFICATION TT-P-1952 PAINT, TRAFFIC AND AIRFIELD MARKING, WATERBORNE, TYPE II, FAST DRY, HIGH HUMIDITY FORMULA.
6. FOR ALL RETRO-REFLECTIVE MARKINGS, USE GLASS BEADS AVAILABLE UNDER FEDERAL
SPECIFICATION TT-B-1325C, TYPE I, LOW INDEX OF REFRACTION, GRADATION A, COURSE, DROP-ON.
7. THERMOPLASTIC STOP BARS, STRIPING AND MARKINGS ARE ONLY APPROVED FOR USE ON THE VEHICLE ACCESS ROADS ADJACENT TO AIRFIELD FEATURES; THERMOPLASTIC TYPE PAINT MARKINGS
SHALL NOT BE USED ON ANY PORTION OF AIRFIELD SUBJECT TO AIRCRAFT TRAFFIC.
8. BLACK PAINT MARKINGS SHALL NEVER CONTAIN GLASS BEADS.
9. CONTRACTOR SHALL PROVIDE PAINT TYPE AND ANTICIPATED PAINT QUANTITIES TO THE
CONTRACTING OFFICER WITH MATERIALS SUBMITTALS PRIOR TO BEGINNING WORK.
10. PRIOR TO START OF PAINTING OF MARKINGS, THE CONTRACTOR SHALL OBTAIN SURVEY LAYOUT OF EXISTING MARKINGS OR OTHERWISE PROVIDE ACCURATE FIELD MARKS IN ORDER TO RE-ESTABLISH
THE EXISTING MARKING FEATURES THAT ARE TO REMAIN IN THE SAME LOCATION. MARKING
FEATURES THAT ARE PROPOSED IN NEW OR REVISED LOCATIONS SHALL BE MEASURED IN THE FIELD
BASED ON PLAN DIMENSIONS AND ACTUAL LOCATIONS OF EDGE OF PAVEMENT, ETC.
5 I 6
AIRFIELD SECURITY NOTES:
1. GENERAL NOTES - THE CONTRACTOR SHALL COMPLY WITH ALL SECURITY REQUIREMENTS
SPECIFIED HEREIN. THE CONTRACTOR SHALL DESIGNATE IN WRITING TO THE
CONTRACTING OFFICER THE NAME OF HIS/HER "CONTRACTOR SECURITY OFFICER". THE
CONTRACTOR SECURITY OFFICER SHALL REPRESENT THE CONTRACTOR ON THE SECURITY
REQUIREMENTS OF THE CONTRACT. PRIOR TO INITIAL CONSTRUCTION ACTIVITIES, THE
CONTRACTOR SHALL COORDINATE ANTICIPATED PROJECT ACTIVITIES WITH THE AIRFIELD
MANAGER AND PROVIDE AN ANTICIPATED SCHEDULE OF WORK.
2. CONTRACTOR PERSONNEL SECURITY ORIENTATION - THE CONTRACTOR SECURITY OFFICER
SHALL BE RESPONSIBLE FOR BRIEFING ALL CONTRACTOR PERSONNEL ON THESE
REQUIREMENTS AND, FROM TIME TO TIME, OTHER SECURITY PROVISIONS ADOPTED BY
PAFB PERSONNEL OR SECURITY POLICE. ALL NEW CONTRACTOR EMPLOYEES SHALL BE
BRIEFED ON THESE REQUIREMENTS PRIOR TO WORKING IN THE CONSTRUCTION AREA.
3. ACCESS TO THE SITE - CONTRACTOR'S ACCESS TO THE SITE SHALL BE AS SHOWN ON THE
PLANS OR AS DIRECTED BY THE CONTRACTING OFFICER. THE CONTRACTOR SHALL NOT
PERMIT ANY UNAUTHORIZED CONSTRUCTION PERSONNEL OR TRAFFIC ON THE SITE. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL TO AND FROM THE VARIOUS
CONSTRUCTION AREAS ON THE SITE. THE CONTRACTOR IS RESPONSIBLE FOR THE
IMMEDIATE CLEAN-UP OF ANY DEBRIS DEPOSITED ALONG THE ACCESS ROAD AS A RESULT
OF HIS/HER CONSTRUCTION TRAFFIC. DIRECTIONAL SIGNING AT THE ACCESS GATE AND
ALONG THE DELIVERY ROUTE TO THE STORAGE AREA OR WORK SITE SHALL BE AS
DIRECTED BY THE CONTRACTING OFFICER.
4. MATERIALS DELIVERY TO THE SITE - ALL CONTRACTOR'S MATERIAL ORDERS FOR DELIVERY
TO THE SITE WILL USE THE ACCESS POINT AT THE CONTRACTOR'S STORAGE SITE
APPROVED BY THE CONTRACTING OFFICER. THIS WILL PRECLUDE DELIVERY TRUCKS FROM
ENTERING INTO THE AIRFIELD OR TAKING SHORT-CUTS THROUGH THE PERIMETER GATES
AND ENTERING INTO AIRCRAFT OPERATIONS AREAS INADVERTENTLY.
5. CONSTRUCTION AREA LIMITS - THE LIMITS OF CONSTRUCTION, MATERIAL STORAGE AREAS, EQUIPMENT STORAGE AREA, PARKING AREA AND OTHER AREAS DEFINED AS REQUIRED FOR
THE CONTRACTOR'S EXCLUSIVE USE DURING CONSTRUCTION SHALL BE MARKED BY THE
CONTRACTOR AND APPROVED BY THE CONTRACTING OFFICER. THE CONTRACTOR SHALL
ERECT AND MAINTAIN AROUND THE PERIMETER OF THESE AREAS SUITABLE FENCING,
SIGNAGE AND WARNING DEVICES VISIBLE FOR BOTH DAY/NIGHT USE TO DELINEATE THE
PERIMETER OF ALL SUCH AREAS.
6. VEHICLE IDENTIFICATION - THE CONTRACTOR, THROUGH THE CONTRACTOR SECURITY
OFFICER, SHALL ESTABLISH AND MAINTAIN A LIST OF CONTRACTOR AND SUB-CONTRACTOR
VEHICLES AUTHORIZED TO OPERATE ON THE SITE. VEHICLE PERMITS SHALL BE ASSIGNED
IN A MANNER TO ASSURE POSITIVE IDENTIFICATION OF THE UNIT AT ALL TIMES. FLIGHTLINE
VEHICULAR PASSES SHALL BE OBTAINED FOR EACH CONTRACTOR AND SUBCONTRACTOR
VEHICLE FROM AIRFIELD MANAGEMENT. THE CONTRACTOR SHALL PROVIDE A CURRENT
LISTING OF VEHICLES AND COMPANIES AUTHORIZED TO ENTER AND CONDUCT WORK ON
PAFB. CONTRACTOR EMPLOYEE PERSONAL VEHICLES SHALL BE RESTRICTED TO THE
CONTRACTOR'S STORAGE AREA OR CONTRACTOR EMPLOYEE PARKING AREA AND ARE NOT
ALLOWED ON THE AIRFIELD AT ANY TIME.
7. IDENTIFICATION - EMPLOYEES· ALL CONTRACTOR EMPLOYEES AND EMPLOYEES OF
APPROVED SUBCONTRACTORS SHALL BE IDENTIFIED BY MEANS OF PAFB-ISSUED
IDENTIFICATION BADGES AT ALL TIMES WHEN THEY ARE INSIDE PAFB. THE PAFB ID
PROGRAM IS SUBJECT TO CHANGE AND ALL CONTEMPORARY SECURITY REQUIREMENTS
WILL GOVERN. THE CONTRACTOR SHALL PROVIDE A SINGLE POINT CONTACT FOR ALL
IDENTIFICATION AND BADGING REQUIREMENTS. THE CONTRACTOR SHALL ASSIGN THE
CONTRACTOR SECURITY OFFICER DESCRIBED ABOVE AS THE SINGLE POINT CONTACT FOR
ALL IDENTIFICATION AND BADGING REQUIREMENTS.
8. BACKGROUND CHECKS - THE CONTRACTOR IS ADVISED THAT ALL EMPLOYEES WHO ARE
BADGED AND ALLOWED TO WORK ON PAFB MAY BE SUBJECTED TO A BACKGROUND CHECK.
9. CONTINUING REQUIREMENTS FOR BADGING - ALL OTHER REQUIREMENTS OF THE PAFB
WRITTEN POLICY ON BASE CONSTRUCTION IDENTIFICATION BADGING SHALL BE ADHERED
TO INCLUDING ANY APPLICABLE UPDATES OR CHANGES WHICH BECOME EFFECTIVE DURING
THE COURSE OF THE PROJECT.
ABBREVIATIONS:
AC
AFI
ATC
ETL
FAA
HELi
IAW
ILS
INST
PAFB
RW
TACAN
TW
TYP.
UFC
UFGS
VFR
ADVISORY CIRCULAR (FAA)
AIR FORCE INSTRUCTION
AIR TRAFFIC CONTROL
ENGINEERING TECHNICAL LETTER
FEDERAL AVIATION
ADMINISTRATION
HELICOPTER
IN ACCORDANCE WITH
INSTRUMENT LANDING SYSTEM
INSTRUMENT
PATRICK AIR FORCE BASE
RUNWAY
TACTICAL AIRCRAFT CONTROL
AND NAVIGATION
TAXIWAY
TYPICAL
UNIFIED FACILITIES CRITERIA
UNIFIED FACILITY GUIDE
SPECIFICATIONS
VISUAL FLIGHT RULES
ENGINEER OF RECORD: DAVID A. LAVENDER
LICENSE NUMBER: 66400
NAME AND ADDRESS OF BUSINESS:
ALLEN ENGINEERING, INC.
106 DIXIE LANE (P.O. BOX 321321)
COCOA BEACH, FLORIDA 32932-1321
OFFICE: (321) 783-7443 - FAX: (321)783-5902
E-MAIL: INFO@ALLENENG.NET
FL C.A. # LB 266
AEI #: 150068.3
RAEIS CONTRACT NO: FA2521-17-F-0441; ES18-0107
ll'. w·o i;; z Q ww >z <( Sl ..J [3 Q 0
.....J u.
u.
<C a..
z 0:::
(!'. w' z > N "' t z (!'.
� <(� O 0
<C � :::) C'\I a L{)
(f) � 0::: u.
w
"' 00 (!'.
I" <(cc w iii al C, C:
0) C:
(I) (I) C:
z:--en w w w o . Oen0 .. z
(9 z w .....J
I I
LO
<C
1- ::c Cl) z
I- . : .
1-z z
<( _J C. � Do uJ � -w LL 0:: c:: - c::
<( wz [lJ
- [lJ � =iz c::
z oz �o
- I > () w =i 0:: 0::[lJ tea C/l <( z
Do Z() <( D C/l _J ww I- -
0 LL
z 0::
_J <( wzw
SHEET
IDENTIFICATION
G-002
'------------.--------------.----------=-------------Jf-----------=----------�---------------------1------------------J_-----------------===-__,, , ------J, 1 I 2 3 I 4 5 I
D
C
B
A
ABBREVIATIONS:
45SW - 45TH SPACE WING
ACM - ASBESTOS CONTAINING MATERIAL
ACT - ACOUSTIC CEILING TILE
AFF - ABOVE FINISHED FLOOR
ALUM - ALUMINUM
ANOD - ANODIZED
BLDG - BUILDING
CFR - CODE OF FEDERAL REGULATIONS
CONC - CONCRETE
CONT - CONTINUOUS
CMDR - COMMANDER'S
CMU - CONCRETE MASONRY UNIT
CPT - CARPET
CT - CERAMIC TILE
DN - DOWN
DWGS - DRAWINGS
EPA - ENVIRONMENTAL PROTECTION AGENCY
EXIST - EXISTING
EXT - EXTERIOR
F.A.C. - FLORIDA ADMINISTRATIVE CODE
F.G. - FIBERGLASS
FDEP - FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION
FIN FL - FINISH FLOOR
F.V. - FIELD VERIFY
GA - GAUGE
GALV - GALVANIZED
GC - GENERAL CONTRACTOR
GRT - GROUT
GYP BD/GWB - GYPSUM WALL BOARD
H.M. - HOLLOW METAL
HAZMAT - HAZARDOUS MATERIALS
HW/HDW - HARDWARE
INSUL - INSULATION
INT - INTERIOR
MAX - MAXIMUM
MFR - MANUFACTURER
MIN - MINIMUM
M.O. - MASONRY OPENING
MTL - METAL
MRGWB - MOISTURE RESIST GYPSUM WALL BOARD
MTD - MOUNTED
NOM - NOMINAL
O.C. - ON CENTER
O.D. - OUTSIDE DIAMETER
OSHA - OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
P/PT - PAINT
P.T. - PRESSURE TREATED
PCB - POLYCHLORINATED BIPHENYLS
PEL - PERMISSIBLE EXPOSURE LEVEL
PLYWD - PLYWOOD
PL - PLASTIC LAMINATE
PLST - PLASTER
PPE - PERSONAL PROTECTIVE EQUIPMENT
PSI - POUNDS PER SQUARE INCH
PTS - POINTS
PVC - POLYVINYL CHLORIDE
RCRA - RESOURCE CONSERVATION AND
RECOVERY ACT
REINF - REINFORCED
R.S. - RUBBER STRINGER
RTNR - RUBBER TREAD/NOSE/RISER
S.C. - SOLID CORE
SCHED/SCH - SCHEDULE
SDS - SAFETY DATA SHEETS
SMS - SHEET METAL SCREW
S.S. - SOLID SURFACE
ST. STL. - STAINLESS STEEL
TBB - TILE BACKER BOARD
TYP - TYPICAL
U.O.N. - UNLESS OTHERWISE NOTED
VWB - VINYL WALL BASE
VAT - VINYL ASBESTOS TILE
PROJECT SPECIFIC NOTES
1. CONTRACTOR SHALL COORDINATE DUST AND EQUIPMENT COVER INSTALLATION
WITH CONTRACTING OFFICER AND WITH FACILITY USER; EXISTING FACILITY
FUNCTION SHALL NOT BE COMPROMISED.
GENERAL HAZARDOUS MATERIAL NOTES:
REFER TO THE APPLICABLE SPECIFICATIONS FOR ADDITIONAL INSTRUCTIONS.
1. THERE SHALL BE NO AIR EMISSIONS OF DEBRIS AND CONTRACTOR SHALL COMPLY WITH 40 CFR 763 AND
29 CFR 1910, GENERAL HEALTH AND SAFETY FOR ALL EMPLOYEES. ANY SANDBLASTING OR NEEDLE-JET
OPERATIONS MUST BE APPROVED BY THE CONTRACTING OFFICER AND SHOULD HAVE FULL
CONTAINMENT.
2. THE GC SHALL UTILIZE HEAVY METALS SURVEY INCLUDED THE SPECIFICATIONS AS AN ATTACHMENT IN
ORDER TO COMPLETE THE SCOPE OF WORK PER THE DRAWINGS AND SPECIFICATIONS. THE
CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER IF THE PRESENCE OF ACM IS SUSPECTED
OR DISTURBED, AND HAS NOT BEEN IDENTIFIED BY THIS CONTRACT, BUT IS REQUIRED TO BE DISTURBED
IN ORDER TO:
· PERFORM THE CONTRACT WORK;
· SAFELY ACCESS THE AREA OF WORK WITHOUT EXPOSURE TO HAZMAT ABOVE THE PEL; OR
· HAVE WORKERS PERFORM THE CONTRACT WORK WITHOUT EXPOSURE TO HAZMAT ABOVE PEL.
UNDER NO CIRCUMSTANCES SHALL ANY ACM BE REMOVED WITHOUT THE CONTRACTING OFFICER
APPROVAL. FOR REFERENCE, SEE HAZMAT LEGEND OR REFER TO HAZMAT DRAWINGS.
3. THE REQUIREMENTS ESTABLISHED IN THE OSHA STANDARD FOR LEAD, CADMIUM AND CHROMIUM IN
CONSTRUCTION, 29 CFR 1926.62, 29 CFR 1926.1127 AND 29 CFR 1926.1126, RESPECTIVELY, MUST BE
COMPLIED WITH FOR ANY CONSTRUCTION, REFURBISHMENT, OR DEMOLITION OPERATIONS WHICH
INVOLVES THE DISTURBANCE OF COATINGS WHICH CONTAIN HAZARDOUS METALS. THE LEAD, CADMIUM
AND CHROMIUM STANDARDS ESTABLISH SPECIFIC PERSONAL PROTECTIVE EQUIPMENT TO INCLUDE
RESPIRATORY PROTECTION BASED ON THE TYPE OF WORK TO BE PERFORMED (SEE SPECIFICATIONS
FOR ADDITIONAL DATA).
4. HEAVY METALS, INCLUDING LEAD, HAVE BEEN DETECTED IN AIRFIELD MARKINGS, RAISING CONCERNS
ABOUT PARTICULATE MATTER IN RINSATE AND ABOUT LEACHABILITY AND IMPACTS TO SURROUNDING
ENVIRONMENTS. WHEN ABATING PAINT CONTAINING HEAVY METALS, CONTRACTOR SHALL PROVIDE
SUBMITTAL FOR ENVIRONMENTAL WORK PLAN TO ADDRESS CONTRACTOR IDENTIFIED BEST MEANS OF
PRACTICE IN COMPLIANCE WITH FDEP, EPA AND OSHA. ONLY THOSE PERSONNEL TRAINED IN
ABATEMENT HANDLING AND DISPOSAL MAY PERFORM WORK AND SHALL DO SO IN A MANNER THAT
MINIMIZES GENERATION OF AIRBORNE DEBRIS. WATER AND DEBRIS SHALL BE COLLECTED, TESTED, MANAGED AND DISPOSED OF IN ACCORDANCE WITH FEDERAL, STATE AND AIR FORCE REGULATIONS.
5. THE CONTRACTOR SHALL COMPLY WITH, BUT NOT LIMITED TO: AFI 32-7086, HAZARDOUS MATERIALS
MANAGEMENT, FEBRUARY 2015 AND THE 45TH SW HAZMAT TRACKING PROCEDURES FOR
CONSTRUCTION AND SERVICE CONTRACTORS. NO HAZARDOUS MATERIALS ARE ALLOWED TO BE
BROUGHT ON TO ANY 45 SW INSTALLATION WITHOUT PRIOR APPROVAL. THE CONTRACTOR SHALL
CONTACT THE CONTRACTING OFFICER TO REVIEW HAZARDOUS MATERIALS AUTHORIZATION
PROCEDURES PRIOR TO HAZARDOUS MATERIALS BEING BROUGHT ON TO 45 SW FACILITIES. ALL
CONSTRUCTION MATERIALS REJECTED BY THE GOVERNMENT SHALL BE REMOVED FROM THE SITE
IMMEDIATELY.
6. PERSONNEL WHO UTILIZE RESPIRATORY EQUIPMENT SHALL COMPLY WITH OSHA STANDARD 29 CFR
1910.134. THE REQUIREMENTS FOR PROTECTION OF PERSONNEL DURING DISTURBANCE OF COATINGS
CONTAINING HAZARDOUS METALS APPLY WHEN THE CONTENT HAS BEEN IDENTIFIED AS "LOW". OSHA
STANDARD 29 CFR 1926.62 DOES NOT INDICATE A LEVEL OF CONTENT LIMIT. IF LEAD IS PRESENT AT ANY
LEVEL, THE STANDARD SHALL BE ADHERED. FOLLOW THE 45SW GUIDANCE FOR THE REMOVAL OF
MATERIALS AND COATINGS CONTAINING HEAVY METALS.
7. THE HAZMAT DRAWINGS ARE REPRESENTATIONS OF LOCATIONS CONTAINING HAZMAT AT LEVELS
MEETING OR EXCEEDING REGULATORY LEVELS. THE GC IS REQUIRED TO SUBMIT A WORK PLAN FOR
THE ABATEMENT OF ACM, HEAVY METALS AND PCB, WHERE APPLICABLE, FOR THIS PROJECT. THE GC
SHALL COORDINATE THE EXTENT OF BUILDING DEMOLITION WITH THE EXTENT OF ABATEMENT
DEMOLITION FOR AVOIDANCE OF WORK DUPLICATION.
8. THE GC SHALL PROVIDE CERTIFICATION OF MONITORED AIR AND TESTING RESULTS PRIOR TO START OF
DEMOLITION WORK.
9. WHERE APPLICABLE, CONTRACTOR SHALL REFER TO SPECIFICATIONS FOR DISPOSAL OF ACM, HEAVY
METALS AND PCB.
10. QUALIFIED CONTRACTOR SHALL COORDINATE REMOVAL OF HAZARDOUS MATERIALS WITH
ENVIRONMENTAL WORK PLAN AND CONTRACTING OFFICER PRIOR TO COMMENCEMENT OF WORK AND
REPORT THE PRESENCE OF ANY OTHER SUSPICIOUS HAZMAT IN AREAS OF WORK PRIOR TO START OF
REMOVAL/DEMOLITION.
11. IF SILICA DUST AND PARTICLES ARE GENERATED DURING AIRFIELD MAINTAINANCE ACTIVITIES, WORKERS SHALL UTILIZE RESPIRATORY PROTECTION PER 29 CFR 1910.134 AND 29 CFR 1926.1153.
12. PRIOR TO FUTURE MAINTENANCE OPERATIONS UNDER THIS CONTRACT REQUIRING AIRFIELD PAINT
MARKING REMOVAL, CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER TO
DETERMINE THE NEED FOR WASTE CHARACTERIZATION TESTING. PAINT SUSPECTED OF CONTAINING
LEAD OR OTHER HEAVY METALS SHALL BE ANALYZED FOR TOXICITY CHARACTERISTIC LEACHING
PROCEDURE (TCLP) METALS PARAMETERS, TOXICITY CHARACTERISTIC LEACHING PROCEDURE (TCLP)
PARAMETERS, EPA SW-846 METHODS 1311 TCLP, 6010 FOR METALS, AND 7470/7471 FOR MERCURY.
HEAVY METALS PRESENT
RUBBER RESIDUE
HAZARDOUS MATERIAL LEGEND:
APPLICABLE CODES
WORK SHALL BE IN COMPLIANCE WITH THE LATEST REVISION OF THE FOLLOWING CODES AND WITH
PROJECT SPECIFICATIONS
2012 OSHA STANDARD FOR RESPIRATORY PROTECTION, 29 CFR 1910.134
2013 OSHA STANDARD FOR HAZARDOUS WASTE COMMUNICATION, 29 CFR 1910.1200
2017 OSHA STANDARD FOR GASES, VAPORS, FUMES, DUSTS AND MISTS, 29 CFR 1926.55
2012 OSHA STANDARD FOR LEAD, 29 CFR 1926.62
2012 OSHA STANDARD FOR ASBESTOS, 29 CFR 1926.1101
2012 OSHA STANDARD FOR CHROMIUM (VI), HEXAVALENT CHROMIUM, 29 CFR 1926.1126
2012 OSHA STANDARD FOR CADMIUM, 29 CFR 1926.1127
2016 OSHA STANDARD FOR RESPIRABLE CRYSTALLINE SILICA, 29 CFR 1926.1153
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL MECHANICAL CODE
2014 ASBESTOS ABATEMENT, FLORIDA STATUTES CHAPTER 469
2012 ASBESTOS PROGRAM, F.A.C. CHAPTER 62-257
2012 IDENTIFICATION AND LISTING OF HAZARDOUS WASTE, 40 CFR 261
2016 GENERAL BUILDING REQUIREMENTS UFC 1-200-01
2017 HAZARDOUS WASTE MANAGEMENT PLAN, 45TH SPACE WING
2016 NATIONAL EMISSION STANDARD FOR ASBESTOS, 40 CFR 61 SUBPART M
2016 EPA STANDARD FOR PCB, 40 CFR 761
2004 SYNTHETIC ORGANIC CONTAMINANTS MONITORING REQUIREMENTS, F.A.C. 62-550.516
H-001
J
B A
R T
O N
J
M C
G A
N N
H A
Z A
R D
O U
S
M
A T
E R
I A
L S
G
E N
E R
N
O T
E S
L E
G E
B B
R E
V I A
T I O
N S
C
H A
R T
N E
T T
S X
H T
F
G
B E
A R
D
M A
I N
T A
I
R
F I E
P
I N
T
R U
B B
R
M
O V
A L
S X
P A
F B
F
L
F
U S
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
U I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
C
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L
E N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
X:\SXHT\12-1060 Maintain Airfield Paint-Rubber Removal\DWG\12-1060 H-001.dwg, 4/4/2018 4:35:36 PM
I
S
N
T
I
S
U
L
F
E
O
D
H
L
N
I
S
T
SCALE:
EXISTING HAZARDOUS MATERIALS PLAN (SHEET 1 OF 9)
1" = 100'
T
R
U
E
N
O
R
T
H
NORTH
PLAN
200' 300'100'0'
GRAPHIC SCALE 1" = 100'
100'
M A
T C
H L
I N
E
S
E
MATCHLINE - SEE SHEET H-103
MATCHLINE - SEE SHEET H-104
MATCHLINE - SEE SHEET H-108
TAXIW
AY Z
RUNWAY 03-21
T
A
X
I
W
Y
A
X I W
A
X
I W
G
A
X
I
W
M
A
X I W
750 APRON
T
A
X
I
W
J
FLAG NOTES:
1. HEAVY METALS, INCLUDING LEAD, HAVE BEEN DETECTED IN PAINT MARKINGS TO BE REMOVED FROM THE
RUNWAY AND TAXIWAY PAVEMENTS. CONTRACTOR SHALL EMPLOY EQUIPMENT AND PROCEDURES CAPABLE
OF REMOVING PAINT MARKINGS WITHOUT LEAVING ANY RESIDUE. WHILE REMOVING PAINT MARKINGS, WORKERS SHALL UTILIZE PERSONAL PROTECTIVE EQUIPMENT FOR LEAD AS PER 29 CFR 1926.62, CADMIUM AS
PER 29 CFR 1926.1127 AND CHROMIUM AS PER 29 CFR 1926.1126.
2. CONTRACTOR SHALL CHARACTERIZE WASTE STREAMS GENERATED DURING PAINT REMOVAL THROUGH
COLLECTION OF REPRESENTATIVE SAMPLES AND ANALYSIS FOR RCRA METALS TOXICITY CHARACTERISTIC
LEACHING PROCEDURE (TCLP) IN ACCORDANCE WITH 40 CFR 261 PRIOR TO DISPOSAL. MANAGEMENT AND
DISPOSAL OF WASTES GENERATED DURING PAINT REMOVAL SHALL BE IN ACCORDANCE WITH ALL APPLICABLE
FEDERAL, STATE AND LOCAL WASTE MANAGEMENT REGULATIONS AND SPECIFICATION SECTION 02 82 33.13 20, REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD OR MERCURY.
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
H-101
J B
A R
T O
N
J M
C G
A N
N
E X
I S
T I N
G
H
A Z
A R
D O
T
E R
I A
A
N
S
H E
C H
A R
T N
E T
T
S X
F
G B
E A
R D
M A
I N
T A
R
F I E
I N
T
R U
B B
M
O V
A L
S X
P A
F B
F
L
F
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L
E N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa
X:\SXHT\12-1060 Maintain Airfield Paint-Rubber Removal\DWG\12-1060 H-101.dwg, 4/4/2018 4:35:41 PM
SCALE:
EXISTING HAZARDOUS MATERIALS PLAN (SHEET 2 0F 9)
1" = 100'
T
R
U
E
N
O
R
T
H
NORTH
PLAN
200' 300'100'0'
GRAPHIC SCALE 1" = 100'
100'
MATCHLINE - SEE SHEET H-105
MATCHLINE - SEE SHEET H-104
RUNWAY 03-21
R U
N W
T
A
X
I
W
MATCHLINE - SEE SHEET H-103
M A
T C
H L
I N
E
S
E
FLAG NOTE:
1. RUNWAY 11/29 AND TAXIWAY J WERE REPAVED IN 2012, AFTER USE OF LEAD-BASED PAINT FOR FLIGHT LINE MARKING
WAS DISCONTINUED AT PATRICK AFB. EXISTING PAINT MARKINGS AT THE INTERSECTION OF RUNWAY 11/29 AND
TAXIWAY J DO NOT CONTAIN LEAD.
H-102
J
B A
R T
O N
J
M C
G A
N N
E X
I S
T I N
G
H
A Z
A R
D O
T
E R
I A
A
N
S
H E
F
C
H A
R T
N E
T T
S X
F
G
B E
A R
D
M A
I N
T A
R
F I E
I N
T
R U
B B
M
O V
A L
S X
P A
F B
F
L
F
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L E
N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa
X:\SXHT\12-1060 Maintain Airfield Paint-Rubber Removal\DWG\12-1060 H-102.dwg, 4/4/2018 4:35:47 PM
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SCALE:
EXISTING HAZARDOUS MATERIALS PLAN (SHEET 3 0F 9)
1" = 100'
T
R
U
E
N
O
R
T
H
NORTH
PLAN
200' 300'100'0'
GRAPHIC SCALE 1" = 100'
100'
M A
T C
H L I N
E
S
E
MATCHLINE - SEE SHEET H-101
TAXIWAY B
R U
N W
T
A
X
I
W
MATCHLINE - SEE SHEET H-102
TW B
T
A
X
I
W
R
O
N
S
O
U
T
R
I
K
R
T
H
B
O
U
N
D
U
T
H
B
O
U
N
D
FLAG NOTES:
1. HEAVY METALS, INCLUDING LEAD, HAVE BEEN DETECTED IN PAINT MARKINGS TO BE REMOVED FROM THE RUNWAY AND
TAXIWAY PAVEMENTS. CONTRACTOR SHALL EMPLOY EQUIPMENT AND PROCEDURES CAPABLE OF REMOVING PAINT
MARKINGS WITHOUT LEAVING ANY RESIDUE. WHILE REMOVING PAINT MARKINGS, WORKERS SHALL UTILIZE PERSONAL
PROTECTIVE EQUIPMENT FOR LEAD AS PER 29 CFR 1926.62, CADMIUM AS PER 29 CFR 1926.1127 AND CHROMIUM AS PER
29 CFR 1926.1126.
2. CONTRACTOR SHALL CHARACTERIZE WASTE STREAMS GENERATED DURING PAINT REMOVAL THROUGH COLLECTION OF
REPRESENTATIVE SAMPLES AND ANALYSIS FOR RCRA METALS TOXICITY CHARACTERISTIC LEACHING PROCEDURE
(TCLP) IN ACCORDANCE WITH 40 CFR 261 PRIOR TO DISPOSAL. MANAGEMENT AND DISPOSAL OF WASTES GENERATED
DURING PAINT REMOVAL SHALL BE IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL WASTE
MANAGEMENT REGULATIONS AND SPECIFICATION SECTION 02 82 33.13 20, REMOVAL/CONTROL AND DISPOSAL OF PAINT
WITH LEAD OR MERCURY.
(TYP)
(TYP)
H-103
J
B A
R T
O N
J
M C
G A
N N
E X
I S
T I N
G
H
A Z
A R
D O
T
E R
I A
A
N
S
H E
F
C
H A
R T
N E
T T
S X
F
G
B E
A R
D
M A
I N
T A
R
F I E
I N
T
R U
B B
M
O V
A L
S X
P A
F B
F
L
F
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L
E N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa
X:\SXHT\12-1060 Maintain Airfield Paint-Rubber Removal\DWG\12-1060 H-103.dwg, 4/4/2018 4:35:52 PM
X
X
U
L
F
E
O
D
H
L
SCALE:
EXISTING HAZARDOUS MATERIALS PLAN (SHEET 4 0F 9)
1" = 100'
T
R
U
E
N
O
R
T
H
NORTH
PLAN
200' 300'100'0'
GRAPHIC SCALE 1" = 100'
100'
M A
T C
H L
I N
E
S
E
MATCHLINE - SEE SHEET H-101
R U
N W
T
A
X
I
W
MATCHLINE - SEE SHEET H-102
T
A
X
I
W
I
T
C
H
RESCUE RD
GUN
SAFETY
BERM
FLAG NOTES:
1. HEAVY METALS, INCLUDING LEAD, HAVE BEEN DETECTED IN PAINT MARKINGS TO BE REMOVED FROM THE
RUNWAY AND TAXIWAY PAVEMENTS. CONTRACTOR SHALL EMPLOY EQUIPMENT AND PROCEDURES
CAPABLE OF REMOVING PAINT MARKINGS WITHOUT LEAVING ANY RESIDUE. WHILE REMOVING PAINT
MARKINGS, WORKERS SHALL UTILIZE PERSONAL PROTECTIVE EQUIPMENT FOR LEAD AS PER 29 CFR
1926.62, CADMIUM AS PER 29 CFR 1926.1127 AND CHROMIUM AS PER 29 CFR 1926.1126.
2. CONTRACTOR SHALL CHARACTERIZE WASTE STREAMS GENERATED DURING PAINT REMOVAL THROUGH
COLLECTION OF REPRESENTATIVE SAMPLES AND ANALYSIS FOR RCRA METALS TOXICITY CHARACTERISTIC
LEACHING PROCEDURE (TCLP) IN ACCORDANCE WITH 40 CFR 261 PRIOR TO DISPOSAL. MANAGEMENT AND
DISPOSAL OF WASTES GENERATED DURING PAINT REMOVAL SHALL BE IN ACCORDANCE WITH ALL
APPLICABLE FEDERAL, STATE AND LOCAL WASTE MANAGEMENT REGULATIONS AND SPECIFICATION
SECTION 02 82 33.13 20, REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD OR MERCURY.
(TYP)
H-104
J
B
A R
T O
N
J
M
C G
A N
N
E X
I S
T I N
G
H
A Z
A R
D O
T
E R
I A
A
N
S
H E
F
C
H
A R
T N
E T
T
S X
F
G
B
E A
R D
M A
I N
T A
R
F I E
I N
T
R U
B B
M
O V
A L
S X
P A
F B
F
L
F
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L E
N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa
X:\SXHT\12-1060 Maintain Airfield Paint-Rubber Removal\DWG\12-1060 H-104.dwg, 4/4/2018 4:35:58 PM
X
X
X
X
X
X
X
X
X
SCALE:
EXISTING HAZARDOUS MATERIALS PLAN (SHEET 5 0F 9)
1" = 100'
T
R
U
E
N
O
R
T
H
NORTH
PLAN
200' 300'100'0'
GRAPHIC SCALE 1" = 100'
100'
R
O
N
C
O
N
T
R
D
I T
C
H
TAXIWAY B
T
A
X
I W
A
X
I W
GENERAL NOTE:
1. THERE ARE NO AREAS ON THIS SHEET THAT NEEDS PAINT/RUBBER REMOVAL.
M A
T C
H L
I N
E
S
E
MATCHLINE - SEE SHEET H-102
M A
T C
H L
I N
E
S
E
H-105
J
B
A R
T O
N
J
M
C G
A N
N
E X
I S
T I N
G
H
A Z
A R
D O
T
E R
I A
A
N
S
H E
F
C
H
A R
T N
E T
T
S X
F
G
B
E A
R D
M A
I N
T A
R
F I E
I N
T
R U
B B
M
O V
A L
S X
P A
F B
F
L
F
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L E
N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa
X:\SXHT\12-1060 Maintain Airfield Paint-Rubber Removal\DWG\12-1060 H-105.dwg, 4/4/2018 4:36:03 PM
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SCALE:
EXISTING HAZARDOUS MATERIALS PLAN (SHEET 6 0F 9)
1" = 100'
T
R
U
E
N
O
R
T
H
NORTH
PLAN
200' 300'100'0'
GRAPHIC SCALE 1" = 100'
100'
M A
T C
H L
I N
E
S
E
T
A
X
I
W
R
O
N
C
O
N
T
R
N
S E
T
B
L V
D
CONTROL
TOWER
(TYP)
(TYP)
FLAG NOTES:
1. HEAVY METALS, INCLUDING LEAD, HAVE BEEN DETECTED IN PAINT MARKINGS TO BE REMOVED FROM THE RUNWAY AND
TAXIWAY PAVEMENTS. CONTRACTOR SHALL EMPLOY EQUIPMENT AND PROCEDURES CAPABLE OF REMOVING PAINT
MARKINGS WITHOUT LEAVING ANY RESIDUE. WHILE REMOVING PAINT MARKINGS, WORKERS SHALL UTILIZE PERSONAL
PROTECTIVE EQUIPMENT FOR LEAD AS PER 29 CFR 1926.62, CADMIUM AS PER 29 CFR 1926.1127 AND CHROMIUM AS PER
29 CFR 1926.1126.
2. CONTRACTOR SHALL CHARACTERIZE WASTE STREAMS GENERATED DURING PAINT REMOVAL THROUGH COLLECTION OF
REPRESENTATIVE SAMPLES AND ANALYSIS FOR RCRA METALS TOXICITY CHARACTERISTIC LEACHING PROCEDURE
(TCLP) IN ACCORDANCE WITH 40 CFR 261 PRIOR TO DISPOSAL. MANAGEMENT AND DISPOSAL OF WASTES GENERATED
DURING PAINT REMOVAL SHALL BE IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL WASTE
MANAGEMENT REGULATIONS AND SPECIFICATION SECTION 02 82 33.13 20, REMOVAL/CONTROL AND DISPOSAL OF PAINT
WITH LEAD OR MERCURY.
H-106
J
B
A R
T O
N
J
M
C G
A N
N
E X
I S
T I N
G
H
A Z
A R
D O
T
E R
I A
A
N
S
H E
F
C
H
A R
T N
E T
T
S X
F
G
B
E A
R D
M A
I N
T A
R
F I E
I N
T
R U
B B
M
O V
A L
S X
P A
F B
F
L
F
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L E
N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa
X:\SXHT\12-1060 Maintain Airfield Paint-Rubber Removal\DWG\12-1060 H-106.dwg, 4/4/2018 4:36:09 PM
S
T
SCALE:
EXISTING HAZARDOUS MATERIALS PLAN (SHEET 7 0F 9)
1" = 100'
T
R
U
E
N
O
R
T
H
NORTH
PLAN
200' 300'100'0'
GRAPHIC SCALE 1" = 100'
100'
TAXIWAY B
H
A
M
M
E
R
H
E
A
D
RUNWAY 03-21
P O
Z
M
I T
S
E N
D
O
F
R
U N
W A
Y
P O
M
I T
S
FLAG NOTES:
1. RUNWAY 03/21 AND TAXIWAY B HAVE BEEN REPAVED SINCE THE USE OF LEAD-BASED
PAINT FOR FLIGHT LINE MARKING WAS DISCONTINUED AT PATRICK AFB. EXISTING
PAINT MARKINGS ON RUNWAY 03/21 AND TAXIWAY B DO NOT CONTAIN LEAD.
(TYP)
1 (TYP)
(TYP)
H-107
J
B
A R
T O
N
J
M
C G
A N
N
E X
I S
T I N
G
H
A Z
A R
D O
T
E R
I A
A
N
S
H E
F
C
H
A R
T N
E T
T
S X
F
G
B
E A
R D
M A
I N
T A
R
F I E
I N
T
R U
B B
M
O V
A L
S X
P A
F B
F
L
F
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L E
N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa
X:\SXHT\12-1060 Maintain Airfield Paint-Rubber Removal\DWG\12-1060 H-107.dwg, 4/4/2018 4:36:14 PM
X X
X X
X X
X X
X X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
T NIS
HH 60
X
SCALE:
EXISTING HAZARDOUS MATERIALS PLAN (SHEET 8 OF 9)
1" = 100'
T
R
U
E
N
O
R
T
H
NORTH
PLAN
200' 300'100'0'
GRAPHIC SCALE 1" = 100'
100'
APRON 750
HANGAR
T A
X I W
E
E
S
H E
MATCHLINE - SEE SHEET H-104
HANGAR
TW G
624 680
R E
S C
FLAG NOTES:
1. HEAVY METALS, INCLUDING LEAD, HAVE BEEN DETECTED IN PAINT MARKINGS TO BE REMOVED FROM THE RUNWAY AND
TAXIWAY PAVEMENTS. CONTRACTOR SHALL EMPLOY EQUIPMENT AND PROCEDURES CAPABLE OF REMOVING PAINT
MARKINGS WITHOUT LEAVING ANY RESIDUE. WHILE REMOVING PAINT MARKINGS, WORKERS SHALL UTILIZE PERSONAL
PROTECTIVE EQUIPMENT FOR LEAD AS PER 29 CFR 1926.62, CADMIUM AS PER 29 CFR 1926.1127 AND CHROMIUM AS PER
29 CFR 1926.1126.
2. CONTRACTOR SHALL CHARACTERIZE WASTE STREAMS GENERATED DURING PAINT REMOVAL THROUGH COLLECTION OF
REPRESENTATIVE SAMPLES AND ANALYSIS FOR RCRA METALS TOXICITY CHARACTERISTIC LEACHING PROCEDURE
(TCLP) IN ACCORDANCE WITH 40 CFR 261 PRIOR TO DISPOSAL. MANAGEMENT AND DISPOSAL OF WASTES GENERATED
DURING PAINT REMOVAL SHALL BE IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL WASTE
MANAGEMENT REGULATIONS AND SPECIFICATION SECTION 02 82 33.13 20, REMOVAL/CONTROL AND DISPOSAL OF PAINT
WITH LEAD OR MERCURY.
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
H-108
J
B
A R
T O
N
J
M
C G
A N
N
E X
I S
T I N
G
H
A Z
A R
D O
T
E R
I A
A
N
S
H E
F
C
H
A R
T N
E T
T
S X
F
G
B
E A
R D
M A
I N
T A
R
F I E
I N
T
R U
B B
M
O V
A L
S X
P A
F B
F
L
F
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L
E N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa
X:\SXHT\12-1060 Maintain Airfield Paint-Rubber Removal\DWG\12-1060 H-108.dwg, 4/4/2018 4:36:20 PM
SCALE:
RUNWAY 03 - EXISTING HAZARDOUS MATERIALS PLAN
1" = 100'
T
R
U
E
N
O
R
T
H
NORTH
PLAN
#FLAG NOTE:
1. MANAGEMENT AND DISPOSAL OF WASTES GENERATED DURING RUBBER
MARKINGS REMOVAL SHALL BE IN ACCORDANCE WITH ALL APPLICABLE
FEDERAL, STATE AND LOCAL WASTE MANAGEMENT REGULATIONS AND
SPECIFICATION SECTION 32 01 11.51, RUBBER AND PAINT REMOVAL FROM
AIRFIELD PAVEMENTS.
200' 300'100'0'
GRAPHIC SCALE 1" = 100'
100'
1175'
SCALE:
RUNWAY 21 - EXISTING HAZARDOUS MATERIALS PLAN
1" = 100'
T
R
U
E
N
O
R
T
H
NORTH
PLAN
1075'
H-109
J
B
A R
T O
N
J
M
C G
A N
N
E X
I S
T I N
G
H
A Z
A R
D O
T
E R
I A
A
N
R U
N W
S
H E
F
C
H
A R
T N
E T
T
S X
F
G
B
E A
R D
M A
I N
T A
R
F I E
I N
T
R U
B B
M
O V
A L
S X
P A
F B
F
L
F
U S
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L
E N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa
X:\SXHT\12-1060 Maintain Airfield Paint-Rubber Removal\DWG\12-1060 H-109.dwg, 4/4/2018 4:36:26 PM
H-110
V
B A
R T
O N
J
M C
G A
N N
E X
I S
T I N
G
H
A Z
A R
D O
T
E R
I A
A
N
W
S
H E
O
F
C
H A
R T
N E
T T
S X
F
G
B E
A R
D
M A
I N
T A
R
F I E
I N
T
R U
B B
M
O V
A L
S X
P A
F B
F
L
F
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A n g i n e e r i n g I n c
L L E
N
E A
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
An O ne id a N at io n Co m pa ny
200' 300'100'0'
GRAPHIC SCALE 1" = 100'
100'
#FLAG NOTE:
1. MANAGEMENT AND DISPOSAL OF WASTES GENERATED DURING RUBBER
MARKINGS REMOVAL SHALL BE IN ACCORDANCE WITH ALL APPLICABLE
FEDERAL, STATE AND LOCAL WASTE MANAGEMENT REGULATIONS AND
SPECIFICATION SECTION 32 01 11.51, RUBBER AND PAINT REMOVAL FROM
AIRFIELD PAVEMENTS.
SCALE:
RUNWAY 29 - EXISTING HAZARDOUS MATERIALS PLAN
1" = 100'
T
R
U
E
N
O
R
T
H
NORTH
PLAN
SCALE:
RUNWAY 11 - EXISTING HAZARDOUS MATERIALS PLAN
1" = 100'
T
R
U
E
N
O
R
T
H
NORTH
PLAN
M A
T C
H L
I N
E
S
L
O W
M A
T C
H L
I N
E
S
O
V E
X:\SXHT\12-1060 Maintain Airfield Paint-Rubber Removal\DWG\12-1060 H-110.dwg, 4/4/2018 4:36:32 PM
1146985528C Line
1146985528C Line i u.:
D
C
.,,_- B
0:, FLAG NOTES: [E>
1. REMOVE BLACKED OUT TEMPORARY DISPLACED THRESHOLD BAR THAT IS STARTING TO BLEED THRU.
2. REMOVE PORTIONS OF BLACKED OUT TEMPORARY DISPLACED THRESHOLD ARROWS THAT DID NOT GET
COVERED BY RUNWAY TOUCHDOWN MARKINGS, TYPICAL 4 PLACES.
3. REMOVE PORTIONS OF BLACKED OUT TEMPORARY DISPLACED THRESHOLD ARROWS THAT DID NOT GET
COVERED BY RUNWAY CENTERLINE MARKINGS, TYPICAL 8 PLACES.
4. REMOVE ENTIRE BLACKED OUT TACAN AIMING MARKER, EXCEPT LEAVE 6" BLACK STRIPE OUTLINE OF
TAXIWAY CENTERLINE.
5. CORRECT LOCATION FOR TACAN MARKER TO REMAIN. REMOVE TACAN MARKER, REPLACE TAXIWAY
CENTERLINE
1 2
TAXIWAY B
RUNWAY 03-21
I
PHASE 1 AIRFIELD REPAIR PLAN
SCALE: 1" = 100'
200' I
GRAPHIC SCALE 1" = 100'
300' I
I
I
ENGINEER OF RECORD: DAVID A. LAVENDER
LICENSE NUMBER: 66400
NAME AND ADDRESS OF BUSINESS
ALLEN ENGINEERING, INC.
106 DIXIE LANE (P.O. BOX 321321)
COCOA BEACH, FLORIDA 32932-1321
OFFICE: (321) 783-7443 - FAX: (321)783-5902
E-MAIL: INFO@ALLENENG.NET
FL C.A. # LB 266
AEI #: 150068.3
RAEIS CONTRACT NO: FA2521-17-F-0441; ES18-0107
z
"" "' w z a;
w"
� ui ""
!,' � �0
0::
w
:,.'. 0 "' z 0 W
� � "' w .
O 0
.....J u.
ca u.
a_ z 0:::
::J a Cf)
0:::
w w
(.9 z w
.....J-
CJ
I I- I.() u.
Cf) ::J
(0 0 � ' N � I-I
I
0 "' 0 � f-rJl
0::
w
> �m f- � 0::
O 0
I u.
I r-,...
I
N I.() N u.
z I-
CJ
I-z
-I-z
Cl. :;
Do uJ � -wLL 0:::
0::: - 0:::
<( w Z 00
- c::i !z 0:::
� d z >- " 0 " ,_ ffi.-!-9 �
5 >N LL
CT1�r-!.o�� f-f-
.. w i:; z 0 f-
� I w .
i"'
"' 0 0 0::
I"" ..:cc w " al "'
C:
C) C:
(I) (I) C:
z--wg'
(I) w w i a
Wi -3 w• • 4i �
Cf) ffi
UJ "'
l!;w ""'
W
Z
'\' " ,_ w " "' UJ z c:::( i8 '-' " "w <( 0.
UJ "'
0::: 1�
Cl.
0:::
Cl. 0()
WLL
0::: 0 0 r--
_. I-WWILW0::: I
w
Cl.
SHEET
IDENTIFICATION
AF-107
D
C
B
A
Cross-Out
Cross-Out
C
I w 15.
co "- C <( f-w I w .,,_- B (j) "-
... w N "' z
_J 0 N
I e;;
<( """ � N
I .-<
_n ci1 oi
'E 'io cx:i
A
N --
0 -- '6,"
1.
T"""
(V) z 0::
228' 20'
DT-502
UJ
(!) UJ
b 0 a..
0 UJ 0::
I-..,. 0 U)... - LL.
en oz
0 +
2 3
480' co b ..,. 0
300'
DT-501
DT-501
co ..A
3 . . -
DT-501
RUNWAY 11-29 --::;;;;=:
I
DT-502
MARKING MAINTENANCE PLAN - RUNWAY 11-29
SCALE: 1" = 100'
2 3
UJ
(!) UJ LO
0 a.. cci RUNWAY 11-29UJ 0:: "St
Cl U) 77.4' 100' 77.4'
- LL.
(/) 0 z
100' 77.4'
I
I
I
MARKING MAINTENANCE PLAN - RUNWAY 11-29
SCALE: 1" = 100'
FLAG NOTES: [I::>
I
1. RETROREFLECTIVE WHITE RUNWAY CENTERLINE, EDGE LINE, AND PERPENDICULAR WHITE BAR MARKINGS, WITH BLACK OUTLINES.
2. RETROREFLECTIVE YELLOW VFR HOLD LINE WITH BLACK BACKGROUND.
3. RETROREFLECTIVE WHITE ASSAULT LANDING MARKING WITH BLACK BACKGROUND, TYPICAL 2 PLACES.
4. RETROREFLECTIVE YELLOW OVERRUN CHEVRON MARKINGS; COMPLY WITH UFC 3-260-04 FIG. 5-7 GENERAL NOTES #1 FOR CASE OF OVERRUN LESS THAN 250' LENGTH. Runway 11 overrun not included in this project.
5. RETROREFLECTIVE WHITE RUNWAY THRESHOLD BARS, AND RUNWAY IDENTIFICATION MARKINGS, WITH
BLACK OUTLINES.
6. RETROREFLECTIVE YELLOW DISPLACED THRESHOLD RUNWAY MARKINGS WITH BLACK OUTLINES.
7. APPROXIMATE MIDPOINT OF RUNWAY, ADJUST RUNWAY CENTERLINE STRIPE LENGTHS ABOUT THIS POINT
PER DIMENSIONS SHOWN.
PAINT MARKING NOTE:
1. AT TIME OF FIRST MAINTENANCE RE-PAINT, REMOVE PORTIONS OF EXISTING MARKINGS
AS NECESSARY TO COMPLY WITH UFC 3-260-04 MARKING SCHEMES.
100' O' I I I I I I I I I I I
�-.Y/, 100' I
GRAPHIC SCALE 1" = 100'
300' I
ENGINEER OF RECORD: DAVID A. LAVENDER
LICENSE NUMBER: 66400
NAME AND ADDRESS OF BUSINESS
ALLEN ENGINEERING, INC.
106 DIXIE LANE (P.O. BOX 321321)
COCOA BEACH, FLORIDA 32932-1321
OFFICE: (321) 783-7443 - FAX: (321)783-5902
E-MAIL: INFO@ALLENENG.NET
FL C.A. # LB 266
AEI #: 150068.3
RAEIS CONTRACT NO: FA2521-17-F-0441; ES18-0107
_j "<(
"'- UJ - ,_ 0 <( � 0
n.
"'- z
" "0 " 0 "' "' w ':' C "' z u C a; LL >
::, w 0::
w 0::
.. � w C r-,.
0::
w
:,.'. 0 "' z C W
� � "' w .
C 0
...J
LL
ca
LL
a_ z 0:::
::J a Cf)
0:::
w w
(.9 z w
...J-
CJ
I I- I.()
LL
Cf) ::J co 0 � ' N � I- I en
> m
I " C
0 "' 0 -.,. � f-rJl
0::
w z N f- 0::
ci
T"""
I
LL
I r-,...
T"""
I
T"""
N I.() N
LL
z I-
CJ
I-z z <( .J a.. :;
Do uJ �
- UJ
LL. Cl'.0::
-(l'.'.
<( UJ
Z 00
- c::i <( ::,!z Cl'.
� d � z >- " C " ,_ ffi.-!-9 �
5 .. >N LL
CT1�r-!.o�� f-
.. w i:; z C f-
� I w .
" u i"'
"' 0 0 0::
I"" <( c W " al "'
C:
C) C:
(I) (I) C:
z--wg'
(I) w -w i a
Wi -3 w• • 4i �
CJ) Wool!;w ""' w z- LI;! ii:,_ w " "' Wz co cc F "w
<( 0. WO>
(!)Z z-z <( .J
LJ.J
OC>
z� z ...
LJ.J >-I- <(
z s:
<( z <.:> 0::
z
SHEET
IDENTIFICATION
AF-122
D
C
B
A
1146985528C Line
1146985528C Line
1146985528C Cross-Out
1146985528C Inserted Text
File details come from the government source that posted it.