FA2521-19-B-A006

Repair Airfield Paint and Markings Patrick AFB, FL

CONSOLIDATED QUESTIONS AND ANSWERS

Contractor Name: Hi-Lite Airfield Services, LLC POC: Dennis Haefner Question #1:

Would the use of GSB-78 be accepted as an alternate to GSB-88 after paint removal? GSB-78 would cure quicker usually within two to three hours after application.

PWS/Technical Specification/Drawings paragraph/page 32 01 11.51 para. 3.4. d, page 7 Answer #1:

The seal coat material must comply with the project specifications Question #2:

Since rubber removal by waterblast is performed at low pressure, would there really be a need to apply GSB-88?

Answer #2:

Yes, all work shall comply with the project drawings and specifications Question #3:

What are the hours and days of week allowed for this work?

Answer #3 Typical work hours are 7:30-16:30. Adjustments to hours can be made based on airfield schedule.

Question #4:

What is the owner’s anticipated schedule for this project?

Answer #4:

The schedule for this project will be based on availability of funding.

Contractor Name: Martinez Construction POC: Matthew Handwork Question #5:

Will joint protection be required for the marking/rubber removal?

Answer #5:

The contractor will be required to repair joint seals damaged during the work performed.

Question #6:

Will a dump site be provided for marking/rubber removal activities be provided? If so, where?

Answer #6:

A dump site will not be provided by the government, it is the contractor’s responsibility to properly dispose of all waste materials.

Question #7 Where is the water source location for marking/rubber removal activities?

Answer #7:

Water can be accessed from a fire hydrant on base. The exact location will be determined after award but several hydrants are within the general area of the airfield.

Question #8:

The project specifies P-608 sealer be applied to asphalt areas where marking removal is taking place. This product is a rejuvenator rather than a surface seal. It will not make the surface black but will rather penetrate to the aggregate to rejuvenate the asphalt. We believe a different product (p-631 surface seal) would be more appropriate given the desired outcome. Is the owner open to a change of specification to more properly seal these removal areas?

Answer #8:

All products used shall comply with the projects specifications and drawings.

Question #9:

What time of year will this project take place?

Answer #9:

The start date will depend on when the project is awarded upon availability of funds.

Contractor Name: TyBe Company

POC: N/A

Question #10:

Is it permissible for the Contractor to perform all work at night?

Answer #10:

The preference would be to perform the work during the day. Airfield closures will be coordinated with Airfield Management.

Question #11:

If performing all work at night is possible, what hours should the Contractor estimate by? 0000-0800? Or 2100 – 0600?

Answer #11:

See Question #1

Question #12:

.If performing all work at night is NOT possible, what hours will the airfield be operational? 0800 – 0000? Or 0730 – 1600?

Answer #12:

The current airfield hours are 0800-2400 Mon-Fri, 0900-1700 Sat-Sun, and closed the 3rd Friday of every month. The hours are subject to change depending on operational requirements.

Question #13:

Is micro-milling required?

Answer #13:

It is preferred. Other methods are also acceptable, see Plans, G-002, Construction Note 1 and 4, and Specifications.

Question #14:

If not, what other options will the government consider for paint removal from ACC?

Answer #14:

See answer to question 13 above.

Question #15:

Will the Government provide a linear foot estimate of the joint seal to be replaced?

Answer #15:

The contractor will be required to replace any joint seal damaged by the removal of paint/rubber from the airfield. The quantity will depend on the contractor’s process.

Question #16:

Will the Government consider adding a separate line item for joint sealing?

Answer #16:

NO

Question #17:

Other than providing the “Construction Staging Plan” outlined in Note 1 under Operation and Staging Notes on plan sheet G-005, is the 72 hour notice all we will need to close any runway, taxiway, apron, or airfield roadway?

Answer #17:

All closures/activities will be coordinated with Airfield Management. The notice is required for Airfield Management to issue the required notice for aircrews Question #18:

Are construction flaggers required to undergo PAFB site specific training?

Answer #18:

YES

Question #19:

Is there a flight plan that can be provided to the Contractor to allow for efficiency when scheduling work?

Answer #19:

Not at this point. Prior to construction starting the contractor will be required to coordinate with the government on the project schedule. Airfield closures will be coordinated with Airfield Management based on operational requirements. The current airfield hours are 0800-2400 Mon-Fri, 0900-1700 Sat-Sun, and closed the 3rd Friday of every month. The hours are subject to change depending on operational requirements.

Question #20:

What runways/taxiways/aprons/roadways can be closed simultaneously?

Answer #20:

It depends on operational requirements.

Question #21:

What area can the Contractor use for laydown? The plans do not identify an area that the Contractor can utilize for storage.

Answer #21:

Typically the 800 Apron is used as a laydown area for airfield projects. If it is unavailable another area on or near the airfield will be provided.

Question #22:

Will the Government provide an estimated count of “non-access” days to allow the Contractor to bid appropriately?

Answer #22:

The “non-access” days no longer applies to PAFB.

Question #23:

Will the Government provide a typical detail, outlining both the desired barricade make/model as well as a typical placement plan for closing a runway, taxiway, or apron?

Answer #23:

See UFC 3-260-04, Figure 8-4. http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc?field_status_value=1&field_series_value_selective=3-200&=Apply

Question #24:

Will the truck drivers that are hauling the hazardous waste off of the base be required to be badged for base access?

Answer #24:

YES

Question #25:

At the site visit, it was noted that some areas of the work are controlled areas and require escorts for access. Can the Government provide the controlled areas on the plans for which escort will be required?

Answer #25:

The controlled area is inside the red line on the 750 apron, see Plans, AF-119.

Question #26:

Will the Government identify hydrant locations that the Contractor will be permitted to use?

Answer #26:

There are several fire hydrants near/on the airfield, one will be provided near the work site. Exact location TBD prior to construction.

Attachment 7