Attachment No. 5 - Project Drawings DBEH 11-1535J
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDUSTRIAL AREA
B
E
A
C
H
L
I N
E
X
P
R
E
S
S
W
A
Y
T
O
R
L
A
N
D
O
TO
COCOA
US
l
N O
R
H
C
U
R T
E N
A Y
P
K W
Y
MERRITT
ISLAND
A1A
BEACH
COCOA
TO
PIER ROAD
AIR FORCE STATION
CAPE CANAVERAL
C
E
N
T
R
L
N
T
R
A
D
R
O
A
D
S
K
I
D
S
R
I
P
R O
A D
L
IG
H T
H O
U S
E
P
H
I L L I P
S
P
A
R
K
W
A
Y
F
L
I G
H
T
C
O
N
T
R
O
L
L
A
U
N
T I T
I
R
D
H
E
A
V
Y
I
C
M
A
D
TITUSVILLE
BEACH ROAD
SPACE
NASA PARKWAY WEST
CENTER
KENNEDY
ORBITER LANDING
SPACE SHUTTLE
FACILITY
C
R
A
W
L
E
R
W
A
Y
VAB
P
A
R
K
W
A
Y
LOCATION
P H
I L L I P
S
ATLANTIC
OCEAN
N
A
U
S
E
W
S
T
BANANA
RIVER
SOUTH GATE
PASS & I.D.
ATLANTIC
OCEAN
PORT
CANAVERAL
INDIAN
RIVER
PROJECT
AREA
V
PORT CANAVERAL
CCAFS
INDUSTRIAL AREA
STATE RD 401
B
A
S
PATROL RD S
H O
U N
D
D
G
R
C L
E
M
A
PIER RD
S
P
S
A
M
U
I L
L
I
W
Y
L
IG
H T
H O
U S
E R
D
S K
Y B
O
B
U
M
P
P
I
F S
A
R D
M
I S
S
I
N
T
R
F
L
I
G
N
T
R
I
R
L
IG
H T
H O
U S
E R
D
L
I
G
H
T
H
O
U
O
B
S
E
R
V
A
T
I
C
A
M
E
P
H
A
C
O
N
T
R
W
C
A
M
E
A
V
O
T
I
M
I
A
R
M
O
A
Z
U
S
K
R
K
R
W
E
R
C
U
M
I
S A
M U
E L
S
A
M
U
I
L
L
I
W
Y
I
N
D
U
S
T
H
A
N
G
T
I
T
SOUTH GATE
PASS & ID
CAPE CANAVERAL
AIR FORCE
STATION
P
I
F L I G
H
T
C
O
N
T R
O
L
R
D
P
I
OLD
SPIN TEST
FACILITY
MSA #5
CAMERA
PAD #21
FSA #1
C
P
H
I L
L
I P
S
P
K
W
Y
HGR
C
LIGHT
HOUSE
I
C
S
K
R
I
P
H
E
A
U
N
CX-14
CX-15
CX-16
C
E
N
T
R
N
T
R
P
H
I
L
L
I
W
Y
CAPE CANAVERAL AIR FORCE STATION
CAPE CANAVERAL, FLORIDA
SCALE:
VICINITY MAP
NONE
SCALE:
LOCATION PLAN
NONE
REPAIR WATER LINES,
DBEH 11-1535J
PIER ROAD, CCAFS
G-001
V I C
I N
I T
Y
M
C A
T I O
N
P
L A
N
A
N D
D R
A W
I N
G
I N
D E
X
HB
DEFINITION DEPICTION
8" FIRE WATER
2" POTABLE WATER
4" POTABLE WATER
ABANDON IN PLACE
EX UG ELECTRIC
EX AERIAL ELECTRIC
EX COMMUNICATION
EX SANITARY SEWER
EX NATURAL GAS
EX STORM DRAIN
EX HIGH PRESSURE GAS
SILT FENCE
POST-INDICATOR VALVE
VALVE (EXISTING/PROPOSED)
BACKFLOW PREVENTER
FIRE HYDRANT (EXISTING/PROPOSED)
REDUCER
PLUG W/ 2" TAP
PIPE PLUG
HAY BALE
GROUT PLUG
HOSE BIB
AC TO PVC PIPE COUPLING
POTABLE WATER METER
GROUNDWATER MONITORING WELL
E E
E/OH
C
SS
NG
SD
SF
2'' W
8'' F
4'' W
AIP
G/N2
AB - AUGER BORE
AC - ASBESTOS CEMENT
AG - ABOVE GROUND
AIP - ABANDON IN PLACE
ALUM - ALUMINUM
ARV - AIR RELEASE VALVE
AWWA - AMERICAN WATER WORKS ASSOCIATION
BFP - BACKFLOW PREVENTER
BO - BLOW-OFF
BST - BELLSOUTH TELEPHONE
C&G - CURB & GUTTER
CES - CIVIL ENGINEERING SQUADRON
CEVP - CIVIL ENGINEERING ENVIRONMENTAL PLANNING
CEVR - CIVIL ENGINEERING ENVIRONMENTAL RESTORATION
CCAFS - CAPE CANAVERAL AIR FORCE STATION
CI - CAST IRON
CLDI - CEMENT-LINED DUCTILE IRON
CLF - CHAIN LINK FENCE
COC - CERTIFICATE OF COMPLETION
CONC - CONCRETE
COMM - COMMUNICATION
CU. FT. - CUBIC FEET
DCVA - DOUBLE CHECK VALVE ASSEMBLY
DI - DUCTILE IRON
DIA - DIAMETER
DIP - DUCTILE IRON PIPE
DR - DIMENSIONAL RATIO
E - EAST
EL - ELEVATION
ELEC - ELECTRIC
EOP - EDGE OF PAVEMENT
EX - EXISTING
FL - FLANGE
FDC - FIRE DEPARTMENT CONNECTION
FDEP - FLORIDA DEPARTMENT ENVIRONMENTAL PROTECTION
FDOT - FLORIDA DEPARTMENT OF TRANSPORTATION
FM - FORCE MAIN
FO - FIBER OPTIC
FP&L - FLORIDA POWER & LIGHT
FT - FOOT/FEET
FW - FIRE WATER
G - GROUND
GALV - GALVANIZED
GV - GATE VALVE
INV - INVERT
IP - IRON PIPE
IRP - INSTALLATION RESTORATION PROGRAM
JBOSC - JOINT BASE OPERATIONS SUPPORT CONTRACT
LBS - POUNDS
LF - LINER FEET
MH - MANHOLE
MIN - MINIMUM
MJ - MECHANICAL JOINT
MW - MONITORING WELL
N - NORTH
NA - NOT APPLICABLE
NFPA - NATIONAL FIRE PROTECTION ASSOCIATION
N&D - NAIL & DISK
OD - OUTSIDE DIAMETER
OH - OVERHEAD UTILITY
OHE - OVERHEAD ELECTRIC
OS&Y - OUTSIDE SCREW AND YOKE
ABBREVIATIONS:
(ALL MAY NOT BE USED)
PAIP - PREVIOUSLY ABANDONED IN PLACE
PE - PLANE END
PIV - POST INDICATOR VALVE
POC - POINT OF CONNECTION
POD - POINT OF DISCONNECTION
PP - POWER POLE
PROP - PROPOSED
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PVC - POLYVINYL CHLORIDE
PVMT - PAVEMENT
PW - POTABLE WATER
RED - REDUCER
RS - RESILIENT SEAT
R/W - RIGHT OF WAY
S - SOUTH
SD - STORM DRAIN
SJRWMD - ST. JOHN'S RIVER WATER MANAGEMENT DISTRICT
SPEC - SPECIFICATIONS
SQ - SQUARE
SQ FT - SQUARE FEET
STA - STATION
STSTL - STAINLESS STEEL
SS - SANITARY SEWER
SWPPP - STORM WATER POLLUTION PREVENTION PERMIT
SY - SQUARE YARD
TEL - TELEPHONE
TH - TEST HOLE
TYP - TYPICAL
UE - UNDERGROUND ELECTRIC
UG - UNDERGROUND
UON - UNLESS OTHERWISE NOTED
W - WEST
WP - WOOD UTILITY POLE
WTR - WATER
WWF - WELDED WIRE FABRIC
CIVIL LEGEND:
(BOLD NOTES NEW ITEMS)
DRAWING INDEX
SHEET ID DESCRIPTION
G-001 VICINITY MAP LOCATION PLAN AND DRAWING INDEX
CIVIL
CC-100 PROJECT - WATER DISTRIBUTION SYSTEM PLAN
CC-101 PIER ROAD - WATER DISTRIBUTION SYSTEM PLAN
CC-102 PIER ROAD - WATER DISTRIBUTION SYSTEM PLAN
CC-103 ASSESS ROAD - WATER DISTRIBUTION SYSTEM PLAN
CD-101
PIER ROAD - EXISTING UTILITIES, DEMOLITION, AND RESTORATION PLAN
CD-102
PIER ROAD - EXISTING UTILITIES, DEMOLITION, AND RESTORATION PLAN
CC-502
DETAILS 2
G-002 STORMWATER POLLUTION PREVENTION PLAN
CD-103
ACCESS ROAD - EXISTING UTILITIES, DEMOLITION, AND RESTORATION PLAN
CV-101
CC-501
IRP - GROUNDWATER PLUMES AND SWMU SITES
DETAILS 1
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
P I E
R
R
O A
D
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
J
4 5 6
U I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
PERMIT(S)/ENVIRONMENTAL ACTIONS
REQUIRED PRIOR TO CONSTRUCTION
ERP/STORMWATER
ERP/WETLANDS/DREDGE & FILL
FDEP/DRINKING WATER
FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL
SURVEY/WILDLIFE
OTHER
NONE
FDEP/IND. WASTE WATER
IRP
FDEP/FUEL TANK
NOI/SWPPP
D B
J
C
D
A
B
D B
E H
ASBESTOS
NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT
IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN
ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL
UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.
HEAVY METALS
YES NO
LEAD
PCB
NOT
VERIFIED
HAZARDOUS MATERIALS
GROUNDWATER CONTAMINATION
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
BASE OPERATIONS:
COMMUNICATIONS:
PROJECT MANAGER:
CHIEF, PROGRAMS FLIGHT:
USER:
SAFETY:
SECURITY FORCES:
ATO:
OTHER:
ENVIRONMENTAL:
FIRE:
A
P
P
R
O
V
G-002
T
O R
M W
A T
L L U
T I O
N
P R
E V
E N
T I O
N
P
L A
N
SITE DESCRIPTION
OWNER AND ADDRESS: UNITED STATES AIR FORCE
1224 JUPITER STREET, BUILDING 534
PATRICK A.F.B., FLORIDA 32925
LOCATION: CAPE CANAVERAL AIR FORCE STATION
LATITUDE: 28° 26' 07" N LONGITUDE: 80° 34' 12" W
SECTION / TOWNSHIP / RANGE: 12 / 23 S / 37 E
PROJECT NAME: REPAIR WATER LINES, PIER ROAD
PROJECT DESCRIPTION: THIS PROJECT WILL CONSIST OF EXCAVATION WORK
FOR THE INSTALLATION OF NEW UNDERGROUND UTILITIES.
SITE MAPS:
* CONSULT ASSOCIATED PLANS FOR EROSION AND SEDIMENT CONTROLS,
STORMWATER DISCHARGE POINTS LOCATION OF SURFACE WATER AND
CONSTRUCTION IMPACT.
SITE AREA:
1. TOTAL AREA OF SITE = 3.5 AC
2. TOTAL AREA DISTURBANCE = 2.0 AC
3. WETLAND AREA = NONE
4. RECEIVING WATER = BANANA RIVER & ATLANTIC OCEAN
CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE AND LOCAL
REGULATIONS
IN AN EFFORT TO ENSURE COMPLIANCE WITH FEDERAL, STATE AND LOCAL
LAWS REGARDING EROSION AND TURBIDITY CONTROLS, THE FOLLOWING
PERMITS HAVE BEEN OBTAINED AND ARE AVAILABLE ON-SITE:
D.E.P. PERMIT: NONE
C.O.E. PERMIT: NONE
S.J.R.W.M.D. E.R.PERMIT: NONE
D.E.P. N.O.I.: TO BE SUBMITTED BY CONTRACTOR
SEQUENCE OF MAJOR ACTIVITIES
THE ORDER OF ACTIVITIES WILL BE AS FOLLOWS:
1. SUBMIT NOTICE OF INTENT (N.O.I.);
2. FLAG THE WORK LIMITS & MARK TREE OR PROTECTED AREA BUFFER, IF
APPLICABLE;
3. COORDINATE PRE-CONSTRUCTION MEETING WITH DESIGNATED SITE
SUPERINTENDENT AND INSPECTOR(S) IN CHARGE OF SWPPP REQUIREMENTS;
4. INSTALL REQUIRED PERIMETER CONTROLS;
5. PERFORM DEMOLITION OPERATIONS, IF APPLICABLE;
6. INSTALL STRUCTURES;
7. STABILIZE DENUDED AREAS AND STOCKPILES AS SOON AS PRACTICABLE;
8. INSTALL PERMANENT SEEDING/SODDING AND PLANTING AND WATER AS
REQUIRED UNTIL PERMANENTLY ESTABLISHED;
9. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS
STABILIZED, COORDINATE INSPECTION OF ALL WORK AREAS;
10. REMOVE ANY EROSION CONTROL DEVICES AND RESEED/SOD AS REQUIRED;
AND
11. SUBMIT NOTICE OF TERMINATION (N.O.T.).
CONSTRUCTION CONTRACTOR REQUIREMENTS
IN ADDITION TO THE RESPONSIBILITIES OUTLINED IN THE ABOVE SECTIONS, IT IS
ALSO THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO ENSURE THE
FOLLOWING IS CONDUCTED:
* N.O.I. FORM IS COMPLETED AND SUBMITTED WITH APPROPRIATE FEE AT LEAST
48 HOURS PRIOR TO INITIATING ANY LAND CLEARING ACTIVITY
* CONSTRUCTION CONTRACTOR AND ALL CONSTRUCTION SUB-CONTRACTORS
COMPLETE CERTIFICATION SIGNIFYING THAT THEY ARE AWARE OF TERMS AND
CONDITIONS OF THE GENERIC PERMIT
* CHANGES TO SWPPP ARE COMPLETED, AS NEEDED, TO ENSURE COMPLIANCE
WITH FEDERAL, STATE AND LOCAL REQUIREMENTS AND THE REPORT FORM
FOR CHANGES TO SWPPP IS COMPLETED, WHEN NECESSARY.
* SITE INSPECTIONS ARE PERFORMED AND THE INSPECTION REPORT FORM
COMPLETED AS INDICATED BY PLAN BY CONSTRUCTION CONTRACTOR'S
QUALIFIED INSPECTOR.
* MAINTENANCE ON BMPs AND MAINTENANCE RECORD COMPLETED AS
INDICATED BY PLAN.
* N.O.T. FORM IS COMPLETED AND SUBMITTED AS INDICATED BY PLAN.
IT IS THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO IMPLEMENT THE
BEST MANAGEMENT PRACTICES (BMPs) AS SHOWN ON THE SITE PLAN AND AS
CONTAINED IN THIS SWPPP. IT IS ALSO THE CONSTRUCTION CONTRACTOR'S
RESPONSIBILITY TO ENSURE THESE BMPs ARE PROPERLY INSTALLED, MAINTAINED AND FUNCTIONING PROPERLY TO PREVENT TURBID OR POLLUTED
WATER FROM LEAVING THE PROJECT SITE. THE CONSTRUCTION CONTRACTOR
SHALL ADJUST THE EROSION AND TURBIDITY CONTROLS SHOWN ON THE SITE
PLAN AND ADD ADDITIONAL CONTROL MEASURES, AS REQUIRED TO ENSURE
THE SITE MEETS ALL FEDERAL, STATE AND LOCAL EROSION AND TURBIDITY
CONTROL REQUIREMENTS. BEST MANAGEMENT PRACTICES SHALL BE
IMPLEMENTED BY THE CONSTRUCTION CONTRACTOR AS REQUIRED TO MEET
THE SEDIMENT AND TURBIDITY REQUIREMENTS IMPOSED ON THE PROJECT SITE
BY THE REGULATORY AGENCIES.
THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION,
MITIGATION, & REPAIR COSTS ASSOCIATED WITH NON-COMPLIANCE. IT IS THE
CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO INSTALL ADDITIONAL
MEASURES TO ATTAIN IMMEDIATE COMPLIANCE, SHOULD VIOLATIONS BE
IDENTIFIED.
EROSION AND SEDIMENT CONTROLS
PERIMETER CONTROLS:
1. SILT FENCE: FILTER FABRIC BARRIERS CAN BE USED BELOW DISTURBED
AREAS SUBJECT TO SHEET AND RILL EROSION WITH THE FOLLOWING
LIMITATIONS:
A. WHERE THE MAXIMUM DRAINAGE AREA IS 1/4 ACRE PER 100 FEET OF LENGTH.
B. USE 4"x4" TRENCH & 8" FABRIC EXTENDED INTO GROUND BEFORE BACKFILL &
COMPACTION.
C. MAXIMUM USEFUL LIFE 6 MONTHS.
SWALE / LIVE STREAM SILT / SEDIMENT CONTAINMENT:
1. SEE FDOT INDEX 102, CHART 1, SHEET 1 FOR SPACING REQUIREMENTS FOR
TYPE I AND II SYNTHETIC BALE BARRIERS & SILT FENCES.
2. TURBIDITY CURTAINS SHALL BE LOCATED PARALLEL TO FLOW OF A MOVING
BODY OF WATER & SHALL NOT BE PLACED ACROSS THE MAIN FLOW OF A
SIGNIFICANT BODY OF MOVING WATER.
3. SOIL PARTICLES SHALL BE ALLOWED TO SETTLE A MINIMUM OF 6-12 HOURS
BEFORE REMOVAL OF TURBIDITY CURTAIN.
4. LAND DISTURBING ACTIVITY SHALL NOT CREATE VIOLATIONS OF WATER
QUALITY STANDARDS. MONITORING OF TURBIDITY LEVELS SHALL OCCUR IN
ACCORDANCE WITH PERMIT CONDITIONS.
STOCKPILING MATERIAL:
1. NO EXCAVATED MATERIAL SHALL BE STOCKPILED IN SUCH A MANNER AS TO
DIRECT RUNOFF DIRECTLY OFF THE PROJECT SITE INTO ANY ADJACENT WATER
BODY OR STORM WATER COLLECTION FACILITY.
VEGETATION:
1. TEMPORARY STABILIZATION SHALL BE APPLIED TO AREAS OPENED BY
CONSTRUCTION OPERATIONS AND THAT ARE NOT ANTICIPATED TO BE
RE-DISTURBED AND RECEIVE FINAL STABILIZING TREATMENT WITHIN 14 DAYS.
IF, AFTER 14 DAYS FROM TIME OF STABILIZATION, THE TEMPORARY GRASSED
AREAS HAVE NOT ATTAINED A MINIMUM OF 70% GOOD GRASS COVER, THE
AREA WILL BE REWORKED AND ADDITIONAL MEASURES APPLIED SUFFICIENT TO
ESTABLISH THE DESIRED VEGETATIVE COVER.
2. PERMANENT STABILIZATION SHALL BE PERFORMED IN ALL AREAS THAT HAVE
BEEN DISTURBED BY CONSTRUCTION ACTIVITY UNLESS OTHERWISE DIRECTED
BY THE CONTRACTING OFFICER TO PRESERVE THE FUNCTION OF CRITICAL
SCRUB HABITAT. FINAL STABILIZATION MUST BE INITIATED NO MORE THAN 7
DAYS AFTER LAND DISTURBING ACTIVITIES HAVE CEASED IN THAT AREA.
UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR BE PERMITTED TO CAUSE
A DEGRADATION OF OFFSITE WATER QUALITY. IF SEED IS USED THE SEEDING
MIX MUST PROVIDE BOTH LONG-TERM VEGETATION AND RAPID GROWTH
SEASONAL VEGETATION. SLOPES STEEPER THAN 4:1 SHALL BE SODDED.
3. DISTURBED SIDE SLOPES OF DRAINAGE CONVEYANCE SWALES OR SURFACE
WATERS SHALL BE IMMEDIATELY SODDED. SOD SHALL BE PEGGED OR STAPLED
TO RESIST WASHOUT.
4. CONSTRUCTION CONTRACTOR SHALL STABILIZE COMPLETED PORTIONS OF
THE PROJECT AS WORK PROGRESSES TO PROTECT AGAINST EROSION UNLESS
OTHERWISE DIRECTED BY THE CONTRACTING OFFICER TO PRESERVE THE
FUNCTION OF CRITICAL SCRUB HABITAT. CONSTRUCTION CONTRACTOR SHALL
IMMEDIATELY REPAIR, FILL AND SOD ERODED AREAS OF THE PROJECT THAT
RESULT FROM THE CONSTRUCTION LAND ALTERATIONS.
5. ALL AREAS THAT ARE SEEDED/SODDED SHALL BE INSTALLED AND WATERED
UNTIL THE GROUND COVER IS FULLY ESTABLISHED
POLLUTANT SOURCE CONTROLS:
WASTE DISPOSAL:
WASTE MATERIALS AND RUBBISH SHALL BE COLLECTED AND STORED IN
CONTAINERS OR, IF APPROPRIATE, IN PILES. SEPARATE, SELF-CLOSING,
NONFLAMMABLE, NON-REACTIVE CONTAINERS SHALL BE USED FOR GARBAGE.
OILY FLAMMABLE AND DANGEROUS WASTES, NON-SALVAGE MATERIAL AND
DEBRIS SHALL BE REMOVED FROM WORK AREAS AND DISPOSED OF DAILY.
ASBESTOS WASTE SHALL BE DISPOSED OF OFF BASE UNLESS OTHERWISE
DIRECTED BY THE CONTRACTING OFFICER.
REFER TO SPECIFICATIONS FOR FURTHER WASTE AND DISPOSAL AND RECORD
KEEPING REQUIREMENTS.
HAZARDOUS / NON HAZARDOUS:
ALL HAZARDOUS WASTE SHALL BE MANAGED IN ACCORDANCE WITH STATE AND
FEDERAL REGULATIONS BY THE CONSTRUCTION CONTRACTOR AND SHALL BE
TURNED OVER TO THE AIR FORCE FOR DISPOSAL UNDER THE AIR FORCE'S EPA
IDENTIFICATION NUMBER.
AT THE PRE-CONSTRUCTION CONFERENCE, THE CONSTRUCTION CONTRACTOR
SHALL PROVIDE THE CONTRACTING OFFICER WITH A LIST OF ALL HAZARDOUS
MATERIALS TO BE INCORPORATED INTO THE PROJECT INCLUDING THE
MATERIAL SAFETY DATA SHEET IN ACCORDANCE WITH DFARS 52.223-3,
HAZARDOUS WASTE MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA
AND PROJECT SPECIFICATIONS. THE CONSTRUCTION CONTRACTOR SHALL
SUBMIT COPIES OF SIGNED INTERNAL MANIFESTS TO THE CONTRACTING
OFFICER MONTHLY.
THE CONSTRUCTION CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER
IMMEDIATELY IF ANY CONTAMINATED SOIL, GROUND WATER OR SUSPECT
DEBRIS IS ENCOUNTERED DURING EXCAVATION, DEMOLITION OR
CONSTRUCTION OF THE PROJECT.
SANITARY WASTE:
ALL SANITARY WASTE SHALL BE COLLECTED FROM THE PORTABLE UNITS AS
NEEDED TO PREVENT POSSIBLE SPILLAGE. THE WASTE SHALL BE COLLECTED
AND DISPOSED OF IN ACCORDANCE WITH STATE AND LOCAL WASTE DISPOSAL
REGULATIONS FOR SANITARY SEWER.
OFFSITE VEHICLE TRACKING:
A STABILIZED CONSTRUCTION ENTRANCE SHALL BE PROVIDED, WHERE
NECESSARY, TO HELP REDUCE VEHICLE TRACKING OF SEDIMENT. THE PAVED
STREET ADJACENT TO THE SITE ACCESS SHALL BE SWEPT DAILY TO REMOVE
ANY EXCESS MUD, DIRT OR ROCK TRACKED FROM THE SITE. DUMP TRUCKS
HAULING MATERIAL FROM THE CONSTRUCTION SITE SHALL BE COVERED
WITH A TARPAULIN.
FERTILIZERS, PESTICIDES, HERBICIDES:
THE SPECIFIED REQUIREMENT FOR FERTILIZERS, PESTICIDES, AND HERBICIDES
SHALL BE IDENTIFIED. THE QUANTITIES AND METHODS OF APPLICATION SHALL
BE CHECKED TO ASCERTAIN THEY ARE APPROPRIATE AND CONSISTENT WITH
LOCAL GUIDELINES.
GOOD HOUSEKEEPING:
THE FOLLOWING GOOD HOUSEKEEPING PRACTICES SHALL BE FOLLOWED
ONSITE DURING THE CONSTRUCTION PROJECT:
ALL CONSTRUCTION EQUIPMENT SHALL BE IN PROPER WORKING ORDER AND
INSPECTED REGULARLY. ALL EQUIPMENT SHALL HAVE THE BUILT-IN CAPACITY,
STABILITY, AND NECESSARY SAFETY FEATURES TO FULLY COMPLY WITH THE
PROJECT SPECIFICATIONS AND REQUIREMENTS, WITHOUT SHOWING EVIDENCE
OF UNDUE STRESS OR FAILURE. CONSTRUCTION CONTRACTOR PERSONNEL
SHALL BE IN SUFFICIENT NUMBER OF COMPETENT WORKERS ON THE JOB AT
ALL TIMES TO INSURE WORK IS MADE A TIMELY AND SATISFACTORY MANNER. A
COMPETENT AND EXPERIENCED SUPERVISOR, REPRESENTING THE
CONSTRUCTION CONTRACTOR, SHALL BE IN DIRECT CHARGE AND CONTROL OF
OPERATIONS AT ALL TIMES. EQUIPMENT BREAKDOWNS OR OTHER
UNFORESEEN WORK STOPPAGES SHALL IMMEDIATELY CONSIDER THE
PROTECTION OF SURFACE WATERS FROM POTENTIAL POLLUTION.
DRIP PANS SHALL CONTAIN LEAKS OR SPILLS WHENEVER NECESSARY FOR
MAINTENANCE ACTIVITIES. ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY IN
ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
AN EFFORT SHALL BE MADE TO STORE ONLY ENOUGH PRODUCTS REQUIRED TO
DO THE JOB.
ALL MATERIALS STORED ONSITE SHALL BE STORED IN NEAT, ORDERLY MANNER
IN THEIR APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER A ROOF OR
OTHER ENCLOSURE.
PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE
ORIGINAL MANUFACTURER'S LABEL.
SUBSTANCES SHALL NOT BE MIXED WITH ONE ANOTHER UNLESS
RECOMMENDED BY THE MANUFACTURER.
WHENEVER POSSIBLE, ALL OF A PRODUCT SHALL BE USED UP BEFORE
DISPOSING OF THE CONTAINER.
MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND DISPOSAL
SHALL BE FOLLOWED.
INSPECTION AND MAINTENANCE PLAN
INSPECTION AND MAINTENANCE REPORTS:
THE CONSTRUCTION CONTRACTOR'S QUALIFIED INSPECTOR SHALL INSPECT
ALL POINTS OF DISCHARGE INTO SURFACE WATERS, ALL DISTURBED AREAS OF
CONSTRUCTION THAT HAVE NOT BEEN FINALLY STABILIZED, AREAS OF
STORAGE MATERIALS THAT ARE EXPOSED TO PRECIPITATION, STRUCTURAL
CONTROLS AND LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE AT
LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE
END OF A STORM THAT IS 0.50 INCHES OR GREATER. WHEN THE SITE HAS BEEN
FINALLY STABILIZED, THE INSPECTION SHALL OCCUR AT LEAST MONTHLY. ALL
INSPECTIONS SHALL BE DOCUMENTED IN THE SWPPP USING THE SWPPP
INSPECTION REPORT FORM.
THE EROSION CONTROL SHALL BE MAINTAINED IN GOOD AND EFFECTIVE
OPERATING CONDITIONS, AND REPAIR TO IMPACTED SYSTEMS SHALL BE
INITIATED AND COMPLETED IMMEDIATELY. WHERE EROSION CONTROL
MEASURES ARE DEEMED INEFFECTUAL BY THE CONSTRUCTION CONTRACTOR,
THE GOVERNMENT ENVIRONMENTAL REPRESENTATIVE OR THE CONTRACTING
OFFICER, THE CONSTRUCTION CONTRACTOR SHALL IMMEDIATELY COORDINATE
CORRECTIVE MEASURES FOR REPAIR AND REPLACEMENT. ALL REGULAR AND
SPECIAL MAINTENANCE SHALL BE RECORDED IN THE SWPPP ON THE
MAINTENANCE REPORT FORM. ALTERNATIVE MEASURES, REPAIRS, AND
REPLACEMENT SHALL BE IMMEDIATELY IMPLEMENTED AND RECORDED WITH
THE FORM FOR CHANGES TO THE SWPPP. IN NO CASE SHALL IMPLEMENTATION
OF THE REPAIR OR REPLACEMENT OCCUR MORE THAN 7 CALENDAR DAYS
FOLLOWING THE INSPECTION.
THE GOVERNMENT ENVIRONMENTAL REPRESENTATIVE'S QUALIFIED
INSPECTORS SHALL PERIODICALLY REVIEW THE CONSTRUCTION
CONTRACTOR'S INSPECTION REPORTS FOR ADEQUACY AND COMPLETION
CONTRACTOR'S INSPECTION REPORTS FOR ADEQUACY AND COMPLETION AND
REPORT, IN WRITING, TO THE CONTRACTING OFFICER ANY DEFICIENCIES IN THE
REPORTING. THE CONSTRUCTION CONTRACTOR SHALL ADJUST THE
REPORTING REQUIREMENTS TO THE SATISFACTION OF SHALL ADJUST THE
REPORTING REQUIREMENTS TO THE SATISFACTION OF THE CONTRACTING
OFFICER. THE GOVERNMENT ENVIRONMENTAL REPRESENTATIVE REPORTS
SHALL ALSO BE MADE A RECORD OF THE SWPPP.
ALL REPORTS, PLANS, AND AMENDMENTS SHALL BE MADE PART OF THE SWPPP.
SUCH REPORTS SHALL IDENTIFY ANY INCIDENTS OF NON-COMPLIANCE. WHEN
A REPORT DOES NOT IDENTIFY ANY INCIDENCES OF NONCOMPLIANCE, THE
REPORT SHALL CONTAIN A CERTIFICATION THAT THE FACILITY IS IN
COMPLIANCE WITH THE SWPPP AND GENERIC PERMIT. THE REPORT SHALL BE
SIGNED IN ACCORDANCE WITH THE GENERIC PERMIT.
NON-STORM WATER DISCHARGES
DEWATERING DISCHARGES:
DEWATERING ACTIVITIES ARE SUBJECT TO REVIEW OF THE JURISDICTIONAL
STATE AGENCIES, THE CONTRACTING OFFICER AND UNITED STATES AIR FORCE
ENVIRONMENTAL AND IRP OFFICES. DISCHARGES SHALL PROVIDE PROVISIONS
SO THAT NO UPSTREAM FLOODING OR IMPOUNDMENT OCCURS AND NO
SILTATION, EROSION, OR TURBID DISCHARGES OCCURS IN VIOLATION OF STATE
WATER QUALITY STANDARDS. ALL TEMPORARY WORKS SHALL BE COMPLETELY
REMOVED AND ALL AREAS RESTORED TO GRADES, ELEVATIONS AND
CONDITIONS THAT OCCURRED BEFORE CONSTRUCTION AS SOON AS POSSIBLE.
IT IS NOTED HERE THAT GROUNDWATER DEWATERING ACTIVITIES AT
CONSTRUCTION SITES CANNOT BE CONDUCTED UNDER THE GENERIC PERMIT
FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION
ACTIVITIES. PURSUANT TO SECTION 62-621.300(2), FAC, A SEPARATE PERMIT,
ENTITLED, GENERIC PERMIT FOR THE DISCHARGE OF PRODUCED GROUND
WATER FROM ANY NON-CONTAMINATED SITE ACTIVITY, MUST BE APPLIED FOR
TO CONDUCT GROUND WATER DEWATERING ACTIVITIES, IF NECESSARY.
TERMINATION PLAN
WHEN THE SITE HAS BEEN FINALLY STABILIZED AND ALL STORMWATER
DISCHARGES FROM CONSTRUCTION SITES ELIMINATED, THE CONSTRUCTION
CONTRACTOR SHALL SUBMIT A NOTICE OF TERMINATION (N.O.T.) WITHIN 14
DAYS OF FINAL STABILIZATION WITH A SUFFICIENT AMOUNT OF ESTABLISHED
PERMANENT VEGETATION.
AFTER FILING N.O.T., THE CONSTRUCTION CONTRACTOR SHALL SUBMIT THE
FINAL SWPPP, INCLUDING ALL REPORTS AND RECORDS, TO THE CONTRACTING
OFFICER. THE OWNER SHALL THEN BE RESPONSIBLE TO RETAIN A COPY OF
THE POLLUTION PREVENTION PLAN FOR A PERIOD OF THREE YEARS FROM THE
DATE THE SITE IS FINALLY STABILIZED.
CERTIFICATION:
"I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND, AND SHALL COMPLY
WITH, THE TERMS AND CONDITIONS OF THE STATE OF FLORIDA GENERIC
PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL
CONSTRUCTION ACTIVITIES AND THIS STORMWATER POLLUTION PREVENTION
PLAN PREPARED THEREUNDER."
SIGNATURE
BUSINESS NAME AND ADDRESS
OF CONSTRUCTION CONTRACTOR
RESPONSIBLE FOR/
DUTIES
GENERAL CONTRACTOR
SUB-CONTRACTOR
SUB-CONTRACTOR
AND ALL SUBS
SILT FLOW
M
I N
FILTER FABRIC
ELEVATION
SECTION
EROSION CONTROL NOTES:
1. AFTER EACH STORM EVENT, THE SILT FENCE SHALL BE INSPECTED. SEDIMENT DEPOSITS SHALL BE REMOVED AND
WASHOUTS/STRUCTURAL FAILURES SHALL BE REPAIRED IMMEDIATELY.
2. TWO SILT FENCES SHALL BE ATTACHED BY PLACING THE END POST OF THE SECOND FENCE INSIDE THE END POST
OF THE FIRST FENCE. BOTH POSTS SHALL BE ROTATED AT LEAST 180° IN A CLOCKWISE DIRECTION TO CREATE A
TIGHT SEAL WITH THE FABRIC MATERIAL. DRIVE BOTH POSTS 18" INTO THE GROUND & BURY FLAP.
3. SILT FENCES SHALL BE REMOVED ONLY AFTER DISTURBED AREAS HAVE BEEN STABILIZED.
WOOD POST @ 10' O.C.
MIN 1" X 2" X 3'
TRENCH MIN 4" X 4"
BURY MIN 8" OF FABRIC IN TRENCH
GEOTEXTILE SILT SCREEN
STAPLE TO POST
SCALE:
EROSION CONTROL MEASURES
NONE
G-002
THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET DRAINS A RELATIVELY FLAT AREA
(SLOPES NO GREATER THAN 5 PERCENT) WHERE SHEET OR OVERLAND FLOWS (NOT EXCEEDING 0.5 cfs)
ARE TYPICAL. THE METHOD SHALL NOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS. SUCH AS
IN STREET OR HIGHWAY MEDIANS.
FABRIC SEDIMENT FILTER
SPECIFIC APPLICATION
BURLAP FABRIC
STAKES
BURIED BURLAP
FABRIC
RUNOFF WATER
WITH SEDIMENT
FILTERED WATER
CATCH BASIN INLET SEDIMENT TRAP
SILT FENCE
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
P I E
R
R
O A
D
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
J
4 5 6
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
J
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
A
I
P
A
I
P
A I P
A
I
P
AIP
AIP
AIP
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
12'' F 12'' F
F
I
P
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
I
P
A I P
A I P
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
S
H
S
H
S
H
S
H
S
H
S
H
S
H
S
H
S
F
I
P
I
PIER RD
LC 25 & 29
MSA 3
SPACE MUSEUM
A
C
C
E
S A
F E
12"F
8"F
F
8"F
F
8"F
F
8"F
12"F
CC-100
P R
O J E
C T
W A
T E
R
D
I S
T R
I B
U T
I O
N
S
Y S
T E
M
P
L A
N
SCALE:
PIER ROAD WATER SYSTEM
1" = 200'
600'400'200'0'200'
GRAPHIC SCALE 1" = 200'
PROJECT SCOPE FLAG NOTES:
A. NEW FIRE WATER DISTRIBUTION OR SERVICE PVC PIPE.
B. WATER PIPE HORIZONTAL DIRECTIONAL DRILL INSTALLATION.
C. EXISTING FIRE WATER DISTRIBUTION PIPE TO REMAIN AS PART OF THE BASE FIRE WATER DISTRIBUTION SYSTEM.
D. EXISTING POTABLE WATER DISTRIBUTION & SERVICE PIPE TO BE ABANDON IN PLACE.
E. VIEW 5 PERFORM WORK INSIDE MSA 3 WHICH IS AN ACCESS RESTRICTED AREA. CONTRACTOR WILL NEED TO PROVIDE APPROVED
ESCORTS FOR PERSONAL TO WORK WITHIN THIS ACCESS RESTRICTED AREA.
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
P I E
R
R
O A
D
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
J
4 5 6
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
J
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
VIEW 1
VIEW 2
VIEW 3
VIEW 4
VIEW 5
VIEW 6
CC-101
I E
R
R
O A
D
W A
T E
R
D
I S
T R
I B
U T
I O
N
S
Y S
T E
M
P
L A
N
SCALE:
PIER ROAD WATER SYSTEM - VIEW 2
1" = 40'
120'80'40'0'40'
GRAPHIC SCALE 1" = 40'
PROJECT CONSTRUCTION FLAG NOTE COORDINATION:
SEE SHEET CC-103 FOR CONSTRUCTION FLAG NOTE APPLICABLE TO THIS SHEET.
SEE SHEET CD-101 FOR DEPICTION OF EXISTING UTILITIES, PROJECT DEMOLITION AND
RESTORATION WORK APPLICABLE TO THIS SHEET.
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
P I E
R
R
O A
D
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
J
4 5 6
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
J
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
M
A
T
E
M A
T C
H
L
I N
E
A
M A
T C
H
L
I N
E
A
SCALE:
PIER ROAD WATER SYSTEM - VIEW 1
1" = 40'
CC-102
I E
R
R
O A
D
W A
T E
R
D
I S
T R
I B
U T
I O
N
S
Y S
T E
M
P
L A
N
120'80'40'0'40'
GRAPHIC SCALE 1" = 40'
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
P I E
R
R
O A
D
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
J
4 5 6
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
J
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
M A
T C
H
L I N
E
B
S E
E
S
H E
M A
T C
H
L
I N
E
C
M A
T C
H
L
I N
E
C
M A
T C
H
L
I N
E
D
M A
T C
H
L
I N
E
D
SCALE:
PIER ROAD WATER SYSTEM - VIEW 4
1" = 40'
SCALE:
PIER ROAD WATER SYSTEM - VIEW 3
1" = 40'
SCALE:
PIER ROAD WATER SYSTEM - VIEW 5
1" = 40'
MATCH LINE E
SEE SHEET CC-103
PROJECT CONSTRUCTION FLAG NOTE COORDINATION:
SEE SHEET CC-103 FOR CONSTRUCTION FLAG NOTE APPLICABLE TO THIS SHEET.
SEE SHEET CD-102 FOR DEPICTION OF EXISTING UTILITIES, PROJECT DEMOLITION AND
RESTORATION WORK APPLICABLE TO THIS SHEET.
TO SPACE MUSEUM
CC-103
C
C E
A
D
W A
T E
R
D
I S
T R
I B
U T
I O
N
S
Y S
T E
M
P
L A
N
SCALE:
ACCESS ROAD WATER SYSTEM VIEW 6
1" = 40'
120'80'40'0'40'
GRAPHIC SCALE 1" = 40'
PROJECT CONSTRUCTION FLAG NOTE COORDINATION:
SEE SHEET CD-103 FOR DEPICTION OF EXISTING UTILITIES, PROJECT DEMOLITION AND RESTORATION WORK APPLICABLE TO THIS SHEET.
PROJECT CONSTRUCTION FLAG NOTES (SHEET CC-101, CC-102, & CC-103):
THE FOLLOWING CONSTRUCTION FLAG NOTES ARE A RECOMMENDED SEQUENCE OF CONSTRUCTION NOTING MATERIALS PROVIDED AND SPECIFIC TASKS. THE CONTRACTOR
MAY PRESENT AN ALTERNATIVE SEQUENCE TO THE CONTRACTING OFFICER FOR REVIEW AND ACCEPTANCE PRIOR TO VARYING FROM THE RECOMMENDED SEQUENCE OF
CONSTRUCTION.
1. HDD PIPE INSTALLATION - 1 LOCATIONS, PROVIDE BY HORIZONTAL DIRECTIONAL DRILL (HDD) UNDER ROADWAY PIPE RUN SIZE FUSED DR18 PVC PIPE, 4” AND LARGER DIAMETER PIPE.
2. 12” WATER PIPE - PIER ROAD - PROVIDE TEMPORARY 12” MJ PLUG W/ SAMPLE PORT, 12” C-900 BLUE (DR14) PVC PIPE, 2-12”MJ RS GAVE VALVE W/ VALVE BOX, 3-12” MJ 45 BEND, 12”X12” MJ
TEE, 2-12”X12” MJ TEE W/ 12”X6” MJ REDUCER & FIRE HYDRANT ASSEMBLY, 2-12”X6” MJ TEE W/ FIRE HYDRANT ASSEMBLY, 2-12”X8” MJ TEE W/ 8”MJ RS GAVE VALVE & VALVE BOX, 12”X8” MJ
REDUCER, 8”MJ RS GAVE VALVE W/ VALVE BOX, TEMPORARY 2-8” MJ PLUG W/ SAMPLE PORT, MAKE CONNECTION BETWEEN NEW AND HDD INSTALLATION PIPES, AND 12”, 8”, & 6” MJ
ANCHOR FOLLOWER GLANDS & THRUST BLOCKS.
3. 8” WATER PIPE - SAFETY ROAD - 12” & 8” C-900 BLUE (DR14) PVC PIPE,12”X18” MJ REDUCER, 8”MJ RS GAVE VALVE & VALVE BOX, 8” MJ 45 BEND, TEMPORARY 2-8” MJ PLUG W/ SAMPLE
PORT, 12” & 8” MJ ANCHOR FOLLOWER GLANDS & THRUST BLOCKS.
4. 8” WATER PIPE - ACCESS ROAD - REMOVE 4" BACKFLOW WATER MAIN CONNECTION BACK TO 8" PIPING AT HYDRANT, BURIED 4" VALVE, AND 4" ABOVEGROUND BACKFLOW, SALVAGE 4"
BACKFLOW OS&Y VALVE IN PLACE, PROVIDE 4" DI SPOOL ABOVE GRADE IN LOCATION OF REMOVE 4" BACKFLOW (PAINT RED), 8"X4" MJ TEE, 8” & 4" C-900 BLUE (DR14) PVC PIPE, 8” MJ RS
GAVE VALVE & VALVE BOX, RECONNECT 4" FIRE SERVICE, 2- 8” MJ 45 BEND, PROVIDE 8”X8” MJ TEE W/ SALVAGED HYDRANT ASSEMBLY, 8” & 6” MJ ANCHOR FOLLOWER GLANDS & THRUST
BLOCKS.
5. 8” WATER PIPE - MAS3 - 8” C-900 BLUE (DR14) PVC PIPE, TEMPORARY 8” MJ PLUG W/ SAMPLE PORT, 8” MJ ANCHOR FOLLOWER GLANDS & THRUST BLOCKS, ON ACCESS ROAD REMOVE, WORK WITHIN MSA3 REQUIRES APPROVED ACCESS OR ESCORTED WORKERS .
6. WATER SYSTEM TESTING - FILL & FLUSH FROM 8” CONNECTION, AND TEST FIRE WATER AT 200 PSI & LEAK TEST.
7. 8” WATER PIPE CONNECTION - MAS3 EAST - REMOVE TEMPORARY 8” PLUG, PIPE, & FITTINGS, PROVIDE 8” C-900 DR 18 PVC PIPE, 8” MJ PVC PIPE COUPLINGS, MAKE CONNECTION
BETWEEN NEW AND EXISTING PIPE, 8” MJ ANCHOR FOLLOWER GLANDS & THRUST BLOCKS, GROUT PLUG ABANDON OPEN END PIPES, AND WORK WITHIN MSA3 REQUIRES APPROVED
ACCESS OR ESCORTED WORKERS.
8. 8” WATER PIPE CONNECTION - MAS3 WEST - REPEAT FLAG NOTE 7.
9. 8” WATER PIPE CONNECTION - SAFETY ROAD - REMOVE TEMPORARY 8” PLUG & AC PIPE, ABATE REMOVED AC PIPE, PROVIDE 8” C-900 DR 18 PVC PIPE, 8+ MJ 45 BEND, 8” MJ PVC X AC PIPE
COUPLINGS, MAKE CONNECTION BETWEEN NEW AND EXISTING PIPE, 8” MJ ANCHOR FOLLOWER GLANDS & THRUST BLOCKS, AND GROUT PLUG ABANDON OPEN END PIPES.
10. 12” WATER PIPE CONNECTION - PIER & SAFETY ROAD - REPEAT FLAG NOTE 9 REMOVING 12” & 8” PIPE, FITTINGS, & VALVES USING 12” PIPE & FITTINGS FOR NEW FIRE PIPE SYSTEM.
11. FIRE HYDRANTS - PAINT FIRE HYDRANT BARRELS RED AND BONNET BASED ON FLOW TEST BY BASE CONTRACTOR.
FLAG NOTES LEGEND:
FLAG NOTES DETAILS:
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
P I E
R
R
O A
D
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
J
4 5 6
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
J
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
M A
T C
H
L
I N
E
E
S E
E
S
H E
THRU
CC-502
CC-501
CC-501
CC-501
CC-501
CC-502
THRU
CD-101
I E
R
R
O A
D
E
X I S
T I N
G
U
T I L
I T
I E
S
D E
M O
L I T
I O
N
A
S
T O
R A
T I O
N
P
L A
N
SCALE:
PIER ROAD WATER SYSTEM - VIEW 2
1" = 40'
120'80'40'0'40'
GRAPHIC SCALE 1" = 40'
PROJECT DEMOLITION AND RESTORATION FLAG NOTE COORDINATION:
SEE SHEET CD-103 FOR DEMOLITION AND RESTORATION FLAG NOTE APPLICABLE TO THIS SHEET.
SEE SHEET CC-101 FOR CONSTRUCTION WORK APPLICABLE TO THIS SHEET.
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
P I E
R
R
O A
D
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
J
4 5 6
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
J
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
M
A
T
E
M A
T C
H
L
I N
E
A
M A
T C
H
L
I N
E
A
SCALE:
PIER ROAD WATER SYSTEM - VIEW 1
1" = 40'
CD-102
I E
R
R
O A
D
E
X I S
T I N
G
U
T I L
I T
I E
M
O L
I T
I O
N
A
S
T O
R A
T I O
N
P
L A
N
120'80'40'0'40'
GRAPHIC SCALE 1" = 40'
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
P I E
R
R
O A
D
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
J
4 5 6
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
J
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
M A
T C
H
L I N
E
B
S E
E
S
H E
M A
T C
H
L
I N
E
C
M A
T C
H
L
I N
E
C
M A
T C
H
L
I N
E
D
M A
T C
H
L
I N
E
D
SCALE:
PIER ROAD WATER SYSTEM - VIEW 4
1" = 40'
SCALE:
PIER ROAD WATER SYSTEM - VIEW 3
1" = 40'
SCALE:
PIER ROAD WATER SYSTEM - VIEW 5
1" = 40'
MATCH LINE E
SEE SHEET CD-103
PROJECT DEMOLITION AND RESTORATION FLAG NOTE
COORDINATION:
SEE SHEET CD-103 FOR DEMOLITION AND RESTORATION FLAG NOTE
APPLICABLE TO THIS SHEET.
SEE SHEET CC-102 FOR CONSTRUCTION WORK APPLICABLE TO THIS SHEET.
TO SPACE MUSEUM
CD-103
C
C E
A
D
E
X I S
T I N
G
U
T I L
I T
I E
M
O L
I T
I O
N
A
S
T O
R A
T I O
N
P
L A
N
SCALE:
ACCESS ROAD WATER SYSTEM VIEW 6
1" = 40'
120'80'40'0'40'
GRAPHIC SCALE 1" = 40'
PROJECT CONSTRUCTION FLAG NOTE COORDINATION:
SEE SHEET CC-103 FOR CONSTRUCTION WORK APPLICABLE TO THIS SHEET.
PROJECT DEMOLITION AND RESTORATION FLAG NOTES (SHEET CD-101, CD-102, & CD-103):
20. PROVIDE & MAINTAIN EROSION CONTROL MEASURES.
21. REMOVE PORTION OF EXISTING PVC, CAST IRON, OR DUCTILE IRON WATER PIPE AND FITTINGS. GROUT PLUG ABANDON OPEN END PIPES.
22. REMOVE AND ABATE PORTION OF EXISTING TRANSITE (ASBESTOS CEMENT) PIPE. GROUT PLUG ABANDON OPEN END PIPES.
23. REMOVE ABOVEGROUND BACKFLOW ASSEMBLY, SALVAGE 1-OS&Y VALVE IN PLACE AND THE RISER PIPES & BENDS IN PLACE.
24. REMOVE WATER VALVE BOX.
25. SAW CUT, REMOVE, AND REPLACE ASPHALT PAVEMENT, PROVIDE MINIMUM 10' WIDE TRENCH ASPHALT PATCH.
26. PROVIDE AS NOTED OR DISTURBED PROJECT AREAS SOD RESTORATION W/ SLOPES 5:1 OR STEEPER, SEED & MULCH RESTORATION ON SLOPES 5:1 OR LESS, IN OPEN
STORM WATER CONVEYANCE WAYS PROVIDE 4' WIDE SOD DITCH SECTIONS EVERY 25' W/ DOUBLE APPLICATION SEED & MULCH BETWEEN SOD SECTIONS. WATER TO
INSURE LAID SOD & SEED GROWTH ESTABLISHMENT.
CONCRETE TESTING:
PRIOR TO SAW CUTTING OR DEMOLISHING CONCRETE IT SHALL BE SAMPLED AND TESTED FOR THE PRESENCE OF ASBESTOS. THE CONTRACTOR SHALL SECURE THE
SERVICES OF A STATE OF FLORIDA LICENSED ASBESTOS ABETMENT CONTRACTOR TO TAKE CONCRETE SAMPLES AND HAVE THE COLLECTED SAMPLES TESTED FOR
ASBESTOS. THE NUMBER AND LOCATION OF SAMPLES SHALL BE OF SUFFICIENT NUMBER REPRESENTATIVE OF THE CONCRETE PLACED IN DIFFERENT TIMES AND PROJECTS.
SAMPLING RESULTS AND LOCATION PLAN SHALL BE PROVIDED AS A SUBMITTAL TO THE CONTRACTING OFFICER AS DOCUMENTATION OF WORK PREFORMED. IF ANY SAMPLE
TEST POSITIVE FOR THE PRESENCE OF ASBESTOS, THE REPRESENTATIVE CONCRETE SHALL NOT BE DISTURBED AND THE PRESENCE OF ASBESTOS SHALL BE BROUGHT TO
THE CONTRACTING OFFICERS ATTENTION.
FLAG NOTE LEGEND:
FLAG NOTE DETAILS:
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
P I E
R
R
O A
D
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
J
4 5 6
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
J
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
M A
T C
H
L
I N
E
E
S E
E
S
H E
THRU
CC-501
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
A
I
P
A
I
P
A I P
A
I
P
AIP
AIP
AIP
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
12'' F 12'' F
I
P
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
I
P
A I P
A I P
A
I
P
A
I
P
A
I
P
A
I
P
A
I
P
S
H
S
H
S
H
S
H
S
H
S
H
S
H
S
H
S
F
C
12"F PVC
12"PVC
P
V
C
12"PVC
P
I
P
I
PIER RD
LC 25 & 29
MSA 3
SPACE MUSEUM
A
C
C
E
S A
F E
12"F
8"F
F
8"F
F
8"F
F
8"F
12"F
P
V
C
P
V
C
C
P
V
C
C
C
CV-101
I R
P
G
R O
U N
D W
A T
E R
P L
U M
M
U
S
I T
E S
SCALE:
PIER ROAD WATER SYSTEM
1" = 200'
600'400'200'0'200'
GRAPHIC SCALE 1" = 200'
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
P I E
R
R
O A
D
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
J
4 5 6
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
J
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
PROJECT FLAG NOTES:
A. AREA OF NEW AND DEMOLITION WATER LINE WORK.
B. NO KNOWN GROUNDWATER CONTAMINATION PLUME WITHIN IMMEDIATE PROJECT WORK AREA..
C. AREA OF SOLID WASTE MANAGEMENT UNIT (SWMU).
D. NO KNOW GROUNDWATER MONITORING WELLS WITHIN IMMEDIATE PROJECT WORK AREA..
FLAG LEGEND
SWMU No. C-144
SWMU No. C-125
SWMU No. C-053
SWMU No. C-124
SWMU No. C-129
FULL JOINT CENTERED
JOINT SPACING AT CROSSINGS
WATER MAIN
3' MINIMUM
ALTERNATE
WATER MAIN
CROSSINGS (1)
12" IS THE MINIMUM, EXCEPT FOR
STORM SEWER, THEN 6" IS THE
MINIMUM AND 12" IS PREFERRED
WATER MAIN
6" MINIMUM
12" PREFERRED
3' MINIMUM
WATER MAIN
HORIZONTAL SEPARATION
3' MINIMUM
10' PREFERRED
WATER MAIN
VACUUM TYPE
SANITARY SEWER
STORM SEWER,
STORMWATER FORCE MAIN
RECLAIMED WATER (2)
OTHER PIPE
LOCATION OF PUBLIC WATER SYSTEM MAINS IN ACCORDANCE WITH F.A.C. RULE 62-555.314
3' MINIMUM
ALTERNATE
WATER MAIN
6' MINIMUM
ALTERNATE
WATER MAIN
FULL JOINT CENTERED
WATER MAIN
12" IS THE MINIMUM, EXCEPT FOR
GRAVITY SEWER, THEN 6" IS THE
MINIMUM AND 12" IS PREFERRED
10' PREFERRED
6' MINIMUM (3)
WATER MAIN
GRAVITY OR PRESSURE
SANITARY SEWER,
SANITARY SEWER FORCE MAIN,
RECLAIMED WATER (4)
10 FT. MINIMUMON-SITE SEWAGE TREATMENT AND
DISPOSAL SYSTEM
1. WATER MAIN SHOULD CROSS ABOVE OTHER PIPE. WHEN WATER MAIN MUST BE BELOW OTHER PIPE, THE MINIMUM SEPARATION IS 12 INCHES.
2. RECLAIMED WATER REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C.
3. 3 FT. FOR GRAVITY SANITARY SEWER WHERE THE BOTTOM OF THE WATER MAIN IS LAID AT LEAST 6" ABOVE THE TOP OF THE GRAVITY SANITARY SEWER.
4. RECLAIMED WATER NOT REGULATED UNDER PART III OF CHAPTER 62-610.
5. SEE SHEET DEP1 FOR UTILITY SEPARATION LOCATIONS
FULL JOINT CENTERED
PRIME COAT
12" STABILIZED SUBBASE,
COMPACT TO 95% MODIFIED
PROCTOR DENSITY, MIN LBR 40
9" LIMEROCK BASE, COMPACT TO
98% MODIFIED PROCTOR DENSITY,
MIN LBR 100
2 COURSES OF ASPHALTIC CONCRETE, 1ST COURSE
1.5" FDOT TYPE S-I, 2ND COURSE 1.25" FDOT
TYPE S-III, PRIME COAT BETWEEN COURSES
6"
24" SOD
12"
6"
BACKFILL IN 8" LIFTS 95%
COMPACTION PRIOR TO
CONTINUING WITH
SUCCEEDING LAYER
FINISHED GRADE - PROVIDE
NOTED SURFACE RESTORATION
WARNING TAPE
#10 INSULATED
SOLID COPPER WIRE
CC-501
C I V
T
A I L
S
SCALE:
ASPHALT PAVEMENT
NONE
CC-501
SCALE:
TYPICAL TRENCH SECTION
NONE
CC-501
SCALE:
THRUST BLOCKS
NONE
CC-501
SCALE:
UTILITY SEPARATION
NONE
CC-501
TRENCH NOTES:
1. TRENCH SIDE SLOPE AND SHORING SHALL BE IN
ACCORDANCE WITH OSHA CONSTRUCTION STANDARDS
FOR EXCAVATION ( 29 CFR PART 1926.650 - .652, SUBPART
P).
2. COMPACTED BACKFILL MATERIAL SHALL BE FREE OF
ASPHALT, LARGE ROCKS (3" DIA. MAX.), WOOD, ROOTS AND
OTHER ORGANIC MATTER.
3. CONTRACTOR SHALL EXCAVATE BOTTOM OF TRENCH TO
ALLOW FOR BELL SECTION OF PIPE.
4. BACKFILL SHALL BE COMPACTED BENEATH THE
HAUNCHES OF THE PIPE USING MECHANICAL TAMPS. THIS
COMPACTION SHALL BE 95% OF MAXIMUM DENSITY AS
DETERMINED BY AASHTO T-180, O D.OR O.T.
SPECIFICATIONS WHICHEVER IS GREATER.
5. BASE MATERIALS SHALL BE EITHER OF THE SAME TYPE
AND COMPOSITION AS THE MATERIALS REMOVED OR
EQUAL OR GREATER STRUCTURAL ADEQUACY.
MIN 1'
O D
V A
R I E
S
M
C
O V
E R
MIN 2' SEPARATION
SINGLE PIPE
TRENCH WALL
DUAL PIPE
TRENCH WALL
MAX. WATER LEVEL
PERMITTED DURING
CONSTRUCTION
SAW CUT BACK FOR CLEAN
EDGE PRIOR TO PAVING,
TACK COAT
TEMPORARY DRIVING SURFACE
12" CRUSHER RUN GRAVEL
COMPACTED IN PLACE
TYPICAL TRENCH SECTION
C-501
PAVEMENT CROSSING NOTES:
1. CLOSE ALL PAVEMENT UTILITY CROSSING TRENCH SAME DAY OF UTILITY INSTALLATION WORK.
2. PROVIDE AND MAINTAIN TEMPORARY PAVEMENT RESTORATION DURING BACKFILLING OF PAVEMENT
UTILITY TRENCHES.
WATER MAIN
3/4" CORP. STOP
SADDLE
3/4" CURB STOP
GRADE
SCALE:
WATER SAMPLE POINTS
NONE
CC-501
PLUG W/ 3/4" CORP STOP
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
P I E
R
R
O A
D
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
J
4 5 6
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
J
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
3/4" TYPE "K"
COPPER SERVICE
UNDISTURBED STABLE
SOIL MATERIAL
FLAT BOTTOM TRENCH BACKFILL
LIGHTLY CONSOLIDATED TO
CENTERLINE OF PIPE
BACKFILL IN 6" LIFTS
THOROUGHLY TAMPED TO
95% COMPACTION
SLOPE PER OSHA (29 CFR
PART 1926.650-.652)
NOTE: IF THE DEPTH OF THE VALVE NUT IS GREATER THAN 48" BELOW GRADE, OR 30" BELOW GRADE
AND UNDER THE WATER TABLE, A VALVE EXTENSION WILL BE REQUIRED. NAME PLATE WITH VALVE
OPERATION INFORMATION AND VALVE NUMBER TO BE INSTALLED ON ALL NEW VALVES. COORDINATE
WORK WITH CCAFS WATER AND WASTE DEPT.
CC-502
C I V
T
A I L
S
SCALE:
BURIED VALVE
NONE
CC-502
SCALE:
FIRE HYDRANT
NONE
CC-502
FINISHED GRADE
OPEN
CI VALVE BOX
3'x3'x4" CONCRETE PAD INDICATE
PIPE SIZE AND FLOW DIRECTION IN
BLUE PAINT
2" SQ. OPERATOR VALVE
(OPEN CLOCKWISE)
#10 AWG INSULATED
SOLID COPPER WIRE
18"x18"x3"
CONCRETE PAD
POST INDICATOR
VALVE NOTES:
PAINT POTABLE WATER VALVE BOX COVERS BLUE.
PAINT FIRE WATER VALVE BOX COVERS & POST INDICATORS RED.
SCRIBE IN WET POURED CONCRETE PAD WATER LINE DIRECTIONS.
IMBEDDED WITHIN CONCRETE PAD, MIN 2" DIA T BRASS SURVEY MARKER FOR OTHERS TO
MARK OF VALVE NUMBER.
BRASS SURVEY
MARKER (TYP)
BRASS SURVEY
MARKER
ASPHALT SURFACE
BASE
3'X3'X6"
THICK CONC. PAD
TYP. EACH VALVE BOX.
3" DIA. BRONZE OR S.S. DISC
ANCHORED IN CONC.
#4 BARS
ALL AROUND
3" DIA. BRONZE OR STAINLESS STEEL
DISC ANCHORED IN CONC.
4" x 4" x 18" LONG (MIN.)
PRECAST POST WITH 3"
DIAMETER BRONZE DISC SET
IN GROUT AS SHOWN ABOVE.
NOTES:
1. BRONZE OR S.S. IDENTIFICATION DISC SHALL BE REQUIRED FOR ALL VALVES.
VALVE BOX AND
COVER (TYP.)
TOP FLUSH WITH
FINISHED GRADE
3000 P.S.I. CONCRETE MIN.
VALVE BOX AND COVER (TYP.)
ANCHOR
(TYP.)
SCALE:
VALVE COLLAR
NONE
CC-502
IMPROVED CONDITION
UNIMPROVED CONDITION
9"
2" MIN.
12"
4"
CC-502
CC-502
CC-502
WATER
VALVE
PIPE W/ ANCHOR MJ GLANDS
2 1/2"Ø THRU 36"Ø PIPE
GRINNELL FIGURE 264
ADJUSTABLE CAST IRON
SADDLE SUPPORT
PAINT SAME AS PIPING
STANDARD PIPE FLANGE,
ATTACH TO CONCRETE W/ 4
SST STUD TYPE CONCRETE
ANCHORS
1 1/2" GROUT BED
SCALE:
SUPPORT STAND
NONE
CC-502
SCALE:
FIRE SERVICE ASSEMBLY
NONE
CC-502
FIRE HYDRANT NOTES:
HAVE BASE CONTRACTOR FLOW TEST AND CONTRACTOR THEN
PAINT ALL NEW, REUSED, OR FIRE HYDRANTS LOCATED ON
EXISTING WATER LINES CONVERTED TO DEDICATED FIRE WATER
DISTRIBUTION SYSTEM:
SAFETY BLUE - 1,500 GMP OR MORE
SAFETY GREEN - 1,000 TO 1,499 GPM
SAFETY ORANGE - 500 TO 999 GPM
SAFETY RED - BELOW 500 GPM
PAINT FIRE HYDRANT BONNET COLOR BASED OF FLOW TEST
RATE.
ALL REMAINING EXPOSED PORTIONS OF FIRE HYDRANT PAINT
COLOR BASED ON TYPE OF WATER SYSTEM IT IS CONNECTED TO.
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
P I E
R
R
O A
D
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
J
4 5 6
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
J
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
SALVAGE IN PLACE
2-FL 90° BENDS,
RISERS, & PAD
SALVAGE IN PLACE
1-FL RES. SEAT OS&Y VALVE
CC-501
THRUST BLOCK
CC-501