Attach._23_-_Questions_and_Answers_(Amend_0002).pdf
PDF 65 KB Posted
- Attached to
- Repair Water Distribution Lines, CCAFS (LET) Federal contract opportunity
- Solicitation number
- FA2521-15-B-0007
About this file
Attachment 23 - Questions and Answers (Amend 0002) 01 JUL 2015
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION FA2521-15-B-0007 – ATTACHMENT 23
REPAIR WATER DISTRIBUTION LINES, CCAFS (LET)
QUESTIONS AND ANSWERS – 01 JUL 2015
Question 11
RFP Section N/A Paragraph N/A
SOW/Technical Specification/Drawings paragraph/page:
Other (Specify):
Question:
There are several sites in this project that require contractor provided escorts. How many workers can one escort oversee and is the escort allowed to be a working member of the crew?
Answer 11:
(1) The number of people each escort can oversee is based on the scope of the work to be done at each project site. The escort must maintain positive control (line of sight) with each employee at all times. If the work crew is spread out over a distance such that a single escort can't maintain positive control over of all employees, then additional escorts would be needed. If all employees are working together and one escort can maintain positive control over all employees, then one is enough. Positive control at all times includes work, break, lunch, bathroom breaks, etc. A smaller work area with fewer workers would require fewer escorts at one time.
(2) There is no prohibition against a crew member serving as an escort, as long as that crew member is able to do their job and maintain positive control of all employees they’re escorting.
If the crew person/escort turns their attention to their job and an employee moves out of sight, it will cause a security response.
Question 12
SOW/Technical Specification/Drawings paragraph/page:
DBEH 111535J – REPAIR WATER LINE, PIER ROAD, CCAFS
• CC-101, VIEW 1
o Flag Notes 9 & 10
• CD-101, VIEW 1
o Flag Note 22
• CD-103, CONCRETE TESTING
DBEH 11-1535H – REPAIR WATER LINES – SKID STRIP, FLIGHT CONTROL AND
LIGHTHOUSE ROAD, CCAFS
• CC-110, PROJECT CONSTRUCTION FLAG NOTES
o Flag Notes 3, 10, 34, 40 & 41
• CC-111, VIEW 1, VIEW 2, VIEW, 3
o Flag Notes 3 & 10
• CD-111, VIEW 1, VIEW 2, VIEW ,3
o Flag Note 62
• CC-113, VIEW 9
o Flag Note 34
• CD-113, VIEW 9
o Flag Note 62
• CC-114, VIEW 12, VIEW 13
o Flag Notes 40 & 41
• CD-114, NEIW 12, VIEW 13
o Flag Note 62
DBEH 11-1535B – REPAIR WATER LINES, CENTRAL INDUSTRIAL AREA, CCAFS
• CC-102, WATER SYSTEM HANGAR J AND I ANNEX
o Flag Note 29
• CD-101 & CD-102, DEMOLITION AND RESORATION CENTRAL INDUSTRIAL
AREA
o Flag Note 51
DBEH 11-1535E – REPAIR POTABLE WATER LINES, PORT AREA, CCAFS
• CD-101, DEMOLITION & RESTORATION POSEIDON ROAD WATER SYSTEM
o Flag Note 32
DBEH 11-1535I – REPAIR WATER LINES, TITAN ROAD, FACILITY 69800, CCAFS (LET)
• No Asbestos Containing Material identified in Construction Flag Notes
DBEH 11-1535K – REPAIR WATER LINES, LC41 FIRE SERVICE, CCAFS (LET)
No Asbestos Containing Material identified in Construction Flag Notes
Other (Specify): N/A
Question:
1. How is the asbestos containing pipe and/or connections to be quantified on the above referenced drawings > construction flag notes?
2. Drawing DBEH 11-1535J, sheet CD-103, Concrete Testing, indicates concrete shall be sampled for asbestos prior to saw cutting or demolishing. How is the number of samples and locations to be quantified? Will this requirement also include testing thrust blocks?
Answer 12:
(1) The contractor is responsible for determining the amount of asbestos pipe that can be abandoned in place and the amount that must be removed in order to safely make the connections between the new and existing pipe.
(2) The contractor shall, at his discretion, determine the location and number of samples that would be representative of common material. This note refers to an EPA requirement for recovered materials; it would only apply to thrust blocks if the blocks were to be recycled (which is not typical).
Question 13
RFP Section Paragraph
SOW/Technical Specification/Drawings paragraph/page: Dwg H, CD-111
Other (Specify):
Question:
Drawing "H", Page CD-111 refers us to Sheet CD-104. CD-104 is not in the package. Please advise.
Answer 13:
The reference to sheet "CD-104" is a typo. The correct reference is to sheet CD-114.
Question 14
SOW/Technical Specification/Drawings paragraph/page: Dwg H, CD-114
Other (Specify):
Question:
Note 68 says to sawcut, remove, & replace concrete curb and pavement at Building 411019.
Note 74 says directional bore. Are we boring under the sidewalks or removing and replacing them?
Answer 14:
For FAC 41109, flag note #68 applies and flag note #74 does not. The #74 is a typo; it should refer to flag note #73 on sod restoration. On page CD-114, View 12, flag note #75 is also a typo;
it should refer to flag note #74 for horizontal directional drill.
Question 15
SOW/Technical Specification/Drawings paragraph/page: Dwg. B, CC-101
Other (Specify):
Question:
There is a concrete pad between Bldgs 60748 & 60709 approximately 20 ft. x 20 ft. Do we remove and replace it?
Answer 15:
Yes, the concrete pad is to be removed and replaced. Refer to flag note #57 on drawing sheet
CD-101.
Question 16
SOW/Technical Specification/Drawings paragraph/page: All Drawings
Other (Specify):
Question:
The drawings provided do not have any profile sheets or show existing utilities. Can the bid form be revised to include conflict crossings 2” – 12”?
Or are we going to be required to address each unknown conflict during construction?
Answer 16:
Known existing utilities are shown on the Demolition and Restoration sheets (CD sheets in the drawing packages). Any additional conflicts arising from unforeseen sight conditions will be addressed during construction.
Question 17
SOW/Technical Specification/Drawings paragraph/page: 01 11 00.00 55
Other (Specify):
Question:
To confirm, the air force base is performing all locates within Contractors staked areas?
Answer 17:
Yes, the base operations contractor will perform all locates. There is no charge to the construction contractor for this service, but the construction contractor is responsible for contacting the operations contractor directly to schedule the locates.
Question 18
SOW/Technical Specification/Drawings paragraph/page: Dwgs & Specs
Other (Specify):
Question:
Since soil borings were not provided, are we to base our bid on native soil backfilling and bedding?
Answer 18:
Yes, the contractor shall base his/her bids on native soil backfilling and bedding.
Question 19
SOW/Technical Specification/Drawings paragraph/page: Drawings
Other (Specify):
Question:
Is there a place on-site that we can dump (permanently) the excess backfill material?
Answer 19:
Excess backfill materials are to be spread onsite or disposed of outside of CCAFS.
Question 20
SOW/Technical Specification/Drawings paragraph/page: drawings
Other (Specify):
Question:
Is there a place on-site that we can dump Horizontal Directional Drill spoils permanently?
Answer 20:
There shall be no disposal of Horizontal Directional Drill (HDD) fluids on CCAFS. As noted in the specifications, excess HDD drilling fluids “shall be hauled off U.S. Government property and deposited at a disposal site selected by the Contractor. Disposal shall be in accordance with federal, state, county and city ordinances and at the expense of the Contractor.”
Question 21
SOW/Technical Specification/Drawings paragraph/page: drawings
Other (Specify):
Question:
Can HDPE be utilized in lieu of fused C-900 PVC?
Answer 21:
No, HDPE piping will not be accepted in lieu of fused C-900.
Question 22
SOW/Technical Specification/Drawings paragraph/page: Dwgs& Spec
Other (Specify):
Can mechanical joint fittings be used in lieu of thrust blocks with exception to tie-in locations?
Deadmen can be poured at tie-in locations and all-thread rod back to the new MJ fitting.
Answer 22:
No, bids should reflect thrust blocks as specified in the Plans and Specifications.
Question 23
SOW/Technical Specification/Drawings paragraph/page: CC-101
Other (Specify): DBEH - 11-1535B
Question:
On CC-101, DBEH 11-1535B, The drawing indicates a 2” water line running along back of the ball park, but the flag notes indicate both a 2” and 8” water main. Can you clarify?
Answer 23:
Disregard Flag Note #5 on sheet CC-101 “Proposed Water Systems Skid Strip Road”. Only Flag Note #3 applies to the 2” line running behind the ball field.
Question 24
SOW/Technical Specification/Drawings paragraph/page: CC-103
Other (Specify): DBEH - 11-1535B
Question:
On CC-103, DBEH 11-1535B, your note indicates that we are to have the base Contractor to flow test the new fire hydrants. Are we to pay the base contractor for that scope of work? Or is that cost associated and paid for through a separate contract? If we are required to include that cost, do you know what that cost is?
Answer 24:
Yes, the base operations contractor will perform flow tests on the hydrants. There is no charge to the construction contractor for this service, but the construction contractor is responsible for coordinating/scheduling the flow tests.
Question 25
SOW/Technical Specification/Drawings paragraph/page: CC-114
Other (Specify): DBEH - 11-1535H
Question:
Water line is indicated crossing the utility ductbank leading from Block House to each pad As this is an historic site will these need to be protected?
Answer 25:
There is no requirement to protect the ductbank.
Question 26
SOW/Technical Specification/Drawings paragraph/page:
Other (Specify):
Question:
There are several sites in this project that require the replacement of fire water piping. The drawings notes call for the use of DR-14 & DR-18 piping and the specifications are calling for the use of only DR-14 piping. Please advise.
Answer 26:
DR-14 is required for 12" diameter piping and smaller. DR-18 is required for 16" diameter piping and larger.
Question 27
SOW/Technical Specification/Drawings paragraph/page: Repair Water Lines, Central Industrial Area, CCAFS (DBEH 11-1535B)
Other (Specify):
Question:
The drawings and specifications for this area of work call for potable and fire water lines to be installed but the solicitation only asks for the pricing of fire water lines. Please advise.
Answer 27:
All new piping required per the drawings and specifications for both the potable and fire water systems is to be included in the applicable bid, regardless of any shortcomings in the text of the solicitation that describes the acquisition, i.e., CLIN description only references fire water lines.
Question 28
SOW/Technical Specification/Drawings paragraph/page: Repair Water Lines, Central Industrial Area, CCAFS (DBEH 11-1535B) CC-101
Other (Specify):
Question:
Note 13 on drawing CC-101 outlines a bid alternate which is not addressed in the solicitation.
Please advise.
Answer 28:
Disregard the "bid alternate" text. There is no bid alternate for Drawing Package 1535-B; all work described in this package shall be included in the base bid.
Question 29
SOW/Technical Specification/Drawings paragraph/page:
Other (Specify): Sheet ID CC-101
Flag Note 13 on the above sheet states that there is to be a “bid alternate” for 4” industrial water service. Is this still applicable to the project?
Answer 29:
Disregard the "bid alternate" text. There is no bid alternate for Drawing Package 1535-B; all work described in this package shall be included in the base bid.
Question 30
SOW/Technical Specification/Drawings paragraph/page:
Other (Specify): Sheet ID CC-101
Question:
There is a flag note 5 pointing to the 2” waterline that goes around the ball field. Should this have a different flag note number?
Answer 30:
Disregard Flag Note #5 on sheet CC-101 “Proposed Water Systems Skid Strip Road”. Only Flag Note #3 applies to the 2” line running behind the ball field.
Question 31
SOW/Technical Specification/Drawings paragraph/page:
Other (Specify): Sheet ID G-001
Question:
The symbol for “Grout Plug” on G-001 shows up throughout the plans. Is it the intent to grout fill each abandoned water line complete between the plugs, or just plug the ends?
Answer 31:
As indicated in the flag notes, the plug goes on the open end only of the abandoned pipe.