Attachment No. 4 - Project Drawings DBEH 11-1535I
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDUSTRIAL AREA
B
E
A
C
H
L
I N
E
X
P
R
E
S
S
W
A
Y
T
O
R
L
A
N
D
O
TO
COCOA
US
N O
R
H
C
U
R T
E N
A Y
P
K W
Y
MERRITT
ISLAND
A1A
BEACH
COCOA
TO
PIER ROAD
AIR FORCE STATION
CAPE CANAVERAL
C
E
N
T
R
L
N
T
R
A
D
R
O
A
D
S
K
I
D
S
R
I
P
R O
A D
L
IG
H T
H O
U S
E
P
H
I L L I P
S
P
A
R
K
W
A
Y
F
L
I G
H
T
C
O
N
T
R
O
L
L
A
U
N
T I T
I
R
D
H
E
A
V
Y
I
C
M
A
D
TITUSVILLE
PASS AND I.D.
BEACH ROAD
SPACE
NASA PARKWAY WEST
CENTER
KENNEDY
ORBITER LANDING
SPACE SHUTTLE
FACILITY
C
R
A
W
L
E
R
W
A
Y
VAB
P
A
R
K
W
A
Y
LOCATION
P H
I L
L I P
S
ATLANTIC
OCEAN
N
A
U
S
E
W
S
T
BANANA
RIVER
SOUTH GATE
PASS & I.D.
ATLANTIC
OCEAN
PORT
CANAVERAL
INDIAN
RIVER
PROJECT
AREA
I
C
M
S
K
R
I
P
H
E
A
V
U
N
CX-14
CX-15
CX-20
CX-16
CX-19
C
E
N
T
R
N
T
R
P
H
I
L
L
I
W
Y
TITAN III RD.
PATROL RD.
T
I T
I
R
D
CX-37
CX-40
CENTAUR RD.
P
H
I
L
L
I
W
Y
KENNEDY SPACE CENTER
CAPE CANAVERAL AIR FORCE STATION
CAPE CANAVERAL, FLORIDA
SCALE:
VICINITY MAP
NONE
SCALE:
LOCATION PLAN
NONE
REPAIR WATER LINES,
DBEH 11-1535I
TITAN III ROAD,
FACILITY 69800, CCAFS (LET)
G-001
V I C
I N
I T
Y
M
C A
T I O
N
P
L A
N
A
N D
D R
A W
I N
G
I N
D E
X
DRAWING INDEX
SHEET ID DESCRIPTION
G-001 VICINITY MAP LOCATION PLAN AND DRAWING INDEX
CIVIL
CC-100 PROJECT SCOPE - ITL FIRE WATER SYSTEM TITAN ROAD
CC-101 ITL FIRE WATER TITAN III ROAD RAILROAD YARD & CENTAUR ROAD
CC-102 ITL FIRE WATER TITAN III ROAD FACILITY 69800
CD-101
EXISTING UTILITY, DEMOLITION, AND RESTORATION PLAN 1
CD-102
EXISTING UTILITY, DEMOLITION, AND RESTORATION PLAN 2
CC-501
CIVIL DETAILS
G-002 STORMWATER POLLUTION & PREVENTION GUIDE AND DETAILS
HB
DEFINITION DEPICTION
8" FIRE WATER
2" POTABLE WATER
4" POTABLE WATER
ABANDON IN PLACE
EX UG ELECTRIC
EX AERIAL ELECTRIC
EX COMMUNICATION
EX SANITARY SEWER
EX NATURAL GAS
EX STORM DRAIN
EX HIGH PRESSURE GAS
SILT FENCE
POST-INDICATOR VALVE
VALVE (EXISTING/PROPOSED)
BACKFLOW PREVENTER
FIRE HYDRANT (EXISTING/PROPOSED)
REDUCER
PLUG W/ 2" TAP
PIPE PLUG
HAY BALE
GROUT PLUG
HOSE BIB
AC TO PVC PIPE COUPLING
POTABLE WATER METER
GROUNDWATER MONITORING WELL
E E
C C
SS
NG
SD
SF
2'' W
8'' F
4'' W
AIP
G/N2
AB - AUGER BORE
AC - ASBESTOS CEMENT
AG - ABOVE GROUND
AIP - ABANDON IN PLACE
ALUM - ALUMINUM
ARV - AIR RELEASE VALVE
AWWA - AMERICAN WATER WORKS ASSOCIATION
BFP - BACKFLOW PREVENTER
BO - BLOW-OFF
BST - BELLSOUTH TELEPHONE
C&G - CURB & GUTTER
CES - CIVIL ENGINEERING SQUADRON
CEVP - CIVIL ENGINEERING ENVIRONMENTAL PLANNING
CEVR - CIVIL ENGINEERING ENVIRONMENTAL RESTORATION
CCAFS - CAPE CANAVERAL AIR FORCE STATION
CI - CAST IRON
CLDI - CEMENT-LINED DUCTILE IRON
CLF - CHAIN LINK FENCE
COC - CERTIFICATE OF COMPLETION
CONC - CONCRETE
COMM - COMMUNICATION
CU. FT. - CUBIC FEET
DCVA - DOUBLE CHECK VALVE ASSEMBLY
DI - DUCTILE IRON
DIA - DIAMETER
DIP - DUCTILE IRON PIPE
DR - DIMENSIONAL RATIO
E - EAST
EL - ELEVATION
ELEC - ELECTRIC
EOP - EDGE OF PAVEMENT
EX - EXISTING
FL - FLANGE
FDC - FIRE DEPARTMENT CONNECTION
FDEP - FLORIDA DEPARTMENT ENVIRONMENTAL PROTECTION
FDOT - FLORIDA DEPARTMENT OF TRANSPORTATION
FM - FORCE MAIN
FO - FIBER OPTIC
FP&L - FLORIDA POWER & LIGHT
FT - FOOT/FEET
FW - FIRE WATER
G - GROUND
GALV - GALVANIZED
GV - GATE VALVE
INV - INVERT
IP - IRON PIPE
IRP - INSTALLATION RESTORATION PROGRAM
JBOSC - JOINT BASE OPERATIONS SUPPORT CONTRACT
LBS - POUNDS
LF - LINER FEET
MH - MANHOLE
MIN - MINIMUM
MJ - MECHANICAL JOINT
MW - MONITORING WELL
N - NORTH
NA - NOT APPLICABLE
NFPA - NATIONAL FIRE PROTECTION ASSOCIATION
N&D - NAIL & DISK
ABBREVIATIONS:
(ALL MAY NOT BE USED)
OD - OUTSIDE DIAMETER
OH - OVERHEAD UTILITY
OHE - OVERHEAD ELECTRIC
OS&Y - OUTSIDE SCREW AND YOKE
PAIP - PREVIOUSLY ABANDONED IN PLACE
PE - PLANE END
PIV - POST INDICATOR VALVE
POC - POINT OF CONNECTION
POD - POINT OF DISCONNECTION
PP - POWER POLE
PROP - PROPOSED
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PVC - POLYVINYL CHLORIDE
PVMT - PAVEMENT
PW - POTABLE WATER
RED - REDUCER
RS - RESILIENT SEAT
R/W - RIGHT OF WAY
S - SOUTH
SD - STORM DRAIN
SJRWMD - ST. JOHN'S RIVER WATER MANAGEMENT DISTRICT
SPEC - SPECIFICATIONS
SQ - SQUARE
SQ FT - SQUARE FEET
STA - STATION
STSTL - STAINLESS STEEL
SS - SANITARY SEWER
SWPPP - STORM WATER POLLUTION PREVENTION PERMIT
SY - SQUARE YARD
TEL - TELEPHONE
TH - TEST HOLE
TYP - TYPICAL
UE - UNDERGROUND ELECTRIC
UG - UNDERGROUND
UON - UNLESS OTHERWISE NOTED
W - WEST
WP - WOOD UTILITY POLE
WTR - WATER
WWF - WELDED WIRE FABRIC
CIVIL LEGEND:
(BOLD NOTES NEW ITEMS)
A
B
2 3
C
D
1 2 3
R E
P A
W
T
N
E S
T I T
I
R
O A
D
F
A C
I L I T
Y
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
I
N A
4 5 6
U I
T
E
C O
N T
R O
L
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
PERMIT(S)/ENVIRONMENTAL ACTIONS
REQUIRED PRIOR TO CONSTRUCTION
ERP/STORMWATER
ERP/WETLANDS/DREDGE & FILL
FDEP/DRINKING WATER
FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL
SURVEY/WILDLIFE
OTHER
NONE
FDEP/IND. WASTE WATER
IRP
FDEP/FUEL TANK
NOI/SWPPP
D B
I
C
D
A
B
D B
E H
ASBESTOS
NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT
IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN
ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL
UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.
HEAVY METALS
YES NO
LEAD
PCB
NOT
VERIFIED
HAZARDOUS MATERIALS
GROUNDWATER CONTAMINATION
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
ENGINEER OF RECORD: STEVEN V. HOUGHTALING
LICENSE NUMBER: 39515
NAME AND ADDRESS OF BUSINESS:
ONEIDA TOTAL INTEGRATED ENTERPRISES, LLC.
FAC. 1708, HANGAR R SOUTH WING, CCAFS
108 DIXIE LANE, COCOA BEACH, FLORIDA, 32931
(321) 853-4775
FLA. BOARD OF P.E. NO.: 29060 / CERT OF AUTH
FLA. BUSINESS PERMIT: MO9000001094
RAEIS CONTRACT NO: FA2521-13-D-0005
CC-103 ITL FIRE WATER TITAN III ROAD FACILITY 70000
BASE OPERATIONS:
COMMUNICATIONS:
PROJECT MANAGER:
CHIEF, PROGRAMS FLIGHT:
USER:
SAFETY:
SECURITY FORCES:
ATO:
OTHER:
ENVIRONMENTAL:
FIRE:
A
P
P
R
O
V
G-002
T
O R
M W
A T
L
L U
T I O
N
P R
E V
E N
T I O
N
G
U I D
E
A
T
A I L
S
SITE DESCRIPTION
OWNER AND ADDRESS: UNITED STATES AIR FORCE
1224 JUPITER STREET, BUILDING 534
PATRICK A.F.B., FLORIDA 32925
LOCATION: CAPE CANAVERAL AIR FORCE STATION
LATITUDE: 28° 33' 14" N LONGITUDE: 80° 35' 20" W
SECTION / TOWNSHIP / RANGE: 23 & 26 / 22 S / 37 E
PROJECT NAME: REPAIR WATER LINES, TITAN III ROAD FACILITY 69800
PROJECT DESCRIPTION: THIS PROJECT WILL CONSIST OF EXCAVATION WORK
FOR THE INSTALLATION OF NEW UNDERGROUND UTILITIES.
SITE MAPS:
* CONSULT ASSOCIATED PLANS FOR EROSION AND SEDIMENT CONTROLS,
STORMWATER DISCHARGE POINTS LOCATION OF SURFACE WATER AND
CONSTRUCTION IMPACT.
SITE AREA:
1. TOTAL AREA OF SITE = 2.0 AC
2. TOTAL AREA DISTURBANCE = 1.0 AC
3. WETLAND AREA = NONE
4. RECEIVING WATER = BANANA RIVER
CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE AND LOCAL
REGULATIONS
IN AN EFFORT TO ENSURE COMPLIANCE WITH FEDERAL, STATE AND LOCAL
LAWS REGARDING EROSION AND TURBIDITY CONTROLS, THE FOLLOWING
PERMITS HAVE BEEN OBTAINED AND ARE AVAILABLE ON-SITE:
D.E.P. PERMIT: NONE
C.O.E. PERMIT: NONE
S.J.R.W.M.D. E.R.PERMIT: NONE
D.E.P. N.O.I.: TO BE SUBMITTED BY CONTRACTOR
SEQUENCE OF MAJOR ACTIVITIES
THE ORDER OF ACTIVITIES WILL BE AS FOLLOWS:
1. SUBMIT NOTICE OF INTENT (N.O.I.);
2. FLAG THE WORK LIMITS & MARK TREE OR PROTECTED AREA BUFFER, IF
APPLICABLE;
3. COORDINATE PRE-CONSTRUCTION MEETING WITH DESIGNATED SITE
SUPERINTENDENT AND INSPECTOR(S) IN CHARGE OF SWPPP REQUIREMENTS;
4. INSTALL REQUIRED PERIMETER CONTROLS;
5. PERFORM DEMOLITION OPERATIONS, IF APPLICABLE;
6. INSTALL STRUCTURES;
7. STABILIZE DENUDED AREAS AND STOCKPILES AS SOON AS PRACTICABLE;
8. INSTALL PERMANENT SEEDING/SODDING AND PLANTING AND WATER AS
REQUIRED UNTIL PERMANENTLY ESTABLISHED;
9. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS
STABILIZED, COORDINATE INSPECTION OF ALL WORK AREAS;
10. REMOVE ANY EROSION CONTROL DEVICES AND RESEED/SOD AS REQUIRED;
AND
11. SUBMIT NOTICE OF TERMINATION (N.O.T.).
CONSTRUCTION CONTRACTOR REQUIREMENTS
IN ADDITION TO THE RESPONSIBILITIES OUTLINED IN THE ABOVE SECTIONS, IT IS
ALSO THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO ENSURE THE
FOLLOWING IS CONDUCTED:
* N.O.I. FORM IS COMPLETED AND SUBMITTED WITH APPROPRIATE FEE AT LEAST
48 HOURS PRIOR TO INITIATING ANY LAND CLEARING ACTIVITY
* CONSTRUCTION CONTRACTOR AND ALL CONSTRUCTION SUB-CONTRACTORS
COMPLETE CERTIFICATION SIGNIFYING THAT THEY ARE AWARE OF TERMS AND
CONDITIONS OF THE GENERIC PERMIT
* CHANGES TO SWPPP ARE COMPLETED, AS NEEDED, TO ENSURE COMPLIANCE
WITH FEDERAL, STATE AND LOCAL REQUIREMENTS AND THE REPORT FORM
FOR CHANGES TO SWPPP IS COMPLETED, WHEN NECESSARY.
* SITE INSPECTIONS ARE PERFORMED AND THE INSPECTION REPORT FORM
COMPLETED AS INDICATED BY PLAN BY CONSTRUCTION CONTRACTOR'S
QUALIFIED INSPECTOR.
* MAINTENANCE ON BMPs AND MAINTENANCE RECORD COMPLETED AS
INDICATED BY PLAN.
* N.O.T. FORM IS COMPLETED AND SUBMITTED AS INDICATED BY PLAN.
IT IS THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO IMPLEMENT THE
BEST MANAGEMENT PRACTICES (BMPs) AS SHOWN ON THE SITE PLAN AND AS
CONTAINED IN THIS SWPPP. IT IS ALSO THE CONSTRUCTION CONTRACTOR'S
RESPONSIBILITY TO ENSURE THESE BMPs ARE PROPERLY INSTALLED, MAINTAINED AND FUNCTIONING PROPERLY TO PREVENT TURBID OR POLLUTED
WATER FROM LEAVING THE PROJECT SITE. THE CONSTRUCTION CONTRACTOR
SHALL ADJUST THE EROSION AND TURBIDITY CONTROLS SHOWN ON THE SITE
PLAN AND ADD ADDITIONAL CONTROL MEASURES, AS REQUIRED TO ENSURE
THE SITE MEETS ALL FEDERAL, STATE AND LOCAL EROSION AND TURBIDITY
CONTROL REQUIREMENTS. BEST MANAGEMENT PRACTICES SHALL BE
IMPLEMENTED BY THE CONSTRUCTION CONTRACTOR AS REQUIRED TO MEET
THE SEDIMENT AND TURBIDITY REQUIREMENTS IMPOSED ON THE PROJECT SITE
BY THE REGULATORY AGENCIES.
THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION,
MITIGATION, & REPAIR COSTS ASSOCIATED WITH NON-COMPLIANCE. IT IS THE
CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO INSTALL ADDITIONAL
MEASURES TO ATTAIN IMMEDIATE COMPLIANCE, SHOULD VIOLATIONS BE
IDENTIFIED.
EROSION AND SEDIMENT CONTROLS
PERIMETER CONTROLS:
1. SILT FENCE: FILTER FABRIC BARRIERS CAN BE USED BELOW DISTURBED
AREAS SUBJECT TO SHEET AND RILL EROSION WITH THE FOLLOWING
LIMITATIONS:
A. WHERE THE MAXIMUM DRAINAGE AREA IS 1/4 ACRE PER 100 FEET OF LENGTH.
B. USE 4"x4" TRENCH & 8" FABRIC EXTENDED INTO GROUND BEFORE BACKFILL &
COMPACTION.
C. MAXIMUM USEFUL LIFE 6 MONTHS.
SWALE / LIVE STREAM SILT / SEDIMENT CONTAINMENT:
1. SEE FDOT INDEX 102, CHART 1, SHEET 1 FOR SPACING REQUIREMENTS FOR
TYPE I AND II SYNTHETIC BALE BARRIERS & SILT FENCES.
2. TURBIDITY CURTAINS SHALL BE LOCATED PARALLEL TO FLOW OF A MOVING
BODY OF WATER & SHALL NOT BE PLACED ACROSS THE MAIN FLOW OF A
SIGNIFICANT BODY OF MOVING WATER.
3. SOIL PARTICLES SHALL BE ALLOWED TO SETTLE A MINIMUM OF 6-12 HOURS
BEFORE REMOVAL OF TURBIDITY CURTAIN.
4. LAND DISTURBING ACTIVITY SHALL NOT CREATE VIOLATIONS OF WATER
QUALITY STANDARDS. MONITORING OF TURBIDITY LEVELS SHALL OCCUR IN
ACCORDANCE WITH PERMIT CONDITIONS.
STOCKPILING MATERIAL:
1. NO EXCAVATED MATERIAL SHALL BE STOCKPILED IN SUCH A MANNER AS TO
DIRECT RUNOFF DIRECTLY OFF THE PROJECT SITE INTO ANY ADJACENT WATER
BODY OR STORM WATER COLLECTION FACILITY.
VEGETATION:
1. TEMPORARY STABILIZATION SHALL BE APPLIED TO AREAS OPENED BY
CONSTRUCTION OPERATIONS AND THAT ARE NOT ANTICIPATED TO BE
RE-DISTURBED AND RECEIVE FINAL STABILIZING TREATMENT WITHIN 14 DAYS.
IF, AFTER 14 DAYS FROM TIME OF STABILIZATION, THE TEMPORARY GRASSED
AREAS HAVE NOT ATTAINED A MINIMUM OF 70% GOOD GRASS COVER, THE
AREA WILL BE REWORKED AND ADDITIONAL MEASURES APPLIED SUFFICIENT TO
ESTABLISH THE DESIRED VEGETATIVE COVER.
2. PERMANENT STABILIZATION SHALL BE PERFORMED IN ALL AREAS THAT HAVE
BEEN DISTURBED BY CONSTRUCTION ACTIVITY UNLESS OTHERWISE DIRECTED
BY THE CONTRACTING OFFICER TO PRESERVE THE FUNCTION OF CRITICAL
SCRUB HABITAT. FINAL STABILIZATION MUST BE INITIATED NO MORE THAN 7
DAYS AFTER LAND DISTURBING ACTIVITIES HAVE CEASED IN THAT AREA.
UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR BE PERMITTED TO CAUSE
A DEGRADATION OF OFFSITE WATER QUALITY. IF SEED IS USED THE SEEDING
MIX MUST PROVIDE BOTH LONG-TERM VEGETATION AND RAPID GROWTH
SEASONAL VEGETATION. SLOPES STEEPER THAN 4:1 SHALL BE SODDED.
3. DISTURBED SIDE SLOPES OF DRAINAGE CONVEYANCE SWALES OR SURFACE
WATERS SHALL BE IMMEDIATELY SODDED. SOD SHALL BE PEGGED OR STAPLED
TO RESIST WASHOUT.
4. CONSTRUCTION CONTRACTOR SHALL STABILIZE COMPLETED PORTIONS OF
THE PROJECT AS WORK PROGRESSES TO PROTECT AGAINST EROSION UNLESS
OTHERWISE DIRECTED BY THE CONTRACTING OFFICER TO PRESERVE THE
FUNCTION OF CRITICAL SCRUB HABITAT. CONSTRUCTION CONTRACTOR SHALL
IMMEDIATELY REPAIR, FILL AND SOD ERODED AREAS OF THE PROJECT THAT
RESULT FROM THE CONSTRUCTION LAND ALTERATIONS.
5. ALL AREAS THAT ARE SEEDED/SODDED SHALL BE INSTALLED AND WATERED
UNTIL THE GROUND COVER IS FULLY ESTABLISHED
POLLUTANT SOURCE CONTROLS:
WASTE DISPOSAL:
WASTE MATERIALS AND RUBBISH SHALL BE COLLECTED AND STORED IN
CONTAINERS OR, IF APPROPRIATE, IN PILES. SEPARATE, SELF-CLOSING,
NONFLAMMABLE, NON-REACTIVE CONTAINERS SHALL BE USED FOR GARBAGE.
OILY FLAMMABLE AND DANGEROUS WASTES, NON-SALVAGE MATERIAL AND
DEBRIS SHALL BE REMOVED FROM WORK AREAS AND DISPOSED OF DAILY.
ASBESTOS WASTE SHALL BE DISPOSED OF OFF BASE UNLESS OTHERWISE
DIRECTED BY THE CONTRACTING OFFICER.
REFER TO SPECIFICATIONS FOR FURTHER WASTE AND DISPOSAL AND RECORD
KEEPING REQUIREMENTS.
HAZARDOUS / NON HAZARDOUS:
ALL HAZARDOUS WASTE SHALL BE MANAGED IN ACCORDANCE WITH STATE AND
FEDERAL REGULATIONS BY THE CONSTRUCTION CONTRACTOR AND SHALL BE
TURNED OVER TO THE AIR FORCE FOR DISPOSAL UNDER THE AIR FORCE'S EPA
IDENTIFICATION NUMBER.
AT THE PRE-CONSTRUCTION CONFERENCE, THE CONSTRUCTION CONTRACTOR
SHALL PROVIDE THE CONTRACTING OFFICER WITH A LIST OF ALL HAZARDOUS
MATERIALS TO BE INCORPORATED INTO THE PROJECT INCLUDING THE
MATERIAL SAFETY DATA SHEET IN ACCORDANCE WITH DFARS 52.223-3,
HAZARDOUS WASTE MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA
AND PROJECT SPECIFICATIONS. THE CONSTRUCTION CONTRACTOR SHALL
SUBMIT COPIES OF SIGNED INTERNAL MANIFESTS TO THE CONTRACTING
OFFICER MONTHLY.
THE CONSTRUCTION CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER
IMMEDIATELY IF ANY CONTAMINATED SOIL, GROUND WATER OR SUSPECT
DEBRIS IS ENCOUNTERED DURING EXCAVATION, DEMOLITION OR
CONSTRUCTION OF THE PROJECT.
SANITARY WASTE:
ALL SANITARY WASTE SHALL BE COLLECTED FROM THE PORTABLE UNITS AS
NEEDED TO PREVENT POSSIBLE SPILLAGE. THE WASTE SHALL BE COLLECTED
AND DISPOSED OF IN ACCORDANCE WITH STATE AND LOCAL WASTE DISPOSAL
REGULATIONS FOR SANITARY SEWER.
OFFSITE VEHICLE TRACKING:
A STABILIZED CONSTRUCTION ENTRANCE SHALL BE PROVIDED, WHERE
NECESSARY, TO HELP REDUCE VEHICLE TRACKING OF SEDIMENT. THE PAVED
STREET ADJACENT TO THE SITE ACCESS SHALL BE SWEPT DAILY TO REMOVE
ANY EXCESS MUD, DIRT OR ROCK TRACKED FROM THE SITE. DUMP TRUCKS
HAULING MATERIAL FROM THE CONSTRUCTION SITE SHALL BE COVERED
WITH A TARPAULIN.
FERTILIZERS, PESTICIDES, HERBICIDES:
THE SPECIFIED REQUIREMENT FOR FERTILIZERS, PESTICIDES, AND HERBICIDES
SHALL BE IDENTIFIED. THE QUANTITIES AND METHODS OF APPLICATION SHALL
BE CHECKED TO ASCERTAIN THEY ARE APPROPRIATE AND CONSISTENT WITH
LOCAL GUIDELINES.
GOOD HOUSEKEEPING:
THE FOLLOWING GOOD HOUSEKEEPING PRACTICES SHALL BE FOLLOWED
ONSITE DURING THE CONSTRUCTION PROJECT:
ALL CONSTRUCTION EQUIPMENT SHALL BE IN PROPER WORKING ORDER AND
INSPECTED REGULARLY. ALL EQUIPMENT SHALL HAVE THE BUILT-IN CAPACITY,
STABILITY, AND NECESSARY SAFETY FEATURES TO FULLY COMPLY WITH THE
PROJECT SPECIFICATIONS AND REQUIREMENTS, WITHOUT SHOWING EVIDENCE
OF UNDUE STRESS OR FAILURE. CONSTRUCTION CONTRACTOR PERSONNEL
SHALL BE IN SUFFICIENT NUMBER OF COMPETENT WORKERS ON THE JOB AT
ALL TIMES TO INSURE WORK IS MADE A TIMELY AND SATISFACTORY MANNER. A
COMPETENT AND EXPERIENCED SUPERVISOR, REPRESENTING THE
CONSTRUCTION CONTRACTOR, SHALL BE IN DIRECT CHARGE AND CONTROL OF
OPERATIONS AT ALL TIMES. EQUIPMENT BREAKDOWNS OR OTHER
UNFORESEEN WORK STOPPAGES SHALL IMMEDIATELY CONSIDER THE
PROTECTION OF SURFACE WATERS FROM POTENTIAL POLLUTION.
DRIP PANS SHALL CONTAIN LEAKS OR SPILLS WHENEVER NECESSARY FOR
MAINTENANCE ACTIVITIES. ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY IN
ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
AN EFFORT SHALL BE MADE TO STORE ONLY ENOUGH PRODUCTS REQUIRED TO
DO THE JOB.
ALL MATERIALS STORED ONSITE SHALL BE STORED IN NEAT, ORDERLY MANNER
IN THEIR APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER A ROOF OR
OTHER ENCLOSURE.
PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE
ORIGINAL MANUFACTURER'S LABEL.
SUBSTANCES SHALL NOT BE MIXED WITH ONE ANOTHER UNLESS
RECOMMENDED BY THE MANUFACTURER.
WHENEVER POSSIBLE, ALL OF A PRODUCT SHALL BE USED UP BEFORE
DISPOSING OF THE CONTAINER.
MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND DISPOSAL
SHALL BE FOLLOWED.
INSPECTION AND MAINTENANCE PLAN
INSPECTION AND MAINTENANCE REPORTS:
THE CONSTRUCTION CONTRACTOR'S QUALIFIED INSPECTOR SHALL INSPECT
ALL POINTS OF DISCHARGE INTO SURFACE WATERS, ALL DISTURBED AREAS OF
CONSTRUCTION THAT HAVE NOT BEEN FINALLY STABILIZED, AREAS OF
STORAGE MATERIALS THAT ARE EXPOSED TO PRECIPITATION, STRUCTURAL
CONTROLS AND LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE AT
LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE
END OF A STORM THAT IS 0.50 INCHES OR GREATER. WHEN THE SITE HAS BEEN
FINALLY STABILIZED, THE INSPECTION SHALL OCCUR AT LEAST MONTHLY. ALL
INSPECTIONS SHALL BE DOCUMENTED IN THE SWPPP USING THE SWPPP
INSPECTION REPORT FORM.
THE EROSION CONTROL SHALL BE MAINTAINED IN GOOD AND EFFECTIVE
OPERATING CONDITIONS, AND REPAIR TO IMPACTED SYSTEMS SHALL BE
INITIATED AND COMPLETED IMMEDIATELY. WHERE EROSION CONTROL
MEASURES ARE DEEMED INEFFECTUAL BY THE CONSTRUCTION CONTRACTOR,
THE GOVERNMENT ENVIRONMENTAL REPRESENTATIVE OR THE CONTRACTING
OFFICER, THE CONSTRUCTION CONTRACTOR SHALL IMMEDIATELY COORDINATE
CORRECTIVE MEASURES FOR REPAIR AND REPLACEMENT. ALL REGULAR AND
SPECIAL MAINTENANCE SHALL BE RECORDED IN THE SWPPP ON THE
MAINTENANCE REPORT FORM. ALTERNATIVE MEASURES, REPAIRS, AND
REPLACEMENT SHALL BE IMMEDIATELY IMPLEMENTED AND RECORDED WITH
THE FORM FOR CHANGES TO THE SWPPP. IN NO CASE SHALL IMPLEMENTATION
OF THE REPAIR OR REPLACEMENT OCCUR MORE THAN 7 CALENDAR DAYS
FOLLOWING THE INSPECTION.
THE GOVERNMENT ENVIRONMENTAL REPRESENTATIVE'S QUALIFIED
INSPECTORS SHALL PERIODICALLY REVIEW THE CONSTRUCTION
CONTRACTOR'S INSPECTION REPORTS FOR ADEQUACY AND COMPLETION
CONTRACTOR'S INSPECTION REPORTS FOR ADEQUACY AND COMPLETION AND
REPORT, IN WRITING, TO THE CONTRACTING OFFICER ANY DEFICIENCIES IN THE
REPORTING. THE CONSTRUCTION CONTRACTOR SHALL ADJUST THE
REPORTING REQUIREMENTS TO THE SATISFACTION OF SHALL ADJUST THE
REPORTING REQUIREMENTS TO THE SATISFACTION OF THE CONTRACTING
OFFICER. THE GOVERNMENT ENVIRONMENTAL REPRESENTATIVE REPORTS
SHALL ALSO BE MADE A RECORD OF THE SWPPP.
ALL REPORTS, PLANS, AND AMENDMENTS SHALL BE MADE PART OF THE SWPPP.
SUCH REPORTS SHALL IDENTIFY ANY INCIDENTS OF NON-COMPLIANCE. WHEN
A REPORT DOES NOT IDENTIFY ANY INCIDENCES OF NONCOMPLIANCE, THE
REPORT SHALL CONTAIN A CERTIFICATION THAT THE FACILITY IS IN
COMPLIANCE WITH THE SWPPP AND GENERIC PERMIT. THE REPORT SHALL BE
SIGNED IN ACCORDANCE WITH THE GENERIC PERMIT.
NON-STORM WATER DISCHARGES
DEWATERING DISCHARGES:
DEWATERING ACTIVITIES ARE SUBJECT TO REVIEW OF THE JURISDICTIONAL
STATE AGENCIES, THE CONTRACTING OFFICER AND UNITED STATES AIR FORCE
ENVIRONMENTAL AND IRP OFFICES. DISCHARGES SHALL PROVIDE PROVISIONS
SO THAT NO UPSTREAM FLOODING OR IMPOUNDMENT OCCURS AND NO
SILTATION, EROSION, OR TURBID DISCHARGES OCCURS IN VIOLATION OF STATE
WATER QUALITY STANDARDS. ALL TEMPORARY WORKS SHALL BE COMPLETELY
REMOVED AND ALL AREAS RESTORED TO GRADES, ELEVATIONS AND
CONDITIONS THAT OCCURRED BEFORE CONSTRUCTION AS SOON AS POSSIBLE.
IT IS NOTED HERE THAT GROUNDWATER DEWATERING ACTIVITIES AT
CONSTRUCTION SITES CANNOT BE CONDUCTED UNDER THE GENERIC PERMIT
FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION
ACTIVITIES. PURSUANT TO SECTION 62-621.300(2), FAC, A SEPARATE PERMIT,
ENTITLED, GENERIC PERMIT FOR THE DISCHARGE OF PRODUCED GROUND
WATER FROM ANY NON-CONTAMINATED SITE ACTIVITY, MUST BE APPLIED FOR
TO CONDUCT GROUND WATER DEWATERING ACTIVITIES, IF NECESSARY.
TERMINATION PLAN
WHEN THE SITE HAS BEEN FINALLY STABILIZED AND ALL STORMWATER
DISCHARGES FROM CONSTRUCTION SITES ELIMINATED, THE CONSTRUCTION
CONTRACTOR SHALL SUBMIT A NOTICE OF TERMINATION (N.O.T.) WITHIN 14
DAYS OF FINAL STABILIZATION WITH A SUFFICIENT AMOUNT OF ESTABLISHED
PERMANENT VEGETATION.
AFTER FILING N.O.T., THE CONSTRUCTION CONTRACTOR SHALL SUBMIT THE
FINAL SWPPP, INCLUDING ALL REPORTS AND RECORDS, TO THE CONTRACTING
OFFICER. THE OWNER SHALL THEN BE RESPONSIBLE TO RETAIN A COPY OF
THE POLLUTION PREVENTION PLAN FOR A PERIOD OF THREE YEARS FROM THE
DATE THE SITE IS FINALLY STABILIZED.
CERTIFICATION:
"I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND, AND SHALL COMPLY
WITH, THE TERMS AND CONDITIONS OF THE STATE OF FLORIDA GENERIC
PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL
CONSTRUCTION ACTIVITIES AND THIS STORMWATER POLLUTION PREVENTION
PLAN PREPARED THEREUNDER."
SIGNATURE
BUSINESS NAME AND ADDRESS
OF CONSTRUCTION CONTRACTOR
RESPONSIBLE FOR/
DUTIES
GENERAL CONTRACTOR
SUB-CONTRACTOR
SUB-CONTRACTOR
AND ALL SUBS
SILT FLOW
M
I N
FILTER FABRIC
ELEVATION
SECTION
EROSION CONTROL NOTES:
1. AFTER EACH STORM EVENT, THE SILT FENCE SHALL BE INSPECTED. SEDIMENT DEPOSITS SHALL BE REMOVED AND
WASHOUTS/STRUCTURAL FAILURES SHALL BE REPAIRED IMMEDIATELY.
2. TWO SILT FENCES SHALL BE ATTACHED BY PLACING THE END POST OF THE SECOND FENCE INSIDE THE END POST
OF THE FIRST FENCE. BOTH POSTS SHALL BE ROTATED AT LEAST 180° IN A CLOCKWISE DIRECTION TO CREATE A
TIGHT SEAL WITH THE FABRIC MATERIAL. DRIVE BOTH POSTS 18" INTO THE GROUND & BURY FLAP.
3. SILT FENCES SHALL BE REMOVED ONLY AFTER DISTURBED AREAS HAVE BEEN STABILIZED.
WOOD POST @ 10' O.C.
MIN 1" X 2" X 3'
TRENCH MIN 4" X 4"
BURY MIN 8" OF FABRIC IN TRENCH
GEOTEXTILE SILT SCREEN
STAPLE TO POST
EROSION CONTROL MEASURES
NONE
G-002
THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET DRAINS A RELATIVELY FLAT AREA
(SLOPES NO GREATER THAN 5 PERCENT) WHERE SHEET OR OVERLAND FLOWS (NOT EXCEEDING 0.5 cfs)
ARE TYPICAL. THE METHOD SHALL NOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS. SUCH AS
IN STREET OR HIGHWAY MEDIANS.
FABRIC SEDIMENT FILTER
SPECIFIC APPLICATION
BURLAP FABRIC
STAKES
BURIED BURLAP
FABRIC
RUNOFF WATER
WITH SEDIMENT
FILTERED WATER
CATCH BASIN INLET SEDIMENT TRAP
SILT FENCE
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
T I T
I
R
O A
D
F
A C
I L
I T
Y
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
I
N A
4 5 6
I L
T
D
A T
E
C O
N T
R O
L
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
I
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
CC-100
R
O J E
O
L
F
I R
E
W
A T
S
T E
M
T
I T
A
D
ITL FIRE WATER SYSTEM TITAN III ROAD - FAC 69800
1" = 100'
300'200'100'0'100'
GRAPHIC SCALE 1" = 100'
PROJECT SCOPE FLAG NOTES:
A. NEW 16" FIRE WATER PIPE OPEN TRENCH INSTALLATION.
B. NEW 16" FIRE WATER PIPE HDD INSTALLATION.
C. NEW FIRE HYDRANT.
D. FIRE LOOP SERVICE TO FACILITY 69800.
E. CONNECTION TO EXISTING FIRE WATER SYSTEM.
F. TAKE OUT OF SERVICE AND ABANDON FIRE WATER SYSTEM.
G. POTABLE WATER ITEM REMOVAL & VALVE REPLACEMENT.
H. CONFLICT PIPE AND WATER SYSTEM APPURTENANCE REMOVAL.
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
T I T
I
R
O A
D
F
A C
I L
I T
Y
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
I
N A
4 5 6
I L
T
D
A T
E
C O
N T
R O
L
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
I
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
E
H
E
H
B
A
A
B
H
B
H
A
H
C
C
C
D
D
G
F
F
F
ITL FIRE WATER SYSTEM TITAN III ROAD - FAC 70000
1" = 100'
A
G
CC-101
T
L
F
I R
E
W
A T
T
I
R
O A
D
R A
I L
R O
R
D
A
N
T A
A
D
ITL FIRE WATER - TITAN ROAD RAILROAD YARD
1" = 30'
90'60'30'0'30'
GRAPHIC SCALE 1" = 30'
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
T I T
I
R
O A
D
F
A C
I L
I T
Y
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
I
N A
4 5 6
I L
T
D
A T
E
C O
N T
R O
L
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
I
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
ITL FIRE WATER - TITAN AND CENTAUR ROAD
1" = 30'
M A
T C
H
L
I N
E
B
S E
E
S
H E
M A
T C
H
L
I N
E
A
M A
T C
H
L
I N
E
A
HDD 16" PIPE INSTALLATION
HDD 16" PIPE INSTALLATION
PROJECT CONSTRUCTION FLAG NOTE COORDINATION:
SEE SHEET CC-102 FOR CONSTRUCTION FLAG NOTE APPLICABLE TO THIS SHEET.
SEE SHEET CD-101 FOR DEPICTION OF EXISTING UTILITIES, PROJECT DEMOLITION AND
RESTORATION WORK APPLICABLE TO THIS SHEET.
CC-102
T
L
F
I R
E
W
A T
T
I
R
O A
D
F A
C I L
I T
Y
90'60'30'0'30'
GRAPHIC SCALE 1" = 30'
PROJECT CONSTRUCTION FLAG NOTE COORDINATION:
SEE SHEET CD-102 FOR DEPICTION OF EXISTING UTILITIES, PROJECT DEMOLITION AND RESTORATION WORK APPLICABLE TO THIS SHEET.
PROJECT CONSTRUCTION FLAG NOTES:
THE FOLLOWING CONSTRUCTION FLAG NOTES ARE A RECOMMENDED SEQUENCE OF CONSTRUCTION NOTING MATERIALS PROVIDED AND
SPECIFIC TASKS. THE CONTRACTOR MAY PRESENT AN ALTERNATIVE SEQUENCE TO THE CONTRACTING OFFICER FOR REVIEW AND
ACCEPTANCE PRIOR TO VARYING FROM THE RECOMMENDED SEQUENCE OF CONSTRUCTION.
1. FIRE HYDRANT - 2 LOCATIONS PROVIDE 16"X6" TAPPING SADDLE, 6" MJ RS TAPPING VALVE & VALVE BOX, MAKE ASSEMBLY & PRESSURE
TEST, MAKE 6" TAP, FIRE HYDRANT ASSEMBLY.
2. ISOLATE NORTHERN WATER SUPPLY - CLOSE 3 ISOLATION VALVES AND VERIFY CLOSURE TO TAKE 12" WESTERN SIDE TITAN III ROAD &
16" ROADWAY CROSSING OF ITL FIRE WATER SYSTEM OUT OF SERVICE.
3. 16" 3 WAY JUNCTION - REMOVE PORTIONS OF EXISTING FIRE LINE 12" & 16" PIPE, FITTINGS, & FIRE HYDRANT ASSEMBLY, SALVAGE 12" & 6"
BURIED VALVE & FIRE HYDRANT & TRANSPORT TO BASE CCAFS PLUMBING CONTRACTOR STORAGE YARD, PROVIDE 12"X16" MJ REDUCER
& CONNECT TO 12" PVC PIPE, 16" - DR 18 - C-905 - BLUE STRIPE - PVC PIPE, 2-16" MJ RS GATE VALVE W / VALVE BOX, 2-16" MJ 45 BEND, 16"
MJ WYE, 16"X6" MJ TEE W / FIRE HYDRANT ASSEMBLY, 2-TEMPORARY 16" MJ PLUG, 16" & 12" ANCHOR FOLLOWER GLANDS, RESTRAIN ALL
PIPE JOINTS WITHIN 100' OF VALVES & FITTINGS, RESTRAIN TEMPORARY PLUGS AGAINST TEST PRESSURE THRUST, PRESSURE TEST NEW
NORTHERN Y PIPING ASSEMBLY @ 200 PSI, REMOVE TEMPORARY 16" PLUG, PROVIDE CONCRETE PLUG TO ABANDON OPEN END PIPE, ADDITIONAL 16" PVC PIPE, 16" MJ COUPLING, MAKE CONNECTION TO EXISTING 16" PIPE, RESTORE NORTHERN ITL WESTERN SIDE TITAN III
ROAD FIRE WATER SERVICE LEAVING SOUTHERN 12" RUN TO FAC 69800 ABANDON OUT OF SERVICE.
4. ABANDONMENT OF 12" & 10" FIRE LINE & CLEARING OF CONSTRUCTION CONFLICTS - SALVAGE 3 FIRE HYDRANT & TRANSPORT TO BASE
CCAFS PLUMBING CONTRACTOR STORAGE YARD, REMOVE CONSTRUCTION CONFLICT HYDRANT VALVES, 12", 10", & 6" WATER PIPES, 10"
WATER PIPE INSIDE CASING, CONCRETE KNEE WALL, AND ABANDON IN PLACE VALVES VALVE BOX, AND ISOLATE NORTHERN FIRE WATER
LOOP FACILITY 69800, PROVIDE CONCRETE PLUG TO ABANDON OPEN END PIPE.
5. 16" WATER PIPE - REMOVE TEMPORARY 16" PLUG & PORTION OF 10" PIPE, PROVIDE 2-45 MJ BEND, 16" - DR 18 - C-905 - BLUE STRIPE -
STICK AND FUSED PVC PIPE, INSTALL BY HORIZONTAL DIRECTIONAL DRILL METHOD FUSED 16" PVC PIPE UNDER RAILROAD MIN 6' BELOW
BOTTOM OF RAIL, 16"X12" MJ TEE W / 12" MJ RS GATE VALVE (CLOSED), VALVE BOX, 12"X10" REDUCER, MAKE CONNECTION TO EXISTING
10" FIRE WATER PIPE, 16" MJ RS GATE VALVE W / VALVE BOX, 16"X6" MJ TEE W / FIRE HYDRANT ASSEMBLY, TEMPORARY 16" MJ PLUG, 16", 12", & 6" ANCHOR FOLLOWER GLANDS, RESTRAIN ALL PIPE JOINTS WITHIN 100' OF VALVES & FITTINGS, PRESSURE TEST NEW PIPING
ASSEMBLY BETWEEN NEW VALVES @ 200 PSI, RESTORE PORTION OF NEW PIPE TO RESTORE NORTHERN FIRE WATER SUPPLY AND LOOP
TO FACILITY 69800 LEAVING NEW 16" FRONTING FACILITY 69800 OUT OF SERVICE.
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
T I T
I
R
O A
D
F
A C
I L
I T
Y
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
I
N A
4 5 6
I L
T
D
A T
E
C O
N T
R O
L
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
I
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
SCALE:
ITL FIRE WATER - FAC 69800
1" = 30'
M A
T C
H
L
I N
E
B
S E
E
S
H E
6. ABANDONMENT OF 10" FIRE LINE - ISOLATE SOUTHERN FIRE WATER LOOP FACILITY 69800 KEEPING FACILITY 69800 FIRE WATER SERVICE
SUPPLIED FROM THE NORTH, TAKE OUT OF SERVICE REMAINING ACTIVE TITAN III ROAD 10" FIRE WATER PIPE, REMOVE PORTIONS OF 10"
PIPE MULTIPLE LOCATIONS, CONFLICT TO BE ABANDON BRANCH WATER SERVICE PIPES, VALVES, & FITTINGS, AND FIRE HYDRANT.
7. SOUTHERN FIRE WATER SERVICE TO FACILITY 69800 - REMOVE TEMPORARY 16" PLUG, PROVIDE 16"X12" MJ TEE W / 12" MJ RS GATE
VALVE, VALVE BOX, 12"X10" REDUCER, MAKE CONNECTION TO EXISTING 10" FIRE WATER PIPE, 16", 12", & 10" ANCHOR FOLLOWER
GLANDS, RESTRAIN ALL PIPE JOINTS WITHIN 100' OF VALVES & FITTINGS, PROVIDE CONCRETE PLUG TO ABANDON OPEN END PIPE.
8. 16" WATER PIPE - PROVIDE MJ 16" - DR 18 - C-905 - BLUE STRIPE - STICK PVC PIPE, 16"X6" MJ TEE W / FIRE HYDRANT ASSEMBLY, 2-22.5 MJ
BEND, MAKE CONNECTION TO EXISTING 16" SOUTHERN VALVE 16" & 12" ANCHOR FOLLOWER GLANDS, RESTRAIN ALL PIPE JOINTS
WITHIN 100' OF VALVES & FITTINGS, RESTRAIN TEMPORARY PLUGS AGAINST TEST PRESSURE THRUST, PRESSURE TEST NEW PIPING
ASSEMBLY @ 200 PSI, PLACE INTO SERVICE ALL NEW 16" FIRE WATER PIPING & FACILITY 69800 FULL 10" FIRE WATER LOOP.
9. POTABLE WATER SERVICE FACILITY 69800 - 2 LOCATIONS - EXCAVATE & VERIFY EXISTING WATER PIPE AND SERVICE SIZE & MATERIAL, REMOVE VALVE, BLOW-OFF ASSEMBLY, 4" BACKFLOW ASSEMBLY, & CONCRETE PADS, PROVIDE 2- 4" RS GATE VALVE & VALVE BOX, 4"
MJ PLUG W / 2" TAP, 4" - DR 18 - C-905 - BLUE STRIPE - PVC PIPE, 2 " SCH 80 PVC PIPE, MAKE CONNECTION BETWEEN NEW VALVE & PIPE
TO EXISTING WATER SERVICE PIPING, FLUSH, AND PLACE INTO SERVICE.
FLAG NOTE LEGEND:
FLAG NOTE DETAILS:
CC-501
CC-501
CC-501
CC-501
CC-103
T
L
F
I R
E
W
A T
T
I
R
O A
D
F A
C I L
I T
Y
60'40'20'0'20'
GRAPHIC SCALE 1" = 20'
PROJECT CONSTRUCTION FLAG NOTES:
THE FOLLOWING CONSTRUCTION FLAG NOTES ARE A RECOMMENDED SEQUENCE OF CONSTRUCTION NOTING MATERIALS PROVIDED AND
SPECIFIC TASKS. THE CONTRACTOR MAY PRESENT AN ALTERNATIVE SEQUENCE TO THE CONTRACTING OFFICER FOR REVIEW AND
ACCEPTANCE PRIOR TO VARYING FROM THE RECOMMENDED SEQUENCE OF CONSTRUCTION.
11. 16" HORIZONTAL DIRECTIONAL DRILL (HDD) - PROVIDE 16" FUSED JOINT DR-18 BLUE C-905 PVC PIPE INSTALLED BY HDD METHOD, TEMPORARY 16" MJ PLUG EAST END, SECURE AGAINST PRESSURE TEST FORCES..
12. 16" PIPE - ISOLATE WESTERN PARKWAY 16" FIRE WATER SYSTEM, REMOVE 16" PLUG, PROVIDE 16" BLUE DR-18 C-905 PVC PIPE, 2-16" MJ
90 BENDS, 16" MJ COUPLING, 16" ANCHOR MJ FOLLOWER GLANDS, MAKE CONNECTION BETWEEN NEW AND ALL EXISTING FIRE WATER
PIPE SYSTEMS, RESTRAIN TEMPORARY PLUGS AGAINST TEST PRESSURE THRUST, PRESSURE TEST NEW PIPING ASSEMBLY @ 200 PSI .
13. 16" CONNECTION - ISOLATE EASTERN PARKWAY 16" FIRE WATER SYSTEM, REMOVE 16" PLUG, PROVIDE 16" BLUE DR-18 C-905 PVC PIPE, 16" MJ COUPLING, 16" ANCHOR MJ FOLLOWER GLANDS, MAKE CONNECTION BETWEEN NEW AND EXISTING FIRE WATER PIPE SYSTEMS, RESTORE ALL FIRE WATER PIPING SYSTEMS TO SERVICE.
PROJECT RESTORATION AND DEMOLITION FLAG NOTES:
20. PROVIDE & MAINTAIN EROSION CONTROL MEASURES.
31. PROVIDE AS NOTED OR DISTURBED PROJECT AREAS SOD RESTORATION STORM WATER CONVEYANCE & TREATMENT SYSTEMS, AREAS
WITHIN 30' OF SCRUB VEGETATION, AND SLOPES STEEPER THAN 5:1, SEED & MULCH RESTORATION ON SLOPES 5:1 OR LESS. WATER TO
INSURE LAID SOD & SEED GROWTH ESTABLISHMENT.
33. REMOVE 16" MJ PLUG
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
T I T
I
R
O A
D
F
A C
I L
I T
Y
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
I
N A
4 5 6
I L
T
D
A T
E
C O
N T
R O
L
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
I
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
SCALE:
UTILITY, RESTORATION, AND DEMOLITION PLAN
1" = 20'
ITL FIRE WATER - FAC 70000
SCALE:
FIRE WATER SYSTEM PLAN
1" = 20'
ITL FIRE WATER - FAC 70000
HDD 16" PIPE INSTALLATION
CD-101
X
I S
I T
G
I L
I T
Y
D
E M
O L
I T
I O
N
A N
D
R
E S
T O
R A
T I O
N
P
L A
N
90'60'30'0'30'
GRAPHIC SCALE 1" = 30'
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
T I T
I
R
O A
D
F
A C
I L
I T
Y
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
I
N A
4 5 6
I L
T
D
A T
E
C O
N T
R O
L
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
I
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
M A
T C
H
L
I N
E
B
S E
E
S
H E
M A
T C
H
L
I N
E
A
M A
T C
H
L
I N
E
A
ITL FIRE WATER - TITAN AND CENTAUR ROAD
1" = 30'
ITL FIRE WATER - TITAN ROAD RAILROAD YARD
1" = 30'
PROJECT DEMOLITION AND RESTORATION FLAG NOTE COORDINATION:
SEE SHEET CD-102 FOR DEMOLITION AND RESTORATION FLAG NOTE APPLICABLE TO THIS SHEET.
SEE SHEET CC-101 FOR CONSTRUCTION WORK APPLICABLE TO THIS SHEET.
CD-102
X
I S
T I N
G
U
T I L
I T
Y
D
E M
O L
I T
I O
N
A N
D
R
E S
T O
R A
T I O
N
P
L A
N
90'60'30'0'30'
GRAPHIC SCALE 1" = 30'
PROJECT CONSTRUCTION FLAG NOTE COORDINATION:
SEE SHEET CC-102 FOR CONSTRUCTION WORK APPLICABLE TO THIS SHEET.
DEMOLITION AND RESTORATION FLAG NOTES:
20. PROVIDE & MAINTAIN EROSION CONTROL MEASURES.
21. REMOVE PORTION OF EXISTING PVC, CAST IRON, OR DUCTILE IRON WATER PIPE AND FITTINGS. GROUT PLUG ABANDON OPEN END PIPES.
22. REMOVE & SALVAGE FIRE HYDRANT.
23. REMOVE & SALVAGE IN LINE & HYDRANT BURIED VALVE.
24. REMOVE FIRE HYDRANT VALVE.
25. ABANDON IN PLACE VALVE, CLOSE VALVE, REMOVE VALVE BOX IN EARTHEN OR DISTURBED PAVEMENT AREA, IN UNDISTURBED PAVEMENT
REMOVE COVER AND FILL OPEN VALVE BOX W/ CONCRETE BROOM FINISH.
26. SAW CUT, REMOVE, AND REPLACE CONCRETE WALK & CURB.
27. REMOVE TRAFFIC BOLLARD.
28. REMOVE WATER SAMPLE ASSEMBLY AND CONCRETE PAD.
29. SAW CUT, REMOVE, AND REPLACE ASPHALT PAVEMENT, PROVIDE MINIMUM 10' WIDE TRENCH ASPHALT PATCH.
30. SAW CUT AND REMOVE CONCRETE KNEE WALL, BACKFILL TO REPLACED PAVEMENT GRADE AND SLOPE AWAY AT 6:1 GRADE.
31. PROVIDE AS NOTED OR DISTURBED PROJECT AREAS SOD RESTORATION STORM WATER CONVEYANCE & TREATMENT SYSTEMS, AREAS
WITHIN 30' OF SCRUB VEGETATION, AND SLOPES STEEPER THAN 5:1, SEED & MULCH RESTORATION ON SLOPES 5:1 OR LESS. WATER TO
INSURE LAID SOD & SEED GROWTH ESTABLISHMENT.
32. REMOVE 4" ABOVEGROUND BACKFLOW PREVENTION ASSEMBLY AND CONCRETE PAD.
FLAG NOTE LEGEND:
FLAG NOTE DETAILS:
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
T I T
I
R
O A
D
F
A C
I L
I T
Y
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
I
N A
4 5 6
I L
T
D
A T
E
C O
N T
R O
L
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
I
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
UTILITY, DEMOLITION, AND RESTORATION PLAN
M A
T C
H
L
I N
E
B
S E
E
S
H E
CC-501
CC-501
CC-501
PRIME COAT
12" STABILIZED SUBBASE,
COMPACT TO 95% MODIFIED
PROCTOR DENSITY, MIN LBR 40
9" LIMEROCK BASE, COMPACT TO
98% MODIFIED PROCTOR DENSITY,
MIN LBR 100
2 COURSES OF ASPHALTIC CONCRETE, 1ST COURSE
1.5" FDOT TYPE S-I, 2ND COURSE 1.25" FDOT
TYPE S-III, PRIME COAT BETWEEN COURSES
SLOPE PER PLAN
GRASS EDGE
6"
24" SOD
EXISTING ASPHALT
EXISTING SUBGRADE
EXISTING BASE
EXISTING ASPHALT EDGE
12"
6"
BACKFILL IN 8" LIFTS 95%
COMPACTION PRIOR TO
CONTINUING WITH
SUCCEEDING LAYER
FINISHED GRADE - PROVIDE
NOTED SURFACE RESTORATION
WARNING TAPE
#10 INSULATED
SOLID COPPER WIRE
SCALE:
ASPHALT PAVEMENT
NONE
CC-501
SCALE:
THRUST BLOCKS
NONE
CC-501
TRENCH NOTES:
1. TRENCH SIDE SLOPE AND SHORING SHALL BE IN ACCORDANCE WITH OSHA
CONSTRUCTION STANDARDS FOR EXCAVATION ( 29 CFR PART 1926.650 - .652,
SUBPART P).
2. COMPACTED BACKFILL MATERIAL SHALL BE FREE OF ASPHALT, LARGE ROCKS (3"
DIA. MAX.), WOOD, ROOTS AND OTHER ORGANIC MATTER.
3. CONTRACTOR SHALL EXCAVATE BOTTOM OF TRENCH TO ALLOW FOR BELL
SECTION OF PIPE.
4. BACKFILL SHALL BE COMPACTED BENEATH THE HAUNCHES OF THE PIPE USING
MECHANICAL TAMPS. THIS COMPACTION SHALL BE 95% OF MAXIMUM DENSITY AS
DETERMINED BY AASHTO T-180, O D.OR O.T. SPECIFICATIONS WHICHEVER IS
GREATER.
5. BASE MATERIALS SHALL BE EITHER OF THE SAME TYPE AND COMPOSITION AS
THE MATERIALS REMOVED OR EQUAL OR GREATER STRUCTURAL ADEQUACY.
MIN 1'
O D
V A
R I E
S
M
C
O V
E R
MIN 2' SEPARATION
SINGLE PIPE
TRENCH WALL
DUAL PIPE
TRENCH WALL
MAX. WATER LEVEL
PERMITTED DURING
CONSTRUCTION
SAW CUT BACK FOR CLEAN
EDGE PRIOR TO PAVING,
TACK COAT
SCALE:
TYPICAL TRENCH SECTION
NONE
CC-501
CC-501
C I V
T
A I L
S
A
B
2 3
C
D
1 2 3
R E
P A
T
N
E S
T I T
I
R
O A
D
F
A C
I L
I T
Y
C
C A
F S
S
H
O U
G H
T A
L I N
G
G
B
E A
R D
I
N A
4 5 6
I L
T
D
A T
E
C O
N T
R O
L
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E A
P P
R
D B
I
C
D
A
B
D B
E H
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
R A
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
NOTE: IF THE DEPTH OF THE VALVE NUT IS GREATER THAN 48" BELOW GRADE, OR 30" BELOW GRADE
AND UNDER THE WATER TABLE, A VALVE EXTENSION WILL BE REQUIRED. NAME PLATE WITH VALVE
OPERATION INFORMATION AND VALVE NUMBER TO BE INSTALLED ON ALL NEW VALVES. COORDINATE
WORK WITH CCAFS WATER AND WASTE DEPT.
SCALE:
BURIED VALVE
NONE
CC-501
SCALE:
FIRE HYDRANT
NONE
CC-501
FINISHED GRADE
OPEN
CI VALVE BOX
3'x3'x4" CONCRETE PAD
INDICATE PIPE SIZE AND FLOW
DIRECTION IN BLUE PAINT
2" SQ. OPERATOR VALVE
(OPEN CLOCKWISE)
#10 AWG INSULATED
SOLID COPPER WIRE
18"x18"x3"
CONCRETE PAD
POST INDICATOR
VALVE NOTES:
PAINT POTABLE WATER VALVE BOX COVERS BLUE.
PAINT FIRE WATER VALVE BOX COVERS & POST INDICATORS RED.
SCRIBE IN WET POURED CONCRETE PAD WATER LINE DIRECTIONS.
IMBEDDED WITHIN CONCRETE PAD, MIN 2" DIA T BRASS SURVEY MARKER FOR OTHERS TO
MARK OF VALVE NUMBER.
BRASS SURVEY
MARKER (TYP)
BRASS SURVEY
MARKER
ASPHALT SURFACE
BASE
3'X3'X6"
THICK CONC. PAD
TYP. EACH VALVE BOX.
3" DIA. BRONZE OR S.S. DISC
ANCHORED IN CONC.
#4 BARS
ALL AROUND
3" DIA. BRONZE OR STAINLESS STEEL
DISC ANCHORED IN CONC.
4" x 4" x 18" LONG (MIN.)
PRECAST POST WITH 3"
DIAMETER BRONZE DISC SET
IN GROUT AS SHOWN ABOVE.
NOTES:
1. BRONZE OR S.S. IDENTIFICATION DISC SHALL BE REQUIRED FOR ALL VALVES.
VALVE BOX AND
COVER (TYP.)
TOP FLUSH WITH
FINISHED GRADE
3000 P.S.I. CONCRETE MIN.
VALVE BOX AND COVER (TYP.)
ANCHOR
(TYP.)
SCALE:
VALVE COLLAR
NONE
CC-501
IMPROVED CONDITION
UNIMPROVED CONDITION
9"
2" MIN.
12"
4"
CC-502
CC-502
CC-501
CC-501
THRUST BLOCK
CC-501
BACKFILL & COMPACT
VALVE W/ BRICK
SUPPORTS
PAVEMENT CURB EDGE
ASPHALT COURSE
6"
1'-4"8"
1'-6"
6"
SLOPE PER PLAN
BASE COURSE
SUBBASE COURSE
1/2" 1/2"
1/2"
1/2"
RIGID STRUCTURE
120' MAX.*
120' MAX.
30' MAX.
5'
FD
SAWED JOINTS
OPEN JOINTS
ADDDDDDDD EA
ACCCC BBBBBA
5' 5' 5' 5' 5' 5' 5' 5' 5'
30' MAX.
30' MAX.
5' 5'
5' 5'
5'5'5' 5'
5'
RIGID STRUCTURE
RIGID STRUCTURE
RIGID STRUCTURE
SCALE:
ASPHALT PAVEMENT
NONE
CC-501
SCALE:
CONCRETE WALKWAY
NONE
CC-501
PAVEMENT SURFACE TO BE
0.25" ABOVE LIP OF GUTTER
FLAT BOTTOM TRENCH BACKFILL
LIGHTLY CONSOLIDATED TO
CENTERLINE OF PIPE
BACKFILL IN 6" LIFTS
THOROUGHLY TAMPED TO
95% COMPACTION
UNDISTURBED STABLE
SOIL MATERIAL
SLOPE PER OSHA (29 CFR
PART 1926.650-.652)
JOINT LEGEND
A - 1/2" EXPANSION JOINT W/PREFORMED JOINT FILLER
B - 1/8" DUMMY JOINT, TOOLED
C - 1/8" FORMED OPEN JOINT
D - 3/16" SAW CUT JOINT, 1 1/2" DEEP (24 HOURS) MAX. 5' CENTER
E - 3/16" SAW CUT JOINT, 1 1/2" DEEP (12 HOUR) MAX. 30' CENTER
F - 1/2" EXPANSION JOINT WHEN RUN EXCEEDS 120'
G - COLD JOINT WITH BOND BREAKER, TOOLED
FIRE HYDRANT NOTES:
HAVE BASE CONTRACTOR FLOW TEST AND CONTRACTOR THEN PAINT
ALL NEW, REUSED, OR FIRE HYDRANTS LOCATED ON EXISTING WATER
LINES CONVERTED TO DEDICATED FIRE WATER DISTRIBUTION
SYSTEM:
SAFETY BLUE - 1,500 GMP OR MORE
SAFETY GREEN - 1,000 TO 1,499 GPM
SAFETY ORANGE - 500 TO 999 GPM
SAFETY RED - BELOW 500 GPM
PAINT FIRE HYDRANT BONNET COLOR BASED OF FLOW TEST RATE.
ALL REMAINING EXPOSED PORTIONS OF FIRE HYDRANT PAINT COLOR
BASED ON TYPE OF WATER SYSTEM IT IS CONNECTED TO.