ATTACHMENT 2 Technical Specifications
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USAF 45th Space Wing / NASA - KSC
JOB ORDER CONTRACT
Technical Specifications
Book 1 of 5
CSI SECTIONS 01 - 07
January 2012
This Page Intentionally Left Blank
Table of Contents
USAF 45th Space Wing / NASA - KSC TOC - 1
01 General Requirements
01 20 00 00 Summary of Work 01 22 16 00 No Specification Required 01 32 33 00 Submittal Procedures 01 32 33 00a General Safety Requirements 01 32 33 00b Schedule Of Values 01 32 33 00c Special Procedures for Historic Treatment 01 32 33 00d LEED Requirements 01 32 33 00e References 01 32 33 00f Abbreviations, Acronyms, Definitions, and Symbols 01 32 33 00g Temporary Pressure Differential Systems 01 32 33 00h Respiratory Protection 01 32 33 00i Decontamination Units 01 32 33 00j Cutting and Patching 01 41 26 00 Sources for Reference Publications 01 52 13 00 Temporary Facilities and Controls 01 54 23 00 Scaffolding Tubular Steel 01 56 39 00 Temporary Pest Control 01 58 00 00 Environmental Protection 01 58 00 00a Temporary Storm Water Pollution Control 01 66 19 00 Recycled / Recovered Materials 01 74 19 00 Integrated Solid Waste Management 01 74 19 00a Closeout Procedures 01 74 19 00b Construction Waste Management
02 Existing Conditions
02 32 13 00 Subsurface Drilling, Sampling, And Testing 02 41 13 13 Selective Demolition 02 41 13 13a Portland Cement Concrete Removal 02 41 16 13 Building Demolition 02 61 00 00 Excavation And Handling Of Contaminated Material 02 61 13 00 Underground Storage Tank Removal 02 61 13 00a Precision Testing Of Underground Fuel Oil Tanks 02 61 13 00b Hydrostatic Pressure Testing Of Air Receiving Tanks 02 81 00 00 Disposal Of Hazardous Materials 02 82 00 00 General Provisions (Asbestos Abatement Projects) 02 82 00 00a Removal Of Friable Asbestos-Containing Materials 02 82 00 00b Removal Of Nonfriable Asbestos-Containing Materials 02 82 00 00c Encapsulation (Lock-Down) Of Asbestos-Containing Materials 02 83 19 00 Removal And Disposal Of Lead-Containing Paint 02 83 19 00a Lead Paint Related Abatement Procedures 02 83 19 00b XRF Testing For Lead-Based Paint 02 83 19 00c Lead Dust Wipe, Air And Tclp Sampling And Analysis 02 85 00 00 Mold Remediation 02 87 00 00 Bird And Bird Waste Abatement
03 Concrete
03 01 30 71 Concrete Rehabilitation 03 05 00 00 Cast-In-Place Concrete 03 11 16 00 Cast-In-Place Architectural Concrete 03 35 23 00 Exposed Aggregate Surface Concrete Walls 03 35 39 00 Rusticated Concrete Finishes 03 37 13 00 Shotcrete 03 37 13 00a Glass Fiber Reinforced Concrete 03 41 16 00 Plant-Precast Structural Concrete 03 41 16 00a Precast Lighweight Roof Slabs 03 41 23 00 Architectural Precast Concrete 03 41 26 00 Unbonded Post-Tensioned Concrete 03 51 13 00 Cementitious Wood-Fiber Deck 03 51 16 00 Gypsum Plank Decking
TOC - 2 USAF 45th Space Wing / NASA - KSC
03 51 16 00a Gypsum Concrete Decks 03 52 16 00 Lightweight Insulating Concrete 03 53 00 00 Concrete Floor Topping 03 54 00 00 Cement-Based Underlayment
04 Masonry
04 01 20 51 Clay Masonry Restoration And Cleaning 04 01 40 52 Stone Restoration And Cleaning 04 05 13 26 Unit Masonry Assemblies 04 23 13 00 Glass Unit Masonry Assemblies 04 41 00 00 Dimension Stone Cladding 04 41 00 00a Stone Masonry 04 41 00 00b Interior Stone Facing
05 Metals
05 12 23 00 Structural Steel 05 12 23 00a Cold-Formed Metal Framing 05 14 16 00 Structural Aluminum 05 15 16 00 Ornamental Metal 05 21 19 00 Steel Joists 05 31 00 00 Steel Deck 05 50 00 00 Metal Fabrications 05 51 13 00 Metal Stairs 05 51 13 00a Fabricated Spiral Stairs 05 52 13 00 Pipe And Tube Railings 05 53 00 00 Gratings 05 58 16 00 Ornamental Formed Metal 05 73 00 00 Miscellaneous Ornamental Metals 05 73 00 00a Ornamental Railings
06 Wood, Plastics, and Composites
06 01 20 91 Wood Restoration 06 05 23 00 Timber Bridge Components 06 05 23 00a Rough Carpentry 06 05 23 00b Miscellaneous Carpentry 06 05 23 00c Heavy Timber Construction 06 05 23 00d Structural Glued-Laminated Timber 06 05 73 33 Wood Decking 06 11 13 00 Rough Carpentry Renovation 06 15 13 00 Exterior Rough Carpentry 06 16 23 00 Sheathing 06 17 33 00 Metal-Plate-Connected Wood Trusses 06 22 13 00 Exterior Finish Carpentry 06 22 13 00a Interior Finish Carpentry 06 25 16 00 Paneling 06 41 13 00 Interior Architectural Woodwork 06 42 19 00 Plastic Paneling 06 46 29 00 Exterior Architectural Woodwork 06 51 13 00 Plastic Lumber 06 51 13 00a Composite Plastic Lumber 06 51 13 00b Structural Plastic Lumber 06 74 13 00 Pultruded Fiberglass Industrial Grating 06 85 00 00 Pultruded Fiberglass Structural Shapes
USAF 45th Space Wing / NASA - KSC TOC - 3
07 Thermal And Moisture Protection
07 05 13 00 Built-Up Coal-Tar Roofing 07 05 13 00a CSPE Membrane Roofing 07 05 13 00b APP-Modified Bituminous Membrane Roofing 07 05 13 00c SBS-Modified Bituminous Membrane Roofing 07 05 13 00d Membrane Reroofing Preparation 07 11 13 00 Bituminous Dampproofing 07 11 13 00a Cold Fluid-Applied Waterproofing 07 11 13 00b Hot Fluid-Applied Rubberized Asphalt Waterproofing 07 13 13 00 Bituminous Waterproofing 07 13 53 00 Self-Adhering Sheet Waterproofing 07 13 53 00a Elastomeric Sheet Waterproofing 07 16 13 00 Modified Cement Waterproofing 07 16 13 00a Crystalline Waterproofing 07 16 19 00 Metal-Oxide Waterproofing 07 17 13 00 Bentonite Waterproofing 07 19 13 00 Water Repellents 07 21 13 13 Building Insulation 07 21 13 13a Stretched-Fabric Wall Systems 07 22 16 00 Fluid-Applied Protected Membrane Roofing 07 24 13 00 Polymer-Based Exterior Insulation And Finish System (EIFS) 07 24 13 00a Water-Drainage Exterior Insulation and Finish System (EIFS) 07 31 13 00 Asphalt Shingles 07 31 13 00a Preparation for Reroofing 07 31 16 00 Metal Shingles 07 31 33 00 Composite Rubber Shingles 07 32 13 00 Clay Roof Tiles 07 32 16 00 Concrete Roof Tiles 07 34 00 00 Slate Shingles 07 34 00 00a Wood Shingles And Shakes 07 41 13 00 Metal Roof Panels 07 41 13 00a Sheet Metal Roofing 07 42 13 19 Glazing 07 46 16 00 Metal Wall Panels 07 46 16 00a Metal Plate Wall Panels 07 46 16 00b Siding 07 46 63 00 Insulated-Core Metal Wall Panels 07 51 13 00 Built-Up Asphalt Roofing 07 53 16 00 EPDM Membrane Roofing 07 54 19 00 Polyvinyl-Chloride (PVC) Roofing 07 54 23 00 Thermoplastic Polyolefin (TPO) Roofing 07 56 00 00 Coated Foamed Roofing 07 62 00 00 Sheet Metal Flashing And Trim 07 63 00 00 Common Work Results for Fire Suppression 07 63 00 00a Common Work Results for Plumbing 07 63 00 00b Common Work Results for HVAC 07 71 19 00 Manufactured Roof Specialties 07 72 13 00 Packaged, Outdoor, Central-Station Air-Handling Units 07 72 13 00a Power Ventilators 07 72 13 00b Intake and Relief Ventilators 07 72 23 00 Roof Accessories 07 81 16 00 Sprayed Fire-Resistive Materials 07 82 00 00 Board Fire Protection 07 84 13 00 Through-Penetration Firestop Systems 07 84 13 00a Fire-Resistive Joint Systems 07 84 13 00b Firestopping 07 92 00 00 Joint Sealants 07 95 13 00 Architectural Joint Systems 07 95 13 00a Roof Expansion Assemblies
08 Openings
08 01 11 00 Steel Doors And Frames 08 01 11 00a Steel Entry Doors 08 01 52 61 Wood Windows 08 05 13 00 Stainless Steel Doors And Frames
TOC - 4 USAF 45th Space Wing / NASA - KSC
08 05 13 00a Wood Doors 08 05 13 00b Flush Wood Doors 08 11 63 13 Steel Storm Doors 08 11 63 13a Security Window Screens and Doors 08 11 63 23 Aluminum Storm Doors 08 11 73 00 Sliding Metal Fire Doors 08 14 16 00 Stile And Rail Wood Doors 08 16 13 00 Fiberglass Reinforced Plastic (FRP) Doors and Frames 08 16 13 00a Insulated Fiberglass Doors and Frames 08 16 13 00b Dry-Chemical Fire-Extinguishing Systems 08 31 13 00 Access Doors And Frames 08 32 13 00 Sliding Aluminum-Framed Glass Doors 08 32 19 00 Sliding Wood-Framed Glass Doors 08 33 13 00 Overhead Coiling Doors 08 33 26 00 Overhead Coiling Grilles 08 33 36 00 Side Coiling Grilles 08 34 49 13 Radiation Protection 08 34 53 00 Detention Doors And Frames 08 34 53 00a Security Grilles 08 34 63 13 Detention Door Hardware 08 34 63 13a Detention Enclosures 08 34 63 13b Detention Furniture 08 34 73 00 Sound Control Doors 08 35 13 13 Folding Doors 08 36 13 00 Sectional Overhead Doors 08 38 13 00 Flexible Doors 08 41 00 00 Aluminum-Framed Entrances And Storefronts 08 42 26 00 All-Glass Entrances And Storefronts 08 44 13 00 Glazed Aluminum Curtain Walls 08 44 13 00a Structural-Sealant-Glazed Curtain Walls 08 44 13 00b Sloped Glazing Assemblies 08 51 13 00 Aluminum Windows 08 51 13 00a Aluminum Replacement Windows 08 51 23 00 Steel Windows 08 51 69 00 Aluminum Storm Windows 08 53 13 00 Vinyl Windows 08 56 19 00 Security Windows 08 56 83 00 Roof Windows 08 63 00 00 Unit Skylights 08 63 00 00a Metal-Framed Skylights 08 63 00 00b Structured-Polycarbonate-Panel Assemblies 08 63 00 00c Fiberglass-Sandwich-Panel Assemblies 08 71 16 00 Door Hardware 08 75 00 00 Automatic Door Operators 08 83 00 00 Mirrors 08 84 00 00 Plastic Glazing 08 87 23 16 Fragment Retention Film For Glass 08 88 53 00 Security Glazing 08 91 16 00 Louvers And Vents
09 Finishes
09 01 60 00 Carpet 09 22 13 00 Gypsum Plaster 09 22 13 00a Gypsum Veneer Plaster 09 22 13 00b Portland Cement Plaster 09 22 16 00 Non-Load-Bearing Steel Framing 09 22 36 23 Lath and Plaster Renovation 09 23 13 00 Gypsum Board Renovation 09 28 13 00 Gypsum Board 09 28 13 00a Gypsum Board Shaft-Wall Assemblies 09 31 00 00 Ceramic Tile 09 51 13 00 Acoustical Panel Ceilings 09 51 23 00 Acoustical Tile Ceilings 09 61 36 00 Static-Control Resilient Floor Coverings 09 63 13 00 Brick Flooring
USAF 45th Space Wing / NASA - KSC TOC - 5
09 64 23 00 Wood Flooring 09 64 23 00a Wood Sports-Floor Assemblies 09 65 13 13 Cork Flooring 09 65 13 13a Resilient Wall Base And Accessories 09 65 13 33 Resilient Floor Tile 09 65 13 33a Resilient Sheet Flooring 09 65 13 33b Linoleum Floor Coverings 09 65 66 00 Fluid-Applied Athletic Flooring 09 65 66 00a Resilient Sports-Floor Coverings 09 66 13 00 Portland Cement Terrazzo Flooring 09 66 23 16 Resinous Matrix Terrazzo Flooring 09 67 16 00 Resinous Flooring 09 68 13 00 Carpet Tile 09 69 13 00 Access Flooring 09 72 16 00 Wall Coverings 09 84 13 00 Acoustical Wall Panels 09 91 13 00 Exterior Painting 09 91 13 00a Wood Stains and Transparent Finishes 09 91 13 00b High-Temperature-Resistant Coatings 09 91 23 00 Interior Painting 09 91 23 00a Multicolored Interior Coatings 09 93 00 00 Floor Treatment Refinishing Wood Floors 09 93 00 00a High-Performance Coatings
10 Specialties
10 11 13 13 Visual Display Surfaces 10 14 16 00 Signage 10 14 53 00 Traffic Signs 10 17 16 13 Telephone Specialties 10 21 13 13 Toilet Compartments 10 21 13 19 Solid Surface Material Toilet Compartments 10 21 16 00 Cubicle Curtains and Tracks 10 22 13 00 Wire Mesh Partitions 10 22 19 13 Demountable Partitions 10 22 43 00 Operable Panel Partitions 10 26 13 00 Impact-Resistant Wall Protection 10 28 13 13 Toilet And Bath Accessories 10 28 13 13a Detention Toilet Accessories 10 28 16 13 Bath Accessories 10 28 19 00 Plumbing Fixtures 10 44 13 00 Fire Extinguisher Cabinets 10 44 13 00a Fire-Suppression Standpipes 10 44 16 13 Fire Extinguishers 10 51 13 00 Metal Lockers 10 51 26 00 Solid Plastic Lockers 10 55 23 23 Postal Specialties 10 56 13 00 Metal Storage Shelving 10 71 13 13 Exterior Shutters 10 71 13 13a Hurricane Shutters 10 73 13 00 Awnings 10 75 16 00 Flagpoles 10 81 13 00 Oriented Flexible Netting Bird Barrier
11 Equipment
11 12 13 00 Parking Control Equipment 11 12 13 00a Prefabricated Control Booths 11 13 13 00 Loading Dock Equipment 11 14 13 16 Turnstiles 11 21 13 00 Food Service Equipment 11 26 13 00 Unit Kitchens 11 27 13 00 Revolving Darkroom Doors 11 27 13 00a Revolving Darkroom Pass-Through Windows 11 31 13 00 Residential Appliances
TOC - 6 USAF 45th Space Wing / NASA - KSC
11 31 13 00a Refrigerators 11 31 13 00b Gas Ranges 11 31 13 00c Electric Ranges 11 31 13 00d Range Hoods 11 41 33 00 Residential Casework 11 52 13 13 Projection Screens 11 66 13 00 Playground Equipment And Structures 11 66 13 00a Recreational Facilities 11 66 13 00b Gymnasium Equipment 11 66 53 00 Gymnasium Dividers 11 68 23 13 Playing Fields 11 82 19 00 Packaged Incinerators 11 82 26 00 Waste Compactors
12 Furnishings
12 01 60 00 Fixed Audience Seating 12 21 13 13 Horizontal Louver Blinds 12 21 13 13a Vertical Louver Blinds 12 22 13 00 Draperies and Tracks 12 24 13 00 Roller Shades 12 24 13 00a Pleated Shades 12 31 13 00 Kitchen Casework, Stainless Steel Cabinets 12 36 23 13 Stone Countertops 12 36 61 16 Solid Polymer Fabrications 12 48 13 13 Floor Mats And Frames 12 48 13 13a Foot Grilles 12 66 00 00 Telescoping Stands 12 93 23 00 Site Furnishings 12 93 23 00a Miscellaneous Site and Street Furnishings
13 Special Construction
13 34 16 13 Fixed Wood Bleachers (Exterior) 13 34 16 13a Demountable Bleachers (Exterior) 13 34 16 13b Grandstands And Bleachers 13 34 16 53 Portable Bleachers 13 34 19 00 Metal Building Systems 13 42 63 16 Security Ceiling Systems
14 Conveying Equipment
14 01 20 00 Electric Traction Elevators 14 01 20 00a Hydraulic Elevators 14 11 00 00 Dumbwaiters 14 24 13 00 Hydraulic Freight Elevators 14 26 00 00 Limited-Use/Limited-Application Elevators 14 31 00 00 Escalators 14 41 16 00 Personnel Lifts 14 42 13 00 Wheelchair Lifts 14 91 33 00 Chutes
21 Fire Suppression
21 05 19 00 Water Distribution 21 09 00 00 Preaction Control Systems 21 13 00 00 Fire Suppression Sprinkler Systems
USAF 45th Space Wing / NASA - KSC TOC - 7
21 13 13 00 Wet-Pipe Fire-Suppression Sprinklers 21 13 16 00 Dry-Pipe Fire-Suppression Sprinklers 21 13 19 00 Preaction Sprinkler Systems 21 13 26 00 Deluge Fire Suppression Sprinkler Systems 21 13 39 00 Foam Fire Extinguishing 21 22 16 00 Clean-Agent Extinguishing Systems 21 30 00 00 Fire Pumps 21 31 13 00 Electric-Drive, Centrifugal Fire Pumps 21 31 13 00a Pressure-Maintenance Pumps 21 31 13 00b Controllers for Fire-Pump Drivers 21 31 16 00 Diesel-Drive, Centrifugal Fire Pumps
22 Plumbing
22 01 40 00 Emergency Plumbing Fixtures 22 05 19 00 Meters and Gages for Plumbing Piping 22 05 23 00 General-Duty Valves for Plumbing Piping 22 05 76 00 Sanitary Sewerage 22 05 76 00a Storm Drainage Piping Specialties 22 07 19 00 Fire-Suppression Systems Insulation 22 07 19 00a Plumbing Insulation 22 07 19 00b Piping Insulation 22 11 16 00 Domestic Water Piping 22 11 16 00a Sanitary Waste And Vent Piping 22 11 16 00b Storm Drainage Piping 22 11 16 00c Hydronic Piping 22 11 16 00d Steam And Condensate Piping 22 11 16 00e General-Service Compressed-Air Piping 22 11 16 00f Compressed-Air Piping For Laboratory And Healthcare Facilities 22 11 16 00g Vacuum Piping For Laboratory And Healthcare Facilities 22 11 16 00h Gas Piping For Laboratory And Healthcare Facilities 22 11 19 00 Piped Utilities Basic Materials And Methods 22 11 19 00a Storm Drainage 22 11 23 13 Water Distribution Pumps 22 11 23 13a Packaged Booster Pumps 22 11 23 39 Water Supply Wells 22 11 23 39a Hydronic Pumps 22 12 23 13 Electric, Domestic Water Heaters 22 12 23 13a Fuel-Fired, Domestic Water Heaters 22 12 23 26 Underground Storage Tanks 22 13 16 00 Relief Wells 22 13 19 26 Interceptors 22 13 29 13 Packaged Sewage Pumping Stations 22 13 29 13a Lift Station 22 13 29 13b Sewage Pumps 22 14 29 13 Sump Pumps 22 15 13 00 General-Service Packaged Air Compressors and Receivers 22 15 13 00a HVAC Instrumentation And Controls 22 35 23 00 Domestic Water Heat Exchangers 22 42 16 00 Medical Plumbing Fixtures 22 42 19 00 Porcelain Steel Bathtub Liners and Surrounds 22 46 13 00 Security Plumbing Fixtures 22 47 13 00 Drinking Fountains And Water Coolers 22 66 83 16 Chemical-Waste Systems for Laboratory and Healthcare Facilities
23 Heating, Ventilating, And Air-Conditioning (HVAC)
23 01 10 00 Sequence Of Operation 23 01 10 00a Testing, Adjusting, And Balancing 23 01 30 51 Air Duct Cleaning 23 01 50 00 Cast-Iron Boilers 23 01 60 00 Condensing Units 23 05 16 00 Expansion Fittings and Loops for Plumbing Piping 23 05 16 00a Expansion Fittings and Loops for HVAC Piping 23 05 23 00 General-Duty Valves for HVAC Piping
TOC - 8 USAF 45th Space Wing / NASA - KSC
23 05 23 00a Refrigerant Piping 23 05 29 00 Hangers and Supports for Plumbing Piping and Equipment 23 05 29 00a Hangers and Supports for HVAC Piping and Equipment 23 05 48 00 Vibration And Seismic Controls For Fire-Suppression Piping And Equipment 23 05 48 00a Vibration And Seismic Controls For Plumbing Piping And Equipment 23 05 48 00b Vibration And Seismic Controls For HVAC Piping And Equipment 23 05 53 00 Identification for Plumbing Piping and Equipment 23 05 53 00a Identification for HVAC Piping and Equipment 23 07 13 00 HVAC Insulation 23 07 13 00a Equipment Insulation 23 07 13 00b Duct Insulation 23 07 19 00 Steam Distribution 23 09 23 00 Enclosed Controllers 23 11 23 00 Monitoring Wells 23 11 23 00a Facility Natural-Gas Piping 23 11 23 00b Facility Liquefied-Petroleum Gas Piping 23 21 13 23 Facility Fuel-Oil Piping 23 21 13 23a Radiant Heating Piping 23 21 23 23 Electric-Drive, Vertical-Turbine Fire Pumps 23 21 23 23a Diesel-Drive, Vertical-Turbine Fire Pumps 23 22 16 00 Meters and Gages for HVAC Piping 23 22 23 13 Steam Condensate Pumps 23 23 16 00 Refrigerant Detection And Alarm 23 25 13 00 HVAC Water Treatment 23 31 13 13 Metal Ducts 23 31 13 13a HVAC Casings 23 31 13 16 Tailpipe Exhaust Equipment 23 31 13 33 Duct Accessories 23 31 16 13 Nonmetal Ducts 23 33 13 13 Draft Control Devices 23 34 13 00 Axial Fans 23 34 16 00 Centrifugal Fans 23 34 33 00 Air Curtains 23 36 13 00 Diffusers, Registers, And Grilles 23 41 13 00 Air Filters 23 41 13 00a Electronic Air Cleaners 23 41 33 00 High-Efficiency Particulate Filtration 23 42 13 00 Gas-Phase Air Filtration 23 44 00 00 Material and Design Standards 23 51 13 00 Breechings, Chimneys, And Stacks 23 52 13 00 Electric Boilers 23 52 33 00 Condensing Boilers 23 52 33 00a Water-Tube Boilers 23 52 36 00 Fire-Tube Boilers 23 53 16 00 Feedwater Equipment 23 53 16 00a Deaerators 23 54 19 00 Furnaces 23 55 23 00 Radiant Heating and Cooling Units 23 55 23 00a Radiant-Heating Electric Panels 23 55 33 00 Fuel-Fired Unit Heaters 23 55 33 00a Unit Heaters 23 57 13 00 Heat Exchangers 23 61 13 00 Centrifugal Water Chillers 23 61 16 00 Rotary-Screw Water Chillers 23 62 13 00 Indirect-Fired Absorption Water Chillers 23 63 13 00 Air-Cooled Condensers 23 63 13 00a Split-System Air-Conditioning Units 23 64 13 16 Direct-Fired Absorption Water Chillers 23 64 16 16 Fan-Coil Units 23 64 19 00 Reciprocating Water Chillers 23 64 23 00 Scroll Water Chillers 23 65 00 00 Cooling Towers 23 72 13 00 Air-To-Air Energy Recovery Units 23 73 13 00 Modular Indoor Central-Station Air-Handling Units 23 74 13 00 Rooftop Replacement Air Units 23 74 13 00a Self-Contained Air-Conditioners 23 74 13 00b Unit Ventilators 23 74 23 00 Direct-Fired, Makeup Air Units 23 74 23 00a Indirect-Fired, Packaged H&V Units 23 76 13 00 Dehumidification Units
USAF 45th Space Wing / NASA - KSC TOC - 9
23 81 13 00 Packaged Terminal Air Conditioners 23 81 23 00 Computer-Room Air-Conditioners 23 82 16 00 Air Coils 23 82 33 00 Convection Heating Units 23 83 13 00 Radiant-Heating Electric Cables 23 83 13 00a Heat Tracing for Fire-Suppression Piping 23 83 13 00b Heat Tracing for Plumbing Piping 23 83 13 00c Heat Tracing for HVAC Piping 23 84 13 00 Humidifiers
26 Electrical
26 01 20 00 Electrical Renovation 26 01 50 51 Removal of Fluorescent Light Ballasts/Capacitors and Fluorescent Light Tubes 26 01 50 51a Interior Lighting 26 01 50 51b Exterior Lighting 26 05 13 00 Conductors And Cables 26 05 13 00a Undercarpet Cables 26 05 13 00b Medium-Voltage Cables 26 05 19 13 Raceways And Boxes 26 05 19 13a Underfloor Raceways For Electrical Systems 26 05 19 16 Common Work Results for Electrical 26 05 19 16a Common Work Results for Communications 26 05 19 16b Common Work Results for Electronic Safety and Security 26 05 19 16c Communications Equipment Room Fittings 26 05 19 16d Communications Backbone Cabling 26 05 19 16e Communications Horizontal Cabling 26 05 19 16f Conductors and Cables for Electronic Safety and Security 26 05 19 23 Monorails With Electric Powered Hoists 26 05 19 23a Cranes, Overhead Electric, Underrunning (Under 20,000 Pounds) 26 05 23 00 Control-Voltage Electrical Power Cables 26 05 26 00 Lightning Protection 26 05 26 00a Grounding And Bonding 26 05 26 00b Overhead Electrical Distribution 26 05 29 00 Hangers And Supports For Electrical Systems 26 05 29 00a Vibration And Seismic Controls For Electrical Systems 26 05 33 16 Wiring Devices 26 05 36 00 Cable Trays 26 05 53 00 Electrical Identification 26 09 23 00 Lighting Controls 26 09 23 00a Lighting Control Devices 26 09 23 00b Electrical Power Monitoring And Control 26 09 23 00c Motor-Control Centers 26 09 23 00d Central Dimming Controls 26 09 23 00e Modular Dimming Controls 26 11 13 00 Secondary Unit Substations 26 11 16 00 Switchgear 26 12 13 00 Medium-Voltage Transformers 26 12 13 00a Low-Voltage Transformers 26 24 13 00 Electricity Metering 26 24 13 00a Enclosed Switches And Circuit Breakers 26 24 13 00b Switchboards 26 24 16 00 Panelboards 26 24 19 00 Power Distribution Units 26 25 00 00 Enclosed Bus Assemblies 26 28 13 00 Fuses 26 32 13 13 Packaged Engine Generators 26 33 43 00 Central Battery Inverters 26 33 43 00a Nurse Call 26 33 43 00b Public Address and Mass Notification Systems 26 33 53 00 Static Uninterruptible Power Supply 26 33 53 00a Variable Frequency Controllers 26 35 33 00 Power Factor Correction Capacitors 26 36 13 00 Transfer Switches 26 42 13 00 Cathodic Protection 26 55 61 00 Stage Lighting
TOC - 10 USAF 45th Space Wing / NASA - KSC
27 Communications
27 05 26 00 Intercommunications and Program Systems 27 11 19 00 Loose-Tube Gel-Filled Fiber Optic Cables 27 51 16 00 Educational Intercommunications and Program Systems 27 53 13 00 Clock And Program Control
28 Electronic Safety And Security
28 13 33 16 Perimeter Security 28 13 33 16a Intrusion Detection 28 23 00 00 Video Surveillance 28 31 00 00 Fire Detection and Alarm 28 31 00 00a Fire Detection and Alarm (Proprietary) 28 31 00 00b Fire Detection and Alarm Interfaces 28 31 23 00 Digital, Addressable Fire-Alarm System 28 31 23 00a Zoned (DC Loop) Fire-Alarm System
31 Earthwork
31 05 13 00 Earthwork 31 05 13 00a Subdrainage 31 11 00 00 Site Clearing 31 13 13 00 Tree Protection And Trimming 31 23 16 13 Excavation Support And Protection 31 24 13 00 Embankment 31 24 13 00a Levee Closure 31 25 14 13 Sediment Removal 31 25 14 13a Geosynthetic Fabric 31 25 14 13b Erosion Control 31 25 14 23 Unit Pavers 31 25 14 26 Silt Fences 31 31 19 13 Termite Control 31 31 19 13a Soil Sterilization 31 32 13 16 Soil Stabilization-Lime 31 32 19 16 Sewage Treatment Lagoons 31 32 19 16a Pond Reservoir Liners 31 36 00 00 Wire Mesh Gabions 31 37 00 00 Riprap 31 41 13 00 Drilled Piers 31 45 13 00 Soil Stabilization-Vibroflotation 31 62 23 13 Concrete-Filled Steel Piles
32 Exterior Improvements
32 01 11 53 Asphalt Paving 32 01 11 53a Cement Concrete Pavement 32 01 11 53b Traffic Coatings 32 01 16 71 Cold Mix Recycling 32 01 17 61 Crack Sealing Of Bituminous Pavements 32 01 17 61a Spray Applications, Seal Coats, And Surface Treatments 32 01 26 71 Grinding/Grooving Pavement 32 11 16 00 Crushed Stone Paving 32 11 16 00a Crushed Stone 32 11 16 00b Select Gravel 32 12 13 13 Bituminous Paving-Repair And Resurfacing 32 12 13 13a Asphaltic Concrete Overlays
USAF 45th Space Wing / NASA - KSC TOC - 11
32 13 13 00 Roller Compacted Concrete Pavement 32 13 13 00a Decorative Cement Concrete Pavement 32 13 13 00b Portland Cement Concrete Overlays 32 13 13 00c Steel Reinforced Portland Cement Concrete Overlays 32 13 13 00d Fiber Reinforced Portland Cement Concrete Overlays 32 14 09 00 Exterior Plants 32 14 11 00 Asphalt Concrete Sidewalks 32 14 11 00a Miscellaneous Sidewalks 32 14 11 00b Precast Sidewalks And Pavers 32 14 43 00 Porous Unit Paving 32 14 43 00a Vitrified Brick Pavement Replacement 32 16 13 13 Steel Curbs 32 17 23 13 Track, Court, And Playground Markings 32 17 26 00 Tactile/Detectable Warning Tile 32 18 23 29 Colored Athletic Wearing Surface 32 18 23 29a Synthetic Turf 32 18 23 33 Synthetic Running Track Surface 32 31 11 00 Chain-Link Fences And Gates 32 31 13 00 Vinyl Coated Chain Link Fence 32 31 13 00a High-Security Chain-Link Fences And Gates 32 31 19 00 Ornamental Metal Fences and Gates 32 31 29 00 Permanent Wood Fencing 32 32 13 00 Segmental Retaining Walls 32 32 13 00a Modular Retaining Wall 32 84 13 00 Irrigation Systems 32 91 13 16 Tree Relocation 32 91 13 33 Lawns And Grasses 32 91 19 13 Concrete Revetment 32 91 19 13a Septic Tank Systems
33 Utilities
33 01 30 51 Repair And Maintenance Of Imhoff Tanks 33 01 30 51a Repair And Maintenance Of Siphon Tank And Siphons 33 01 30 51b Sewer Line Cleaning 33 01 30 72 Pipe Lining 33 01 30 73 Underground Ducts And Utility Structures 33 05 23 13 Trenchless Excavation Using Microtunneling 33 11 13 23 Sand Drains 33 11 13 23a Hydronic Distribution 33 41 13 19 Ground-Loop Heat-Pump Piping 33 42 16 13 Culverts
34 Transportation
34 41 13 00 Electrical Traffic Control Signals 34 71 13 16 Active Vehicle Barriers 34 71 13 16a Beam-Type Guardrail
35 Waterway and Marine Construction
35 20 16 26 Sluice Gate
41 Material Processing And Handling Equipment
41 01 20 00 Material Handling Hoists 41 22 23 13 Monorails With Air Motor Powered Hoist 41 22 23 13a Monorails With Manual Hoist
TOC - 12 USAF 45th Space Wing / NASA - KSC
41 22 23 23 Ash Hoists
01 - General Requirements
January 2012 Summary of Work USAF 45th Space Wing / NASA - KSC 01 20 00 00 - 1
SECTION 01 20 00 00 - SUMMARY OF WORK
01/11
PART 1 GENERAL 1.1
SUMMARY
The work to be performed under this project is located at Cape Canaveral Air Force Station. Cape Canaveral Air Force Station is located at the end of State Road 401, north of Port Canaveral.
The work to be performed under this project is located at Patrick Air Force Base. Patrick Air Force Base is located approximately three miles south of Cocoa Beach on State Road A1A.
The work to be performed under this project consists of providing the labor, equipment and materials to [_____].
1.2 PROJECT DESCRIPTION
1.2.1 Civil/Site
1.2.2 Structural
1.2.3 Architectural
1.2.4 Mechanical
1.2.5 Electrical
[1.2.6 Telecommunications
[1.2.7 Special Construction
1.3 REFERENCES
The Wing publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
45TH SPACE WING (SWI)
45 SWI 31-101 CCAFS Physical Security Program
AMERICAN WELDING SOCIETY (AWS)
AWS B2.1 (2005; Errata 2006; Errata 2006) Welding Procedure and Performance Qualification
AWS D1.1/D1.1M (2008) Structural Welding Code - Steel
Summary of Work January 2012 01 20 00 00 - 2 USAF 45th Space Wing / NASA - KSC
ASME INTERNATIONAL (ASME)
ASME BPVC SEC IX (2007; Addenda 2008) Boiler and Pressure Vessel Code; Section IX, Welding and Brazing Qualifications
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 241 Safeguarding Construction,Alteration, and Demolition Operations
U.S. AIR FORCE (USAF)
AFI 33-118
COE
EM
U.S.
385-1-1
U.S.
(2002) Radio Frequency (RF) Spectrum Management
ARMY CORPS OF ENGINEERS (USACE)
Safety and Health Requirements Manual
DEPARTMENT OF DEFENSE (DOD)
UF
C
3-600-01 (26 September 2006 Change 1, 14 July 2009) Fire Protection Engineering for Facilities
U.S.NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CF
R 1910 Occupational Safety and Health Standards
29 CF
R
1926 Safety and Health Regulations for Construction
1.4 SUBMITTALS
The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES in sufficient detail to show full compliance with the specification:
SD-01 Preconstruction Submittals
Submit the following items to the Contracting Officer (throughout this document, the term "Contracting Officer" shall mean "Contracting Officer or his Representative:"
[Lifting Operation Plan] Utility Outage
Requests
Connection Requests
Hazardous Materials (including all paint) Disposal Log
1.5 CONTRACT DRAWINGS
See Drawing Index for list of project drawings.
Contract drawings, maps, and specifications will be furnished to the Contractor either hard copy or electronic at the Government's discretion (electronic drawings are to be provided in .dwg format). Reference publications will not be furnished.
Contractor shall immediately check furnished drawings and notify the Contracting Officer of any
USAF 45th Space Wing / NASA - KSC 01 20 00 00 - 3 discrepancies. Verify all drawings are 100 percent final drawings released for construction.
The drawings indicate the general location and arrangement of existing conditions. It is mandatory that the Contractor visit the site to determine the complexity of the work and the existing conditions affecting the work.
Field measurements may be necessary to determine the size and quantity of materials. Conditions which are obvious/visible or which should be reasonably anticipated by the Contractor on inspection will not be considered under the Differing Site Conditions clause of this contract.
1.5.1 Layout of Work and Elevations
Dimensions and elevations indicated in the layout of work shall be verified by the Contractor. Discrepancies between the drawings, specifications and/or existing conditions shall be referred to the Contracting Officer in writing, for review, before the affected work is performed. Failure to make notification shall place the responsibility upon the Contractor to carry out the work in a satisfactory and workmanlike manner.
1.6 WORK SCHEDULING
Work Schedules for all on-site activities must be reviewed and approved by the Contracting Officer prior to start of the project; and all activities coordinated with the Contracting Officer once work has begun. Due to the critical nature of the work location, all work pertaining to this contract shall be completed [without disrupting] [with minimal disruption to] the operation of [_____] .
Contractor shall allow for non-access days where construction activity is prohibited due to hazardous operations or launch activity. When possible, the Government will provide 24 hour notification each time the restrictions are invoked.
1.6.1 Requirements
Working hours will normally range between the hours of 7:30 AM and 4:00 PM (0730-1600) excluding Saturdays, Sundays and Federal Holidays. If work must be done during periods other than above, additional Government inspection and Range Support personnel may be required. Notification must be given to the Contracting Officer five working days in advance of intention to work during other periods to allow assignment of additional inspection forces when the Contracting Officer determines that they are reasonably available. If such support is reasonably available, the Contracting Officer may authorize work to be performed during periods other than normal duty hours/days. Work beyond normal hours/days will be required for major utility outages.
No construction work shall take place over the Christmas/New Year holiday period. This period will start one full work day before the Federal Christmas holiday and end the first work day after the Federal New Year Holiday. The Contractor may request to work during this time at the discretion of the Contracting Officer, however no base support will be available.
1.7 OCCUPANCY OF PREMISES/ACCESS REQUIREMENTS
Building(s) [will] [will not] be occupied during performance of work under this Contract. If occupied, occupancy notifications will be posted in a prominent location in the work area.
Before work is started, the Contractor shall submit a plan to the Contracting Officer or Representative for approval. The plan shall include a sequence of procedures, means of access, space plan for storage of materials and equipment, and use of approaches, corridors, and stairways.
This plan must comply with NFPA 241 requirements that all exits and exit access must be maintained at all times (Ref: UFC 3-600-01). Base Fire Department is required to approve any deviations which affect the exiting or exit access from the building.
1.7.1 Facility Contents
01 20 00 00 - 4 USAF 45th Space Wing / NASA - KSC
1.7.1.1 Responsibilities
The schedule of work shall be closely coordinated with the Contracting Officer. Unless otherwise stated, remove all furniture, equipment, curtains, drapes, pictures, blackboards, etc., as required to perform the work.
Any movable or fixed furniture, equipment, carpet, etc., remaining in the work area shall be covered and protected from damage. All relocated items shall also be protected from damage throughout the construction period. After completion of work and prior to final acceptance, replace removed items in their original location.
[ The entire area will not be available to the Contractor at one time. The following phases of work and procedures are required:
a. [ _ _ _ _ _ ]
b. [ _ _ _ _ _ ] ]
[ Demolition of critical facility systems [mechanical, electrical, etc.] shall not be started until replacement equipment is on site.]
1.7.1.2 Maintain Clean Work Areas
All work areas shall be kept clean at all times. Contractor shall prevent introduction of dirt or dust into areas adjacent to the work areas. All materials, tools and equipment shall be thoroughly cleaned prior to being brought into the work areas or adjacent areas.
1.7.1.3 Damage To Existing Equipment
Any damage must be reported to the contracting officer immediately. Damage to existing materials, equipment or systems occurring from Contractor activities or neglect, shall, at the sole discretion of the Contracting Officer, be repaired or replaced by the Contractor at no cost to the Federal Government.
1.7.1.4 New Material and Construction Equipment
Only material and construction equipment designated for performance of contract work may be stored at the construction site or located in Government-controlled warehouses or shop facilities.
1.7.2 Construction Area Access And Control
1.7.2.1 Access and Control Requirements
Exclusive use or control of any area will not be allowed as the Government must have access to all areas at all times. All work must be scheduled around operational constraints.
1.7.3 Vehicle Parking
1.7.3.1 Requirements
Job and support vehicles for workers will be parked in designated parking areas within reasonable access to the worksite. All vehicle operators must comply with all traffic laws including mandatory seat belt usage, speed limits and hauling restrictions. Contractor shall be responsible for repairing or replacing any facility/grounds damaged areas.
1.8 STORAGE, TRANSPORTATION AND PROTECTION 1.8.1
Storage
Contractor may be assigned a storage area upon written request to the Contracting Officer. Contractor's request shall indicate dimensions of trailer, size of storage area, and utilities required. Space at one of the base central storage areas will be assigned to the Contractor by the Contracting Officer. All trailers shall be in good and safe condition. Storage space may not be co-located with construction site, at the Contracting
USAF 45th Space Wing / NASA - KSC 01 20 00 00 - 5
Officer's discretion.
[ Contractor is responsible for contacting the local phone company, BellSouth, to request a telephone number and line for their office trailer.]
[ Office trailers and long term (longer than one year) storage trailers shall be painted to match the base standard color "Conch Shell", as noted in the base Facilities Excellence guide. Trailers located on site for short term storage, less than one year, will not need to meet this requirement. In addition, all office trailers and long term storage trailers shall be skirted along the entire perimeter with a wood lattice material. This skirting shall be painted to match the same trailer color as described above. Contractor shall be responsible for the storage and protection of all his materials and equipment, whether incorporated into the job or not.
1.8.2 Protection
Store and protect products in accordance with manufacturer's instructions. Store products with seals, labels intact and legible. Store sensitive products in weather tight, climate controlled, enclosures in an environment favorable to the product. Products acceptable for exterior storage shall be on sloped supports above ground.
1.8.3 Transportation
Transport and handle products in accordance with manufacturer's instructions. Promptly inspect shipments to ensure the products comply with requirements, quantities are correct, and products are undamaged. Protect products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products. Store loose granular materials on solid flat surfaces in a well drained area. Prevent mixing with foreign materials.
1.8.4 Hazardous Materials
Hazardous Materials & petroleum product containers shall be stored on an impervious surface with containment. Incompatible materials shall be segregated and have separate containment systems.
Additional HAZMAT requirements are provided in Section 01 57 20.00 55 ENVIRONMENTAL
PROTECTION.
1.8.5 Site Protection Plan
Structures, utilities, sidewalks, pavements, and other facilities immediately adjacent to excavations shall be protected against damage. Contractor shall comply with UFC 3-600-01 and is required to protect areas adjacent to the construction site.
1.9 PROTECTION OF WORK
Prior to performing any excavation work or any surface penetrations on any ground surface, the Contractor shall obtain from the Contracting Office or representative, assistance for locating current subsurface utilities for the particular area to be worked on. Contractor shall stake out subsurface high voltage cables, communication cables, and pipe lines indicated within the scope of the work contemplated.
Contractor shall notify the Contracting Officer, 14 days prior to the start of excavation work or surface penetration, to enable the Contracting Officer to review measures being taken to prevent hazard to employees and possible damage to subsurface utilities, and allow Infrastructure O&M Services (IOMS) time to respond to scanning requests. Where emergency conditions preclude the 14 days advance notification, the Contractor shall immediately inform the Contracting Officer of his intention to initiate work prior to actual start of activity.
After excavation permit has been obtained and prior to any excavating, verify with Cape Support (853-5211) that there are no "Critical Days" that would prevent excavation.
Contractor shall temporarily halt any machine excavation work or other surface penetration when approaching within 5 feet of the existing utility line until the Contractor has exposed the utility line by hand excavation to fix its location.
1.10 GOVERNMENT-FURNISHED MATERIALS [- None]
[ Government will furnish to the Contractor the following property to be incorporated or installed in the work, or used in its performance. Such property will be furnished as Freight On Board (F.O.B.) at [_____]. Maintain and protect Government furnished property once it is on the construction site.
SALVAGE
RECEIVING
ITEM DESCRIPTION QUANTITY AVAILABLE POINT
01 20 00 00 - 6 USAF 45th Space Wing / NASA - KSC
Quantities indicated for the above-listed items marked with an asterisk are estimates. It is the intention of the Government to furnish all quantities of the asterisk items required to complete the work as specified.
Quantities stated for the above items not marked with an asterisk are all that will be furnished by the Government. Contractor shall furnish any additional quantities required.]
1.11 ON-SITE PERMITS
1.11.1 Utility Outage Requests And Connection Requests
Work shall be scheduled to hold outages to a minimum.
Utility outages and Connection Requests required during the execution of work that affect existing systems shall be arranged at the convenience of the Government, which may require scheduling outside of the regular working hours or on weekends, at no additional cost to the Government.
Each Utility Outage and Connection Requests shall state the system involved, area involved, approximate duration of outage, and the nature of work involved.
1.11.1.1 Requirements
A written request for a utilities outage (electricity, communication, water, compressed air, gas, steam, air conditioning, fire detection and suppression systems, etc.) must be submitted to the Contracting Officer at least 14 calendar days in advance of the desired outage. Approval is required prior to scheduling any outage. All limitations noted on the approved outage authorization shall be carefully observed. Final verbal coordination shall be made 4 hours prior to the outage by calling the Contracting Officer or his representative. A utilities outage without prior approval and coordination is prohibited.
Utility outages affecting fire alarm, fire detection, fire suppression, fire pumps and water supplies to fire protection systems greater than 4 hours will require a fire watch per NFPA 241 (Chapter 7).
Since many systems are critical to facility operations, the number and duration of utility outages shall be kept to an absolute minimum. All work effort shall be coordinated and sufficient manpower, materials, and equipment shall be provided to complete the work within the authorized outage window.
Existing utility services may be interrupted only when approved by the Contracting Officer. The interruption shall be scheduled at a time of minimum demand on the utility, convenient to the Government. Outages on weekends, holidays, or evenings shall be performed at no additional cost to the Government.
Contractor shall make all necessary arrangements to schedule and provide connections to existing utilities and to cause minimum interruption to system operation. All temporary utility hook-ups and disconnects shall be made by the Contractor.
If the Contractor fails to comply with a scheduled outage, the cost to reschedule the outage will be deducted from the final contract payment.
1.11.2 Work Clearance Request
[All construction work requires a Work Clearance Request, AF IMT 103. This permit is processed by the
Government and provided to the Contractor. It is required prior to the start of any construction at the project site and must be posted in a conspicuous location on site during all construction activities.] [Contractor shall obtain (from technical representative), prepare, and properly complete "Base Civil
Engineering Work Clearance Request" AF IMT 103. Contractor shall provide coordination for location of buried structures and utility lines before beginning any work involving digging/excavation. Upon receipt of an approved AF IMT 103 the contractor shall mark out in white paint all locations requiring utility locates.
Contact the PAFB utility shops to schedule locates prior to any excavation. The Technical representative shall be the first and the last to coordinate on the AF IMT 103.]
1.11.3 Burn Permits
Burn permits are required for any spark or flame producing activity. Burn Permits shall be obtained thru [Cape Support (853-5211)][the Base Fire Department (494-7642)].
Permits shall be posted at a conspicuous location in the construction area. Burning of trash or rubbish is not
USAF 45th Space Wing / NASA - KSC 01 20 00 00 - 7 permitted on any USAF facility.
1.12 SALVAGE AND DISPOSAL OF MATERIAL AND EQUIPMENT
1.12.1 Removal
Remove and/or relocate only those materials or items of equipment specifically indicated in the drawings and specifications. Removal operations shall be performed in such a manner that adjacent areas, installed equipment, or existing utilities are not damaged. Repair all openings that occur due to removal or demolition operations to match adjacent, existing surfaces. Any damage incurred during removal operations shall be repaired at no additional cost to the Government.
1.12.2 Housekeeping
Sufficient personnel and equipment shall be provided to ensure compliance with all housekeeping requirements.
Work will not be allowed in those areas that do not comply with the requirements of Section 14.C of COE EM 385-1-1. Job sites are to be kept clean on an ongoing, daily basis. All areas are to be thoroughly cleaned prior to leaving the jobsite at completion of project work.
1.12.3 Salvage Of Material And Equipment
All salvageable materials or items to be removed shall remain the property of the Federal Government. Salvageable items are listed below in the paragraph entitled, "Salvage Items". Salvageable items shall be transported to and deposited at the Defense Reutilization and Marketing Office (DRMO) at Cape Canaveral Air Force Station at the contractor's expense.
Salvageable material must be segregated and separated into categories before transport. Material shall be palletized or moveable by forklift (maximum 10,000 lbs). For material that is not palletized, it will be the responsibility of the Contractor to provide labor support for material removal. Scrap metal shall be maximum 15 feet in length and 4 feet in width.
Deliveries to DRMO shall be scheduled through the Contracting Officer a minimum of 72 hours in advance. All salvageable items delivered to DRMO shall be accompanied by a properly prepared DD Form 1348. This form will be furnished by the Contracting Officer. A signed copy by DRMO reflecting the turn in materials shall be furnished to the Contracting Officer.
Contractor shall maintain property control records for material or equipment designated as salvage. Contractor's system of property control may be used if approved by the Contracting Officer. Contractor shall be responsible for storage and protection of salvaged materials and equipment until disposition by the Contracting Officer.
Material to be salvaged and reinstalled by the Contractor shall be protected during removal and stored to prevent damage.
For reference purposes salvageable is defined as: items, material, equipment which can be refitted, reworked, and restored and put to use or sold. The Contracting Officer shall have sole discretion as to determining whether any particular item is salvageable.
1.12.3.1 Salvage Items [- None]
[ The following equipment and materials shall be salvaged for the Government:
a. [ _____ ]
b. [_____] c. [_____]
Any additional items shall be inspected by the Contracting Officer to determine whether salvageable or debris. All salvageable materials shall be delivered to the DRMO facility within Cape Canaveral Air Force Station at Contractor's expense. Salvageable material delivery shall also be accompanied by a properly prepared DD Form 1348.]
1.12.4 Waste Disposal
Non-salvageable material and debris shall be removed from work areas and disposed of daily. Contractor may use Cape Canaveral Air Force Station (CCAFS) landfill for disposal of CCAFS and PAFB C&D debris in accordance with Florida Department of Environmental Protection (FDEP) permits.
Asbestos waste shall be disposed of at the CCAFS asbestos mono-fill unless otherwise directed by the Contracting Officer.
01 20 00 00 - 8 USAF 45th Space Wing / NASA - KSC
Refer to Section 01 57 20.00 55 ENVIRONMENTAL PROTECTION for further waste disposal and record keeping requirements.
1.12.5 Cleanup
[ All waste materials, except indicated salvaged items, generated by the construction shall be hauled off U.S.
Government property at the end of each work day and deposited at a disposal site selected by the Contractor.
Disposal shall be in accordance with federal, state, county and city ordinances and at the expense of the Contractor.] Upon completion of the construction each day, the Contractor shall leave the work premises in a clean, neat and workmanlike condition, satisfactory to the Contracting Officer.
1.12.6 Salvage And Disposal Record Keeping
Contractor shall maintain and submit quarterly and at the completion of the project to the contracting officer a Disposal Log of all materials removed from the job site. This inventory shall include waste materials disposed in landfills and materials reused on the job, sold for salvage and recycled. At a minimum the Contractor shall identify the type of materials, material weight, disposition (landfill or recycle), receiving facility (name, address and phone number).
1.13 RADIO FREQUENCY MANAGEMENT PROCEDURES
The following procedures shall be followed in obtaining radio frequency authorization:
The policy and procedures contained in AFI 33-118 shall be followed to obtain frequency allocation approval of electronic devices and USAF Radio Frequency Assignment.
1.14 COMMUNICATION SECURITY
Government telecommunications networks are continually subject to interception by hostile/unfriendly intelligent organizations. Therefore, the DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls from, or terminating at, DOD organizations. Contractor shall assume the responsibility for ensuring frequent dissemination of this information to all employees dealing with official DOD information.
PART 2 PRODUCTS Not Used
PART 3 EXECUTION
3.1 CCAFS ACCESS REQUIREMENTS 3.1.1
Badge Requirements
Employees working at CCAFS are required to have in their possession a current Cape Badge. Badges must be displayed above the waist in a visible location at all times. These badges are described below and may be obtained at the CCAFS Pass and ID office (Building 1068) after the required information/identified in the following paragraphs is submitted (Requests must be submitted AT LEAST 48 hours, 2 work days, prior to issue date to complete required checks). The CCAFS Pass and ID office hours are 0600 to 1600 for temporary badges and 0730 to 1530 for permanent badges (must have an appointment for permanent badges (321) 853-3458). Two forms of identification are required before any badge will be issued. One form must be from the primary list below:
Primary - State issued Drivers License with a photograph; State issued Identification Card with a photograph;
DOD, State, County or City Government ID Card with photograph; US Passport (current or expired);
Resident Alien ID Card; Foreign Passport; US Coast Guard Merchant Marine ID Card
Secondary - US Birth Certificate; Certificate of US Citizenship; Certificate of Naturalization; Unexpired Temporary Resident Card; Voter Registration Card; Native American Tribal Document; US Social Security Card; Certificate of Birth Abroad issued by the Dept of State; Current photo already in PASS or AF Computer…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .