CLOIS Solicitation QA Working Master-Posted 19 Feb

View the file

Other files

File Type Posted
CLOIS_Solicitation_-_Final_Q A_Posting_-_18_March.xlsx XLSX spreadsheet
FA2521-13-R-0019-0004_CLOIS_Amendment_4.doc DOC document
Attachment_L-04_TEP_Task_Ordering_Wrksht_-Amended_17_March_15.xlsx XLSX spreadsheet
FA2521-13-R-0019_0003_CLOIS_Amendment_3.doc DOC document
CLOIS_Solicitation_QA_-_Update_on_12_March_15.xlsx XLSX spreadsheet
FA2521-13-R-0019_0002_CLOIS_Amendment_2.doc DOC document
CLOIS_Solicitation_QA_9_March_Update_to_FBO.xlsx XLSX spreadsheet
Attachment_5_SCA_WD_2005-2117_Rev_16.pdf PDF
Attachment_L-04_TEP_Task_Ordering_Wrksht_-Amended_March_15.xlsx XLSX spreadsheet
Attachment_4__DD254_-_March_update.pdf PDF
CLOIS_Solicitation_QA_-_Posted_27_Feb_2015.xlsx XLSX spreadsheet
Attachment_5_SCA_WD_2005-2117_Rev_15.pdf PDF
L-02_Sample_Mission_-_3_Feb_update_V3.xlsx XLSX spreadsheet
Attachment_12_CBA_SLCS __TWA.pdf PDF
1._FA2521-13-R-0019_CLOIS_Solicitation.doc DOC document
Attachment_15_WD_CBA_Yang _TWA.pdf PDF
L-04_TEP_Task_Ordering_Wrksht_-Final.xlsx XLSX spreadsheet
L-03_Work_Classification_Worksheet.xlsx XLSX spreadsheet
L-05_Labor_Rates_Listing.xlsx XLSX spreadsheet
L-01_Question_and_Answer_Template.xlsx XLSX spreadsheet
Attachment_13_WD_CBA_SCLS _TWA.pdf PDF
L-06a_Fac_60650_Act-Deact_Sample_Work_Plan.pdf PDF
Attachment_6_CBA_-_Indyne_and_IAM.pdf PDF
Attachment_10_CBA_Yang _SPFPA.pdf PDF
Attachment_11_WD_CBA_Yang _SPFPA.pdf PDF
Attachment_7_WD_CBA_Indyne_and_IAM.pdf PDF
Attachment_2_RESERVED_-_CLOIS_DRAFT_Task_Ordering_Worksheet.xlsx XLSX spreadsheet
Attachment_4__DD254.pdf PDF
Attachment_3_RESERVED_-_CLOIS_DRAFT_Labor_Rates_Listing.xlsx XLSX spreadsheet
Attachment_9_WD_CBA_Indyne _TWA.pdf PDF
L-06b_Facility_60650_Floor_Plans.pdf PDF
Attachment_14_CBA_Yang _TWA.pdf PDF
Attachment_8_CBA__Indyne _TWA.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

NumberQuestions/AnswersAnswersRFP Section/ Exhibit/AttachmentParagraph Number
1Pursuant to FAR 52.222-43 (b) included in the solicitation the contractor warrants that the contract prices do not include any allowance for any contingency to cover increased costs for which adjustment is provided under the clause. Paragraph (d)(1) of the clause states that the contract price will be adjusted to reflect changes in wages resulting from wage determinations applicable on the anniversary date of the multiple year contract or at the beginning of the renewal option period. Is it the government’s intent to adjust contract prices annually during the contract base term for wage increases established in applicable collective bargaining agreements?Section H-4 explains that rates will be updated annually on 1 October.Section I -- Contract Clauses, Clauses Incorporated by Reference, FAR 52.222-43Paragraph (d)(1) of FAR Clause 52.222-43
2In the solicitation documents issued February 11, 2015, paragraph 1.2.1 directs Offerors to submit the information requested in paragraph 4.1.2.3 Contractor Responsibility Information no later than 1:00pm local time on February 25, 2015. Does the Government require a paper copy of this information, or will an electronic submission be sufficient? Can the Government please provide submission instructions for the information requested in paragraph 4.1.2.3 Contractor Responsibility Information?Please see FBO update on Submission of Contractor Responsibility Information.Section L-1, 1.2.1; 4.1.2.3paragraph 1.2.1; 4.1.2.3 Contractor Responsibility Information
3Is the Cross Reference Matrix included in the page count? Page 172, paragraph 1.3.1.1 does not list it as not included in page countYes, it is to be included in the page count.Section LParagraph 1.3.1.1 Page limitation; Section L-2 Vol. 1 - Factor 1 Technical Capability, 2.1
4Page 174, paragraph 2.1 specifies the general outline, but does not include "Factor 1 Technical Capability". Should we add "Factor 1 Technical Capability" as item 4 and move the rest down in sequential order?There is no specific narrative associated with Factor 1 Technical Capability, the narrative should be associated with each of the subfactors.Section L-2Paragraph 2.1
5Section L 2.1.1.2 states: "Provide a listing of required positions/personnel certifications and personnel training requirements, at a minimum." Will the government please clarify:

a) What is the definition of "required positions" for the purposes of this proposal?

b) What types of certifications are required to be listed? Are these limited to professional certifications required to ensure technical expertise?

c) What personnel training requirements are required to be listed? Is this limited to the training requirements stated in the PWS? a) These are positions the contractor believes necessary to successfully execute the contract.

b) In addition to requirements in the PWS, the contractor should list any and all certifications specified or necessary to meet the PWS requirements.

c) Minimally the training specified in the PWS and beyond that what the contractor considers necessary.Section L 2.1.1.2Page 6, Paragraph 2.1.1.2
6Page 174, paragraph 2.1 (6) lists the Factor 2: Risk Management as a section at the end of the Subfactors. Page 177, paragraph 2.2 states "As part of each Technical Capability subfactor, the offeror shall address any Technical Risk…" Please clarify if each technical risk item should be identified in Factor 2, separate from Factor 1 subfactors; or be placed at the end of each subfactor in Factor 1.The Government does not have a preference on how this is proposed as long as all Section L requirements are addressed.Section L 2.1 (6); Section L.2.2 Factor 2Pages 174 and 177
7The answer to Question 21 says; “The CLOIS contractor will need to work with the government and the Maximo contractor to setup the system for any new business rules.” Please explain how the process will be managed for the development of enhancements to Maximo, e.g:

a. Who will be the developer of Maximo expanded functions:

b. Will there be a controlled system development methodology; for example, will the CLOIS contractor submit a requirements document to a Government sanctioned Configuration Control Board? What will the approval process include?

c. Will the CLOIS contractor be able to add enhancements to the standard Maximo functions independent of the 3rd party contractor responsible for maintaining and administering Maximo?.

The CLOIS contractor will submit any Maximo change requests to 45 Civil Engineer Squadron (45CES), Cape Engineering Flight. Requests may be submitted via email to the appointed POC. If more information is required, the requestor will be contacted. The government will review the requested change and either approve or deny the request.

a. The government has a separate contract for Maximo administration and development.

b. The CLOIS contractor will submit proposed chnages to the government (45 CES) for approval and implementation.

c. No.

Reference to Questions 21, 23 and 27 and the answers provided
8Please provide details about which Maximo modules are to be implemented for CLOIS?The CLOIS contractor will have access to all Maximo modules including the list shown below. The CLOIS contractor must populate all relevant modules to capture complete work effort of CLOIS execution.

- Asset management

- Work management

- Service management

- Contract management

- Inventory management

- Procurement management

Reference to Questions 21, 23 and 27 and the answers provided
9If the standard Maximo product provides modules, such as Purchasing and Inventory, that are exceptional to capabilities that the IOMS instance employs, and which the CLOIS contractor wishes to use for its maintenance management processes, how will these be provided?The CLOIS contractor will have access to all Maximo modules including the list shown below.

- Asset management

- Work management

- Service management

- Contract management

- Inventory management

- Procurement management

Reference to Questions 21, 23 and 27 and the answers provided
10The answers to Question 23 and 24 states; “The CLOIS contractor will be responsible [for] Maximo data inputs, queries, and reports. The Maximo contractor and the CLOIS contractor will work together.” The answer to Question 27 states; “The IOMS Maximo instance will become the primary CLOIS database, and the LOSC information integrated separately.”

a. It is understood that the CLOIS contractor will be responsible for the post transition phase-in maintenance of operational data. However, who will be responsible for initial data load of assets and other data such as maintenance schedules, and PM work order templates if used from the existing LOSC Maximo data.

The government will provide the initial CLOIS Maximo database with all facilities and assets. All existing maintenance instructions and schedules will be loaded into the CLOIS Maximo database and ready for use. Assets with missing maintenance instructions and schedules may be defaulted to use the Cape Engineering standard (RS Means Facilities Maintenance & Repair, 2014, 21st Edition).Reference to Questions 21, 23 and 27 and the answers provided
11The question about the data warehouse was not in reference to the EDC. The data warehouse is an archive of production data generated during the course of maintenance work performed and written to an auxiliary database on a separate server. The data warehouse is periodically updated with information as it is developed in Maximo or the contractor’s proprietary financial management system. This capability provides a convenient source of data to the Government and other agents with authorized access. It also supports efficient operation and optimum response to users of the Maximo work management system. Is this a facility that the Government would like to have retained and used for the CLOIS contract?

a. Answer d) states; “Under LOSC, the government does not have access to Maximo. Under IOMS it does. Under CLOIS the government will maintain Maximo.” Does the Government want direct access to Maximo and the CLOIS contractor’s financial management system, or can the data of interest be provided through a data warehouse capability as described above?

The CLOIS contractor must use Maximo as a complete computerized maintenance management system (CMMS). All work accomplished for CLOIS execution must be captured in the Maximo system. This includes, but is not limited to, prime and subcontractor labor hours, material costs, work order tracking, asset condition assessments, repair history, service work, collection work, and any other relevant data. Any data or information that cannot be input into the Maximo system must be housed in the Engineering Document Center (EDC). The government will have unlimited access to Maximo and the EDC.Reference to Questions 29 and the answer provided.
12Should the Government’s answer have referenced section 1.1.3 instead of 1.3?Yes, government's answer is in reference to PWS 1.1.3.Reference to Questions 102 and the answer provided.
13Does the EDC use a document management system? Does it provide any capabilities such as those provided by Agile?No. The EDC does not use a document management system.Reference to Questions 105 and the answer provided.
14Can the Government provide a list of the current SRD systems at CCAFS?PendingPWSPage 44 Section 4.2.1
15In the most recent release of Appendix A, dated 15 Jan 15 and release on 30 Jan 2015 it appears that Tiers 1-5, and 0 have the same corresponding COL level. i.e. All Tier 1 facilities are COL 1; all Tier 2 have COL 2 designators, etc. Does the Government expect all facilities within a Tier level to receive the same level of COL service, or is this latest change an error. If this recent change is the Governments intent, how does this change affect the following wording in Section M:Yes. The current COLS and Tiers have been matched (i.e. a Tier 1 facility receives COLS 1).Appendix A
16Section M, para. 2.1.4.1 states: “The offeror provides an outline for the Engineering Management Plan (EMP) that adequately addresses, at a minimum; all work categories (Appendix E); Facility Tiers (Appendix C); Common Output Level Standard (COLS) (Appendix D); and demonstrates consistency and cohesion throughout……”. In light of the most recent change to Appendix A, how are we to address the subfactor evaluation requirement?The offeror must still address Tiers and COLS in the Engineering Management Plan. Tiers and COLS represent different areas of operations, maintenance, and repair. This requirement does not change if Tiers and COLS match for a single facility.Section MPage 190 2.1.4.1
17Section L, para 2.1.4.1 Subfactor 4, Engineering Support does not provide specific instructions on how to address Tier’s and COL’s. Will the Government please provide these instructions.The offeror shall submit an outline of their proposed Engineering Management Plan (EMP). Each offeror's format will vary. The offeror's submittal is part of the evaluation criteria.Section LPage 175 2.1.4.1
18What is the reason for the Governments taking an aggressive approach and moving up the contract start date?As CLOIS is a combination of two existing contracts that end 1 October 15, the government intends to have a contract vehicle in place prior to the IOMS and LOSC completions.General Question
19In section B the unit of measure is in square feet for CLINs 0005 thru CLIN 0009 stating a max quantity for each CLIN identified with respect to the PWS along with facilities identified in Appendix A. However, in Appendix A for those CLINs, not only is the unit of measure in square feet but other various units of measure for those specific Tiered Facilities. Is the Industry required to convert these units of measure? Also, in the TEP the Max Quantity listed does not match section B or the information in Appendix A. Can the Government please clarify these quantities and how the industry should accurately price these CLINS using the data provided in Section B, Appendix A, and the TEP worksheet?Section B and the TEP worksheet do not match, Section B was built into the RFP as a place holder for CLINs and will be populated with totals after award. Offerors are not required to fill out Section B ONLY the TEP worksheet.
CLINS 0005 through 0009 are to be proposed per the TEP worksheet which is Square Foot per month. The quantities listed in Schedule B are built in to provide flexibility in the contract writing system. Offerors are not to fill out section B.Section B/Appendix A/TEP worksheet
20Sub paragraph e. lists CLIN 0017 as a fixed price CLIN which requires unit price. Yet, sub paragraph h. list CLIN 0017 as a Government estimated CLIN which only requires indirect costs and fee in the TEP worksheet. Please clarify this apparent conflict. Note, if a fixed unit price is required, specific workload definition of the Sustainment project to be priced will be required.Concur that CLIN 0017 has no unit price. CLIN 0017's fixed price will be negotiate for each task. Please provide only the indirect costs and profit associated with CLIN 0017 in the TEP worksheet. CLIN 0017 should not have been included in Section L para 3.1.1.7(e).
Section LPage 181 3.1.1.7
21For CLIN xx18, Mission Support, the TEP worksheet refers to the sample mission. The sample mission is defined in Attachment L-02. The implication is that the unit price for mission support to be given in the TEP worksheet should include all the activity given in L-02. Looking closer at L-02, there are tabs for “SV-LV Ordnance Mission Support” and “Comm Mission Support Tasks”. This work would be covered by PWS sections 1.8 and 1.9, respectively. However, those PWS paragraphs are to be priced under CLINs xx19 and xx20, respectively. The TEP worksheet requires an estimated cost for those CLINs. It appears that if L-02 is priced for CLIN xx18, and CLINs xx19 and xx20 are priced for all of the respective PWS requirements, there will be a duplication of cost in the TEP. Please resolve this apparent duplication. If munitions and comm mission support is to be excluded from TEP CLIN xx19 and xx20 pricing, please specify which PWS paragraphs are to be excluded.The Mission Sample costs in the TEP worksheet are for Evaluation Purposes only. The Government understands that the Mission Sample will pull from PWS paragaphs associated with work under other CLINs.TEP Worksheet,
Attachment L-02 (Sample Mission)Page 181 3.1.1.7
22Should the Contractor Responsibility Information that is due 25 FEB 15 be submitted in a binder as a separate volume? If so, is the requirement the same as for Volume 3 - Administrative Documents , an original and 1 hard copy, plus 3 CD-ROMs? Can the information be excluded from Volume 3, since it is being submitted earlier? Does it get submitted to the cognizant DCAA by that same date?Please see FBO update on Submission of Contractor Responsibility Information.Section LPage 183 4.1.2.3
23In the past offerors have only submitted the Price/Cost Volume to their cognizant DCAA. Please confirm that the requirement now is to submit all volumes of the offeror's proposal to the DCAA, and not just Volume 2 - Cost/Price.Please submit all volumes to the DCAA.Section LPage 171 1.2 Receipt of Proposals
24Should the offeror include proof of the required Secret Facility Clearance with Volume 3 - Administrative Documents.Yes.Section LPage 184 Clauses Incorporated by Reference 5352.215-9000 Facility Clearance
25Regarding the answer to question #95, the Government’s response is that Offerors are not required to fill out SCHEDULE B.

• Will the Government confirm that SCHEDULE B and Section B are one in the same?

Section L Paragraph 4.1.1 Indicates that Sections A through K constitute the model contract therefore requiring all “fill-ins” be completed and submitted in Volume 3 Administrative Documents. If Section B is required to be completed, Section B and attachment L-04, TEP worksheet do not directly correlate.

• If it is determined that Section B is required to be completed could the Government please clarify what and how information, if any, is to be populated in that section?

Additionally, CLINs 6001-6025, the six month extension, are not calculated by the Offeror.

• If Section B is to be filled out, what is the expectation for the Offeror to address these CLINS in Section B?

Yes, Section B and Schedule B are one in the same. The offeror is not required to complete Section B, ONLY the TEP worksheet.Section B , Q&A #95Paages 2 - 93
26Can the Government please clarify that CLIN X023 (Phase in) is NOT Fixed Price, and that CLIN X026 (CDRL) is?CLIN X023 (Phase In) is FFP and CLIN X026(CDRL) is Not Separately PricedSection LPage 183 4.1.1
27Regarding the Contractor Responsibility Delivery Requirements;

• What method of delivery is required for this information to be provided on 25 February – Hard copy in a binder with an electronic copy (CD), Email, or other Electronic method?

• Is this information required to be submitted to DCAA early (on 25 February), and if so using which method of delivery – Hard copy with CD, Email, Electronic?

• Is this information still required to be included in the final proposal submission of Volume 3 being submitted on 26 March 2015?

Please see FBO update on Submission of Contractor Responsibility Information.Section LPage 182 4.1.2.3
28In Attachment L-06 the Government asks for two separate plans. An Activation plan and a Deactivation plan. The requirements (Labor) for these two plans can vary widely which means so could the cost. In Attachment L-04, TEP Worksheet, CLIN X025 does not delineate between the Activation and Deactivation cost.

• As the cost can vary widely between the two plans, what cost does the Government expect to see in the TEP Worksheet for CLIN X025 - The most expensive plan cost? The combined cost of both plans? Or the cost of a single plan, and if so, which plan?

• Additionally, if material is required to support either or both plans, does the Government expect these costs to be included in CLIN X025 or does the Government expect to see those costs in CLIN X014?

The cost used on the TEP Workshhet should include the combined labor for both one (1) activiation and one (1) deactivation. Materials will be captured under CLIN X014.Attachment L-06N/A
29The Government requests early submission of the information requested in paragraph 4.1.2.3. Contractor Responsibility Information no later than 1:00 PM local time 25 FEB 15.

1. Does the Government want the information submitted in accordance with the instructions Section L paragraph 1.3 - one original and one copy submitted in three ring binders, plus a CD?

2. Should this information also be included in the final submission of Volume 3?Please see FBO update on Submission of Contractor Responsibility Information.Section L1.2.1
30Will the USG provided the number of work orders by craft for each Tier?A sample 12 month work order history has been provided in the bidder's library. This will not be broken out further.PWS1.3.1
31Will the USG provide the number of work orders for Facility Finishes?A sample 12 month work order history has been provided in the bidder's library.PWS1.3.2
32Will the USG provide the number of Ladders to be maintained?This information is not available.PWS1.3.4
33Will the USG provided the number of work orders by Plumbers for each Tier?A sample 12 month work order history has been provided in the bidder's library. This will not be broken out further.PWS1.3.5
34Will the USG provided the number of work orders by HVAC Mechanics for each Tier and the number size and location of each HVAC system?A sample 12 month work order history has been provided in the bidder's library. This will not be broken out further. Major HVAC systems are identified in Appendix F (real property report) and Appendix X (Asset Listing).PWS1.3.6
35Will the USG provided the number of work orders for boilers for each Tier and the number and location of each boiler?A sample 12 month work order history has been provided in the bidder's library. This will not be broken out further. Major boiler systems are identified in Appendix F (real property report) and Appendix X (Asset Listing).PWS1.3.7
36Will the USG provided the number of pressurized systems for each Tier and location of each?A sample 12 month work order history has been provided in the bidder's library. This will not be broken out further. Pressurized systems are identified in Appendix X (Asset Listing).PWS1.3.8
37Will the USG provided the number of work orders by Electricians for each Tier and locations of each electrical system by facility?A sample 12 month work order history has been provided in the bidder's library. This will not be broken out further. Major electrical systems are identified in Appendix F (real property report) and Appendix X (Asset Listing).PWS1.3.9
38Will the USG provided the number of work orders for Elevators for each Tier and location of each elevator?See Appendix X, Asset Listing.PWS1.3.10
39Will the USG provided the number of Cathodic Protection Systems for each Tier?See Appendix X, Asset Listing.PWS1.3.11
40Will the USG provided the number of fixed cranes along with sizes and locations?See Appendix X, Asset Listing.PWS1.3.12
41Will the USG provided the number of Fire Protection System by location, size and type?See Appendix X, Asset Listing.PWS1.3.13
42Will the USG provided the number of all POL systems along with size and type?See Appendix X, Asset Listing.PWS1.4.5
43Will the USG provided the number Utility Meters?See Appendix H, MetersPWS1.4.4
44Will the USG provided Appendix K for review?Appendix K has been providedPWS1.4.6
45Will the USG provided the number of work orders by craft for each Tier for Pavement and Site improvements?A sample 12 month work order history has been provided in the bidder's library. This will not be broken out further.PWS1.4.7
46Will the USG provided the size if the airfield, number and location of all lights and access gates?See Appendix Z for size/location of airfield.PWS1.4.8
47Will the USG provided the number of work orders for Infrastructure Support for each Tier?A sample 12 month work order history has been provided in the bidder's library. This will not be broken out further.PWS1.4.9
48Will the USG provided the number of work orders for Corrosion Control for each Tier?A sample 12 month work order history has been provided in the bidder's library. This will not be broken out further.PWS1.4.10
49Will the USG provided the number of work orders/ job orders for Heavy Equipment and Mobile cranes for each Tier?A sample 12 month work order history has been provided in the bidder's library. This will not be broken out further.PWS1.4.11
50Will the USG provided Appendix G for review? Will the USG provide the number of Towers to be maintained and the number of work order for each TierSee Appendix G, See 12 month work order history.PWS1.4.12
51Will the USG provided the number of facilities with Asbestos and locations of Asbestos in each facility?Not available at this time.PWS1.4.15
52Will the USG provided the number of work orders for Generators for each Tier along with type, size and location of each?A sample 12 month work order history has been provided in the bidder's library. This will not be broken out further. See Appendix F and Appendix X.PWS1.4.17
53Will the USG provided the number of work orders Crane and lifting Services?A sample 12 month work order history has been provided in the bidder's library. This will not be broken out further.PWS1.5.1
54Will the USG provided the number of work orders for Locksmith and Key Services?A sample 12 month work order history has been provided in the bidder's library. This will not be broken out further.PWS1.5.2
55Will the USG provided the number of work orders and or job orders for Portable Lighting Systems?A sample 12 month work order history has been provided in the bidder's library. This will not be broken out further. See Appendix X.PWS1.5.3
56Will the USG provided the amount of Hazardous waste managed yearly ?Not available at this time.PWS1.5.4
57Will the USG provided the number HAZMAT Response and Clean up Annually?A sample 12 month work order history has been provided in the bidder's library. This will not be broken out further.PWS1.5.5
58Will the USG provide and updated CBA with labor categories and hourly wages as it is missing from current post?Attachment 10 is current and contains labor categories and hourly wagesAttachment 10N/A
59As a listing of contracts performed within the last three years can be in the hundred’s, would the Government prefer a listing of 20-25 relevant contracts?Section L Paragraph numbers references are incorrect. Please be sure you are using the final RFP documents posted to FBO on Feb 11, 2015. The Government reqests a list of contracts performed in the last three years for the entity (CAGE Code) submitting the proposal. If that entity has hundreds of contracts provide the full list. The Government is not requesting an entire list of all parent/sister company contracts nor those of subcontractors or teammates.Section LL-2 Specific Instructions, 2.3 Volume 3 – Administrative Documents, Paragraph 2.3.2.3