1._FA2521-13-R-0019_CLOIS_Solicitation.doc
DOC document 2 MB Posted
- Solicitation number
- FA2521-13-R-0019
About this file
FA2521-13-R-0019 CLOIS Solicitation
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Program Mgt, General, GFP and Logistics
FFP
The contractor shall perform program management, general requirements, government furnished property administration and logistics in accordance with Sections 1.1, 2.0, 3.0 and 4.0 (excluding 2.8 and 2.9) of the PWS.
FOB: Destination
SIGNAL CODE: A
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Cape Duty Office/Work Management
The contractor shall perform all work identified in Section 1.2 (excluding 1.2.5) in accordance with the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Emergency Management and Response
COST
The contractor shall provide emergency management and response operations service as identified in section 1.2.5 of the PWS.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Engineering Services
The contractor shall provide engineering services in accordance with Section 1.7 (excluding section 1.7.11) of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 6,913,800 |
| Square Foot |
Tier 1 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 1.
Unit Price = price per square foot per month for Tier 1 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 3,433,032 |
| Square Foot |
Tier 2 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 2.
Unit Price = price per square foot per month for Tier 2 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 31,774,296 |
| Square Foot |
Tier 3 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 3.
Unit Price = price per square foot per month for Tier 3 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2,399,160 |
| Square Foot |
Tier 4 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 4.
Unit Price = price per square foot per month for Tier 4 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 5,331,552 |
| Square Foot |
Tier 5 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 5.
Unit Price = price per square foot per month for Tier 5 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Emergency Response - Tier 0 Facilities
The contractor shall perform work identified in Section 1.3 of the PWS and the acilities identified in Appendix A, C and D for Tier 0 when requested by the government.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 4,188 |
| Each Per Month |
Maintenance and Repair of Towers
The contractor shall perform all work for the maintenance and repair of towers as identified in Section 1.4.12 of the PWS and identified in Appendix G.
Max Quantity = Total number of towers (349) per month multiplied by 12 for a yearly total of 4188.
Unit Price = Price per tower per month
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Storm Water Maintenance and Repair
The contractor shall perform all work identified for storm water maintenance and repair as identified in Section 1.4.13 of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Base Operations and Infrastructure
The contractor shall perform all work for base operations and infrastructure as specified in section 1.4 of the PWS (excluding paragraphs 1.4.12 and 1.4.13).
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Material
This CLIN provides for reimbursement of the cost of all supplies, materials, and parts utilized in performance of the CLOIS contract except for the following:
(1) All vehicles and equipment required are contractor provided and owned
(reference PWS paragraph 4.3). Vehicle and equipment costs will be charged against the applicable fixed price CLIN.
(2) Planned work materials and sustainment project materials will be purchased under their respective CLINS (X016 and X017, respectively).
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Base Services
CPFF
The contractor shall provide all base services as identified in Section 1.5 of the PWS.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Planned Work
The contractor shall provide any work identified in section 1.3 of the PWS for work identified with written authorization, beyond repair level of effort as defined in PWS section 1.2.2.8.2, and requires detailed planning or capitalization on the real property records.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 8 |
| Each |
Sustainment Projects
The contractor shall provide any work identified in the PWS for work identified with written authorization, beyond repair level of effort as defined in PWS section 1.2.2.8.2, and requires detailed planning or capitalization on the real property records and requires design (architectural-engineering) prior to start.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 23 |
| Each |
Mission Support
The contractor shall provide mission operations support as required in support of launch campaigns as specified in section 1.6 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Munitions Customer and Launch Support
The contractor shall provide munitions and flight hardware service as specified in PWS sections 1.8.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Mission Communications
The contractor shall provide communication services as specified in PWS section 1.9.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
NOTU Specific Support
The contractor shall provide NOTU unique port/wharf and crane service as specified in PWS section 1.10.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
NASA Specific Support
The contractor shall provide NASA unique service as specified in section 1.11 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
Phase-In Period
The contractor shall provide phase-in service as specified in section 2.8 of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
RESERVED
Reserved for future use.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 18 |
| Each |
Activation, Deactivation, Closeout
The contractor shall provide facility activation, deactivation, closeout and/or turnover of facilities identified by the Government. Work to be accomplished as specified in section 1.7.11 of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Contract Data Requirements List (CDRL)
NOT SEPERATELY PRICED: The contractor shall provide CDRLs as required by the Performance Work Statement.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Program Mgt, General, GFP and Logistics
The contractor shall perform program management, general requirements, government furnished property administration and logistics in accordance with Sections 1.1, 2.0, 3.0, and 4.0 (excluding 2.8 and 2.9) of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Cape Duty Office/Work Management
The contractor shall perform all work identified in Section 1.2 (excluding 1.2.5) in accordance with the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Emergency Management and Response
The contractor shall provide emergency management and response operations service as identified in section 1.2.5 of the PWS
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Engineering Services
The contractor shall provide engineering services in accordance with Section 1.7 (excluding section 1.7.11) of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 6,913,800 |
| Square Foot |
Tier 1 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 1.
Unit Price = price per square foot per month for Tier 1 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 3,433,032 |
| Square Foot |
Tier 2 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 2.
Unit Price = price per square foot per month for Tier 2 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 31,774,296 |
| Square Foot |
Tier 3 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 3.
Unit Price = price per square foot per month for Tier 3 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2,399,160 |
| Square Foot |
Tier 4 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 4.
Unit Price = price per square foot per month for Tier 4 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 5,331,552 |
| Square Foot |
Tier 5 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 5.
Unit Price = price per square foot per month for Tier 5 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Emergency Response - Tier 0 Facilities
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C, and D for Tier 0 when requested by the government.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 4,188 |
| Each Per Month |
Maintenance and Repair of Towers
The contractor shall perform all work for the maintenance and repair of towers as identified in Section 1.4.12 of the PWS and identified in Appendix G.
Max Quantity = Total number of towers (349) per month multiplied by 12 for a yearly total of 4,188.
Unit Price = Price per tower per month
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Storm Water Maintenance and Repair
The contractor shall perform all work identified for storm water maintenance and repair as identified in Section 1.4.13 of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Base Operations and Infrastructure
The contractor shall perform all work for base operations and infrastructure as specified in section 1.4 of the PWS (excluding paragraphs 1.4.12 and 1.4.13)
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Material
This CLIN provides for reimbursement of the cost of all supplies, materials, and parts utilized in performance of the CLOIS contract except for the following:
(1) All vehicles and equipment required are contractor provided and owned
(reference PWS paragraph 4.3). Vehicle and equipment costs will be charged against the applicable fixed price CLIN.
(2) Planned work materials and sustainment project materials will be purchased under their respective CLINS (X016 and X017, respectively).
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Base Services
The contractor shall provide all base services as identified in Section 1.5 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Planned Work
The contractor shall provide any work identified in section 1.3 of the PWS for work identified with written authorization, beyond repair level of effort as defined in PWS section 1.2.2.8.2, and requires detailed planning or capitalization on real property records.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 8 |
| Each |
Sustainment Projects
The contractor shall provide any work identified in the PWS for work identified with written authorization, beyond repair level of effort as defined in PWS section 1.2.2.8.2, and requires detailed planning or capitalization on real property records and requires design (architectural-engineering) prior to start.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 23 |
| Each |
Mission Support
The contractor shall provide mission operations support as required in support of launch campaigns as specified in Section 1.6 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
Munitions Customer and Launch Support
The contractor shall provide munitions and flight hardware service as specified in PWS sections 1.8.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Mission Communications
The contractor shall provide communication services as specified in PWS section1.9.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
NOTU Specific Support
The contractor shall provide NOTU unique port/wharf and crane service as specified in section 1.10 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
NASA Specific Support
The contractor shall provide NASA unique service as specified in section 1.11 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
RESERVED
Reserved for future use.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
RESERVED
Reserved for future use.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 18 |
| Each |
Activation, Deactivation, Closeout
Contractor shall provide facility activation, deactivation, closeout and/or turnover of facilities as identified by the Government. Work to be accomplished as specified in section 1.7.11 of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
Contract Data Requirements List (CDRL)
NOT SEPERATELY PRICED: The contractor shall provide CDRLs as required by the Performance Work Statement.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Program Mgt, General, GFP and Logistics
The contractor shall perform program management, general requirements, government furnished property administration and logistics in accordance with Sections 1.1, 2.0, 3.0, and 4.0 (excluding 2.8 and 2.9) of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Cape Duty Office/Work Management
The contractor shall perform all work identified in Section 1.2 (excluding 1.2.5) in accordance with the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Emergency Management and Response
The contractor shall provide emergency management and response operations service as identified in section 1.2.5 of the PWS.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Engineering Services
The contractor shall provide engineering services in accordance with Section 1.7 (excluding section 1.7.11) of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 6,913,800 |
| Square Foot |
Tier 1 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 1.
Unit Price = price per square foot per month for Tier 1 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 3,433,032 |
| Square Foot |
Tier 2 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 2.
Unit Price = price per square foot per month for Tier 2 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 31,774,296 |
| Square Foot |
Tier 3 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 3.
Unit Price = price per square foot per month for Tier 3 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2,399,160 |
| Square Foot |
Tier 4 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 4.
Unit Price = price per square foot per month for Tier 4 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 5,331,552 |
| Square Foot |
Tier 5 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 5.
Unit Price = price per square foot per month for Tier 5 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Emergency Response - Tier 0 Facilities
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C, and D for Tier 0 when requested by the government.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 4,188 |
| Each Per Month |
Maintenance and Repair of Towers
The contractor shall perform all work for the maintenance and repair of towers as identified in Section 1.4.12 of the PWS and identified in Appendix G.
Max Quantity = Total number of towers (349) per month multiplied by 12 for a yearly total of 4,188.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Storm Water Maintenance and Repair
The contractor shall perform all work identified for storm water maintenance and repair as identified in Section 1.4.13 of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Base Operations and Infrastructure
The contractor shall perform all work for base operations and infrastructure as specified in section 1.4 of the PWS (excluding paragraphs 1.4.12 and 1.4.13)
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Material
This CLIN provides for reimbursement of the cost of all supplies, materials, and parts utilized in performance of the CLOIS contract except for the following:
(1) All vehicles and equipment required are contractor provided and owned
(reference PWS paragraph 4.3). Vehicle and equipment costs will be charged against the applicable fixed price CLIN.
(2) Planned work materials and sustainment project materials will be purchased under their respective CLINS (X016 and X017, respectively).
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Base Services
The contractor shall provide all base services as identified in Section 1.5 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Planned Work
The contractor shall provide any work identified in section 1.3 of the PWS for work identified with written authorization, beyond repair level of effort as defined in PWS section 1.2.2.8.2, and requires detailed planning or capitalization on the real property records.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 8 |
| Each |
Sustainment Projects
The contractor shall provide any work identified in the PWS for work identified with written authorization, beyond repair level of effort as defined in PWS section 1.2.2.8.2, and requires detailed planning or capitalization on the real property records and requires design (architectural-engineering) prior to start.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 23 |
| Each |
Mission Support
The contractor shall provide mission operations support as required in support of launch campaigns as specified in Section 1.6 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Munitions Customer and Launch Support
The contractor shall provide munitions and flight hardware service as specified in PWS sections 1.8.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Mission Communications
The contractor shall provide communication services as specified in PWS section1.9.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
NOTU Specific Support
Contractor shall provide NOTU unique port/wharf and crane service as specified in section 1.10 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
NASA Specific Support
The contractor shall provide NASA unique service as specified in section 1.11 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
RESERVED
Reserved for future use.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
RESERVED
Reserved for future use.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 18 |
| Each |
Activation, Deactivation, Closeout
The contractor shall provide facility activation, deactivation, closeout and/or turnover of facilities identified by the Government. Work to be accomplished as specified in section 1.7.11 of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Contact Data Requirements List (CDRL)
NOT SEPERATELY PRICED: The contractor shall provide CDRLs as required by the Performance Work Statement.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Program Mgt, General, GFP and Logistics
The contractor shall perform program management, general requirements, government furnished property administration and logistics in accordance with Sections 1.1, 2.0, 3.0, and 4.0 (excluding 2.8 and 2.9) of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Cape Duty Office/Work Management
The contractor shall perform all work identified in Section 1.2 (excluding 1.2.5) in accordance with the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Emergency Management and Response
The contractor shall provide emergency management and response operations service as identified in section 1.2.5 of the PWS.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Engineering Services
The contractor shall provide engineering services in accordance with Section 1.7 (excluding section 1.7.11) of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 6,913,800 |
| Square Foot |
Tier 1 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 1.
Unit Price = price per square foot per month for Tier 1 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 3,433,032 |
| Square Foot |
Tier 2 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 2.
Unit Price = price per square foot per month for Tier 2 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 31,774,296 |
| Square Foot |
Tier 3 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 3.
Unit Price = price per square foot per month for Tier 3 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2,399,160 |
| Square Foot |
Tier 4 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 4.
Unit Price = price per square foot per month for Tier 4 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 5,331,552 |
| Square Foot |
Tier 5 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 5.
Unit Price = price per square foot per month for Tier 5 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Emergency Response - Tier 0 Facilities
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C, and D for Tier 0 when requested by the government.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 4,188 |
| Each Per Month |
Maintenance and Repair of Towers
The contractor shall perform all work for the maintenance and repair of towers as identified in Section 1.4.12 of the PWS and identified in Appendix G.
Max Quantity = Total number of towers (349) per month multiplied by 12 for a yearly total of 4,188.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Storm Water Maintenance and Repair
The contractor shall perform all work identified for storm water maintenance and repair as identified in Section 1.4.13 of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Base Operations and Infrastructure
The contractor shall perform all work for base operations and infrastructure as specified in section 1.4 of the PWS (excluding paragraphs 1.4.12 and 1.4.13)
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Material
This CLIN provides for reimbursement of the cost of all supplies, materials, and parts utilized in performance of the CLOIS contract except for the following:
(1) All vehicles and equipment required are contractor provided and owned
(reference PWS paragraph 4.3). Vehicle and equipment costs will be charged against the applicable fixed price CLIN.
(2) Planned work materials and sustainment project materials will be purchased under their respective CLINS (X016 and X017, respectively).
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Base Services
The contractor shall provide all base services as identified in Section 1.5 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Planned Work
The contractor shall provide any work identified in section 1.3 of the PWS for work identified with written authorization, beyond repair level of effort as defined in PWS section 1.2.2.8.2, and requires detailed planning or capitalization on the real property records.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 8 |
| Each |
Sustainment Projects
The contractor shall provide any work identified in the PWS for work identified with written authorization, beyond repair level of effort as defined in PWS section 1.2.2.8.2, and requires detailed planning or capitalization on the real property records and requires design (architectural-engineering) prior to start.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 23 |
| Each |
Mission Support
The contractor shall provide mission operations support as required in support of launch campaigns as specified in section 1.6 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Munitions Customer and Launch Support
The contractor shall provide munitions and flight hardware service as specified in PWS sections 1.8.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Mission Communications
The contractor shall provide communication services as specified in PWS section 1.9.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
NOTU Specific Support
The contractor shall provide NOTU unique port/wharf and crane service as specified in section 1.10 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
NASA Specific Support
The contractor shall provide NASA unique service as specified in section 1.11 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
RESERVED
Reserved for future use.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
RESERVED
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 18 |
| Each |
Activation, Deactivation, Closeout
The contractor shall provide facility activation, deactivation, closeout and/or turnover of facilities identified by the Government. Work to be accomplished as specified in section 1.7.11 of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Contract Data Requirements List (CDRL)
NOT SEPERATELY PRICED: The contractor shall provide CDRLs as required by the Performance Work Statement.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Program Mgt, General, GFP and Logistics
The contractor shall perform program management, general requirements, government furnished property administration and logistics in accordance with Sections 1.1, 2.0, 3.0, and 4.0 (excluding 2.8 and 2.9) of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Cape Duty Office/Work Management
The contractor shall perform all work identified in Section 1.2 (excluding 1.2.5) in accordance with the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Emergency Management and Response
The contractor shall provide emergency management and response operations service as identified in section 1.2.5 of the PWS.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Engineering Services
The contractor shall provide engineering services in accordance with Section 1.7 (excluding section 1.7.11) of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 6,913,800 |
| Square Foot |
Tier 1 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 1.
Unit Price = price per square foot per month for Tier 1 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 3,433,032 |
| Square Foot |
Tier 2 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 2.
Unit Price = price per square foot per month for Tier 2 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 31,774,296 |
| Square Foot |
Tier 3 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 3.
Unit Price = price per square foot per month for Tier 3 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2,399,160 |
| Square Foot |
Tier 4 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 4.
Unit Price = price per square foot per month for Tier 4 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 5,331,552 |
| Square Foot |
Tier 5 Facilities Maint/Repair Work
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 5.
Unit Price = price per square foot per month for Tier 5 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Emergency Response - Tier 0 Facilities
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C, and D for Tier 0 when requested by the government.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 4,188 |
| Each Per Month |
Maintenance and Repair of Towers
The contractor shall perform all work for the maintenance and repair of towers as identified in Section 1.4.12 of the PWS and identified in Appendix G.
Max Quantity = Total number of towers (349) per month multiplied by 12 for a yearly total of 4,188.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Storm Water Maintenance and Repair
The contractor shall perform all work identified for storm water maintenance and repair as identified in Section 1.4.13 of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
Base Operations and Infrastructure
The contractor shall perform all work for base operations and infrastructure as specified in section 1.4 of the PWS (excluding paragraphs 1.4.12 and 1.4.13)
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Materials
This CLIN provides for reimbursement of the cost of all supplies, materials, and parts utilized in performance of the CLOIS contract except for the following:
(1) All vehicles and equipment required are contractor provided and owned
(reference PWS paragraph 4.3). Vehicle and equipment costs will be charged against the applicable fixed price CLIN.
(2) Planned work materials and sustainment project materials will be purchased under their respective CLINS (X016 and X017, respectively).
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Base Services
The contractor shall provide all base services as identified in Section 1.5 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Planned Work
The contractor shall provide any work identified in section 1.3 of the PWS for work identified with written authorization, beyond repair level of effort as defined in PWS section 1.2.2.8.2, and requires detailed planning or capitalization on the real property records.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 8 |
| Each |
Sustainment Projects
The contractor shall provide any work identified in the PWS for work identified with written authorization, beyond repair level of effort as defined in PWS section 1.2.2.8.2, and requires detailed planning or capitalization on the real property records and requires design (architectural-engineering) prior to start.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 23 |
| Each |
Mission Support
The contractor shall provide mission operations support as required in support of launch campaigns as specified in section 1.6 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Munitions Customer and Launch Support
The contractor shall provide munitions and flight hardware service as specified in PWS sections 1.8.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
Mission Communications
The contractor shall provide communication services as specified in PWS section 1.9.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
NOTU Specific Support
The contractor shall provide NOTU unique port/wharf and crane service as specified in section 1.10 of the PWS..
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
NASA Specific Support
The contractor shall provide NASA unique service as specified in section 1.11 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
RESERVED
Reserved for future use.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
RESERVED
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 18 |
| Each |
Activation, Deactivation, Closeout
The contractor shall provide facility activation, deactivation, closeout and/or turnover of facilities identified by the Government. Work to be accomplished as specified in section 1.7.11 of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Contract Data Requirements List (CDRL)
NOT SEPERATELY PRICED: The contractor shall provide CDRLs as required by the Performance Work Statement.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
| OPTION |
| Program Mgt, General, GFP and Logistics |
FFP
The contractor shall perform program management, general requirements, government furnished property administration and logistics in accordance with Sections 1.1, 2.0, 3.0, and 4.0 (excluding 2.8 and 2.9) of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
| OPTION |
| Cape Duty Office/Work Management |
FFP
The contractor shall perform all work identified in Section 1.2 (excluding 1.2.5) in accordance with the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
| OPTION |
| Emergency Management and Response |
COST
The contractor shall provide emergency management and response operations service as identified in section 1.2.5 of the PWS.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
| OPTION |
| Engineering Services |
FFP
The contractor shall provide engineering services in accordance with Section 1.7 (excluding section 1.7.11) of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 6,913,800 |
| Square Foot |
| OPTION |
| Tier 1 Facilities Maint/Repair Work |
FFP
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 1.
Unit Price = price per square foot per month for Tier 1 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 3,433,032 |
| Square Foot |
| OPTION |
| Tier 2 Facilities Maint/Repair Work |
FFP
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 2.
Unit Price = price per square foot per month for Tier 2 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 31,774,296 |
| Square Foot |
| OPTION |
| Tier 3 Facilities Maint/Repair Work |
FFP
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 3.
Unit Price = price per square foot per month for Tier 3 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2,399,160 |
| Square Foot |
| OPTION |
| Tier 4 Facilities Maint/Repair Work |
FFP
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 4.
Unit Price = price per square foot per month for Tier 4 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 5,331,552 |
| Square Foot |
| OPTION |
| Tier 5 Facilities Maint/Repair Work |
FFP
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 5.
Unit Price = price per square foot per month for Tier 5 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
| OPTION |
| Emergency Response - Tier 0 Facilities |
COST
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C, and D for Tier 0 when requested by the government.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 4,188 |
| Each |
| OPTION |
| Maintenance and Repair of Towers |
FFP
The contractor shall perform all work for the maintenance and repair of towers as identified in Section 1.4.12 of the PWS and identified in Appendix G.
Max Quantity = Total number of towers (349) per month multiplied by 12 for a yearly total of 4,188.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
| OPTION |
| Storm Water Maintenance and Repair |
FFP
The contractor shall perform all work identified for storm water maintenance and repair as identified in Section 1.4.13 of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Months |
| OPTION |
| Base Operations and Infrastructure |
FFP
The contractor shall perform all work for base operations and infrastructure as specified in section 1.4 of the PWS (excluding paragraphs 1.4.12 and 1.4.13)
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
| OPTION |
| Materials |
COST
This CLIN provides for reimbursement of the cost of all supplies, materials, and parts utilized in performance of the CLOIS contract except for the following:
(1) All vehicles and equipment required are contractor provided and owned
(reference PWS paragraph 4.3). Vehicle and equipment costs will be charged against the applicable fixed price CLIN.
(2) Planned work materials and sustainment project materials will be purchased under their respective CLINS (X016 and X017, respectively).
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
| OPTION |
| Base Services |
CPFF
The contractor shall provide all base services as identified in Section 1.5 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
| OPTION |
| Planned Work |
CPFF
The contractor shall provide any work identified in section 1.3 of the PWS for work identified with written authorization, beyond repair level of effort as defined in PWS section 1.2.2.8.2, and requires detailed planning or capitalization on the real property records.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 8 |
| Each |
| OPTION |
| Sustainment Projects |
FFP
The contractor shall provide any work identified in the PWS for work identified with written authorization, beyond repair level of effort as defined in PWS section 1.2.2.8.2, and requires detailed planning or capitalization on the real property records and requires design (architectural-engineering) prior to start.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 23 |
| Each |
| OPTION |
| Mission Support |
CPFF
The contractor shall provide mission operations support as required in support of launch campaigns as specified in section 1.6 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 12 |
| Each Per Month |
| OPTION |
| Munitions Customer and Launch Support |
CPFF
The contractor shall provide munitions and flight hardware service as specified in PWS sections 1.8.
MAX COST
TOTAL MAX COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
| OPTION |
| Mission Communications |
CPFF
The contractor shall provide communication services as specified in PWS section 1.9.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
| OPTION |
| NOTU Specific Support |
CPFF
The contractor shall provide NOTU unique port/wharf and crane service as specified in section 1.10 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Each Per Month |
| OPTION |
| NASA Specific Support |
CPFF
The contractor shall provide NASA unique service as specified in section 1.11 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| RESERVED |
FFP
Reserved for future use.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| RESERVED |
FFP
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 18 |
| Each |
| OPTION |
| Activation, Deactivation, Closeout |
FFP
The contractor shall provide facility activation, deactivation, closeout and/or turnover of facilities identified by the Government. Work to be accomplished as specified in section 1.7.11 of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Contract Data Requirements List (CDRL) |
NOT SEPERATELY PRICED: The contractor shall provide CDRLs as required by the Performance Work Statement.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 6 |
| Months |
| OPTION |
| 6 Mon Ext-Prog Mgt, Ground, GFP, Log |
FFP
The contractor shall perform program management, general requirements, government furnished property administration and logistics in accordance with Sections 1.1, 2.0, 3.0, and 4.0 (excluding 2.8 and 2.9) of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 6 |
| Months |
| OPTION |
| 6 Month Ext-Cape Duty Office/Work Mgmt |
FFP
Cape Duty Office/Work Management. The contractor shall perform all work identified in Section 1.2 (excluding 1.2.5) in accordance with the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Each Per Month |
| OPTION |
| 6 Month Extension-Emer Mgmt and Resp |
COST
Emergency management and reponse. The contractor shall provide emergency management and response operations as identified in section 1.2.5 of the PWS.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 6 |
| Months |
| OPTION |
| 6 Month Extension-Engineering Services |
FFP
Engineering Services. The contractor shall provide engineering services in accordance with Section 1.7 (excluding section 1.7.11) of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 3,456,900 |
| Square Foot |
| OPTION |
| 6 Mon Ext-Tier 1 Facilities Maint/Rep Wo |
FFP
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 1.
Unit Price = price per square foot per month for Tier 1 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,716,516 |
| Square Foot |
| OPTION |
| 6 Mon Ext-Tier 2 Facilities Maint/Rep Wo |
FFP
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 2.
Unit Price = price per square foot per month for Tier 2 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 15,887,148 |
| Square Foot |
| OPTION |
| 6 Mon Ext-Tier 3 Facilities Maint/Rep Wo |
FFP
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 3.
Unit Price = price per square foot per month for Tier 3 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,199,580 |
| Square Foot |
| OPTION |
| 6 Mon Ext-Tier 4 Facilities Maint/Rep Wo |
FFP
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 4.
Unit Price = price per square foot per month for Tier 4 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2,665,776 |
| Square Foot |
| OPTION |
| 6 Mon Ext-Tier 5 Facilities Maint/Rep Wo |
FFP
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C and D for Tier 5.
Unit Price = price per square foot per month for Tier 5 facilities.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Each Per Month |
| OPTION |
| 6 Month Extension-Tier 0 Facilities |
COST
The contractor shall perform work identified in Section 1.3 of the PWS and the facilities identified in Appendix A, C, and D for Tier 0 for emergency response when requested by the government.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 2,094 |
| Each Per Month |
| OPTION |
| 6 Month Extension-Towers |
FFP
The contractor shall perform work for the maintenance and repair of towers as identified in Section 1.4.12 of the PWS and identified in Appendix G.
Max Quantity = Total number of towers (349) per month multiplied by 6 for a 6 month total of 2,094.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 6 |
| Months |
| OPTION |
| 6 Month Extension-Storm Water |
FFP
The contractor shall perform all work identified for storm water maintenance and repair as identified in Section 1.4.13 of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 6 |
| Months |
| OPTION |
| 6 Month Extension-Base Op and Infra |
FFP
The contractor shall perform all work base operations and infrastructure as specified in section 1.4 (excluding paragraphs 1.4.12 and 1.4.13) of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Each Per Month |
| OPTION |
| 6 Month Extension - Materials |
COST
This CLIN provides for reimbursement of the cost of all supplies, materials, and parts utilized in performance of the CLOIS contract except for the following:
(1) All vehicles and equipment required are contractor provided and owned
(reference PWS paragraph 4.3). Vehicle and equipment costs will be charged against the applicable fixed price CLIN.
(2) Planned work materials and sustainment project materials will be purchased under their respective CLINS (X016 and X017, respectively).
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Each Per Month |
| OPTION |
| 6 Month Extension-Base Services |
CPFF
The contractor shall provide all base services as identified in Section 1.5 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Each Per Month |
| OPTION |
| 6 Month Extension-Planned Work |
CPFF
The contractor shall provide any work identified in section 1.3 of the PWS for work identified with written authorization, beyond repair level of effort as defined in PWS section 1.2.2.8.2, and requires detailed planning or capitalization on the real property records.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 8 |
| Each |
| OPTION |
| 6 Month Extension-Sustainment Projects |
FFP
The contractor shall provide any work identified in the PWS for work identified with written authorization, beyond repair level of effort as defined in PWS section 1.2.2.8.2, and requires detailed planning or capitalization on the real property records and requires design (architectural-engineering) prior to start.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 23 |
| Each |
| OPTION |
| 6 Month Extension-Mission Support |
CPFF
The contractor shall provide mission operations support as required in support of launch campaigns as specified in section 1.6 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Each Per Month |
| OPTION |
| 6 Mon Ext-Munitions Cust and Launch Supp |
CPFF
The contractor shall provide munitions and flight hardware service as specified in PWS sections 1.8.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Each Per Month |
| OPTION |
| 6 Mon Ext-Mission Communications |
CPFF
The contractor shall provide communication services as specified in PWS section 1.9.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Each Per Month |
| OPTION |
| 6 Month Extension- NOTU Specific Support |
CPFF
The contractor shall provide NOTU unique port/wharf and crane service as specified in section 1.10 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 6 |
| Each Per Month |
| OPTION |
| 6 Month Extension-NASA Specific Support |
CPFF
The contractor shall provide NASA unique service as specified in section 1.11 of the PWS.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| 6 Month Extension-RESERVED |
FFP
Reserved for future use.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| Reserved-6 Month Extension |
FFP
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 18 |
| Each |
| OPTION |
| 6 Month Extension-Act/Deact/Closeout |
FFP
The contractor shall provide facility activation, deactivation, closeout and/or turnover of facilities identified by the Government. Work to be accomplished as specified in section 1.7.11 of the PWS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
| OPTION |
| 6 Month Extension-CDRLs |
NOT SEPERATELY PRICED: The contractor shall provide CDRLs as required by the Performance Work Statement.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Each |
| OPTION |
| Phase-Out Period |
FFP
The contractor shall provide phase-in service as specified in section 2.9 of the PWS.
MAX
SECTION B NOTES:
B-1 Contract Type
This is an Indefinite Delivery/Indefinite Quantity (IDIQ) type contract with multiple pricing arrangements available for use in pricing individual task orders. Available arrangements shall include Firm-Fixed-Price (FFP), Cost-Plus-Fixed-Fee (CPFF) and Cost Reimbursable (CR). Travel and Other Direct Costs (ODCs) under CPFF task orders shall be priced on a cost-reimbursement, no fee basis.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .