SOLISITATION QUESTIONS AND ANSWERED VOLUME 2 DATED 20 SEPTEMBER 2011
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA2521-11-R-0023-0005.pdf | ||
| 11-R-0023-04.pdf | ||
| 11-R-0023-03.pdf | ||
| 01 SOLICITATION Q A PAVING IDIQ.docx | DOCX document | |
| FA2521-11-R-0023 Amendment 2.pdf | ||
| FA2521-11-R-0023-0001.pdf | ||
| PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| Paving IDIQ Solicitation.pdf | ||
| Attachment 2 Specs.pdf | ||
| Attachment 1 Paving IDIQ Pricing schedule.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAVING IDIQ SOLICITATION Q&A VOLUME 2
Q1: A09- Milling of concrete will be more expensive than asphalt can that be two separate line items?
A1:The amount of unreinforced concrete is incidental and should be bid as negligible, less than 1% of milled area.
Q2: AO5- It is assumed that hauling will be on the base, is this correct?
| A2: Typically all hauling is on base. It is anticipated the typical haul | ||
| will be a 5-mile round trip, that is 2.5 miles loaded, 2.5 miles unloaded. | If the trip exceeds these distances Line A06 would be used to account for | the additional mileage. |
Q3: A15/16- it is assumed that the concrete depth is 6-9 what is the depth range of asphalt overlay?
A3: The composite/total depth, asphalt + concrete, is 6-9 inches.
Q4: A17- It is assumed removal only not to include filling of the removal area under this line item?
A4: Assumption is Correct.
Q5: A19- It is assumed to be standard bollards and small traffic signs, is this correct?
A5: Assumption is Correct.
Q6: D07- is reinforcement field or shop fab? If shop fab are shop drawings req'd?
| A6: Shop drawings are specified in Section 03 20 02. It will be |
| to the contractor's discretion to fabricate reinforcement in the shop or |
| field. |
Q7: Can a line item be created for mobilization under each work type?
A7: Any costs for mobilization should be included as a component in each line item. That is each line items would have typical components of labor, materials, equipment, and mobilization.