MFR Site Visit Q and A.pdf
PDF 364 KB Posted
- Attached to
- BDLG 1 Landscape Maintenance Federal contract opportunity
- Solicitation number
- FA251725Q0020
About this file
This is a Questions and Answers document from a Department of Air Force/Space Force site visit for solicitation FA2517Q0020 regarding indoor plant/landscape maintenance at Space Base Delta 1. The document addresses 20 questions about facility access, plant maintenance requirements, and logistics.
Key details include: maintenance is required weekly for 6-7 hours, with work hours between 0800-1600; there are 5 plant bed sections on the first floor plus a 200 sq ft "catwalk" area on the third floor; plant beds range from 1-3 feet deep with specific dimensions provided for each section; contractors must provide their own portable water tanks and tools; no cell phones or Bluetooth devices are allowed in the building; access is through a loading dock entrance requiring temporary badges; dead plants must be replaced by the contractor; and a freight elevator is available for moving supplies. The facility floor plan is included showing the locations of the plant beds and loading dock.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA251725Q0020_Amendment 2.pdf | ||
| FA251725Q0020 _Amendment 1.pdf | ||
| MFR-Answers for Solicitation Qs.pdf | ||
| FA251725Q0020.pdf | ||
| Attachment 1 Landscape MX Performance Work Statement.pdf | ||
| Attachment 4 Wage Determination.pdf | ||
| Attachment 3 Pricing Sheet 1.xlsx | XLSX spreadsheet | |
| Attachment 2 Landscape MX Provisions and Clauses.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Semper Supra
DEPARTMENT OF THE AIR
FORCE UNITED STATES SPACE
FORCE SPACE BASE DELTA 1
27 January 2025
MEMORANDUM FOR RECORD
FROM: 21 CONS
SUBJECT: Questions Regarding FA2517Q0020 – Indoor Plant/Landscape Maintenance
1. This MFR is being accomplished to address questions in relation to the site visit that occurred on 24 January 2025. If there is a question that is answered in the PWS, the section has been added to the end of the answer.
2. Questions:
i. Are all the plants indoors?
1. Yes, the plants that will be cared for are all indoors in plants beds. We have changed the name of the requirement to better align with the service.
ii. Are the plants in pots, interior beds, or both?
1. Both, some are in pots for easier rotation.
iii. What is the largest plant size?
1. Unknown.
iv. Where are the plant beds located in the building?
1. There are 5 sections on the first floor, labeled in the attached diagram. There is an additional section on the 3rd floor called the “catwalk” that is not pictured.
v. How big is the “catwalk”?
1. 200 square feet of planting area.
vi. Is there a plant list?
1. It is in the PWS. The plants listed in the PWS are the ones that are authorized to be in the building. (Section 1.2)
vii. Does the government pay for dead plant replacement?
1. No. The contractor will be responsible for replacing dead or dying plants with new ones. The replacement plant does not need to be the same species as the dead one. (Section 2.9)
viii. There are rocks in the plant beds, is that a requirement?
1. No. There is no rock requirement in the PWS.
ix. How do we water the plants?
1. The current incumbent has two portable water tanks on wheels that they use to water the plants, so that should be included in your quote. (Section 2.8)
x. How often is maintenance?
1. Once a week, generally about 6-7 hours for one person. There is no specific day of the week that the work needs to be done, that is at the contractor’s discretion.
(Section 3.2)
xi. How early can we arrive? 08:00 Must exit by 16:00
1. Refer to PWS Section 3.2.
xii. Is there a minimum coverage requirement for the plant beds?
1. No.
xiii. Where can we fill the water tanks indoors?
1. There are slop sinks located in the Men’s and Women’s restrooms on the first floor that can be used to fill and store the tanks. (Section 2.8)
xiv. Are cell phones permitted at all?
1. No. No cellphones or Bluetooth devices are allowed in the building.
xv. How do we get into the building?
1. Please see diagram for the loading doc entrance. There is a gate before the entrance with a button to alert facility management that you have arrived. You will enter through the loading dock area and facility management will give you a temporary badge.
xvi. Are we bringing our own tools?
1. Yes. (Section 1.1)
xvii. How do we get our supplies upstairs?
1. There is a freight elevator that can be utilized.
xviii. What past pesticides and chemicals were used on the plants?
1. That is proprietary to the contractor.
xix. How deep are the plants beds?
1. 1- 3 ft depending on the area.
xx. What are the plant bed dimensions?
1. See Measurements (Rough estimates)
a. Plant Bed 1: 18 ft X 45 ft
b. Plants Bed 2: 15 ft X 16 ft
c. Plant Bed 3: 15 ft X 16 ft
d. Plant Bed 4: 18 ft X 30 ft
e. Plant Bed 5: 18 ft X 18 ft X 25 ft
3. If you have any questions or concerns, please contact 719-556-7764/6117, or email anna.moritz@spaceforce.mil and jessica.wright.10@spaceforce.mil
JESSICA R. WRIGHT, SSgt, USAF Contracting Officer
=Loading Dock mailto:anna.moritz@spaceforce.mil mailto:jessica.wright.10@spaceforce.mil
File details come from the government source that posted it. Updated .