Exhibit A – Schedule of Deliverables The award effective date will be 30 September 2016. The delivery date of the completed product shall be 29 September 2019. All deliveries are expressed in calendar months. Each delivery must be submitted to the Designated Government Representative (DGR) on the last calendar day of the designated month, or if this day falls on a weekend or holiday it must be submitted the last business day prior to the last calendar day of the designated month.
As an integral part of fulfilling the requirements of this document, the Contractor may need to travel to domestic locations. See Paragraph 12 of the Statement of Delivery Requirements for probable locations and estimated durations. The Contractor shall incorporate all travel costs in their quote.
This information is provided to potential offerors to assist in pricing. Thirty-six (36) equal payments will be made to the Contractor as invoiced by the Contractor following DGR acceptance of each item.
· (NOTE: Contractor may propose changes to chapter titles, number of chapters, and chapter content as necessary but only with approval in advance and in writing by DGR)
| ITEM NO. |
| ITEM |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0001 |
| Original manuscript on the history of Launch, comprised of the 36 components below: 0001AA through 0001BN |
| 1 |
| each |
| 0001AA |
| Summary of On-Site Project Initiation Review with HQ AFPSC/HO Subject Matter Experts at Peterson AFB |
| 1 |
| each |
| * |
| 0001AB |
| Progress Report on research conducted, with access provided to DGR to research notes and materials. Access may be accomplished by electronic or physical means. |
| 1 |
| each |
| * |
| 0001AC |
| Manuscript outline with proposed chapter titles and with abbreviated summary of projected chapter content |
| 1 |
| each |
| * |
| 0001AD |
| Progress Report on research conducted, with access provided to DGR to research notes and materials. Access may be accomplished by electronic or physical means. |
| 1 |
| each |
| * |
| 0001AE |
| Draft outline of Chapter I, Introduction |
| 1 |
| each |
| * |
| 0001AF |
| Progress Report on research conducted, with access provided to DGR to research notes and materials. Access may be accomplished by electronic or physical means. |
| 1 |
| each |
| * |
| 0001AG |
| Draft outline of Chapter II, Background Chapter on early USAF and other services’ rocket development and launches, 1945–1957 |
| 1 |
| each |
| * |
| 0001AH |
| Progress Report on research conducted, with access provided to DGR to research notes and materials. Access may be accomplished by electronic or physical means. |
| 1 |
| each |
| * |
| 0001AJ |
| Draft Outlines of Chapter III, Cape Canaveral AFS and Eastern Test Range, and Chapter IV, Vandenberg AFB and Western Test Range |
| 1 |
| each |
| * |
| 0001AK |
| Progress Report on research conducted, with access provided to DGR to research notes and materials. Access may be accomplished by electronic or physical means. |
| 1 |
| each |
| * |
| 0001AL |
| Draft Outline of Chapter V, Launch vehicle development from USAF ballistic missiles to EELVs, and Chapter VI, Organizing USAF management responsibilities for the space launch enterprise |
| 1 |
| each |
| * |
| 0001AM |
| Progress Report on research conducted, with access provided to DGR to research notes and materials. Access may be accomplished by electronic or physical means. |
| 1 |
| each |
| * |
| 0001AN |
| Detailed Outline of Chapter I, Introduction |
| 1 |
| each |
| * |
| 0001AP |
| Progress Report on research conducted, with access provided to DGR to research notes and materials. Access may be accomplished by electronic or physical means. |
| 1 |
| each |
| * |
| 0001AQ |
| Detailed Outline of Chapter II, Background Chapter on early USAF and other services’ rocket development and launches, 1945–1957 |
| 1 |
| each |
| * |
| 0001AR |
| Progress Report on research conducted, with access provided to DGR to research notes and materials. Access may be accomplished by electronic or physical means. |
| 1 |
| each |
| * |
| 0001AS |
| Detailed Outline of Chapter III, Cape Canaveral AFS and Eastern Test Range |
| 1 |
| each |
| * |
| 0001AT |
| Progress Report on research conducted, with access provided to DGR to research notes and materials. Access may be accomplished by electronic or physical means. |
| 1 |
| each |
| * |
| 0001AU |
| Detailed Outline of Chapter IV, Vandenberg AFB and Western Test Range |
| 1 |
| each |
| * |
| 0001AV |
| Progress Report on research conducted, with access provided to DGR to research notes and materials. Access may be accomplished by electronic or physical means. |
| 1 |
| each |
| * |
| 0001AW |
| Detailed Outline of Chapter V, Launch vehicle development from USAF ballistic missiles to EELVs |
| 1 |
| each |
| * |
| 0001AX |
| Progress Report on research conducted, with access provided to DGR to research notes and materials. Access may be accomplished by electronic or physical means. |
| 1 |
| each |
| * |
| 0001AY |
| Detailed Outline of Chapter VI, Organizing USAF management responsibilities for the space launch enterprise |
| 1 |
| each |
| * |
| 0001AZ |
| Progress Report on research conducted, with access provided to DGR to research notes and materials. Access may be accomplished by electronic or physical means. |
| 1 |
| each |
| * |
| 0001BA |
| Final Rough Draft of Chapter I, Introduction |
| 1 |
| each |
| * |
| 0001BB |
| 26 calendar months after award Final Rough Draft of Chapter II, Background Chapter |
| 1 |
| each |
| * |
| 0001BC |
| Final Rough Draft of Chapter III, Cape Canaveral AFS and Eastern Test Range |
| 1 |
| each |
| * |
| 0001BD |
| Final Rough Draft of Chapter IV, Vandenberg AFB and Western Test Range |
| 1 |
| each |
| * |
| 0001BE |
| Final Rough Draft of Chapter V, Launch vehicle development from USAF ballistic missiles to EELVs |
| 1 |
| each |
| * |
| 0001BF |
| Final Rough Draft of Chapter VI, Organizing USAF management responsibilities for the space launch enterprise |
| 1 |
| each |
| * |
| 0001BG |
| Final Rough Draft of Chapter VII, Conclusion |
| 1 |
| each |
| * |
| 0001BH |
| First Draft of Finished Manuscript |
| 1 |
| each |
| * |
| 0001BJ |
| First Draft of Front Matter, Back Matter, Appendices and Suggested Photos with Captions |
| 1 |
| each |
| * |
| 0001BK |
| Completed Edits of First Draft of Manuscript |
| 1 |
| each |
| * |
| 0001BL |
| Second Draft of Finished Manuscript with Front Matter and Back Matter Added |
| 1 |
| each |
| * |
| 0001BN |
| Completed Edits of Second Draft of Manuscript; Submission of Final Completed Manuscript with Front Matter and Back Matter and all Ancillary Material Included (including all research documents utilized for this project). All copies of the final manuscript must be identical in format and submitted on one (1) compact disk using a word processing program that is approved by the DGR before work begins and two (2) paper copies on 8 ½ by 11 inch bond paper. |
| 1 |
| each |
| * |
· Thirty-six (36) equal payments will be made to the Contractor as invoiced by the Contractor following DGR acceptance of each delivery.