0._DRAFT_Request_For_Proposal_FA2517-15-R-8001.pdf

PDF 3 MB Posted

Attached to
Solid State Phased Array Radar System (SSPARS) Federal contract opportunity
Solicitation number
FA2517-15-R-8001
Issued by
Department of the Air Force Space Command

About this file

This sources sought notice seeks potential sources to provide operations and maintenance support for five geographically separated radar sites that are part of the Solid State Phased Array Radar System. Services required include 24/7 O&M support for radar and communications systems at locations in Clear, Alaska; Beale AFB, California; Cape Cod AFS, Massachusetts; Thule AB, Greenland; and RAF Fylingdales, United Kingdom. The draft request for proposal will solicit this support for a period to be determined, under a previously used mix of fixed-price incentive and cost-reimbursement contract types. Interested parties are requested to respond to attached market research questions by July 15, 2015. The agency intends to hold an industry day in the fourth quarter of fiscal year 2016 to provide additional information to potential offerors.

Updated Draft RFP as of 8 March 2017

View the file

Other files for this federal contract opportunity

Other files attached to Solid State Phased Array Radar System (SSPARS), newest first.
File Type Posted
6._Attch_6,_Clear_CBA_(FJCC)_1_Oct_2015_-_30_Sep_2019.pdf PDF
9._Attch_9,_Scheduled_Government_Furnished_Property.pdf PDF
0a._Amendment_0001_(SF30).pdf PDF
3._Attch_3,_DD_Form_254.pdf PDF
10._Attch_10,_Staffing_Matrix.xlsx XLSX spreadsheet
2._Attch_2,_Contractor_Assessment_and_Performance_Reporting_(CAsPR)_Matrix.xlsx XLSX spreadsheet
12._Attch_12,_Questions_and_Answers.pdf PDF
11._Attch_11,_CLIN_Schedule_Worksheet.xlsx XLSX spreadsheet
4._Attch_4,_Beale_CBA_1_Oct_2015_-_30_Sep_2019.pdf PDF
0._Request_For_Proposal_FA2517-15-R-8001.pdf PDF
2._Attch_2,_Contractor_Assessment_and_Performance_Reporting_(CAsPR)_Matrix.xlsx XLSX spreadsheet
1._Attch_1,_Performance_Work_Statement.docx DOCX document
5._Attch_5,_Cape_Cod_CBA_1_Oct_2016_-_30_Sep_2019.pdf PDF
8._Attch_8,_Quality_Assurance_Surveillance_Plan.docx DOCX document
7._Attch_7,_Clear_CBA_(IBT)_1_Oct_2016_-_30_Sep_2019.pdf PDF
7._Attch_7,Clear_CBA_(IBT)_1_Oct_2016_-_30_Sep_2019.pdf PDF
6._Attch_6,_Clear_CBA_(FJCC)_1_Oct_2015_-_30_Sep_2019.pdf PDF
3._Attch_3,_DD_Form_254.pdf PDF
2._Attch_2,_Contractor_Assessment_and_Performance_Reporting_(CAsPR)_Matrix.xlsx XLSX spreadsheet
1._Attch,_Performance_Work_Statement.docx DOCX document
11._Attch_11,_CLIN_Schedule_Worksheet.xlsx XLSX spreadsheet
RFP_Release_Date_Change.pdf PDF
17._Attch_17,_Site_Visit_REAL_ID_Act_Primer.pdf PDF
14._Attch_14,_Site_Visit_Beale_AFB_EAL_Form.xls XLS spreadsheet
13._Attch_13,_Site_Visit_Base_Maps.pdf PDF
7._Attch_7,_Clear_CBA_(IBT)_1_Oct_2016_-_30_Sep_2019.pdf PDF
5._Attch_5,_Cape_Cod_CBA_1_Oct_2016_-_30_Sep_2019.pdf PDF
15._Attch_15,_Site_Visit_7_SWS_VAR_Form.doc DOC document
11._Attch_11,_Draft_RFP_and_Industry_Day_Questions_and_Answers.pdf PDF
10._Attch_10,_Staffing_Matrix.xlsx XLSX spreadsheet
4._Attch_4,_Beale_CBA_1_Oct_2015_-_30_Sep_2019.pdf PDF
1._Attch_1,_Performance_Work_Statement.docx DOCX document
12._Attch_12_Site_Visit_Schedule.doc DOC document
9._Attch_9,_Schedule_Government_Furnished_Property.pdf PDF
0._DRAFT_Request_For_Proposal_FA2517-15-R-8001.pdf PDF
2._Attch_2,_Contractor_Assessment_and_Performance_Reporting_(CAsPR)_Matrix.xlsx XLSX spreadsheet
6._Attch_6,_Clear_CBA_(FJCC)_1_Oct_2015_-_Sep_2019.pdf PDF
17._Attch_17,_Site_Visit_REAL_ID_Act_Primer.pdf PDF
3._Attch_3,_DD_Form_254.pdf PDF
SSPARS_Draft_RFP_and_Industry_Day_Comments-_ROUND_3.pdf PDF
SSPARS_Draft_RFP_and_Industry_Day_Comments_-_ROUND_2.pdf PDF
SSPARS_Industry_Day_Attendees.pdf PDF
Attch_3_DRAFT_DD_Form_254_SSPARS.pdf PDF
FAQ_and_Answers_for_Form_DD2345.pdf PDF
DD2345.pdf PDF
Attch_2_-_Base_Map.pdf PDF
Notice_of_Industry_Day.pdf PDF
FA2517-15-R-8001_Synopsis.docx DOCX document
RFI_3_LoS _Prof_Emp.pdf PDF
RFI_2_Risk _CPARS _SB.pdf PDF
Show all 50

Solid State Phased Array Radar System (SSPARS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

CODE

(Hour)

PAGE(S)

until local time

X

A

X B

C

D

E

X

G

F 132 - 141

142 - 155

X H 156 - 161

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

DO-A7 1 161

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

FA2517 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 81

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE 82 - 96

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 97 - 101 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 102 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

103 - 130

PART II - CO NTRACT CLAUSES

FA2517 - 21 CONS/LGCZB

AUSTIN FRINDT

(719) 554-2940

135 DOVER STREET, SUITE 2225, BLDG 350

PETERSON AFB CO 80914

(719) 554-2940

(719) 556-8922FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

08 Mar 2017

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

FA2517-15-R-8001

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0006 3 Months PHASE-IN Cape Cod AFS, MA

FFP

Phase-In Cape Cod AFS, MA Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform phase-in services as defined in the SSPARS Performance Work Statement (PWS) paragraph 2.16.1. Period of Performance: 01 June 2018 - 31 August 2018.

FOB: Destination

SIGNAL CODE: A

NET AMT

0007 3 Months PHASE-IN Beale AFB, CA

FFP

Phase-In Beale AFB, CA Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform phase-in services as defined in the SSPARS Performance Work Statement (PWS) paragraph 2.16.1. Period of Performance: 01 June 2018 - 31 August 2018.

0012 3 Months PHASE-IN Thule AB, GL

FFP

Phase-In Thule AB, GL Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform phase-in services as defined in the SSPARS Performance Work Statement (PWS) paragraph 2.16.1. Period of Performance: 01 June 2018 - 31 August 2018.

0013 3 Months PHASE-IN Clear AFS, AK

FFP

Phase-In Clear AFS, AK Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform phase-in services as defined in the SSPARS Performance Work Statement (PWS) paragraph 2.16.1. Period of Performance: 01 June 2018 - 31 August 2018.

0018 3 Months PHASE-IN RAF Fylingdales, UK

FFP

Phase-In RAF Fylingdales, UK Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform phase-in services as defined in the SSPARS Performance Work statement (PWS) paragraph 2.16.1. Period of Performance: 01 June 2018 - 31 August 2018.

0106 8 Months BASE PERIOD Cape Cod AFS, MA

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 September 2018 - 30 April 2019.

010610 O&M

FFP

010630

MILSATCOM

010650

ENVIRONMENTAL

0107 8 Months BASE PERIOD Beale AFB, CA

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 September 2018 - 30 April 2019.

010710

010730

0112 8 Months BASE PERIOD Thule AB, GL

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 September 2018 - 30 April 2019.

011210

011230

0113 8 Months BASE PERIOD Clear AFS, AK

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 September 2018 - 30 April 2019.

011310

011330

011350

0118 8 Months BASE PERIOD RAF Fylingdales, UK

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 September 2018 - 30 April 2019.

011810

011830

0200 Lot BASE PERIOD Cost Reimbursables

COST

Contractor shall be reimbursed for parts and materials necessary for repairs and for government-approved and non-local travel as stated in PWS paragraphs

1.1.10. and 2.7.1. Contractor will be reimbursed IAW Section G, paragraph "2.c."

Period of Performance: 01 September 2018- 30 April 2019.

ESTIMATED COST $450,000.00

BASE PERIOD Individual Job Orders

Cost/FFP

Individual Job Orders - Separately negotiated projects within the scope of the contract not specifically identified in the PWS, but which is still within the general scope of the contract. Period of Performance: 01 September 2018 - 30 April 2019.

0400 Lot BASE PERIOD Termination Liability

COST

Termination Liability Contingencies. Cost for informational purposes only. IAW

DFARS 252.232-7007, Limitation of Government's Obligation and in the circumstances where the Government must incrementally fund firm fixed price

CLINs, identify the costs required to terminate the contract should additional funds not become available. The proposed amount should reflect the maximum estimated termination costs. Period of Performance: 01 September 2018 - 30

April 2019.

ESTIMATED COST

040006 TERMINATION LIABILITY Cape Cod AFS MA

COST

040007 TERMINATION LIABILITY Beale AFB CA

040012 TERMINATION LIABILITY Thule AB GL

040013 TERMINATION LIABILITY Clear AFS AK

040018 TERMINATION LIABILITY RAF Fylingdales UK

1006 12 Months OPTION OPTION YEAR 1 Cape Cod AFS, MA

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2019 - 30 April 2020.

100610

100630

100650

1007 12 Months OPTION OPTION YEAR 1 Beale AFB, CA

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2019 - 30 April 2020.

100710

100730

1012 12 Months OPTION OPTION YEAR 1 Thule AB, GL

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2019 - 30 April 2020.

101210

101230

1013 12 Months OPTION OPTION YEAR 1 Clear AFS, AK

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2019 - 30 April 2020.

101310

101330

101350

1018 12 Months OPTION OPTION YEAR 1 RAF Fylingdales, UK

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2019 - 30 April 2020.

101810

101830

1200 Lot OPTION OPTION YEAR 1 Cost Reimbursables

COST

Contractor shall be reimbursed for parts and materials necessary for repairs and for government-approved and non-local travel as stated in PWS paragraphs

1.1.10. and 2.7.1. Contractor will be reimbursed IAW Section G, paragraph "2.c."

Period of Performance: 01 May 2019- 30 April 2020.

ESTIMATED COST $700,000.00

OPTION OPTION YEAR 1 Individual Job Orders contract not specifically identified in the PWS, but which is still within the general scope of the contract. Period of Performance: 01 May 2019 - 30 April 2020.

1400 Lot OPTION OPTION YEAR 1 Termination Liability

COST

Termination Liability Contingencies. Cost for informational purposes only. IAW

DFARS 252.232-7007, Limitation of Government's Obligation and in the circumstances where the Government must incrementally fund firm fixed price

CLINs, identify the costs required to terminate the contract should additional funds not become available. The proposed amount should reflect the maximum estimated termination costs. Period of Performance: 01 May 2019 - 30 April

2020.

140006

140007

140012

140013

140018

2006 12 Months OPTION OPTION YEAR 2 Cape Cod AFS, MA

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2020 - 30 April 2021.

200610

200630

200650

2007 12 Months OPTION OPTION YEAR 2 Beale AFB, CA

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2020 - 30 April 2021.

200710

200730

2012 12 Months OPTION OPTION YEAR 2 Thule AB, GL

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2020 - 30 April 2021.

201210

201230

2013 12 Months OPTION OPTION YEAR 2 Clear AFS, AK

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2020 - 30 April 2021.

201310

201330

201350

2018 12 Months OPTION OPTION YEAR 2 RAF Fylingdales, UK

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2020 - 30 April 2021.

201810

201830

2200 Lot OPTION OPTION YEAR 2 Cost Reimbursables

COST

Contractor shall be reimbursed for parts and materials necessary for repairs and for government-approved and non-local travel as stated in PWS paragraphs

1.1.10. and 2.7.1. Contractor will be reimbursed IAW Section G, paragraph "2.c."

Period of Performance: 01 May 2020 - 30 April 2021.

ESTIMATED COST $725,000.00

OPTION OPTION YEAR 2 Individual Job Orders contract not specifically identified in the PWS, but which is still within the general scope of the contract. Period of Performance: 01 May 2020 - 30 April 2021.

2400 Lot OPTION OPTION YEAR 2 Termination Liability

COST

Termination Liability Contingencies. Cost for informational purposes only. IAW

DFARS 252.232-7007, Limitation of Government's Obligation and in the circumstances where the Government must incrementally fund firm fixed price

CLINs, identify the costs required to terminate the contract should additional funds not become available. The proposed amount should reflect the maximum estimated termination costs. Period of Performance: 01 May 2020 - 30 April

2021.

240006

240007

240012

240013

240018

3006 12 Months OPTION OPTION YEAR 3 Cape Cod AFS, MA

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2021 - 30 April 2022.

300610

300630

300650

3007 12 Months OPTION OPTION YEAR 3 Beale AFB, CA

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2021 - 30 April 2022.

300710

300730

3012 12 Months OPTION OPTION YEAR 3 Thule AB, GL

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2021 - 30 April 2022.

301210

301230

3013 12 Months OPTION OPTION YEAR 3 Clear AFS, AK

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2021 - 30 April 2022.

301310

301330

301350

3018 12 Months OPTION OPTION YEAR 3 RAF Fylingdales, UK

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2021 - 30 April 2022.

301810

301830

3200 Lot OPTION OPTION YEAR 3 Cost Reimbursables

COST

Contractor shall be reimbursed for parts and materials necessary for repairs and for government-approved and non-local travel as stated in PWS paragraphs

1.1.10. and 2.7.1. Contractor will be reimbursed IAW Section G, paragraph "2.c."

Period of Performance: 01 May 2021 - 30 April 2022.

ESTIMATED COST $750,000.00

OPTION OPTION YEAR 3 Individual Job Orders contract not specifically identified in the PWS, but which is still within the general scope of the contract. Period of Performance: 01 May 2021 - 30 April 2022.

3400 Lot OPTION OPTION YEAR 3 Termination Liability

COST

Termination Liability Contingencies. Cost for informational purposes only. IAW

DFARS 252.232-7007, Limitation of Government's Obligation and in the circumstances where the Government must incrementally fund firm fixed price

CLINs, identify the costs required to terminate the contract should additional funds not become available. The proposed amount should reflect the maximum estimated termination costs. Period of Performance: 01 May 2021 - 30 April

2022.

340006

340007

340012

340013

340018

4006 12 Months OPTION OPTION YEAR 4 Cape Cod AFS, MA

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2022 - 30 April 2023.

400610

400630

400650

4007 12 Months OPTION OPTION YEAR 4 Beale AFB, CA

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2022 - 30 April 2023.

400710

400730

4012 12 Months OPTION OPTION YEAR 4 Thule AB, GL

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2022 - 30 April 2023.

401210

401230

4013 12 Months OPTION OPTION YEAR 4 Clear AFS, AK

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2022 - 30 April 2023.

401310

401330

401350

4018 12 Months OPTION OPTION YEAR 4 RAF Fylingdales, UK

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2022 - 30 April 2023.

401810

401830

4200 Lot OPTION OPTION YEAR 4 Cost Reimbursables

COST

Contractor shall be reimbursed for parts and materials necessary for repairs and for government-approved and non-local travel as stated in PWS paragraphs

1.1.10. and 2.7.1. Contractor will be reimbursed IAW Section G, paragraph "2.c."

Period of Performance: 01 May 2022 - 30 April 2023.

ESTIMATED COST $775,000.00

OPTION OPTION YEAR 4 Individual Job Orders contract not specifically identified in the PWS, but which is still within the general scope of the contract. Period of Performance: 01 May 2022 - 30 April 2023.

4400 Lot OPTION OPTION YEAR 4 Termination Liability

COST

Termination Liability Contingencies. Cost for informational purposes only. IAW

DFARS 252.232-7007, Limitation of Government's Obligation and in the circumstances where the Government must incrementally fund firm fixed price

CLINs, identify the costs required to terminate the contract should additional funds not become available. The proposed amount should reflect the maximum estimated termination costs. Period of Performance: 01 May 2022 - 30 April

2023.

440006

440007

440012

440013

440018

5006 12 Months OPTION OPTION YEAR 5 Cape Cod AFS, MA

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2023 - 30 April 2024.

500610

500630

500650

ENVIROMENTAL

5007 12 Months OPTION OPTION YEAR 5 Beale AFB, CA

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2023 - 30 April 2024.

500710

500730

5012 12 Months OPTION OPTION YEAR 5 Thule AB, GL

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2023 - 30 April 2024.

501210

501230

5013 12 Months OPTION OPTION YEAR 5 Clear AFS, AK

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2023 - 30 April 2024.

501310

501330

501350

5018 12 Months OPTION OPTION YEAR 5 RAF Fylingdales, UK

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2023 - 30 April 2024.

501810

501830

5200 Lot OPTION OPTION YEAR 5 Cost Reimbursables

COST

Contractor shall be reimbursed for parts and materials necessary for repairs and for government-approved and non-local travel as stated in PWS paragraphs

1.1.10. and 2.7.1. Contractor will be reimbursed IAW Section G, paragraph "2.c."

Period of Performance: 01 May 2023 - 30 April 2024.

ESTIMATED COST $800,000.00

OPTION OPTION YEAR 5 Individual Job Orders contract not specifically identified in the PWS, but which is still within the general scope of the contract. Period of Performance: 01 May 2023 - 30 April 2024.

5400 Lot OPTION OPTION YEAR 5 Termination Liability

COST

Termination Liability Contingencies. Cost for informational purposes only. IAW

DFARS 252.232-7007, Limitation of Government's Obligation and in the circumstances where the Government must incrementally fund firm fixed price

CLINs, identify the costs required to terminate the contract should additional funds not become available. The proposed amount should reflect the maximum estimated termination costs. Period of Performance: 01 May 2023 - 30 April

2024.

540006

540007

540012

540013

540018

6006 12 Months OPTION OPTION YEAR 6 Cape Cod AFS, MA

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2024 - 30 April 2025.

600610

600630

600650

6007 12 Months OPTION OPTION YEAR 6 Beale AFB, CA

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2024 - 30 April 2025.

600710

600730

6012 12 Months OPTION OPTION YEAR 6 Thule AB, GL

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2024 - 30 April 2025.

601210

601230

6013 12 Months OPTION OPTION YEAR 6 Clear AFS, AK

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2024 - 30 April 2025.

601310

601330

601350

6018 12 Months OPTION OPTION YEAR 6 RAF Fylingdales, UK

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2024 - 30 April 2025.

601810

601830

6200 Lot OPTION OPTION YEAR 6 Cost Reimbursables

COST

Contractor shall be reimbursed for parts and materials necessary for repairs and for government-approved and non-local travel as stated in PWS paragraphs

1.1.10. and 2.7.1. Contractor will be reimbursed IAW Section G, paragraph "2.c."

Period of Performance: 01 May 2024 - 30 April 2025.

ESTIMATED COST $825,000.00

OPTION OPTION YEAR 6 Individual Job Orders contract not specifically identified in the PWS, but which is still within the general scope of the contract. Period of Performance: 01 May 2024 - 30 April 2025.

6400 Lot OPTION OPTION YEAR 6 Termination Liability

COST

Termination Liability Contingencies. Cost for informational purposes only. IAW

DFARS 252.232-7007, Limitation of Government's Obligation and in the circumstances where the Government must incrementally fund firm fixed price

CLINs, identify the costs required to terminate the contract should additional funds not become available. The proposed amount should reflect the maximum estimated termination costs. Period of Performance: 01 May 2024 - 30 April

2025.

640006

640007

640012

640013

640018

7006 12 Months OPTION OPTION YEAR 7 Cape Cod AFS, MA

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2025 - 30 April 2026.

700610

700630

700650

7007 12 Months OPTION OPTION YEAR 7 Beale AFB, CA

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2025 - 30 April 2026.

700710

700730

7012 12 Months OPTION OPTION YEAR 7 Thule AB, GL

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2025 - 30 April 2026.

701210

701230

7013 12 Months OPTION OPTION YEAR 7 Clear AFS, AK

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2025 - 30 April 2026.

701310

701330

701350

7018 12 Months OPTION OPTION YEAR 7 RAF Fylingdales, UK

FFP

Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform as defined in the SSPARS

PWS, inclusive of deliverables. Included are all equipment, parts, labor and associated costs for all maintenance that is foreseeable and can be forecasted as stated in PWS paragraphs 1.1.9. and 2.7.1. Also included are all consumable items that may be necessary as part of day-to-day site operations. Period of

Performance: 01 May 2025 - 30 April 2026.

701810

701830

7200 Lot OPTION OPTION YEAR 7 Cost Reimbursables

COST

Contractor shall be reimbursed for parts and materials necessary for repairs and for government-approved and non-local travel as stated in PWS paragraphs

1.1.10. and 2.7.1. Contractor will be reimbursed IAW Section G, paragraph "2.c."

Period of Performance: 01 May 2025 - 30 April 2026.

ESTIMATED COST $850,000.00

OPTION OPTION YEAR 7 Individual Job Orders contract not specifically identified in the PWS, but which is still within the general scope of the contract. Period of Performance: 01 May 2025 - 30 April 2026.

7400 Lot OPTION OPTION YEAR 7 Termination Liability

COST

Termination Liability Contingencies. Cost for informational purposes only. IAW

DFARS 252.232-7007, Limitation of Government's Obligation and in the circumstances where the Government must incrementally fund firm fixed price

CLINs, identify the costs required to terminate the contract should additional funds not become available. The proposed amount should reflect the maximum estimated termination costs. Period of Performance: 01 May 2025 - 30 April

2026.

740006

740007

740012

740013

740018

8006 6 Months OPTION EXT OF SERVICES Cape Cod AFS, MA

FFP

Extension of Services - Cape Cod AFS: Continued performance may be required of any services within the limits and rates of Option Year 7. The total extension shall not exceed 6 months IAW FAR Clause 52.217-8. Period of Performance: 01 May

2026 - 31 October 2026.

8007 6 Months OPTION EXT OF SERVICES Beale AFB, CA

FFP

Extension of Services - Beale AFB: Continued performance may be required of any services within the limits and rates of Option Year 7. The total extension shall not exceed 6 months IAW FAR Clause 52.217-8. Period of Performance: 01 May

2026 - 31 October 2026.

8012 6 Months OPTION EXT OF SERVICES Thule AB, GL

FFP

Extension of Services - Thule AB: Continued performance may be required of any services within the limits and rates of Option Year 7. The total extension shall not exceed 6 months IAW FAR Clause 52.217-8. Period of Performance: 01 May

2026 - 31 October 2026.

8013 6 Months OPTION EXT OF SERVICES Clear AFS, AK

FFP

Extension of Services - Clear AFS: Continued performance may be required of any services within the limits and rates of Option Year 7. The total extension shall not exceed 6 months IAW FAR Clause 52.217-8. Period of Performance: 01 May

2026 - 31 October 2026.

8018 6 Months OPTION EXT OF SERVICES RAF Fylingdales, UK

FFP

Extension of Services - RAF Fylingdales: Continued performance may be required of any services within the limits and rates of Option Year 7. The total extension shall not exceed 6 months IAW FAR Clause 52.217-8. Period of Performance: 01

May 2026 - 31 October 2026.

8200 Lot OPTION EXT OF SERVICES Cost Reimbursables

COST

Contractor shall be reimbursed for parts and materials necessary for repairs and for government-approved and non-local travel as stated in PWS paragraphs

1.1.10. and 2.7.1. Contractor will be reimbursed IAW Section G, paragraph "2.c."

Period of Performance: 01 May 2026 - 31 October 2026.

ESTIMATED COST $425,000.00

9006 3 Months PHASE-OUT Cape Cod AFS, MA

FFP

Phase-Out Cape Cod AFS, MA Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform phase-out services as defined in the SSPARS Performance Work Statement (PWS) paragraph 2.16.2. Period of Performance: 01 February 2026- 30 April 2026.

9007 3 Months PHASE-OUT Beale AFB, CA

FFP

Phase-Out Beale AFB, CA Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform phase-out services as defined in the SSPARS Performance Work Statement (PWS) paragraph 2.16.2. Period of Performance: 01 February 2026 - 30 April 2026.

9012 3 Months PHASE-OUT Thule AB, GL

FFP

Phase-Out Thule AB, GL Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform phase-out services as defined in the SSPARS Performance Work Statement (PWS) paragraph 2.16.2. Period of Performance: 01 February 2026 - 30 April 2026.

9013 3 Months PHASE-OUT Clear AFS, AK

FFP

Phase-Out Clear AFS, AK Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform phase-out services as defined in the SSPARS Performance Work Statement (PWS) paragraph 2.16.2. Period of Performance: 01 February 2026 - 30 April 2026.

9018 3 Months PHASE-OUT RAF Fylingdales, UK

FFP

Phase-Out RAF Fylingdales, UK Contractor shall provide non-personal services for all personnel, supervision, transportation, items and services necessary to perform phase-out services as defined in the SSPARS Performance Work statement (PWS) paragraph 2.16.2. Period of Performance: 01 February 2026 - 30

April 2026.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0006 Destination Government Destination Government

0007 Destination Government Destination Government

0012 Destination Government Destination Government

0013 Destination Government Destination Government

0018 Destination Government Destination Government

0106 Destination Government Destination Government

010610 N/A N/A N/A N/A

010630 N/A N/A N/A N/A

010650 N/A N/A N/A N/A

0107 Destination Government Destination Government

010710 N/A N/A N/A N/A

010730 N/A N/A N/A N/A

0112 Destination Government Destination Government

011210 N/A N/A N/A N/A

011230 N/A N/A N/A N/A

0113 Destination Government Destination Government

011310 N/A N/A N/A N/A

011330 N/A N/A N/A N/A

011350 N/A N/A N/A N/A

0118 Destination Government Destination Government

011810 N/A N/A N/A N/A

011830 N/A N/A N/A N/A

0200 Destination Government Destination Government

0300 N/A N/A N/A N/A

0400 Destination Government Destination Government

040006 N/A N/A N/A N/A

040007 N/A N/A N/A N/A

040012 N/A N/A N/A N/A

040013 N/A N/A N/A N/A

040018 N/A N/A N/A N/A

1006 Destination Government Destination Government

100610 N/A N/A N/A N/A

100630 N/A N/A N/A N/A

100650 N/A N/A N/A N/A

1007 Destination Government Destination Government

100710 N/A N/A N/A N/A

100730 N/A N/A N/A N/A

1012 Destination Government Destination Government

101210 N/A N/A N/A N/A

101230 N/A N/A N/A N/A

1013 Destination Government Destination Government

101310 N/A N/A N/A N/A

101330 N/A N/A N/A N/A

101350 N/A N/A N/A N/A

1018 Destination Government Destination Government

101810 N/A N/A N/A N/A

101830 N/A N/A N/A N/A

1200 Destination Government Destination Government

1300 N/A N/A N/A N/A

1400 Destination Government Destination Government

140006 N/A N/A N/A N/A

140007 N/A N/A N/A N/A

140012 N/A N/A N/A N/A

140013 N/A N/A N/A N/A

140018 N/A N/A N/A N/A

2006 Destination Government Destination Government

200610 N/A N/A N/A N/A

200630 N/A N/A N/A N/A

200650 N/A N/A N/A N/A

2007 Destination Government Destination Government

200710 N/A N/A N/A N/A

200730 N/A N/A N/A N/A

2012 Destination Government Destination Government

201210 N/A N/A N/A N/A

201230 N/A N/A N/A N/A

2013 Destination Government Destination Government

201310 N/A N/A N/A N/A

201330 N/A N/A N/A N/A

201350 N/A N/A N/A N/A

2018 Destination Government Destination Government

201810 N/A N/A N/A N/A

201830 N/A N/A N/A N/A

2200 Destination Government Destination Government

2300 N/A N/A N/A N/A

2400 Destination Government Destination Government

240006 N/A N/A N/A N/A

240007 N/A N/A N/A N/A

240012 N/A N/A N/A N/A

240013 N/A N/A N/A N/A

240018 N/A N/A N/A N/A

3006 Destination Government Destination Government

300610 N/A N/A N/A N/A

300630 N/A N/A N/A N/A

300650 N/A N/A N/A N/A

3007 Destination Government Destination Government

300710 N/A N/A N/A N/A

300730 N/A N/A N/A N/A

3012 Destination Government Destination Government

301210 N/A N/A N/A N/A

301230 N/A N/A N/A N/A

3013 Destination Government Destination Government

301310 N/A N/A N/A N/A

301330 N/A N/A N/A N/A

301350 N/A N/A N/A N/A

3018 Destination Government Destination Government

301810 N/A N/A N/A N/A

301830 N/A N/A N/A N/A

3200 Destination Government Destination Government

3300 N/A N/A N/A N/A

3400 Destination Government Destination Government

340006 N/A N/A N/A N/A

340007 N/A N/A N/A N/A

340012 N/A N/A N/A N/A

340013 N/A N/A N/A N/A

340018 N/A N/A N/A N/A

4006 Destination Government Destination Government

400610 N/A N/A N/A N/A

400630 N/A N/A N/A N/A

400650 N/A N/A N/A N/A

4007 Destination Government Destination Government

400710 N/A N/A N/A N/A

400730 N/A N/A N/A N/A

4012 Destination Government Destination Government

401210 N/A N/A N/A N/A

401230 N/A N/A N/A N/A

4013 Destination Government Destination Government

401310 N/A N/A N/A N/A

401330 N/A N/A N/A N/A

401350 N/A N/A N/A N/A

4018 Destination Government Destination Government

401810 N/A N/A N/A N/A

401830 N/A N/A N/A N/A

4200 Destination Government Destination Government

4300 N/A N/A N/A N/A

4400 Destination Government Destination Government

440006 N/A N/A N/A N/A

440007 N/A N/A N/A N/A

440012 N/A N/A N/A N/A

440013 N/A N/A N/A N/A

440018 N/A N/A N/A N/A

5006 Destination Government Destination Government

500610 N/A N/A N/A N/A

500630 N/A N/A N/A N/A

500650 N/A N/A N/A N/A

5007 Destination Government Destination Government

500710 N/A N/A N/A N/A

500730 N/A N/A N/A N/A

5012 Destination Government Destination Government

501210 N/A N/A N/A N/A

501230 N/A N/A N/A N/A

5013 Destination Government Destination Government

501310 N/A N/A N/A N/A

501330 N/A N/A N/A N/A

501350 N/A N/A N/A N/A

5018 Destination Government Destination Government

501810 N/A N/A N/A N/A

501830 N/A N/A N/A N/A

5200 Destination Government Destination Government

5300 N/A N/A N/A N/A

5400 N/A N/A N/A Government

540006 N/A N/A N/A N/A

540007 N/A N/A N/A N/A

540012 N/A N/A N/A N/A

540013 N/A N/A N/A N/A

540018 N/A N/A N/A N/A

6006 Destination Government Destination Government

600610 N/A N/A N/A N/A

600630 N/A N/A N/A N/A

600650 N/A N/A N/A N/A

6007 Destination Government Destination Government

600710 N/A N/A N/A N/A

600730 N/A N/A N/A N/A

6012 Destination Government Destination Government

601210 N/A N/A N/A N/A

601230 N/A N/A N/A N/A

6013 Destination Government Destination Government

601310 N/A N/A N/A N/A

601330 N/A N/A N/A N/A

601350 N/A N/A N/A N/A

6018 Destination Government Destination Government

601810 N/A N/A N/A N/A

601830 N/A N/A N/A N/A

6200 Destination Government Destination Government

6300 N/A N/A N/A N/A

6400 N/A N/A N/A Government

640006 N/A N/A N/A N/A

640007 N/A N/A N/A N/A

640012 N/A N/A N/A N/A

640013 N/A N/A N/A N/A

640018 N/A N/A N/A N/A

7006 Destination Government Destination Government

700610 N/A N/A N/A N/A

700630 N/A N/A N/A N/A

700650 N/A N/A N/A N/A

7007 Destination Government Destination Government

700710 N/A N/A N/A N/A

700730 N/A N/A N/A N/A

7012 Destination Government Destination Government

701210 N/A N/A N/A N/A

701230 N/A N/A N/A N/A

7013 Destination Government Destination Government

701310 N/A N/A N/A N/A

701330 N/A N/A N/A N/A

701350 N/A N/A N/A N/A

7018 Destination Government Destination Government

701810 N/A N/A N/A N/A

701830 N/A N/A N/A N/A

7200 Destination Government Destination Government

7300 N/A N/A N/A N/A

7400 Destination Government Destination Government

740006 N/A N/A N/A N/A

740007 N/A N/A N/A N/A

740012 N/A N/A N/A N/A

740013 N/A N/A N/A N/A

740018 N/A N/A N/A N/A

8006 Destination Government Destination Government

8007 Destination Government Destination Government

8012 Destination Government Destination Government

8013 Destination Government Destination Government

8018 Destination Government Destination Government

8200 Destination Government Destination Government

9006 Destination Government Destination Government

9007 Destination Government Destination Government

9012 Destination Government Destination Government

9013 Destination Government Destination Government

9018 Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0006 POP 01-JUN-2018 TO

31-AUG-2018

N/A F3L2DA - 21 SW/PMD

CATHERINEHADDOCK

135 DOVER STREET

PETERSON AFB CO 80914-1055

(719) 556-3623

F3L2DA

0007 POP 01-JUN-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0012 POP 01-JUN-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0013 POP 01-JUN-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0018 POP 01-JUN-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

0106 POP 01-SEP-2018 TO

30-APR-2019

N/A (SAME AS PREVIOUS LOCATION)

010610 N/A N/A N/A N/A

010630 N/A N/A N/A N/A

010650 N/A N/A N/A N/A

0107 POP 01-SEP-2018 TO

N/A F3L2DA - 21 SW/PMD

CATHERINEHADDOCK

135 DOVER STREET

PETERSON AFB CO 80914-1055

(719) 556-3623

010710 N/A N/A N/A N/A

010730 N/A N/A N/A N/A

0112 POP 01-SEP-2018 TO

30-APR-2019

N/A F3L2DA - 21 SW/PMD

CATHERINEHADDOCK

135 DOVER STREET

PETERSON AFB CO 80914-1055

(719) 556-3623

011210 N/A N/A N/A N/A

011230 N/A N/A N/A N/A

0113 POP 01-SEP-2018 TO

N/A F3L2DA - 21 SW/PMD

CATHERINEHADDOCK

135 DOVER STREET

PETERSON AFB CO 80914-1055

(719) 556-3623

011310 N/A N/A N/A N/A

011330 N/A N/A N/A N/A

011350 N/A N/A N/A N/A

0118 POP 01-SEP-2018 TO

N/A F3L2DA - 21 SW/PMD

CATHERINEHADDOCK

135 DOVER STREET

PETERSON AFB CO 80914-1055

(719) 556-3623

011810 N/A N/A N/A N/A

011830 N/A N/A N/A N/A

0200 POP 01-SEP-2018 TO

N/A F3L2DA - 21 SW/PMD

CATHERINEHADDOCK

135 DOVER STREET

PETERSON AFB CO 80914-1055

(719) 556-3623

0300 N/A N/A N/A N/A

0400 POP 01-SEP-2018 TO

N/A F3L2DA - 21 SW/PMD

CATHERINEHADDOCK

135 DOVER STREET

PETERSON AFB CO 80914-1055

(719) 556-3623

040006 N/A N/A N/A N/A

040007 N/A N/A N/A N/A

040012 N/A N/A N/A N/A

040013 N/A N/A N/A N/A

040018 N/A N/A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .