ATTACHMENT_9_Quality_Control_Plan.pdf

PDF 7 KB Posted

Attached to
DRAFT RFP EGLIN AFB, BACKSHOP MAINTENANCE SUPPORT Federal contract opportunity
Solicitation number
FA2486-19-R-0003
Issued by
Department of the Air Force Materiel Command Test Center

About this file

This document contains a draft request for proposal for backshop maintenance contract services at Eglin Air Force Base, Florida, as well as an attachment outlining quality control requirements. The Air Force Test Center intends to issue the draft RFP to obtain industry feedback to further define the requirement, with comments due by November 12, 2019. The anticipated seven-year contract would provide backshop maintenance in accordance with the performance work statement dated October 25, 2019. The final RFP is expected to be released on December 9, 2019 under NAICS code 488190 with a size standard of $32.5 million, with proposals due around January 13, 2020. Attachment 9 specifies quality control personnel responsibilities and processes that must be included in any proposal, such as training strategies, an organizational chart, corrective action processes, inspection procedures, and a self-inspection program plan.

Attachment 9: Quality Control Plan Placeholder

View the file

Other files for this federal contract opportunity

Other files attached to DRAFT RFP EGLIN AFB, BACKSHOP MAINTENANCE SUPPORT, newest first.
File Type Posted
AttachmentL6CostFormatsAthroughC_21Oct2019.doc DOC document
AttachmentL7CostFormatD_24Oct2019.xlsx XLSX spreadsheet
AttachmentL8CostFormatD_24Oct2019.xlsx XLSX spreadsheet
ATTACHMENT_7_Strike_Plan.pdf PDF
20191007_-_AATC_T2_MOD_Policy_Ltr_Signed_(9_Oct_19).pdf PDF
Attachment_3_Collective_Bargaining_Agreement.pdf PDF
FA2486-19-R-0003_Appdx_C_Equipment_SPRAM_(16_Oct_19).xlsx XLSX spreadsheet
FA2486-19-R-0003_Appdx_C5_GFP_Air_Compressors_(16_Oct_19).pdf PDF
FA2486-19-R-0003_Backshop_PWS_(25_Oct_19).pdf PDF
Attachment_2_DD_Form_254.pdf PDF
ATTACHMENT_8_Contingency_Plan.pdf PDF
FA2486-19-R-0003_Large_Aircraft_Wash_Addendum_(22_Oct_19).pdf PDF
FB2823-18218-0045_between_96_TW_and_NGB_ISO_AATC_OL-F15C.pdf PDF
FA2486-19-R-0003_Appdx_C2_Forward_Supply_Points_Munitions_Acount_(16_Oct_19).pdf PDF
C-130_Wash_Addendum_LOA_(20_Nov_18).pdf PDF
Attachment_4_GFP_Listing.xlsx XLSX spreadsheet
Attachment_10_Section_L_28_Oct_2019.docx DOCX document
FA2486-19-R-0003_Appdx_C6_Phone_Lines_EZGO_Golf_Carts_(16_Oct_19).pdf PDF
FA2486-19-R-0003_Appdx_C1_Govt_Facilities_(16_Oct_19).pdf PDF
FA2486-19-R-0003_Appdx_G_CAP_CAE_Repair_Service_Ltrs_(25_Oct_19).pdf PDF
Attachment_11_Section_M_21_Oct_2019.docx DOCX document
FA2486-19-R-0003_Appdx_D_Pubs_TOs_Forms_(16_Oct_19).pdf PDF
ATTACHMENT_6_Small_Business_Plan.pdf PDF
FA2486-19-R-0003_Appdx_A_Workload_Data_(16_Oct_19).pdf PDF
FA2486-19-R-0003_F-15_Aircraft_Maintenance_Addendum_(22_Oct_19).pdf PDF
Exhibit_A_Draft_Contract_Data_Requirements_List.pdf PDF
FA2486-19-R-0003_Appdx_C3_Information_Technology_Equipment_(16_Oct_19).xlsx XLSX spreadsheet
FA2486-19-R-0003_Appdx_C4_GFP_Composite_Took_Kits_(16_Oct_19).pdf PDF
Attachment_5_Option_CLINs_w_Base_Year.xlsx XLSX spreadsheet
FA2486-19-R-0003_Cover_Letter.pdf PDF
Draft_RFP_FA2486-19-R-0003.pdf PDF
FA2486-19-R-0003_Appdx_B_Base_Map_(16_Oct_19).pdf PDF
FA2486-19-R-0003_Appdx_F_Safety_Rqmts_(16_Oct_19).pdf PDF
FA2486-19-R-0003_Draft_CMO_Form_2_(25_Oct_19).pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 9

Quality Control (QC)

This section will be replaced with the offeror Quality Control Plan and will be incorporated into the resultant contract under Section J. The

Quality Control Plan shall be in accordance with PWS Section 15 and at a minimum, the QCP shall contain the following:

1. A detailed training and QC personnel rotation strategy as per section 13.1.2 of the PWS.

2. An organizational chart for your QC office to include responsibilities per inspector.

3. How QC augmentees will be assigned and managed.

4. Root cause analysis process for corrective actions on findings by

QC and/or the Government and how the proposed fix will ensure no repeat occurrences.

5. An aircraft phase inspection process that satisfies all of the aircraft phase inspection requirement of the PWS.

6. A clear and concise plan on conducting/implementing and sustaining the Self-inspection program.

File details come from the government source that posted it. Updated .