ATTACHMENT_9_Quality_Control_Plan.pdf
PDF 7 KB Posted
- Attached to
- DRAFT RFP EGLIN AFB, BACKSHOP MAINTENANCE SUPPORT Federal contract opportunity
- Solicitation number
- FA2486-19-R-0003
About this file
This document contains a draft request for proposal for backshop maintenance contract services at Eglin Air Force Base, Florida, as well as an attachment outlining quality control requirements. The Air Force Test Center intends to issue the draft RFP to obtain industry feedback to further define the requirement, with comments due by November 12, 2019. The anticipated seven-year contract would provide backshop maintenance in accordance with the performance work statement dated October 25, 2019. The final RFP is expected to be released on December 9, 2019 under NAICS code 488190 with a size standard of $32.5 million, with proposals due around January 13, 2020. Attachment 9 specifies quality control personnel responsibilities and processes that must be included in any proposal, such as training strategies, an organizational chart, corrective action processes, inspection procedures, and a self-inspection program plan.
Attachment 9: Quality Control Plan Placeholder
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 9
Quality Control (QC)
This section will be replaced with the offeror Quality Control Plan and will be incorporated into the resultant contract under Section J. The
Quality Control Plan shall be in accordance with PWS Section 15 and at a minimum, the QCP shall contain the following:
1. A detailed training and QC personnel rotation strategy as per section 13.1.2 of the PWS.
2. An organizational chart for your QC office to include responsibilities per inspector.
3. How QC augmentees will be assigned and managed.
4. Root cause analysis process for corrective actions on findings by
QC and/or the Government and how the proposed fix will ensure no repeat occurrences.
5. An aircraft phase inspection process that satisfies all of the aircraft phase inspection requirement of the PWS.
6. A clear and concise plan on conducting/implementing and sustaining the Self-inspection program.