About this file

TRD_B6 Range Scheduling and Control

View the file

Other files for this federal contract opportunity

Other files attached to Eglin Operations & Maintenance Services (Formerly Eglin Test & Training Complex Technical Services (ETTC-TS) Program), newest first.
File Type Posted
Section_L_Attachment_1_Government_Staffing_Estimate.xlsx XLSX spreadsheet
FA2486-16-R-0002-0001_Signed.pdf PDF
RFP_Comment_Resolution_Matrix.xlsx XLSX spreadsheet
Section_J_Attachment_4_WD_05-2419_Rev_18_WPAFB.pdf PDF
Section_J_Attachment_3_WD_05-3033_Rev_15_Okaloosa_County _FL.pdf PDF
Section_J_Attachment_8_AFTP.pdf PDF
Section_J_Attachment_10_EAFB_WPAFB_GFP.xlsx XLSX spreadsheet
E-OMS_AFP_10_June_2015.pdf PDF
Transition_Plan_for_Spectrum_Relocation_Fund.pdf PDF
Section_L_Attachment_8_Sample_E-OMS_Cost_Element_Summary.xlsx XLSX spreadsheet
Section_L_Attachment_1_Government_Staffing_Estimate.xlsx XLSX spreadsheet
Section_J_Attachment_6_WD_05-2511_Rev_19_Holloman.pdf PDF
Section_J_Attachment_2_WD_05-2121_Rev_15_Walton_County _FL.pdf PDF
Section_M_Final_28_May_2015.pdf PDF
Section_L_Attachment_9_TEP.xlsx XLSX spreadsheet
Notice_of_Intent_to_Propose_MFR.pdf PDF
E-OMS_CLIN_Structure.pdf PDF
E-OMS_Draft_Comments__Glitch_MFR.pdf PDF
Section_L_Attachment_8_Sample_E-OMS_Cost_Element_Summary_3.20.15.xlsx XLSX spreadsheet
Section_L_Attachment_8_Sample_E-OMS_Cost_Element_Summary_3.20.15.xlsx XLSX spreadsheet
Comment_Resolution_Matrix.xlsx XLSX spreadsheet
SNIM_Information.pdf PDF
E-OMS_Industrty_Day__2_List_of_Attendees.pdf PDF
Section_J_Attachment_3_DOL_WD_05-3034_Rev_15_Okaloosa_County _FL.docx DOCX document
Section_L_Attachment_9_TEP.xlsx XLSX spreadsheet
Section_J_Attachment_6_Award_Fee_Award_Term_Plan.pdf PDF
ASP_Synopsis_Update.pdf PDF
E-OMS_Industry_Day_Q_and_A_Notecards.pdf PDF
E-OMS_Industry_Day_Registration_List.pdf PDF
Mobile_Targets_-_FTC_TAIP_-_updated.pdf PDF
CCF_Tour_Script_TAIP_-_updated.pdf PDF
A-13B_script_V2_TAIP_-_updated.pdf PDF
TA_C-72_Script_TAIP_-_updated.pdf PDF
E-OMS_Industry_Day_Agenda_Final.pdf PDF
TRD_A1.pdf PDF
TRD_B9C.pdf PDF
TRD_F3.pdf PDF
TRD_C7.pdf PDF
TRD_A5.pdf PDF
TRD_E3.pdf PDF
TRD_C8.pdf PDF
TRD_F5.pdf PDF
TRD_E2.pdf PDF
TRD_C11.pdf PDF
TRD_C3.pdf PDF
TRD_D3.pdf PDF
TRD_C6.pdf PDF
GFP_ETTC_3_Mar_14.xlsx XLSX spreadsheet
TRD_E1.pdf PDF
E-OMS_Industry_Day_Question_Form.pdf PDF
Show all 50

Eglin Operations & Maintenance Services (Formerly Eglin Test & Training Complex Technical Services (ETTC-TS) Program) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev I

APPENDIX B6

RANGE SCHEDULING AND CONTROL

1.0 PURPOSE. The purpose of the Range Scheduling and Control function is to develop the 96 TW Daily Operations Order through effective and efficient allocation and scheduling of 96 TW resources. It is also tasked with overseeing and facilitating execution of the 96 TW Operations Order by exercising positive control of ongoing range activities.

2.0 GENERAL.

2.1. Range Scheduling and Control is required to provide effective and efficient scheduling and balanced utilization of 96 TW ranges/resources. It provides positive control of ongoing range activities. The Scheduling Flight manages the range scheduling and control functions as part of the 96th Operation Support Squadron, located in building 104 on Eglin main base.

2.2. Center Scheduling Enterprise (CSE) is a Government provided and maintained management information system that uses a "man-in-the-loop" approach to scheduling. It combines the power of a computerized data base management system with the flexibility of a human controller. Project personnel identify test and training resource requirements for each mission on mission requests prepared and submitted through CSE.

2.3. The 96 TW Daily Operations Order (DOO) is an official tasking order for all support agencies, including the O&M Contractor.

3.0 CAPABILITIES.

3.1. The Contractor shall provide range scheduling and control services, including:

3.1.1. Evaluating all mission requests to determine resource availability.

3.1.2. Resolving resource conflicts and developing a schedule using the 96 TW priority system.

3.1.3. Producing the 96 TW DOO.

3.1.4. Coordinating resource and schedule changes that may occur due to the dynamic nature of the test environment.

3.1.5. Continually updating the published 96 TW DOO until handed off to the Range Operations Control Center (ROCC). Changes occurring after the DOO is published require immediate notification to support agencies.

3.1.6. Controlling all range operations.

FA9200-05-C-0001, P00121

Attachment 3

Page B6-1

Rev I

3.1.7. Providing the wing Unit Control Center (UCC).

3.2. The Contractor shall support the Maintenance of Land Test Area Program (MLTAP), including:

3.2.1. Scheduling and coordinating cleanup of all land test areas to include munitions recovery, road repair, vegetation removal, and some target construction. This requires effective coordination with 96TW Range Safety, Natural Resources Branch (Jackson Guard), Environmental Protection Division, and Explosive Ordnance Disposal.

3.2.2. Providing follow up reporting.

3.2.3. Monitoring all land test areas and setting up a monthly maintenance and clean up schedule.

3.2.4. Submitting a quarterly clean up report.

3.2.5. Developing work plans for range residue recovery and disposal operations.

3.2.6. At the AVSF & LGTF at WPAFB, the Contractor shall establish a single point of contact for range scheduling and resources in a timely, efficient, and effective manner.

3.3. The contractor shall maintain and operate the vehicles identified in Table B6-1 in accordance with requirements established in TRD A3. Co-utilization of vehicles from and to other Contractor operated and maintained facilities is an acceptable means for satisfying vehicle shortages due to surge support requirements. Suitable substitute for vehicle type is acceptable.

Table B6-1 MgtCode Nomenclature Qty

B222 TRK 3/4T CREW CAB 4X4 PU 1

FA9200-05-C-0001, P00121

Attachment 3

Page B6-2

APPENDIX B6
1.0 PURPOSE. The purpose of the Range Scheduling and Control function is to develop the 96 TW Daily Operations Order through effective and efficient allocation and scheduling of 96 TW resources. It is also tasked with overseeing and facilitating exe...
2.0 GENERAL.
2.1. Range Scheduling and Control is required to provide effective and efficient scheduling and balanced utilization of 96 TW ranges/resources. It provides positive control of ongoing range activities. The Scheduling Flight manages the range schedul...
2.2. Center Scheduling Enterprise (CSE) is a Government provided and maintained management information system that uses a "man-in-the-loop" approach to scheduling. It combines the power of a computerized data base management system with the flexibili...
2.3. The 96 TW Daily Operations Order (DOO) is an official tasking order for all support agencies, including the O&M Contractor.
3.0 CAPABILITIES.
3.1. The Contractor shall provide range scheduling and control services, including:
3.1.1. Evaluating all mission requests to determine resource availability.
3.1.2. Resolving resource conflicts and developing a schedule using the 96 TW priority system.
3.1.3. Producing the 96 TW DOO.
3.1.4. Coordinating resource and schedule changes that may occur due to the dynamic nature of the test environment.
3.1.5. Continually updating the published 96 TW DOO until handed off to the Range Operations Control Center (ROCC). Changes occurring after the DOO is published require immediate notification to support agencies.
3.1.6. Controlling all range operations.
3.1.7. Providing the wing Unit Control Center (UCC).
3.2. The Contractor shall support the Maintenance of Land Test Area Program (MLTAP), including:
3.2.1. Scheduling and coordinating cleanup of all land test areas to include munitions recovery, road repair, vegetation removal, and some target construction. This requires effective coordination with 96TW Range Safety, Natural Resources Branch (Jac...
3.2.2. Providing follow up reporting.
3.2.3. Monitoring all land test areas and setting up a monthly maintenance and clean up schedule.
3.2.4. Submitting a quarterly clean up report.
3.2.5. Developing work plans for range residue recovery and disposal operations.
3.2.6. At the AVSF & LGTF at WPAFB, the Contractor shall establish a single point of contact for range scheduling and resources in a timely, efficient, and effective manner.

3.3. The contractor shall maintain and operate the vehicles identified in Table B6-1 in accordance with requirements established in TRD A3. Co-utilization of vehicles from and to other Contractor operated and maintained facilities is an acceptable mea...

Table B6-1

File details come from the government source that posted it. Updated .