Attachment 5 - Total Evaluated Price Spreadsheet.xlsx
XLSX spreadsheet 207 KB Posted
- Attached to
- Electrical Equipment Operation and Maintenance Services Contract Electrical Maintenance Contract (EMC)
- Solicitation number
- FA239626RB004
About this file
This is a pricing template spreadsheet for the Electrical Maintenance Contract (EMC) solicitation FA239626RB004 issued by the Department of the Air Force, Air Force Research Laboratory (AFRL) at Wright-Patterson Air Force Base. The template is designed to facilitate contractor pricing submissions for on-site high-voltage electrical equipment support services covering over 3,000 critical low- and medium-voltage electrical assets distributed across 49 research facilities. Contractors must provide all personnel, tools, and materials necessary to perform non-personal engineering, maintenance, and repair services, including both scheduled, standards-based preventive maintenance and rapid, unscheduled emergency troubleshooting. The contractor must be accredited by the InterNational Electrical Testing Association (NETA). The proposal due date has been extended to September 9, 2026, at 11:59 p.m.
The pricing template serves as the standardized format for cost proposals and must be completed in accordance with the solicitation requirements. Contractors are responsible for providing equipment if government-provided shared equipment becomes unavailable. A mandatory site visit was scheduled for August 25, 2026, and an equipment list has been provided to all prospective contractors. All questions regarding the solicitation have been closed as of September 2, 2026, with complete Q&A documentation posted for contractor reference.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI questions and answers 9 sept 26.docx | DOCX document | |
| Solicitation - FA239626RB004_2 1.pdf | ||
| EQUIPMENT LIST FOR SOLICITATION.xlsx | XLSX spreadsheet | |
| RFI Questions with Answers to post 8 28.docx | DOCX document | |
| EMC_Consolidated Q and A.docx | DOCX document | |
| Solicitation - FA239626RB004_1.pdf | ||
| Pricing Template EMC.xlsx | XLSX spreadsheet | |
| Attachment 4 - DD254 pdf.pdf | ||
| Solicitation - FA239626RB004.pdf | ||
| Attachment 3 - Historical CME.xlsx | XLSX spreadsheet | |
| Attachment 1 - RAYO_EMC_PWS.pdf | ||
| Attachment 2 - CDRLS.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| 1) Direct Labor: Input the categories, rates, hours, and Period of Performance for each labor category. If the proposed rates are weighted averages based on fiscal year rates or multiple categories, please indicate so and provide details in the cost narrative. |
| 2) Indirect Rates: Fringe, Overhead, and G&A, Input the categories, bases and rates as applicable. |
| 3) Travel: Fill in the columns as labeled. (NOTE: If being awarded under a GWAC, refer to Master Contract to determine whether fee can be applied to travel.) |
| 4) ODCs: Fill in the columns as labeled. |
| 5) Subcontracts/Consultants: Enter name, hours and total cost per subcontractor/consultant. Also on this tab complete the fill-ins for any Subcontractor/consultant proposed Indirect rates, Travel, and ODCs. |
| 6) If details for any cost categories exceed lines provided, input summary quantities and amounts and provide details separately. |
| 7) Fixed Fee: Please enter you Fixed Fee percentage in Cell (B20) of the Cost Summary Tab. |
| NOTE: Grey Shaded Cells in input tabs contain formulas! Do not overwrite. |
CLINs
| Task Order/CLIN SUMMARY | ||||
| CLIN | Description | Total Hours | Total Cost | Period of Performance |
| 0001 | Labor - Firm Fixed Price | $0 | ||
| 0002 | Unscheduled Labor Hours - Overtime - Firm Fixed Price | |||
| 0003 | Other Direct Cost - Firm Fixed Price | - 0 | $0 | |
| 0004 | Time and Materials Reimbursable | $0 | ||
| 0005 | Planned Outages - Firm Fixed Price | |||
| 0006 | Data - Not Separately Priced | |||
| 0007 | ||||
| 0008 | ||||
| 0009 | ||||
| 0010 |
Cost Summary
| Cost Summary | ||
| Direct Labor | $0.00 | *Input percentages |
| Fringe Benefits | % | $0.00 |
| Overhead On-Site | % | $0.00 |
| Overhead Off-Site | % | $0.00 |
| Material Handling | % | $0.00 |
Travel Cost $0.00
Other Direct Costs $0.00
Subcontractor Costs $0.00
G&A % $0.00
Subtotal Costs $0.00
FCCM $0.00
Fixed Fee % $0.00
Total Cost $0.00
Direct Labor - CLIN 0001
| Labor Category | Hourly Rate | # of Hours | Total Costs | Period of Performance | Note: Direct Labor Rates entered here shall be the actual hourly rate of the Labor Category proposed. |
| Program Manager | $0.00 | ||||
| Electrical Engineer | $0.00 | ||||
| Electrical Engineer | $0.00 | ||||
| Electrical Engineer | $0.00 | ||||
| Drafter | $0.00 | ||||
| General Foreman | $0.00 | ||||
| Foreman | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 |
Total Labor Costs $0.00
Indirect Rates - CLIN 0001
| Indirect Rate Category | Base Amount | Rate Percentage | Total Cost of Indirect Rate |
| Fringe Benefits | $0.00 | ||
| Overhead On-Site | $0.00 | ||
| Overhead Off-Site | $0.00 | ||
| Material Handling | $0.00 | ||
| G&A | $0.00 |
FCCM $0.00
Sub K Costs - CLIN 0001
| Subcontractor Name | Labor Category | Hourly Rate | # of Hours | Total Costs | Period of Performance | Sub K Cost Summary | ||
| $0.00 | Total Direct Labor | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | Fringe Benefits | 0.00% | $0.00 | |||||
| $0.00 | Overhead On-Site | 0.00% | $0.00 | |||||
| $0.00 | Overhead Off-Site | 0.00% | $0.00 | |||||
| $0.00 | Material Handling | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Travel Cost | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | Other Direct Costs | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | G&A | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Subtotal Costs | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | FCCM | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Fixed Fee | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Total Cost | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 |
$0.00
| Indirect Rate Catergory | Base Amount | Rate Percentage | Total Cost of Indirect Rate |
| Fringe Benefits | $0.00 | ||
| Overhead On-Site | $0.00 | ||
| Overhead Off-Site | $0.00 | ||
| Material Handling | $0.00 | ||
| G&A | $0.00 |
FCCM $0.00
| Subcontractor | Trip # | From: City, ST | To: City, ST | Number of People | Number of Nights | Number of Days | POV Mileage | POV Mileage Rate | Flight Cost Per Person | Rental Car Costs | Hotel Per Diem Rate Per Night | M&IE Rate | Total Trip Cost |
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 |
$0.00
| ODCs Name/Type | Quantity of ODCs | Costs Per Item | Total Cost of ODCs | Reference Supporting Documentation in your Cost Proposal |
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 |
$0.00
TOTAL CLIN 0001 COSTS
| Cost Summary CLIN 0001 | ||
| Direct Labor | $0.00 | *Input percentages |
| Fringe Benefits | 0.00% | $0.00 |
| Overhead On-Site | 0.00% | $0.00 |
| Overhead Off-Site | 0.00% | $0.00 |
| Material Handling | 0.00% | $0.00 |
Travel Cost Fill in from Travel Tab
Other Direct Costs Fill in from ODC Tab
Subcontractor Costs $0.00
G&A 0.00% $0.00
Subtotal Costs $0.00
FCCM $0.00
Fixed Fee 0.00% $0.00
Total Cost $0.00
Direct Labor - CLIN 0002
| Labor Category | Hourly Rate | # of Hours | Total Costs | Period of Performance | Note: Direct Labor Rates entered here shall be the actual hourly rate of the Labor Category proposed. |
| Program Manager | $0.00 | ||||
| Electrical Engineer | $0.00 | ||||
| Electrical Engineer | $0.00 | ||||
| Electrical Engineer | $0.00 | ||||
| Drafter | $0.00 | ||||
| General Foreman | $0.00 | ||||
| Foreman | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| Electricians | $0.00 | ||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 |
Total Labor Costs $0.00
Indirects - CLIN 0002
| Indirect Rate Category | Base Amount | Rate Percentage | Total Cost of Indirect Rate |
| Fringe Benefits | $0.00 | ||
| Overhead On-Site | $0.00 | ||
| Overhead Off-Site | $0.00 | ||
| Material Handling | $0.00 | ||
| G&A | $0.00 |
FCCM $0.00
Sub K Costs - CLIN 0002
| Subcontractor Name | Labor Category | Hourly Rate | # of Hours | Total Costs | Period of Performance | Sub K Cost Summary | ||
| $0.00 | Total Direct Labor | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | Fringe Benefits | 0.00% | $0.00 | |||||
| $0.00 | Overhead On-Site | 0.00% | $0.00 | |||||
| $0.00 | Overhead Off-Site | 0.00% | $0.00 | |||||
| $0.00 | Material Handling | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Travel Cost | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | Other Direct Costs | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | G&A | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Subtotal Costs | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | FCCM | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Fixed Fee | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Total Cost | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 |
$0.00
| Indirect Rate Catergory | Base Amount | Rate Percentage | Total Cost of Indirect Rate |
| Fringe Benefits | $0.00 | ||
| Overhead On-Site | $0.00 | ||
| Overhead Off-Site | $0.00 | ||
| Material Handling | $0.00 | ||
| G&A | $0.00 |
FCCM $0.00
| Subcontractor | Trip # | From: City, ST | To: City, ST | Number of People | Number of Nights | Number of Days | POV Mileage | POV Mileage Rate | Flight Cost Per Person | Rental Car Costs | Hotel Per Diem Rate Per Night | M&IE Rate | Total Trip Cost |
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 |
$0.00
| ODCs Name/Type | Quantity of ODCs | Costs Per Item | Total Cost of ODCs | Reference Supporting Documentation in your Cost Proposal |
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 |
$0.00
TOTAL CLIN 0002 COSTS
| Cost Summary CLIN 0003 | ||
| Direct Labor | $0.00 | *Input percentages |
| Fringe Benefits | % | $0.00 |
| Overhead On-Site | % | $0.00 |
| Overhead Off-Site | % | $0.00 |
| Material Handling | % | $0.00 |
Travel Cost Fill in from Travel Tab
Other Direct Costs Fill in from ODC Tab
Subcontractor Costs $0.00
G&A % $0.00
Subtotal Costs $0.00
FCCM $0.00
Fixed Fee 0.00% $0.00
Total Cost $0.00
Direct Labor - CLIN 0003
| Labor Category | Hourly Rate | # of Hours | Total Costs | Period of Performance | Note: Direct Labor Rates entered here shall be the actual hourly rate of the Labor Category proposed. |
| Program Manager (key) | $0.00 | ||||
| Deputy Program Manager | $0.00 | ||||
| Program Financial Analyst Lead | $0.00 | ||||
| Program Financial Analyst | $0.00 | ||||
| Project Manager | $0.00 | ||||
| Project Lead | $0.00 | ||||
| Principal Staff and Architect Engineer (Subject Matter Expert): | $0.00 | ||||
| Subject Matter Expert | $0.00 | ||||
| Technical Writer/Editor | $0.00 | ||||
| Quality Assurance Specialist | $0.00 | ||||
| System Software Engineer Staff | $0.00 | ||||
| System Software Engineer Senior | $0.00 | ||||
| System Software Engineer Mid-Level | $0.00 | ||||
| System Software Engineer Associate | $0.00 | ||||
| Integration and Test Engineer Lead | $0.00 | ||||
| Integration and Test Engineer (Intermediate) | $0.00 | ||||
| Integration and Test Engineer (Associate) | $0.00 | ||||
| Principal Information Assurance Analyst | $0.00 | ||||
| Information Assurance (Intermediate) | $0.00 | ||||
| Hardware Engineer Senior | $0.00 | ||||
| Hardware Engineer Mid-Level | $0.00 | ||||
| System Analyst/Intelligence (Senior) | $0.00 | ||||
| System Analyst/Intelligence (Mid-Level) | $0.00 | ||||
| System Analyst/Intelligence (Associate) | $0.00 | ||||
| Configuration Management Specialist | $0.00 | ||||
| Network Engineer Senior | $0.00 | ||||
| Network Engineer Mid-Level | $0.00 | ||||
| Help Desk Support Specialist | $0.00 | ||||
| Administrative/Clerical | $0.00 | ||||
| Systems Engineer Training Specialist Lead | $0.00 |
Total Labor Costs $0.00
Indirects - CLIN 0003
| Indirect Rate Category | Base Amount | Rate Percentage | Total Cost of Indirect Rate |
| Fringe Benefits | $0.00 | ||
| Overhead On-Site | $0.00 | ||
| Overhead Off-Site | $0.00 | ||
| Material Handling | $0.00 | ||
| G&A | $0.00 |
FCCM $0.00
Sub K Costs - CLIN 0003
| Subcontractor Name | Labor Category | Hourly Rate | # of Hours | Total Costs | Period of Performance | Sub K Cost Summary | ||
| $0.00 | Total Direct Labor | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | Fringe Benefits | 0.00% | $0.00 | |||||
| $0.00 | Overhead On-Site | 0.00% | $0.00 | |||||
| $0.00 | Overhead Off-Site | 0.00% | $0.00 | |||||
| $0.00 | Material Handling | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Travel Cost | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | Other Direct Costs | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | G&A | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Subtotal Costs | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | FCCM | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Fixed Fee | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Total Cost | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 |
$0.00
| Indirect Rate Catergory | Base Amount | Rate Percentage | Total Cost of Indirect Rate |
| Fringe Benefits | $0.00 | ||
| Overhead On-Site | $0.00 | ||
| Overhead Off-Site | $0.00 | ||
| Material Handling | $0.00 | ||
| G&A | $0.00 |
FCCM $0.00
| Subcontractor | Trip # | From: City, ST | To: City, ST | Number of People | Number of Nights | Number of Days | POV Mileage | POV Mileage Rate | Flight Cost Per Person | Rental Car Costs | Hotel Per Diem Rate Per Night | M&IE Rate | Total Trip Cost |
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 |
$0.00
| ODCs Name/Type | Quantity of ODCs | Costs Per Item | Total Cost of ODCs | Reference Supporting Documentation in your Cost Proposal |
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 |
$0.00
TOTAL CLIN 0003 COSTS
| Cost Summary CLIN 0005 | ||
| Direct Labor | $0.00 | *Input percentages |
| Fringe Benefits | % | $0.00 |
| Overhead On-Site | % | $0.00 |
| Overhead Off-Site | % | $0.00 |
| Material Handling | % | $0.00 |
Travel Cost Fill in from Travel Tab
Other Direct Costs Fill in from ODC Tab
Subcontractor Costs $0.00
G&A % $0.00
Subtotal Costs $0.00
FCCM $0.00
Fixed Fee 0.00% $0.00
Total Cost $0.00
Direct Labor - CLIN 0004
| Labor Category | Hourly Rate | # of Hours | Total Costs | Period of Performance | Note: Direct Labor Rates entered here shall be the actual hourly rate of the Labor Category proposed. |
| Program Manager (key) | $0.00 | ||||
| Deputy Program Manager | $0.00 | ||||
| Program Financial Analyst Lead | $0.00 | ||||
| Program Financial Analyst | $0.00 | ||||
| Project Manager | $0.00 | ||||
| Project Lead | $0.00 | ||||
| Principal Staff and Architect Engineer (Subject Matter Expert): | $0.00 | ||||
| Subject Matter Expert | $0.00 | ||||
| Technical Writer/Editor | $0.00 | ||||
| Quality Assurance Specialist | $0.00 | ||||
| System Software Engineer Staff | $0.00 | ||||
| System Software Engineer Senior | $0.00 | ||||
| System Software Engineer Mid-Level | $0.00 | ||||
| System Software Engineer Associate | $0.00 | ||||
| Integration and Test Engineer Lead | $0.00 | ||||
| Integration and Test Engineer (Intermediate) | $0.00 | ||||
| Integration and Test Engineer (Associate) | $0.00 | ||||
| Principal Information Assurance Analyst | $0.00 | ||||
| Information Assurance (Intermediate) | $0.00 | ||||
| Hardware Engineer Senior | $0.00 | ||||
| Hardware Engineer Mid-Level | $0.00 | ||||
| System Analyst/Intelligence (Senior) | $0.00 | ||||
| System Analyst/Intelligence (Mid-Level) | $0.00 | ||||
| System Analyst/Intelligence (Associate) | $0.00 | ||||
| Configuration Management Specialist | $0.00 | ||||
| Network Engineer Senior | $0.00 | ||||
| Network Engineer Mid-Level | $0.00 | ||||
| Help Desk Support Specialist | $0.00 | ||||
| Administrative/Clerical | $0.00 | ||||
| Systems Engineer Training Specialist Lead | $0.00 |
Total Labor Costs $0.00
Indirects - CLIN 0004
| Indirect Rate Category | Base Amount | Rate Percentage | Total Cost of Indirect Rate |
| Fringe Benefits | $0.00 | ||
| Overhead On-Site | $0.00 | ||
| Overhead Off-Site | $0.00 | ||
| Material Handling | $0.00 | ||
| G&A | $0.00 |
FCCM $0.00
Sub K Costs - CLIN 0004
| Subcontractor Name | Labor Category | Hourly Rate | # of Hours | Total Costs | Period of Performance | Sub K Cost Summary | ||
| $0.00 | Total Direct Labor | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | Fringe Benefits | 0.00% | $0.00 | |||||
| $0.00 | Overhead On-Site | 0.00% | $0.00 | |||||
| $0.00 | Overhead Off-Site | 0.00% | $0.00 | |||||
| $0.00 | Material Handling | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Travel Cost | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | Other Direct Costs | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | G&A | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Subtotal Costs | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | FCCM | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Fixed Fee | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Total Cost | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 |
$0.00
| Indirect Rate Catergory | Base Amount | Rate Percentage | Total Cost of Indirect Rate |
| Fringe Benefits | $0.00 | ||
| Overhead On-Site | $0.00 | ||
| Overhead Off-Site | $0.00 | ||
| Material Handling | $0.00 | ||
| G&A | $0.00 |
FCCM $0.00
| Subcontractor | Trip # | From: City, ST | To: City, ST | Number of People | Number of Nights | Number of Days | POV Mileage | POV Mileage Rate | Flight Cost Per Person | Rental Car Costs | Hotel Per Diem Rate Per Night | M&IE Rate | Total Trip Cost |
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 |
$0.00
| ODCs Name/Type | Quantity of ODCs | Costs Per Item | Total Cost of ODCs | Reference Supporting Documentation in your Cost Proposal |
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 |
$0.00
TOTAL CLIN 0004 COSTS
| Cost Summary CLIN 0007 | ||
| Direct Labor | $0.00 | *Input percentages |
| Fringe Benefits | % | $0.00 |
| Overhead On-Site | % | $0.00 |
| Overhead Off-Site | % | $0.00 |
| Material Handling | % | $0.00 |
Travel Cost Fill in from Travel Tab
Other Direct Costs Fill in from ODC Tab
Subcontractor Costs $0.00
G&A % $0.00
Subtotal Costs $0.00
FCCM $0.00
Fixed Fee 0.00% $0.00
Total Cost $0.00
Direct Labor - CLIN 0005
| Labor Category | Hourly Rate | # of Hours | Total Costs | Period of Performance | Note: Direct Labor Rates entered here shall be the actual hourly rate of the Labor Category proposed. |
| Program Manager (key) | $0.00 | ||||
| Deputy Program Manager | $0.00 | ||||
| Program Financial Analyst Lead | $0.00 | ||||
| Program Financial Analyst | $0.00 | ||||
| Project Manager | $0.00 | ||||
| Project Lead | $0.00 | ||||
| Principal Staff and Architect Engineer (Subject Matter Expert): | $0.00 | ||||
| Subject Matter Expert | $0.00 | ||||
| Technical Writer/Editor | $0.00 | ||||
| Quality Assurance Specialist | $0.00 | ||||
| System Software Engineer Staff | $0.00 | ||||
| System Software Engineer Senior | $0.00 | ||||
| System Software Engineer Mid-Level | $0.00 | ||||
| System Software Engineer Associate | $0.00 | ||||
| Integration and Test Engineer Lead | $0.00 | ||||
| Integration and Test Engineer (Intermediate) | $0.00 | ||||
| Integration and Test Engineer (Associate) | $0.00 | ||||
| Principal Information Assurance Analyst | $0.00 | ||||
| Information Assurance (Intermediate) | $0.00 | ||||
| Hardware Engineer Senior | $0.00 | ||||
| Hardware Engineer Mid-Level | $0.00 | ||||
| System Analyst/Intelligence (Senior) | $0.00 | ||||
| System Analyst/Intelligence (Mid-Level) | $0.00 | ||||
| System Analyst/Intelligence (Associate) | $0.00 | ||||
| Configuration Management Specialist | $0.00 | ||||
| Network Engineer Senior | $0.00 | ||||
| Network Engineer Mid-Level | $0.00 | ||||
| Help Desk Support Specialist | $0.00 | ||||
| Administrative/Clerical | $0.00 | ||||
| Systems Engineer Training Specialist Lead | $0.00 |
Total Labor Costs $0.00
Indirects - CLIN 0005
| Indirect Rate Category | Base Amount | Rate Percentage | Total Cost of Indirect Rate |
| Fringe Benefits | $0.00 | ||
| Overhead On-Site | $0.00 | ||
| Overhead Off-Site | $0.00 | ||
| Material Handling | $0.00 | ||
| G&A | $0.00 |
FCCM $0.00
Sub K Costs - CLIN 0005
| Subcontractor Name | Labor Category | Hourly Rate | # of Hours | Total Costs | Period of Performance | Sub K Cost Summary | ||
| $0.00 | Total Direct Labor | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | Fringe Benefits | 0.00% | $0.00 | |||||
| $0.00 | Overhead On-Site | 0.00% | $0.00 | |||||
| $0.00 | Overhead Off-Site | 0.00% | $0.00 | |||||
| $0.00 | Material Handling | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Travel Cost | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | Other Direct Costs | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | G&A | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Subtotal Costs | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | FCCM | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Fixed Fee | 0.00% | $0.00 | |||||
| $0.00 | ||||||||
| $0.00 | Total Cost | $0.00 | ||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 | ||||||||
| $0.00 |
$0.00
| Indirect Rate Catergory | Base Amount | Rate Percentage | Total Cost of Indirect Rate |
| Fringe Benefits | $0.00 | ||
| Overhead On-Site | $0.00 | ||
| Overhead Off-Site | $0.00 | ||
| Material Handling | $0.00 | ||
| G&A | $0.00 |
FCCM $0.00
| Subcontractor | Trip # | From: City, ST | To: City, ST | Number of People | Number of Nights | Number of Days | POV Mileage | POV Mileage Rate | Flight Cost Per Person | Rental Car Costs | Hotel Per Diem Rate Per Night | M&IE Rate | Total Trip Cost |
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 |
$0.00
| ODCs Name/Type | Quantity of ODCs | Costs Per Item | Total Cost of ODCs | Reference Supporting Documentation in your Cost Proposal |
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 | ||||
| $0.00 |
$0.00
TOTAL CLIN 0005 COSTS
| Cost Summary CLIN 0009 | ||
| Direct Labor | $0.00 | *Input percentages |
| Fringe Benefits | % | $0.00 |
| Overhead On-Site | % | $0.00 |
| Overhead Off-Site | % | $0.00 |
| Material Handling | % | $0.00 |
Travel Cost Fill in from Travel Tab
Other Direct Costs Fill in from ODC Tab
Subcontractor Costs $0.00
G&A % $0.00
Subtotal Costs $0.00
FCCM $0.00
Fixed Fee 0.00% $0.00
Total Cost $0.00
Travel
| CLIN Number | Trip # | From: City, ST | To: City, ST | Number of People | Number of Nights | Number of Days | POV Mileage | POV Mileage Rate | Flight Cost Per Person | Rental Car Costs | Hotel Per Diem Rate Per Night | M&IE Rate | Total Trip Cost |
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 | |||||||||||||
| $0.00 |
$0.00
Other Direct Costs
| CLIN Number | ODC Name/Type | Quantity | Unit Cost | Total Cost | Reference Supporting Documentation in your Cost Proposal |
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 |
$0.00
File details come from the government source that posted it. Updated .