Call for OPTIML dated 01 Feb 2024.pdf
PDF 5 MB Posted
- Attached to
- Pioneering Aerospace Capabilities, Engineering and Research Federal contract opportunity
- Solicitation number
- FA2391-23-S-2403
About this file
This document provides details for a Broad Agency Announcement and associated Calls issued by the Department of the Air Force Materiel Command Research Laboratory. The BAA seeks novel concepts and technologies to further the laboratory's mission of pioneering transformative aerospace technologies. It utilizes a two-step process, first soliciting white papers and then requesting proposals from select offerors. The associated Calls provide additional requirements for specific research topics, including optimized propulsion technologies. Key dates include a March 2024 white paper due date and anticipated contract awards from May to June 2024. The estimated total funding is $15.2 million to be distributed across multiple awards. Eligible entities must meet the laboratory's security requirements and technology transfer plans. Data deliverables, reporting requirements, and contract types are defined.
View the file
Other files for this federal contract opportunity
Show all 50
Pioneering Aerospace Capabilities, Engineering and Research has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Broad Agency Announcement: FA2391-23-S-2403 Pioneering Aerospace Capabilities, Engineering and Research (PACER)
CALL Name: Optimized Propulsion Technologies for Intended Mission Life (OPTIML)
01 February 2024
OVERVIEW INFORMATION
Broad Agency Announcement Type: This is a Two-Step Call against the PACER BAA FA2391-23-S-2403. The First Step is a Call for White Papers only. Offerors should monitor SAM.gov for any additional notices or modifications to this Call announcement.
Note: The First Step of OPTIML Call issued on 27 October 2023 was cancelled.
The First Step of the OPTIML Call is reissued via this Call dated 01 February 2024.
NAICS Code: The NAICS Code for this acquisition is 541715 (Research and Technology in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) (with Aircraft, Aircraft Engine, and Engine Parts exception), and the small business size standard is 1,500 employees.
Federal Agency Name: Air Force Research Laboratory, Aerospace Systems Directorate, AFRL/RQ
Moratorium on White Papers: Beginning from the date of publication of this Call and continuing until six months after the due date for Proposals, no White Papers submitted during the PACER BAA Open Period covering the topic specified in this Call, “RQT Topic 13 – Affordability” will be reviewed.
DUE DATE AND TIME:
First Step: WHITE PAPER DUE DATE AND TIME: 05 March 2024, 3:00 P.M. local time, Wright-Patterson AFB, OH. Only White Papers are due at this time.
NOTE: White Paper receipt after the due date and time shall be governed by the provisions of FAR 52.215-1(c)(3). Early proposal submission is encouraged.
Second Step: PROPOSAL DUE DATE AND TIME: To be provided in the Request for Proposal (RFP) sent to offerors that submit White Papers considered to meet the needs of the Air Force. Only White Papers are due at this time.
Submission: The Primary Contracting Point of Contacts (POCs) are: Katherine Ryan, Contracting Officer, AFRL/RQKPB, katherine.ryan.2@us.af.mil; Megan Wetzel, Contract Specialist, AFRL/RQKPB, megan.wetzel@us.af.mil. White Papers must be submitted to Megan Wetzel, Contract Specialist, AFRL/RQKPB, megan.wetzel@us.af.mil. Electronic submission is required. White Papers can be submitted by email to Megan.Wetzel@us.af.mil or offerors may request a DoD Safe Drop-Off link by email to Megan.Wetzel@us.af.mil at least 4 calendar days prior to White Paper due date.
Type of Contract/Instrument: The Air Force reserves the right to award the instrument best suited to the nature of research proposed. Accordingly, the Government may award any appropriate contract type under the FAR or Other Transaction (OT) for Prototype, grant, cooperative agreement, or OT for Research. The Air Force may also consider award of an appropriate technology transfer mechanism if applicable. It is anticipated that awards under this Call will be “C” type contracts with Cost Plus Fixed Fee (CPFF) and/or Cost Share (at the discretion of the offeror) CLINs anticipated. Cost reimbursement contracts require successful offerors to have an accounting system considered adequate for tracking costs applicable to the contract.
Estimated Total Program Cost: The estimated total program cost is $15,200,000.00. This amount is estimated to cover all awards made under this Call and is not the amount estimated to be awarded per contract award.
Anticipated Number of Awards: The Air Force anticipates one or more awards for this Call.
However, the Air Force reserves the right to award zero, one, or more contracts for all, some or none of the solicited efforts based on the offeror’s ability to perform desired work and funding fluctuations.
Brief Program Summary:
Meet the desire to rapidly acquire engine technologies that are low-cost and sufficiently durable for risk-tolerant, unmanned/autonomous systems. Develop and apply innovative technologies and approaches to provide an engine that sufficiently meets the performance and durability requirements at the lowest cost for an accepted risk. Apply and demonstrate rules and tools to a risk-tolerant, unmanned/autonomous engine that is scalable to a thrust of 3000-8000 lbf and has a nominal service life of 1000 hours. It is expected some rules and tools will be robust enough to apply to expendable and man-rated engine design as well. Demonstrate and validate technologies through appropriate methods to include analysis and/or testing such as bench, component, rig, and/or core and engine demonstration.
Offerors will select Statement of Objective (SOO) Topics 3.1-3.5 in part or in entirety. For each individual selected topic (3.1-3.5) chosen, Demonstration Testing and Validation (SOO Topic 3.6) AND Update Design Criteria and Models (SOO Topic 3.7) are required to be addressed. White Papers/proposals should have these required activities (3.6 and 3.7) clearly defined for each individual selected topic (3.1-3.5).
For topics 3.1, 3.3, and 3.4, prospective offerors shall have a DoD-coordinated Advanced Turbine Technologies for Affordable Mission-capability (ATTAM) Advanced Turbo Propulsion Plan (ATPP) or shall have a documented working relationship with a company with a DoD-coordinated ATTAM ATPP. A list of current ATPP holders can be provided upon request.
Topic List:
SOO Topic 3.1 Tailorable Design Criteria SOO Topic 3.2 As-is Component Acceptance Criteria SOO Topic 3.3 Sufficiently Durable Predictive Tools SOO Topic 3.4 Digital Engineering for Fast, Low-Cost Design/Assessment SOO Topic 3.5 Innovative Design/Manufacture for Low-Cost SOO Topic 3.6 Demonstration Testing and Validation SOO Topic 3.7 Update Design Criteria and Models
Communication Between Prospective Offerors and Government Representatives: All communication prior to and after the White Paper deadline shall be directed to both the Contracting POCs listed below.
Contracting POCs:
Katherine Ryan Contracting Officer
AFRL/RQKPB
E-mail address: katherine.ryan.2@us.af.mil
Megan Wetzel Contract Specialist
AFRL/RQKPB
E-mail address: megan.wetzel@us.af.mil
FULL TEXT ANNOUNCEMENT
I. Program Description: Air Force Research Laboratory, AFRL/RQT, Turbine Engine
Division, is soliciting White Papers on the following research effort: Optimized Propulsion Technologies for Intended Mission Life (OPTIML)
1. Statement of Objectives:
See Attachment 1 for the Statement of Objectives (SOO). This effort falls within the PACER BAA (FA2391-23-S-2403), Technical Objective Area RQT Topic 13 – Affordability.
RQT Topic 13 – Affordability: Research, development, demonstration, and validation of technologies or approaches that increase cost effectiveness and reduce development timelines for turbine engine-related applications. This could include, but is not limited to, new design approaches, novel manufacturing techniques, innovative component design and material application, and reduced logistics support.
2. Within Scope Modification: Potential offerors are advised that due to the inherent uncertainty of research and development efforts, awards resulting from this announcement may be modified during performance to make within scope changes, to include but not limited to, modifications which increase overall contract ceiling amount and modifications under authority of DFARS 235.006-71.
3. Deliverable Items:
a. Data Items:
Contract Data Requirements List (CDRL):
Data Item Title Frequency A001 Scientific and Technical Reports One/R A002 Funds and Man-hour Expenditure Report Monthly A003 Contractor Spend and Expenditure Plan Monthly A004 Contract Funds Status Report Quarterly A005 Status Report Monthly A006 Presentation Material As Required A007 Test Plan As Required A008 System Safety Hazard Analysis Report Once A009 Digital Imaging As Generated A010 Operations Security Plan As Required A011 Technical Information Report (SF 424) Annually/R A012 Technical Data Package As Generated A013 Acquisition and Sustainment Data Package (ASDP) Annually
See Attachment 2 for the Contract Data Requirements List.
b. Hardware: Engine hardware, tooling, geometry data. Hardware will be managed with a contract line item number.
c. Software: Design tools, lifing tools, cost modeling. Software will be managed with a contract line item number.
d. Anticipated Deliverables Summary:
Topic Title Data Hardware Software
3.1 Tailorable Design Criteria Geometry, Experimental Test N/A N/A
3.2 As-is Component
Acceptance Criteria
Geometry, Experimental Test, Inspection
Engine/component hardware, tooling, test equipment
Design/lifing tools, cost modeling
3.3 Sufficiently Durable
Predictive Tools
Geometry, Experimental Test
N/A Design/lifing tools
3.4 Digital Engineering for Fast, Low-cost Design and Assessment
Project management data
N/A Design tools, process modeling
3.5 Innovative Design and
Manufacturing for Low-cost
Geometry, Experimental Test, Build Parameters
Engine/component hardware, tooling, test equipment
Design/lifing tools, cost/supply chain modeling
4. Schedule:
o Overall OPTIML PoP:
Overall PoP: 45 months Technical Period of Performance: 42 months Reporting: 3 months o SOO Topic 3.1 – Tailorable Design Criteria PoP:
Overall PoP: 45 months o SOO Topic 3.2 – As-is Component Acceptance Criteria PoP:
Overall PoP: 33 months Technical Period of Performance: 30 months o SOO Topic 3.3 – Sufficiently Durable Predictive Tools PoP:
Overall PoP: 36 months Technical Period of Performance: 33 months o SOO Topic 3.4 – Digital Engineering for Fast, Low-Cost Design and Assessment PoP:
o SOO Topic 3.5 – Innovative Design and Manufacturing for Low-Cost PoP:
o SOO Topic 3.6 – Demonstration Testing and Validation
Required to be addressed in each individual selected Topic 3.1-3.5 o SOO Topic 3.7 – Update Design Criteria and Models Required to be addressed in each individual selected Topic 3.1-3.5
5. Other Requirements:
a. Program Security Classification: Unclassified/CUI
b. OPSEC: Operations Security (OPSEC) requirements, per the PACER BAA, FA2391- 23-S-2403, I. (page 9), will be incorporated into the Statements of Work.
c. Export Control: Information involved in this research effort is subject to Export
Control (International Traffic in Arms Regulation (ITAR) 22 CFR 120-131, or Export Administration Regulations (EAR) 15 CFR 710-774). A Certified DD Form 2345, Military Critical Technical Data Agreement, is required to be submitted with the First Step – White Paper.
d. Export-Controlled Items: As prescribed by DFARS 225.7901-4, DFARS 252.225-
7048, “Export-Controlled Items (JUN 2013)” shall be contained in ALL resulting contracts.
e. Contractor Performance Assessment Reporting System (CPARS): Not Applicable.
f. Science and Technology (S&T) Protection: In accordance with Air Force Research
Laboratory Instruction (AFRLI) 61-113, “Science and Technology (S&T) Protection for the Air Force Research Laboratory”, offerors are required to submit the following as part of their Proposal (Second-Step):
1) A completed initial Standard Form (SF) 424, Research and Related Senior/Key
Person Profile (Expanded) Form, (PACER BAA Attachment 9) for all Senior/Key Personnel proposed in support of the AFRLI 61-113 Personnel Risk Assessment requirement.
2) Documentation of a Security Program Plan in support of the AFRLI 61-113 Initial
Institution S&T Protection Program Review requirement. This must include, at a minimum, a completed Security Program Questionnaire (PACER BAA Attachment 10). Submittal may also include a pre-existing plan that the offeror uses as a matter of course or plan developed specifically for this acquisition. The purpose of requesting the plan is to assess the offeror’s capacity for protection of the Government’s S&T. Failure to demonstrate a plan adequate to meet the needs of the requirements, as determined by the Government in its sole discretion, may be grounds for considering the proposal unawardable.
Government Procedures The Government will review the submitted S&T protection documentation only for those proposals categorized as Selectable and selected for funding and negotiations.
S&T Protection Initial Risk Review:
Personnel Risk Assessment: The Government will review non-government research key/senior performers identified by the offeror on the initial SF 424 for workload conflicts and conflicts of interest.
Initial Institution S&T Protection Program Review: The Government will review the offeror’s security program information submitted in accordance with paragraph 2 of this section (above) to identify any potential risks and ensure appropriate measures are in place to protect S&T information.
The Government may require the offeror to submit additional information and/or a mitigation plan for any identified S&T protection risks. If the Government determines the offeror failed to provide adequate additional information; or an acceptable mitigation plan; or it is determined the offeror’s S&T protection approach is high risk and does not provide adequate protection of S&T information, the Government may reject the proposal and withdraw it from consideration for award.
S&T Protection Annual Risk Review: In accordance with PACER BAA Attachment 8 (SOW Supplemental Requirements), the Contractor shall provide an SF 424 with the following information: 1) an initial report of all Senior/Key Personnel at the time of award; 2) an annual report of all Senior/Key Personnel providing support; 3) a report for any new Senior/Key Personnel who join the contract, agreement, grant, or OT. Any updated SF 424s for new Senior/Key Personnel supporting the award require coordination from the Government prior to the contractor employee receiving access to S&T information. The purpose of this report is oversight and should not be construed as relieving the contractor/recipient of any S&T Protection requirements within the contract, grant, agreement, or OT.
6. Other Information:
a. Government Furnished Property (GFP), Government Furnished Information (GFI) and/or Software, or Contractor Acquired Property: Not Anticipated. If required must be identified in White Paper.
b. Base Support/Network Access: Not Applicable. If required must be identified in White Paper.
c. Data Rights:
1) Technical Data: Unlimited
2) Non-Commercial Software (NCS): Unlimited
3) NCS Documentation: Unlimited
4) Commercial Computer Software Rights: Customary License
Unlimited rights is desired. Other than unlimited rights, must be identified in the White Paper in accordance with PACER BAA and as required by DFARS 252.227- 7017, Identification and Assertion of Restrictions on the Government’s Use, Release, or Disclosure of Technical Data or Computer Software. See PACER BAA I.6.c.
II. Award Information
1. Anticipated Award Date: Anticipated contract award date is approximately May-June 2024.
2. Anticipated Funding: A contract type with Cost Plus Fixed Fee and/or Cost Share CLINs are anticipated in accordance with the anticipated funding set forth below.
The budget for the program, subject to availability, is anticipated to be as follows:
Notional Funding:
Topic Title FY24 ($k) FY25 ($k) FY26 ($k) FY27 ($k) Total ($k)
3.1 Tailorable Design Criteria 547 820 740 1050 3157
3.2 As-is Component Acceptance
Criteria 968 1025 925 0 2918
3.3 Sufficiently Durable Predictive Tools 585 410 370 0 1365
3.4 Digital Engineering for Fast, Low-
cost Design and Assessment 1080 1025 925 1400 4430
3.5 Innovative Design and
Manufacturing for Low-cost
720 820 740 1050 3330
Total 3900 4100 3700 3500 15200
III. Eligibility Information: See PACER BAA FA2391-23-S-2403
IV. White Paper/Proposal Submission Information
Overview: This Call is a Two-Step Call. For a Two-Step Call, White Papers will be solicited, and subsequent RFPs may follow after White Paper Reviews.
1. FIRST STEP - White Paper Instructions
a. General: The FIRST STEP requests a White Paper and a rough order of magnitude (ROM) cost. The White Paper shall include a discussion of the nature and scope of the research and the offeror’s proposed technical approach. The Government will review the White Papers in accordance with the FIRST STEP White Paper Review Criteria, set forth in Section IV.3.a. below. Based on this review, the Government will determine whether the White Paper has the potential to best meet the Air Force’s needs. Those offerors submitting White Papers assessed as meeting Air Force needs will be asked to submit a Technical and Business/Cost proposal. An offeror submitting a Proposal without first submitting a White Paper will not be eligible for an award. The cost of preparing White Papers in response to this Solicitation is not considered an allowable direct charge to any resulting or any other contract; however, it may be an allowable expense to the normal bid and proposal indirect cost as specified in FAR 31.205-18.
Electronic submission is required. White Papers can be submitted by email to Megan.Wetzel@us.af.mil or offerors may request a DoD Safe Drop-Off link by email to Megan.Wetzel@us.af.mil at least 4 calendar days prior to White Paper due date.
b. Page Limitation: The White Paper shall be limited to 6 pages. Offerors are permitted
5 pages for each individual SOO Topic 3.1-3.5 selected with an additional 1 page to address SOO Topics 3.6 and 3.7. SOO Topics 3.6 and 3.7 are required to be addressed for each SOO Topic 3.1-3.5 selected. White Papers shall be prepared and submitted in Word format. Font shall be standard 10-point business font Arial.
Character spacing must be “normal,” not condensed in any manner. Pages shall be double-spaced (must use standard double-space function in Microsoft Word), 8.5 by 11 inches, with at least one-inch margins on both sides, top and bottom. All text, including text in tables and charts, must adhere to all font size and line spacing requirements listed herein. Font and line spacing requirements do not have to be followed for illustrations, flowcharts, drawings, diagrams, cover page, table of contents, and restrictive/proprietary markings (in header or footer). These exceptions shall not be used to circumvent formatting requirements and page count limitations by including lengthy narratives in such items. Pages shall be numbered starting with the cover page being Page 1, and the last page being no greater than Page 6. The page limitation covers all information including indices, photographs, foldouts (counted as 1 page for each 8.5 by 11 portion) tables, charts, appendices, attachments, resumes, etc. The Government will not consider pages in excess of these limitations.
c. Format: The white paper will be formatted as follows:
1) Section A: BAA Number, Title of Program, Topic Number, Name of Company, Business Size, Company’s Commercial and Government Entity (CAGE) number, Dun & Bradstreet (D&B) Data Universal Numbering System (DUNS) number, Unique Entity Identifier (UEI) number, Contracting POC and Technical POCs with appropriate telephone numbers, and email addresses for the POCs. For submissions that will result in classified work, add the following information:
Classified level at which company is cleared, contractor address for forwarding classified material (name, address, zip code), cognizant security office (name, address, zip code), and offeror’s security officer’s name and telephone number).
2) Section B: Period of Performance and Task Objectives;
3) Section C: Technical Summary and Proposed Deliverables; and
4) Section D: Cost of Task (Rough Order of Magnitude (ROM))
5) Section E: A Certified DD Form 2345, Military Critical Technical Data Agreement. This does not count towards page count limitations.
d. Technical Portion: The technical portion of the White Paper shall include a discussion of the nature and scope of the research and the offeror’s proposed technical approach/solution. It may also include any proposed deliverables. Resumes, descriptions of facilities and equipment, and a proposed Statement of Work are not required at this point.
e. Cost Portion: The cost portion of the White Paper shall include a ROM cost estimate.
No detailed price or cost support information should be included; only a time-phased bottom line figure should be provided.
f. Other Information: If the offeror wishes to restrict its White Papers, they must be marked with the restrictive language stated in FAR 52.215-1(e).
g. White Paper Content Summary: You may be ineligible for award if all requirements of this solicitation are not met on the due date.
2. SECOND STEP - Proposal Instructions
a. General Instructions:
1) The SECOND STEP consists of offerors submitting Technical and Cost/Business
Proposals within 45 calendar days of an RFP. After receipt, Proposals will be evaluated in accordance with the award criteria in Section IV.3.b. below.
Proposals will be categorized and subsequently selected for negotiations.
2) Offerors should apply the restrictive notice prescribed in FAR 52.215-1(e) Instructions to Offerors—Competitive Acquisition. Offerors should consider proposal instructions contained in the Broad Agency Announcement (BAA) Guide for Industry, which can be accessed on line at https://www.afrl.af.mil/Portals/90/Documents/HQ/BAA%20Ind%20Guide%2020 20.pdf?ver=7AivkWvoUoptKgypgCuIvw%3d%3d. This guide is specifically designed to assist the offeror in understanding the BAA proposal process.
3) Technical/Management and Cost/Business volumes should be submitted in separate volumes and must be valid for at least 180 days. Offerors must state this on the cover page of each volume of their proposal.
4) Proposals must reference the announcement number FA2391-23-S-2403, Call Name, and the relevant Topic Number.
5) Offerors must submit one electronic copy of their Proposals per the directions in the Request for Proposal. Please contact the Contracting POC identified in the RFP if there are any issues submitting an electronic copy.
a. The cost file(s) spreadsheets must be in Microsoft Excel and include the formulas for calculating cost element bases (i.e., G&A, O/H, etc.)
6) Offerors are advised that only Contracting Officers are legally authorized to contractually bind or otherwise commit the Government.
7) The cost of preparing Proposals in response to this BAA is not considered an allowable direct charge to any resulting or any other contract; however, it may be an allowable expense to the normal bid and proposal indirect cost as specified in
FAR 31.205-18.
8) No classified technical proposals or cost volumes are expected. Offerors are encouraged to keep all elements of the proposal package unclassified. In the rare case where an offeror has a need to submit a classified appendix, please contact the Technical POC identified in the RFP for delivery instructions.
b. Technical/Management Proposal:
1) Page Limitations: The following describes proposal page limitations:
a. The Technical/Management Proposal shall be limited to TBD (page count will be provided in the RFP). Technical/Management proposals and Statements of Work must be provided in Microsoft Word. Signed pages may be submitted in Adobe.
b. Font shall be standard 10-point business font Arial.
c. Character spacing must be “normal,” not condensed in any manner.
d. Pages shall be double-spaced (must use standard double-space function in Microsoft Word), double sided (each side counts as one page), 8.5 by 11 inches, with at least one-inch margins on both sides, top and bottom.
e. All text, including text in tables and charts, must adhere to all font size and line spacing requirements listed herein. Font and line spacing requirements do not have to be followed for illustrations, flowcharts, drawings, diagrams, cover page, table of contents, and restrictive/proprietary markings (in header or footer). These exceptions shall not be used to circumvent formatting requirements and page count limitations by including lengthy narratives in such items.
f. Pages shall be numbered starting with the cover page being Page 1, and the last page being no greater than TBD (page count will be provided in the RFP). The page limitation covers all information including indices, photographs, foldouts (counted as 1 page for each 8.5 by 11 portion) tables, charts, appendices, attachments, resumes, etc.
g. The proposal page limit does not include the offeror’s proposed Statement of Work (SOW); however, the same formatting rules apply to the SOW, which is limited to 10 pages.
h. Please Note: The Government will check the Proposal and SOW for conformance to the stated requirements. Any pages in excess of the stated page limitation after the format check will not be considered for review purposes.
2) The Technical/Management proposal(s) shall include a discussion of the nature and scope of the research and the technical approach. Additional information on prior work in this area, descriptions of available equipment, use of base support (if requested), data and facilities and resumes of personnel who will be participating in this effort should also be included as attachments to the technical proposal. These volumes shall include a SOW detailing the technical tasks proposed to be accomplished under the proposed effort and suitable for contract incorporation. Do not include any proprietary information in the SOW. Refer to the BAA Guide for Industry referenced above to assist in SOW preparation. In addition to the contractor proposed SOW, a Government generated Supplemental SOW containing additional contracting requirements will be included in any resulting contracts (See PACER BAA Attachment 8).
3) Any questions concerning the technical proposal or SOW preparation shall be referred to the Technical POCs listed in the RFP.
c. Cost/Business Proposal:
1) Separate the Proposal into a business section and cost section. If adequate price competition does not exist, and the threshold for a negotiated contract is equal to or expected to exceed $2,000,000.00, submission of certified cost or pricing data may be required.
a. See PACER BAA Attachment 2 for the Model Contract. Note that the document awarded may include contract line items (CLINs)/clauses/articles in addition to those in the model, and/or some of the CLIN/clauses/articles in the model may be deleted, depending on the specific circumstances of the individual award. Any additions or deletions will be negotiated with the offeror prior to award.
b. The business section should contain all business aspects to the proposed contract, such as type of contract, any exceptions to terms and conditions of the announcement including the model contract, any information not technically related, etc. Provide rationale for exceptions.
c. Associate Contractor Agreements: Associate Contractor Agreements (ACAs) are agreements between contractors working on Government contracts that require them to share information, data, technical knowledge, expertise, or resources. The contracting officer may require ACAs when contractors working on separate Government contracts must cooperate, share resources or otherwise jointly participate in working on contracts or projects. Prime contractor to subcontractor relationships do not constitute ACAs. For each award, the contracting officer will identify associate contractors with whom agreements are required.
d. Identify any technical data that will be delivered with less than unlimited rights.
e. Subcontracting Plans: For efforts to exceed $750,000, Subcontracting Plans shall be submitted in the cost/business proposal. Reference FAR 19.704 and DFARS 219.704 for subcontracting plan requirements. Small business concerns are exempt from this requirement. If an IDIQ contract arrangement is anticipated, the basis for the subcontracting plan should reflect the entire ceiling amount.
f. Limitations on Pass-Through Charges: As prescribed in FAR 15.408(n)(1) & 15.408(n)(2), provisions 52.215-22, “Limitations on Pass Through Charges- Identification of Subcontract Effort (Oct 2009),” apply.
g. Completed Certifications and Representations (Section K) are due with the Proposal. Certifications and Representations (Section K) can be found in PACER BAA Attachment 3. Offerors may also be required to submit updated or supplemental Certifications and Representations based on the specifics of their proposal.
h. If an offeror proposes the use of GFP, the offer must specifically identify each piece of GFP in the Cost/Business Proposal and propose and substantiate a rental cost for evaluation purposes in accordance with FAR
45.202. Include the following information in the proposal:
i. A list describing all Government property that the offeror or its subcontractors propose to use on a rent-free basis. The list shall identify the accountable contract under which the property is held and the authorization for its use (from the contracting officer having cognizance of the property);
ii. The dates during which the property will be used and, for any property that will be used concurrently in performing two or more contracts, the amounts of the respective uses in sufficient detail to support prorating the rent;
iii. The amount of rent that would otherwise be charged in accordance with FAR 52.245-9, Use and Charges; and
iv. The voluntary consensus standard or industry leading practices and standards to be used in the management of Government property, or existing property management plans, methods, practices, or procedures for accounting for property.
2) Cost Element Breakdown: Clear, concise, and accurate cost proposals reflect the offeror's financial plan for accomplishing the effort contained in the technical proposal. As a part of its cost proposal, the offeror shall submit the information outlined below, together with supporting breakdowns. All direct costs (labor, material, travel, computer, etc.) as well as labor and overhead rates should be provided by contractor fiscal year (CFY). Detailed cost element breakdowns by Government Fiscal Year or calendar year are not required. The supporting schedules may include summary level estimating rationale used to generate the proposed costs. The cost element breakdown should include the following if applicable.
a. Direct Labor: Direct labor should be detailed by number of labor hours by category of labor.
b. Labor and Overhead Rates: Direct labor hours, with their applicable rates, must be broken out and the bases used clearly identified. The source of labor and overhead rates and all pricing factors should be identified. For instance, if a Forward Pricing Rate Agreement (FPRA) is in existence, that should be noted, along with the Administrative Contracting Officer’s (ACO's) name and telephone number. If the rates are based on current experience in your organization, provide the historical base used and clearly identify all escalation, by year, applied to derive the proposed rates.
If computer usage is determined by a rate, identify the basis used and rationale used to derive the rate.
c. Material/Equipment: List all material/equipment items by type and kind with associated costs and advise if the costs are based on vendor quotes, data and/or engineering estimates; provide copies of vendor quotes and/or catalog pricing data.
d. Subcontractor Costs: Submit all subcontractor proposals and analyses with your cost proposal (See FAR 15.404-3(b)). If the subcontractor will not submit cost and pricing information to the offeror, this information must be submitted directly to the Government for analysis. On all subcontracts and interdivisional transfers, provide the method of selection used to determine the subcontractor and the proposed contract type of each subcontract. An explanation shall be provided if the offeror proposes a different amount than that quoted by the subcontractor. The offeror’s proposal must:
i. Identify principal items/services to be subcontracted.
ii. Identify prospective subcontractors and the basis on which they were selected. If non-competitive, provide selected source justification.
iii. Identify the type of contractual business arrangement contemplated for the subcontract and provide rationale.
iv. Identify the basis for the subcontract costs (e.g., firm quote or engineering estimate, etc).
v. Identify the cost or pricing data submitted by the subcontractor.
vi. Provide an analysis of the proposed subcontract in accordance with
FAR 15.404-3(b). Provide an analysis concerning the reasonableness, realism and completeness of each subcontractor’s proposal. If the analysis is based on comparison with prior prices, identify the basis on which the prior prices were determined to be reasonable. The analysis should include, but not be limited to, an analysis of: materials, labor, travel, other direct costs and proposed profit or fee rates.
e. Special Tooling or Test Equipment: When special tooling, and/or test equipment is proposed, attach a brief description of items and indicate if they are solely for the performance of this particular contract or project and if they are or are not already available in the offeror's existing facilities.
Indicate quantities, unit prices, whether items are to be purchased or fabricated, whether items are of a severable nature and the basis of the price. These items may be included under Direct Material in the summary format.
f. Consultants: When consultants are proposed to be used in the performance of the contract, indicate the specific project or area in which such services are to be used. Identify each consultant, number of hours or days to be used and the consultant's rate per hour or day. State the basis of said rate and give your analysis of the acceptability of the consultant's rate.
g. Travel: Travel costs must be justified and related to the needs of the project. Identify the number of trips, the destination and purpose. Travel costs should be broken out by trip with number of travelers, airfare, per diem, lodging, etc.
h. Computer Use: Detail the amount and kind of computer usage, the cost, and how the costs were derived.
i. Facilities Capital Cost of Money: If Facilities Capital Cost of Money is proposed, a properly executed DD Form 1861 is required.
j. Project Funding Profile: Offerors should include a project funding profile by Government Fiscal Year (GFY) (1 Oct through 30 Sept) for budgetary purposes. This will enable the Government to easily identify program funding needs by GFY.
k. If an offeror takes exceptions to the requirements called out in the announcement (e.g., base support, GFP, CDRLs), the exceptions should be clearly stated in the cost proposal.
l. Forward Pricing Rate Agreements: Offerors who have forward pricing rate agreements (FPRA’s) and forward pricing rate recommendations (FPRR’s) should submit them with their proposal.
m. Cost/Business proposals have no page/formatting limitations.
3) Proposal Content Summary: You may be ineligible for award if all requirements of this solicitation are not met on the proposal due date.
3. White Paper/ Proposal Review Information
a. FIRST STEP - White Paper Peer or Scientific Review Criteria: Those offerors submitting White Papers as assessed as meeting Air Force needs will be asked to submit a Proposal (Second Step). Offerors not selected to proceed will be notified of the disposition of their White Paper. The Government will review White Papers to determine which of them have the potential to best meet the Air Force’s needs based on the following criteria, which are listed in descending order of importance:
1) Unique and innovative approach proposed to accomplish the technical objectives.
New and creative solutions and/or advances in knowledge, understanding, technology, and the state of the art.
2) The offeror’s understanding of the scope of the technical effort.
3) Soundness of the offeror’s technical approach.
4) Affordability (Proposed ROM Cost Estimate).
b. SECOND STEP - Proposal Peer or Scientific Review Criteria: Proposals will be reviewed through a Peer or Scientific Review process.
The following are the standard Proposal Peer or Scientific Review Criteria. The technical aspect, which is ranked as the first order of priority, shall be reviewed based on the following criteria that are of descending order of importance:
(1) Technical:
(a) Unique and innovative approach proposed to accomplish the technical objectives. New and creative solutions and/or advances in knowledge, understanding, technology, and the state of the art.
(b) The offeror’s understanding of the scope of the technical effort.
(c) Soundness of the offeror’s technical approach including whether the proposal identifies major technical risks, clearly defines feasible mitigation efforts, and demonstrates related experience and qualifications of technical personnel.
(d) The potential to transition the research and development deliverables to future Government needs. Any proposed restriction on technical data or computer software will be considered.
(2) Cost/Price: The cost evaluation includes the realism of the proposed cost. Cost/Price is a substantial factor, but ranked as the second order of priority. (If an offeror proposes the use of GFP other than any GFP identified in this BAA, and that proposed GFP provides the offeror an unfair competitive advantage, then FAR 45.202 requires rental equivalent be applied to the Cost Factor for evaluation purposes only).
c. SECOND STEP – Proposal Review and Selection Process
1) Categories: Based on the Peer or Scientific Review, Proposals will be categorized as Selectable, or Not Selectable (see definitions below). The selection of one or more sources for award will be based on the Peer or Scientific Review, as well as importance to agency programs and funding availability.
(a) Selectable: Proposals are recommended for acceptance if sufficient funding is available.
(b) Not Selectable: Even if sufficient funding existed, the proposal should not be funded.
Note: The Government reserves the right to award some, all, or none of the proposals. When the Government elects to award only a part of a proposal, the selected part may be categorized as Selectable, though the proposal as a whole may not merit such a categorization.
2) No other evaluation criteria will be used.
3) Prior to award of a potentially successful offer, the Contracting Officer will make a determination regarding price reasonableness.
4) As indicated in Section I.5.f. above, the Government will conduct a S&T
Protection Initial Risk Review only for those Proposals categorized as Selectable and selected for funding and negotiations.
5) Additional terms, conditions, and instructions applicable to the Second Step – Proposal will be sent with the RFP.
6) Section K: A completed Section K will be required to be completed with the
Proposal requested in the Second Step.
7) Model Contract: The BAA contains a model contract as an example only.
Applicable Clauses, terms, and conditions may vary per contractor and per proposal and will be addressed during potential negotiations.
4. Award Administration Information
1) Award Notices: Offerors will be notified whether their Proposal is recommended for award by e-mail. The notification is not to be construed to mean the award of a contract is assured, as availability of funds and if necessary, successful negotiations are prerequisites to any award.
V. Other Information
1. BAA terms, conditions, and instructions: All BAA terms, conditions, and instructions contained in BAA FA2391-23-S-2403 shall be considered applicable to this Call and First Step - White Papers/Second Step - Proposals shall be in accordance with the BAA, unless deviations are authorized in this call.
2. Availability of Funds: Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
3. White Paper/ Proposal Reminders: You may be ineligible for award if all requirements of this solicitation are not met.
a. White Papers are due no later than the due date and time specified in the Call.
b. If selected to provide a Proposal, Proposals are due no later than the due date and time specified in the RFP.
c. White Paper and Proposal Page limits are strictly enforced.
d. White Papers and Proposals must be submitted in the format specified.
e. White Papers are due to the Contracting POCs identified in the Call.
f. Offerors other than small businesses must include a subcontracting plan.
Attachments:
1. Statement of Objectives (SOO) dated 15 December 2023
2. Contract Data Requirements List (CDRLs)
CALL: Optimized Propulsion Technologies for Intended Mission Life
Statement of Objectives (SOO)
15 December 2023
BACKGROUND:
The Department of the Air Force (DAF) is currently assessing various options of risk-tolerant unmanned aircraft, which fall between unmanned vehicles and missiles relative to life and cost. In order to realize reductions in lifecycle cost and development schedule, it is envisioned that multiple approaches must be taken; all of which present themselves as higher risk than approaches typically accepted today. Examples include, but are not limited to, replacing physical engine validation testing with virtual validation, improved design processes, and innovative manufacturing approaches. State of the art engine design processes are composed of analytical and empirical methods intended to achieve the required performance, reliability, and cost goals of weapon system programs. While these processes have developed world-leading military engines, they are not without limitations. Identifying additional capability requires development of new design criteria for non-traditional engine usage, higher fidelity analytical tools to reduce overdesign, and improved experimental approaches for assuring engine capability. Advancement in all three areas is necessary to develop the broad range of engine concepts of interest to the
DAF.
1.0 OBJECTIVES:
Meet the desire to rapidly acquire engine technologies that are low-cost and sufficiently durable for risk-tolerant, unmanned/autonomous systems. Develop and apply innovative technologies and approaches to provide an engine that sufficiently meets the performance and durability requirements at the lowest cost for an accepted risk. Apply and demonstrate rules and tools to a risk-tolerant, unmanned/autonomous engine that is scalable to a thrust of 3000-8000 lbf and has a nominal service life of 1000 hours. It is expected some rules and tools will be robust enough to apply to expendable and man-rated engine design as well. Demonstrate and validate technologies through appropriate methods to include analysis and/or testing such as bench, component, rig, and/or core and engine demonstration.
2.0 APPLICABLE DOCUMENTS:
2.1 Air Breathing Turbine Engine Aircraft and Missile Propulsion Security Classification Guide (SCG), dated 6 Jan 97, revised 5 Nov 20, or current version.
2.2 Technology Demonstrator Systems Engineering Best Practice, revised 24 Jan 18.
2.3 Test Planning Best Practice, dated 1 Oct 17.
The below tasks are to be completed and priced separately (per task) in accordance with paragraph 3.0, including paragraphs 4, 5, 6, 7 and 8:
3.0 TASKS:
3.1 Tailorable Design Criteria:
Define a spectrum of component design criteria as a function of risk. Choosing an appropriate level of risk for a low-cost unmanned/autonomous engine, select components for criteria application and develop component models. Estimate the level of savings in terms of reduced criteria, reduced cost, reduced manpower and reduced schedule as a result of tailored approach. Plan for testing in Task 3.6. (CDRLS A001, A002, A005, A006, A009, A011, A012, A013) (ATPP Partners Only)
3.2 As-is Component Acceptance Criteria:
Investigate and determine approaches that enable the maximum use of as-manufactured and non-conforming components; approaches include, but are not limited to: M&S, Digital Engineering, inspection, manufacturing process control and in situ life prediction.
Consider non-aerospace-traditional manufacturing approaches and supply chains. Select traditionally high-cost component(s), define and document acceptance criteria to enable max usage for agreed upon risk, demonstrate approach(s) on component, estimate production cost savings and schedule savings obtained. Plan for testing in Task 3.6.
(CDRLS A001, A002, A005, A006, A009, A011, A012, A013) (OPEN)
3.3 Sufficiently Durable Predictive Tools:
Develop advanced predictive analysis tools to increase accuracy of component life prediction. Develop approaches to enable rapid, accurate life assessment for all components. Select component for demonstration and determine improvements on prediction variability and cost, schedule, and manpower savings. Plan for testing in Task
3.6. (CDRLS A001, A002, A005, A006, A009, A011, A012, A013) (ATPP Partners Only)
3.4 Digital Engineering for Fast, Low-Cost Design/Assessment:
Develop processes to collect and exploit digital data available during development, manufacturing, and operations. Define approaches to use data to increase speed, lower cost and support life assessment as related to all phases of development, manufacturing, and operations. Define and execute method to validate models, processes, and approaches. Estimate schedule and cost savings that result from digital process. Plan for testing in Task 3.6. (CDRLS A001, A002, A005, A006, A009, A011, A012, A013) (ATPP Partners Only)
3.5 Innovative Design/Manufacture for Low Cost:
Develop and demonstrate innovative component/engine designs to reduce development time and life cycle cost. Examples include, but are not limited to, reduced part counts, advanced manufacturing techniques, non-aerospace vendors, etc. Demonstrate cost & schedule savings while meeting durability requirements for agreed upon risk. Plan for testing. (CDRLS A001, A002, A005, A006, A009, A011, A012, A013) (OPEN)
3.6 Demonstration Testing and Validation:
Write a test plan for bench, component, rig and/or core and engine demonstration, as appropriate. Engine test plan shall be in accordance with the AFRL test planning best practice. Execute planned tests and correlate test results with pre-test predictions for Tasks 3.1-3.5, as applicable. (CDRLS A001, A002, A005, A006, A007, A009, A011, A012)
3.7 Update Design Criteria and Models:
Using test results from Task 3.6, validate design criteria and durability models, and modify/update criteria used in tasks 3.1-3.5 as required. (CDRLS A001, A002, A005, A006, A009, A011, A012)
4.0 ENVIRONMENTAL PROTECTION:
The contractor shall assess the environmental consequences of the technology being developed from the standpoint of the project itself and from the standpoint of future scale-up for larger quantity production. If the technology has adverse environmental effects, the contractor shall develop suggestions for making the technology environmentally acceptable and indicate what impact the suggestions will have on the technology from an economic standpoint. The contractor shall document the findings. (CDRLs A001, A007)
5.0 RELIABILITY, MAINTAINABILITY & SUPPORTABILITY (RM&S):
The contractor shall give specific consideration to RM&S during the execution of this program. These considerations shall be based on sound, practical engineering judgment, experience and available data. No separate reliability testing program shall be conducted as part of this program however, RM&S data shall be documented and shortcomings reported for consideration during future developments. Supportability considerations should be addressed at levels consistent with Applied Research (6.2) activities. The contractor shall document the findings. (CDRL A001)
6.0 SYSTEM SAFETY:
The contractor shall identify and document any safety hazards introduced during design, fabrication and testing. The design goal shall be to eliminate all hazards. Any residual hazards and subsequent design risk shall be summarized and provide enough detail to support an informed program management decision with regard to the design’s overall safety risk. The contractor shall address the identified hazards and recommend corrective actions. (CDRL A008)
7.0 OPERATIONS SECURITY (OPSEC)
7.1 Purpose
OPSEC must be an integral part of our daily activities. As we maintain security on our future technologies that are vital to national interest, we must recognize and prepare for the threat poised against our technology. Department of Defense policies mandate a high degree of security throughout the acquisition process.
However, heightened security awareness and threat-based countermeasures are particularly essential during the research and development phase when our technology is most vulnerable to espionage, sabotage, or exploitation. It is the obligation of each employee or persons involved on this contract to be constantly aware of and strictly adhere to security requirements designed to protect sensitive unclassified and other information and resources produced by acquisition, research and development, and technological security efforts outlined in this SOW. The contractor shall ensure employees received training and follow appropriate OPSEC measures during the performance of this contract. (CDRL A010)
7.2 Coordination and Update
The contractor shall develop an OPSEC plan to protect classified and unclassified sensitive data from exploitation. The contractor shall be responsible to coordinate on all OPSEC requirements and the OPSEC plan. The contractor shall also update the OPSEC plan when updated critical or other information is received including, as appropriate, at the sub-task level. The OPSEC plan shall apply to the task order. In addition, the contractor shall submit an updated SF 424 annually, or when new senior/key personnel are added. (CDRL A010, A011)
7.3 Compliance
The contractor shall comply with the approved OPSEC plan. OPSEC surveys to measure the effectiveness of the OPSEC program may be conducted by the government. The contractor shall comply with these surveys. The contractor shall train personnel in, and follow appropriate OPSEC measures during, the performance of this contract. (CDRL A010)
8.0 PROGRAM &…