Environmental_Regulations_and_Requirements.docx

DOCX document 53 KB Posted

Attached to
ENVIRONMENTAL REMEDIATION SERVICES Federal contract opportunity
Solicitation number
F7R0026116AW01
Issued by
Department of the Army Ohio Army National Guard

About this file

Environmental regulations and requirements info

View the file

Other files for this federal contract opportunity

Other files attached to ENVIRONMENTAL REMEDIATION SERVICES, newest first.
File Type Posted
FBO_doc_-_AT-OPSEC_REQUIREMENTS.pdf PDF
FBO_doc_-_RFI_Format.doc DOC document
Statement_of_Objectives.pdf PDF
FBO_-_provisions_ _clauses_attachment_(services).pdf PDF
179AW_Contractor_HM_Tracking_Inventory.docx DOCX document
Solicitation_-_ADDITIONAL_INFORMATION.pdf PDF
179AW_CD D_Tracking_Form_2015.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

179AW & 200RHS DET-1

CONTRACTOR

ENVIRONMENTAL REGULATORY REQUIREMENTS

SITUATION/ENVIRONMENTAL REQUIREMENT:
DATE OF COMPLETION:

OEPA Division of Surface Water

The construction project site impacts more than 1 acre:

· Complete a Construction Storm Water Pollution Prevention Plan. This plan must be on hand in the Environmental Office prior to the submittal of the NOI
Submitted to Base EMO 60 days prior to the start of construction for review
· Complete a Notice of Intent (NOI) to OEPA – Central Office along with a payment for processing
Submitted 30 days prior to the start of construction
· Storm Water Pollution Prevention control inspections submitted to the Environmental Office.
Weekly throughout the project duration

A sanitary sewer line is installed that is 6” or larger and/or not gravity fed:

· Complete a Permit to Install (PTI) and all other applicable forms (i.e., Sanitary Sewer Data Sheet and Engineering Plans): http://www.epa.state.oh.us/dsw/pti/index.aspx . Submit to OEPA – Northwest District Office
60 days prior to the start of construction

Two Sanitary Sewer lines are being connected – regardless of size:

· Complete a Permit to Install (PTI) and all other applicable forms (i.e., Sanitary Sewer Data Sheet and Engineering Plans): http://www.epa.state.oh.us/dsw/pti/index.aspx . Submit to OEPA – Northwest District Office
60 days prior to the start of construction

A lift/pump station is installed or replaced:

· Complete a Permit to Install (PTI) and all other applicable forms (i.e., Sanitary Sewer Data Sheet and Engineering Plans): http://www.epa.state.oh.us/dsw/pti/index.aspx . Submit to OEPA – Northwest District Office
60 days prior to the start of construction

A line is installed that is considered a “main” feed over 2 inches:

· Complete a Permit to Install (PTI) and all other applicable forms (i.e., Sanitary Sewer Data Sheet and Engineering Plans): http://www.epa.state.oh.us/dsw/pti/index.aspx . Submit to OEPA – Northwest District Office
60 days prior to the start of construction

Existing lines are replaced with lines of equal size:

· No Paperwork to OEPA is required

Line taps are tied to existing lines:

· No Paperwork to OEPA is required

Water Line Disinfection per the Recommended Standard for Water and AWWA Standard C651 for Disinfection

For Building Construction, Demolition or Renovation Projects:

Fluorescent Bulbs, Light Ballasts, and Mercury Switches:
The Contractor is responsible for recycling these materials with a certified recycler and providing the 179AW with a copy of recycling tickets/records.
Hazardous Materials/Waste:
The Contractor is responsible for the disposal of all hazardous materials/waste in accordance with all Federal, State, and Local Regulations. These items may not be disposed of on 179AW property.
Asbestos:
The Contractor must perform an AHERA asbestos building survey for all suspect ACBM which may potentially be disturbed during the project.
Lead Based Paint (LBP):
The Contractor must perform a LBP survey for any painted surfaces that may potentially be disturbed during the project.
Ozone Depleting Substances (ODSs) (e.g. Freon):
The Contractor is responsible for the disposal of all ODSs in accordance with all Federal, State, and Local Regulations. These items may not be disposed of on 179AW property.