179AW_Contractor_HM_Tracking_Inventory.docx

DOCX document 50 KB Posted

Attached to
ENVIRONMENTAL REMEDIATION SERVICES Federal contract opportunity
Solicitation number
F7R0026116AW01
Issued by
Department of the Army Ohio Army National Guard

About this file

Base hazardous materials tracking document

View the file

Other files for this federal contract opportunity

Other files attached to ENVIRONMENTAL REMEDIATION SERVICES, newest first.
File Type Posted
FBO_doc_-_AT-OPSEC_REQUIREMENTS.pdf PDF
FBO_doc_-_RFI_Format.doc DOC document
Statement_of_Objectives.pdf PDF
FBO_-_provisions_ _clauses_attachment_(services).pdf PDF
Solicitation_-_ADDITIONAL_INFORMATION.pdf PDF
Environmental_Regulations_and_Requirements.docx DOCX document
179AW_CD D_Tracking_Form_2015.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

179TH AIRLIFT WING/200TH REDHORSE SQUADRON DET-1

CONTRACTOR HAZARDOUS MATERIALS INVENTORY

This form is to be used by Contractors for approval and tracking of all hazardous materials being used during the project. This form will need to be submitted twice. PRIOR to the project, the form will need to be filled out EXCEPT for the ACTUAL USAGE and STOCK NUMBER columns. A Safety Data Sheet (SDS) must accompany this form for every hazardous material listed. This step is to gain access to bring the hazardous materials onto the installation. At the end of the project, this form must be re-submitted with the ACTUAL USAGE column completed. The final submittal of this form can occur with all other closeout documents. The STOCK NUMBER column will be completed by the 179AW.

CONTRACT NUMBER:
WORKPLACE/BUILDING:
PRIME CONTRACTOR/ORGANIZATION:
EXPECTED START DATE:
EXPECTED FINISH DATE:

PROJECT TITLE/DECRIPTION:

PRODUCT NAME

MANUFACTURER

PHYSICAL FORM (S,L,G)

CONTAINER SIZE1

MAX AMOUNT ONSITE AT ANY TIME2

EXPECTED USAGE AMOUNT

ACTUAL USAGE AMOUNT

PROCESS TYPE3

STOCK NUMBER (to be completed by 179AW)

FOOTNOTES:

1. Specifically list the container size you will be using (i.e., 1 gallon, 5 gallons, 18 oz., 1 quart, etc.) and the vessel the material comes in (i.e., bucket, can, bottle, jar, etc). The 179AW requires the exact container size for correct hazardous materials tracking.

2. Identify maximum amount expected to be present onsite at any one time. This will typically be the amount delivered at the beginning of the project.

3. See Reverse: Table 1 – PROCESS TYPES for appropriate codes.

TABLE 1 – PROCESS TYPES

CODE
PROCESS DESCRIPTION
CODE
PROCESS DESCRIPTION
A
Adhering/Bonding/Sealing – Aerosol
V
Equipment Repair/Prev. Maintenance – Equipment Installation, Cable Pulling
B
Adhering/Bonding/Sealing – All Usages
W
Equipment Repair/Prev. Maintenance – Equipment Installation/Removal
C
Asbestos Work, NOC
X
Equipment Repair/Prev. Maintenance – NOC
D
Brazing
Y
Housekeeping/Janitorial/Maintenance – Facility Maintenance, Multiple Operations
E
Cutting – Multiple Operations
Z
Housekeeping/Janitorial/Maintenance – Janitorial/Custodial, Multiple Operations
F
Soldering – Torch
AA
HVAC – Air Conditioning/Refrigeration Charging
G
Soldering – NOC
BB
HVAC – HVAC Repair and Maintenance
H
Welding – Multiple Operations
CC
Lead Paint Abatement – Lead Abatement, All Methodologies
I
Cleaning, Chemical & Degreasing – Chemical Stripping
DD
Miscellaneous Operations – Chemical Processing, NOC
J
Cleaning, Chemical & Degreasing – Multiple Operations
EE
Miscellaneous Operations – Decontamination
K
Cleaning, Other – Multiple Operations
FF
Miscellaneous Operations – Service, NOC
L
Coating/Painting Operations – Brush/Roller
GG
Miscellaneous Operations – Testing, NOC
M
Coating/Painting Operations – Spray/Aerosol
HH
Pest Control – Aerosol Can Spray
N
Coating/Painting Operations – NOC
II
Pest Control – Multiple Operations
O
Communications – Multiple Operations
JJ
Plumbing – Multiple Operations
P
Drywall/Plastering – NOC
KK
Protective Services, Fire – NOC
Q
Electrical/Electronics – Multiple Operations
LL
Protective Services, Security – NOC
R
Electrical/Electronics – Electronic Repairs, Multiple Operations
MM
Structure Demolition – Multiple Operations
S
Electrical/Electronics – Telecommunications
NN
Structure Fabrication/Renovation – General Construction
T
Electrical/Electronics – Installation, Repair, Service
OO
Structure Fabrication/Renovation – Multiple Operations
U
Equipment Repair/Prev. Maintenance – Charging, Recharging, NOC
PP
Water Operations – Drinking Water System, Operation & Maintenance

image1.jpeg image2.jpeg

File details come from the government source that posted it. Updated .