F7-SWMP_APPROVED 2023-11-16.pdf
PDF 9 MB Posted
- Attached to
- Filing 7/25 Landscape
- Solicitation number
- 2025-1002
- Issued by
- Arapahoe County, Aurora City, Colorado
About this file
This document is a Stormwater Management Plan (SWMP) for The Aurora Highlands Filing 7 project, located in the City of Aurora, Adams County, Colorado. The plan, prepared by Matrix Design Group in May 2023 and approved on November 16, 2023, provides comprehensive erosion control and stormwater management documentation for a specific phase of the larger Aurora Highlands development. The plan includes multiple sheets detailing erosion control strategies, construction limits, best management practices (BMPs), and site-specific notes for controlling sediment and managing stormwater during construction activities.
The SWMP covers approximately 223 acres, with detailed topographical information, benchmark elevations, and specific erosion control measures such as silt fencing, rock socks, vehicle tracking controls, and stabilized staging areas. The document includes specific requirements for contractors, such as utility notification, sediment control, maintaining construction best practices, and ensuring minimal environmental impact. The plan references previous mass grading work (Filing 1 Phase 3) and provides precise guidance for managing stormwater runoff, controlling dust emissions, and implementing landscape stabilization techniques during and after construction. The project is part of a larger master-planned community near Denver International Airport, with multiple metropolitan districts and stakeholders involved in its development.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
AI
N S
TR
EE
T
THE AURORA
HIGHLANDS PARKWAY
E-
38TH PARKWAY
WARM SPRINGS
AVENUE
26TH AVENUE
HIGHLAND CREEK
PARKWAY
RIVER FRONT DRIVE
X-1229-11-TITLE BLOCK-SWMP
X-1229-11-EX-Roads X-1229-11-EX-Parcels X-1229-11-PR-Parcels_PH1 X-1229-00-EX-Parcels
HORIZ.
VERT.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE DATE ISSUED: DRAWING No.
SEAL
FOR AND ON BEHALF OF
MATRIX DESIGN GROUP, INC.
PROJECT No.
PREPARED BY:
REFERENCE
DRAWINGS
FILE NAME:
CTB FILE:
PLOT DATE:
THIS DRAWING IS CURRENT AS OF PLOT DATE AND MAY BE SUBJECT TO CHANGE.
COMPUTER FILE MANAGEMENT
No. DATE DESCRIPTION BY
REVISIONS
SHEET
X-1229-11-TITLE BLOCK-SWMP
X-1229-11-EX-Roads X-1229-11-EX-Parcels X-1229-11-PR-Parcels_PH1 X-1229-00-EX-Parcels
SHEET No.
Know what's below.
before you dig.Call
R
STORMWATER MANAGEMENT
PLANS
This electronic plan is a facsimile of the signed and sealed PDF plan
JEFF KILLION PE #40736
08/22/23
8/28/2023 2:43 PM
R:\22.1229.011 (The Aurora Highlands_Filing 7)\500 CADD\504 Plan Sets\Construction Plans\SWMP\TS01.dwg
N/A
2 ECTS
MAY 2023
N/AJK
JD
SK
CONSTRUCTION DOCUMENTS
CITY OF AURORA, COUNTY OF ADAMS, STATE OF COLORADO
THE AURORA HIGHLANDS FILING 7
22.1229.011
TITLE SHEET
THE AURORA HIGHLANDS SUBDIVISION FILING NO. 7
SITUATED IN NORTH HALF OF SECTION 30, TOWNSHIP 3 SOUTH, RANGE 65
WEST OF THE SIXTH PRINCIPAL MERIDIAN,
CITY OF AURORA COUNTY OF ADAMS, STATE OF COLORADO
SITE LOCATION
LOCATION MAP
SCALE: 1" = 1,000'
THE AURORA HIGHLANDS - FILING 7
STORM WATER MANAGEMENT PLANS
MAY 2023
MATRIX DESIGN GROUP
707 17TH STREET, SUITE 3150
DENVER, CO. 80202
PH: 303-572-0200
CONTACT: JEFF KILLION, P.E.
JEFF.KILLION@MATRIXDESIGNGROUP.COM
CIVIL ENGINEER
BASIS OF BEARINGS:
THE NORTH LINE OF THE NORTHWEST QUARTER, SECTION 30, TOWNSHIP 3 SOUTH, RANGE 65 WEST OF THE SIXTH PRINCIPAL MERIDIAN, TAKEN TO BEAR NORTH 89°36'22" EAST, A MODIFIED STATE
PLANE DISTANCE OF 2,643.20 FEET.
BENCHMARK:
CITY OF AURORA BENCHMARK 3S6636NE003 BEING A 3" DIAM. BRASS CAP (COA BM, 19-020B, E-090A) ATOP THE S. WALL @ THE S.E. COR. OF THE E. 26TH AVE. BRIDGE CROSSING OVER E-470. BRASS CAP AT LOWER STEP ON WALL WHERE
THE RAILING ENDS ON THE E. END. AKA 19-020B.
ELEVATION = 5521.54 (NAVD88)
MATRIX DESIGN GROUP
707 17TH STREET, SUITE 3150
DENVER, CO. 80202
PH: 303-572-0200
CONTACT: CHAD HERD, PLA, ASLA
CHAD.HERD@MATRIXDESIGNGROUP.COM
LANDSCAPE ARCHITECT
AURORA HIGHLANDS, LLC
CARLO FERREIRA
250 S PILOT ROAD
LAS VEGAS, NV 89119
DEVELOPER
PROJECT APPLICANT
INDEX OF SHEETS
SHEET NUMBERDESCRIPTION
EROSION CONTROL TITLE SHEET
EROSION CONTROL GENERAL NOTES
EROSION CONTROL INDEX PLAN
EROSION CONTROL PLANS INITIAL
EROSION CONTROL PLANS FINAL
06 - 09
APPROVED ONE YEAR FROM THIS DATE
WATER DEPARTMENT
CITY ENGINEER
DATE
DATE
PLAN PREPARER SIGNATURE BLOCK
I ACKNOWLEDGE MY RESPONSIBILITY FOR THE PREPARTION
OF THE STORMWATER MANAGEMENT PLAN.
JEFF KILLION, P.E.
FOR AND ON BEHALF OF MATRIX DESIGN
GROUP, INC.
DATE
PROJECT OWNER/DEVELOPER
SIGNATURE BLOCK
MATT HOPPER, AACM DISTRICT DATE
I HAVE REVIEWED THE INFORMATION CONTAINED WITHIN
THE STORMWATER MANAGEMENT PLAN AND ACCEPT
RESPONSIBILITY FOR THE REQUIREMENTS SET FORTH.
AEROTROPOLIS AREA COORDINATING
METROPOLITAN DISTRICT
8390 EAST CRESCENT PARKWAY, SUITE 300
GREENWOOD VILLAGE, CO 80111
PH: (303) 339-4938
CONTACT: MATT HOPPER
08/22/23
This electronic plan is a facsimile of the signed and sealed PDF plan
9-12-23
APPROVED ON 11/16/2023
Julie Bingham Initials cwoo Stamp cwoo Date
KPatrick 2 - Initials
Haley Johansen Haley Signature
Haley Johansen Date jfelling Typewritten Text 11/16/2023 jfelling Text Box 223239
X-1229-11-TITLE BLOCK-SWMP
HORIZ.
VERT.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE DATE ISSUED: DRAWING No.
SEAL
FOR AND ON BEHALF OF
MATRIX DESIGN GROUP, INC.
PROJECT No.
PREPARED BY:
REFERENCE
DRAWINGS
FILE NAME:
CTB FILE:
PLOT DATE:
THIS DRAWING IS CURRENT AS OF PLOT DATE AND MAY BE SUBJECT TO CHANGE.
COMPUTER FILE MANAGEMENT
No. DATE DESCRIPTION BY
REVISIONS
SHEET
X-1229-11-TITLE BLOCK-SWMP
SHEET No.
Know what's below.
before you dig.Call
R
STORMWATER MANAGEMENT
PLANS
This electronic plan is a facsimile of the signed and sealed PDF plan
JEFF KILLION PE #40736
08/22/23
10/12/2023 10:03 AM
R:\22.1229.011 (The Aurora Highlands_Filing 7)\500 CADD\504 Plan Sets\Construction Plans\SWMP\GN01.dwg
N/A
3 ECGN
MAY 2023
N/AJK
JD
SK
CONSTRUCTION DOCUMENTS
CITY OF AURORA, COUNTY OF ADAMS, STATE OF COLORADO
THE AURORA HIGHLANDS FILING 7
22.1229.011
EROSION CONTROL GENERAL NOTES
1. CONTRACTOR AND CONSTRUCTION MANAGER SHALL VERIFY EXISTING TOPOGRAPHY AND ESTIMATED EARTHWORK
QUANTITIES PRIOR TO EXECUTING WORK.
2. ADDITIONAL FINE GRADING WILL BE REQUIRED PRIOR TO PAVEMENT CONSTRUCTION. EARTHWORK SEQUENCING AND METHODOLOGY SHALL BE COORDINATED BETWEEN THE CONTRACTOR AND THE CONSTRUCTION MANAGER.
3. UTILITY NOTIFICATION CENTER - CONTRACTOR SHALL CONTACT UTILITY NOTIFICATION CENTER FOR LOCATION OF UNDERGROUND UTILITIES AT LEAST 48 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION. PHONE: 1-800-922-1987.
4. ESTIMATED EARTHWORK QUANTITIES PROVIDED HEREIN DO NOT INCLUDE EARTHWORK FOR FOUNDATION AND
BASEMENT EXCAVATION.
5. ESTIMATED EARTHWORK QUANTITIES ARE TO FINISH GRADE. NO ALLOWANCE HAS BEEN MADE FOR STRIPPING, EXISTING PAVEMENT THICKNESS, FUTURE PAVEMENT THICKNESS, UTILITY SPOILS, NOR SHRINKAGE DUE TO
SCARIFICATION/COMPACTION.
6. NO ALLOWANCE HAS BEEN MADE FOR TOPSOIL IMPORT.
7. THE ENGINEER MAY REQUIRE SILT FENCING OR ROCK SOCKS AS NECESSARY TO RETARD SEDIMENT TRANSPORT ON OR OFF THE PROJECT SITE. SILT FENCE SHALL BE INSTALLED ALONG THE EXISTING BACK OF CURB OR SIDEWALK. SILT FENCE OR ROCK SOCKS SHALL BE REMOVED AND REPLACED AS CONSTRUCTION PHASING PROGRESSES.
8. FINAL LOCATION AND SIZE OF STAGING AREA (SSA) AND SITE ENTRANCE (VTC) MAY BE DETERMINED AT THE SITE BY THE
CONTRACTOR.
9. INLET PROTECTION FOR PROPOSED STORM SEWER SHALL BE INSTALLED UPON CONSTRUCTION OF THE INLET.
CONSTRUCTION PHASING NOTES:
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING REASONABLE AND PRUDENT EROSION AND SEDIMENT CONTROL MEASURES TO PROTECT THE DOWNSTREAM FACILITIES AND WHICH ARE RELEVANT TO THE CURRENT CONSTRUCTION
ACTIVITY. AT A MINIMUM THE FOLLOWING BMPS SHALL BE INSTALLED FOR EACH PHASE:
1. DEMO AND GRADING
a. VEHICLE TRACKING CONTROL
b. STABILIZED STAGING AREA
c. SILT FENCE
d. INLET PROTECTION
e. SURFACE ROUGHENING
f. ROCK SOCKS
2. UTILITY CONSTRUCTION - ALL ABOVE BMPS PLUS
a. ADDITIONAL INLET PROTECTION AT NEW INLETS
b. CONCRETE WASHOUT AREA
3. PAVING AND STABILIZATION
a. SEEDING & MULCHING
b. REMOVE BMPS AS UPSTREAM AREA IS ESTABLISHED
PROJECT SPECIFIC NOTES
PURSUANT TO SECTIONS 138-440 AND 138-442 OF THE AURORA MUNICIPAL CODE, THE PERMITTEE SHALL LOCATE, INSTALL, AND MAINTAIN ALL BEST MANAGEMENT PRACTICES, INCLUDING, BUT NOT LIMITED TO, EROSION CONTROLS, SEDIMENT CONTROLS, DRAINAGE CONTROLS, AND WATER QUALITY BMPS AS INDICATED IN THE APPROVED STORMWATER
MANAGEMENT PLAN (SWMP).
BMP INSTALLATIONS SHALL BE INSTALLED PER THE COA STANDARD DETAIL IN EFFECT AT THE TIME OF INSTALLATION OR PER THE APPROVED SWMP DESIGN DRAWING, A COA APPROVED VARIANCE, OR A COA APPROVED DESIGN DRAWING PLAN
AMENDMENT.
1. THE PERMITTEE SHALL BE RESPONSIBLE FOR REMEDIATION OF ANY ADVERSE IMPACTS TO ADJACENT WATERWAYS, WETLANDS, STORM SEWERS, STORM SEWER APPURTENANCES, OTHER PROPERTIES, ETC., RESULTING FROM WORK
DONE AS PART OF THIS PROJECT.
2. ADDITIONAL EROSION AND SEDIMENT CONTROL BMPS MAY BE REQUIRED DURING AND AFTER CONSTRUCTION AND SHALL BE EXECTUED AND COMPLETED BY THE PERMITTEE. THE PERMITTEE SHALL PLAN, INSTALL, AND MAINTAIN ALL EROSION, AND SEDIMENT CONTROL MEASURES, INCLUDING DRAINAGE AND WATER QUALITY BMPS AS INDICATED ON THIS PLAN AND AS NECESSARY TO REDUCE THE DISCHARGE OF POLLUTANTS TO THE MAXIMUM EXTENT PRACTICABLE ADVERSE IMPACTS, EROSION AND SEDIMENT DEPOSITION ONTO PAVED SECTIONS, INTO STORM SEWERS, STORM
SEWER APPURTENANCES, RECEIVING WATERS, OR OFF THE PROJECT SITE.
3. THE PERMITTEE SHALL TAKE APPROPRIATE PREVENTIVE MEASURES TO MINIMIZE TO THE MAXIMUM EXTENT PRACTICABLE DIRT AND MUD FROM BEING TRACKED OR DEPOSITED ONTO PAVED SECTIONS VIA MULTIPLE BMPS.
SEDIMENT, MUD, AND CONSTRUCTION DEBRIS THAT MAY BE TRACKED, DEPOSITED, OR ACCUMULATED ON PAVED SECTIONS, IN THE FLOW LINES, PRIVATE PROPERTY, AND/OR PUBLIC RIGHTS-OF-WAY OF THE CITY AS A RESULT OF
THIS CONSTRUCTION PROJECT SHALL BE CLEANED UP.
4. AREAS REACHING SUBSTANTIAL COMPLETION OF GRADING AND TOPSOIL PLACEMENT OPERATIONS MUST BE DRILL SEEDED AND CRIMP MULCHED WITHIN 14 DAYS OF SUBSTANTIAL COMPLETION OF GRADING AND TOPSOIL OPERATIONS.
IF AN INCOMPLETE AREA IS TO REMAIN INACTIVE FOR LONGER THAN 30 DAYS, IT MUST BE DRILL SEEDED AND CRIMP MULCHED OR OTHERWISE LANDSCAPED WITHIN 14 DAYS FROM THE SUSPENSION OR COMPLETION OF LAND
DISTURBANCE ACTIVITIES.
5. THIS APPROVED SWMP DESIGN DRAWING, THE ASSOCIATED APPROVED SWMP NARRATIVE, A COPY OF THE STORMWATER QUALITY DISCHARGE PERMIT, AND THE RULES AND REGULATIONS REGARDING STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES MANUAL SHALL BE KEPT ON SITE AT ALL TIMES.
6. ACCUMULATED SEDIMENT AND DEBRIS SHALL BE REMOVED FROM A BMP (MAINTENANCE) WHEN THE SEDIMENT LEVEL OR DEBRIS ADVERSELY IMPACTS THE FUNCTIONING OF THE BMP OR AS DEFINED WITHIN THE RULES AND REGULATIONS REGARDING STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES MANUAL, WHICHEVER IS MORE RESTRICTIVE. IF MAINTENANCE OF THE BMP DOES NOT RESTORE THE INTENDED FUNCTION, THEN THE BMP MUST BE
REPLACED.
7. THE DISCHARGING OF CEMENT, CONCRETE, OR MORTAR FROM READY MIX DELIVERY TRUCKS, PUMP TRUCKS, BATCH PLANTS OR SMALL MECHANICAL MIXERS DIRECTLY ONTO PAVED SURFACES OR DISTURBED GROUND HAVING NO CONTAINMENT IS PROHIBITED. THE DISPOSAL OF ANY LIQUID WASTES OR WASH WATER FROM ANY OPERATIONS SUCH AS PAINTING, DRYWALL, OR TILE INSTALLATIONS DIRECTLY ONTO PAVED SURFACES OR THE GROUND WITHOUT CONTAINMENT IS PROHIBITED. THE PERMITTEE SHALL PROTECT ALL CURB FLOW LINES, ADJACENT WATERWAYS, WETLANDS, STORM SEWERS, STORM SEWER APPURTENANCES, OTHER PROPERTIES, ETC., ADJACENT TO ANY LOCATION WHERE PAVEMENT CUTTING OPERATIONS INVOLVING WHEEL CUTTING, SAW CUTTING, OR ABRASIVE WATER
JET CUTTING ARE TAKING PLACE.
8. IT SHALL BE THE RESPONSIBILITY OF THE PERMITTEE TO RESOLVE CONSTRUCTION PROBLEMS DUE TO CHANGING CONDITIONS OR DESIGN ERRORS THEY MAY ENCOUNTER DURING THE PROGRESS OF ANY PORTION OF THE WORK. IF CONDITIONS IN THE FIELD REQUIRE CHANGES AND THE PROPOSED MODIFICATIONS TO THE APPROVED PLANS INVOLVE SIGNIFICANT CHANGES TO THE CHARACTER OF THE WORK OR TO FUTURE CONTIGUOUS PUBLIC OR PRIVATE IMPROVEMENTS, THE CONTRACTOR, THROUGH THE ENGINEER OF RECORD, SHALL BE RESPONSIBLE TO REVISE PLANS AND SUBMIT THEM TO THE CITY OF AURORA FOR APPROVAL PRIOR TO ANY FURTHER CONSTRUCTION RELATED TO THAT PORTION OF THE WORK. ANY CONTROLS, FEATURES OR IMPROVEMENTS NOT CONSTRUCTED IN ACCORDANCE WITH THE APPROVED SWMP, CITY OF AURORA STANDARD DETAIL DESIGNS, CITY OF AURORA APPROVED VARIANCES, OR AN APPROVED DESIGN DRAWING AMENDMENT SHALL BE REMOVED AND THE CONTROLS, FEATURES AND/OR
IMPROVEMENTS SHALL BE RECONSTRUCTED.
9. SECONDARY CONTAINMENT FEATURES SHALL BE IN PLACE FOR ANY BULK FUEL STORAGE, MIXERS, GENERATORS, OR ANY OTHER SPILL OR LEAK SOURCE THAT REMAINS ONSITE FOR A PERIOD LONGER THAN 7 CALENDAR DAYS. A RECOVERY OR SALVAGE DRUM SHALL BE KEPT ON-SITE FOR STORAGE OF CONTAMINATED SOILS.
10. STRAW BALES AND RECYCLED ASPHALT OR CONCRETE ARE NOT ACCEPTABLE FOR THE CONSTRUCTION OF BMPS
WITHIN THE CITY OF AURORA AND MAY NOT BE USED.
CITY OF AURORA GENERAL EROSION CONTROL NOTES
1. A CITY OF AURORA STORMWATER QUALITY DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES MUST BE ISSUED BY THE CITY AND EXECUTED BY A COA EROSION CONTROL STAFF PRIOR TO ANY EARTHWORK ACTIVITIES.
AN ON‐SITE INSPECTION WILL BE CONDUCTED TO VERIFY THE CORRECT INSTALLATION AND ADEQUACY OF INITIAL BMPS FOR THE SITE. NO EARTHWORK, INCLUDING CLEARING AND GRUBBING, OR DEMOLITION ACTIVITIES ARE TO BEGIN UNTIL THE PROJECT SITE HAS PASSED AN INSPECTION AND THE CITY OF AURORA STORMWATER QUALITY DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES HAS BEEN EXECUTED. THE PERMITTEE IS REQUIRED TO PRESENT THE PROJECT’S CDPHE‐WQCD STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY PERMIT TO THE INSPECTOR DURING THE INITIAL INSPECTION. THE PERMITTEE SHALL DESIGNATE A STORMWATER MANAGEMENT PLAN (SWMP) ADMINISTRATOR ON THE APPLICATION FOR THE CITY OF AURORA STORMWATER QUALITY DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES. THE SWMP ADMINISTRATOR WILL ACT AS THE PROJECT REPRESENTATIVE FOR ANY CONCERNS OR ISSUES REGARDING ENVIRONMENTAL CONTROLS AND
STORMWATER MANAGEMENT.
2. THESE REQUIREMENTS SHALL BE THE OBLIGATION OF THE PERMITTEE, UNTIL SUCH TIME AS THE PERMIT IS
PROPERLY CLOSED, OR OTHERWISE ALLOWED BY THE CITY TO BE VOIDED, MODIFIED, TRANSFERRED, RE‐
ASSIGNED OR REPLACED.
3. THIS SWMP NARRATIVE, THE SWMP DESIGN DRAWINGS, AND THE PERMITTE’S INSPECTION AND
MAINTENANCE RECORDS ARE ALL COMPONENTS OF REQUIRED RECORD KEEPING AND SHALL BE KEPT ON SITE AT ALL TIMES AND UPDATED AS REQUIRED. THESE AND ANY OTHER PERTINENT RECORDS SHALL BE PROVIDED TO
THE CITY WHEN REQUESTED.
4. ANY DISCREPANCY BETWEEN THIS SWMP AND ANY OTHER APPROVED STORMWATER MANAGEMENT PLAN
FOR THIS SITE SHALL REQUIRE COMPLIANCE WITH THE MORE RESTRICTIVE VALID, APPROVED PLAN.
5. STREETS SHALL BE CONSTRUCTED WITH ROUGH CUT STREET CONTROL MEASURES, SURFACE ROUGHENED OR
OTHERWISE TEMPORARILY STABILIZED WITH ROUGH CUT STREET CONTROLS WITHIN SEVEN (7) DAYS OF COMPLETION OF GRADING IN THE APPROPRIATE PHASE. IF PAVING IS TO OCCUR WITHIN FOURTEEN (14) DAYS
AFTER FINAL GRADING, ROUGH CUT STREET CONTROLS SHALL BE WAIVED.
6. INSPECTION AND MAINTENANCE OF EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMPS) ARE THE CONTINUOUS OBLIGATIONS OF THE PERMITTEE. BMPS SHALL BE INSPECTED AT A MINIMUM EVERY SEVEN (7) DAYS AND WITHIN 24‐HOURS AFTER THE END OF A PRECIPITATION EVENT THAT PRODUCES RUN-OFF, AND FOLLOWING SNOWMELT EVENTS. IF A SITE IS TEMPORARILY IDLE AND NO CONSTRUCTION ACTIVITIES WILL OCCUR DURING THE 48 HOURS FOLLOWING A STORM EVENT, THE POST‐PRECIPITATION EVENT (INCLUDING SNOWMELT) INSPECTION SHALL BE CONDUCTED PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES ON THE SITE, BUT NO LATER THAN 72 HOURS FOLLOWING THE STORM EVENT. ALL NECESSARY MAINTENANCE AND REPAIRS SHALL BE INITIATED AND COMPLETED ON AN ON‐GOING BASIS, AS FEATURES ARE REQUIRED TO OPERATE CONTINUOUSLY. INSPECTIONS MAY NEED TO BE CONDUCTED AT A GREATER FREQUENCY THAN NOTED ABOVE, TO ENSURE FEATURES AND SYSTEMS ARE OPERATING ADEQUATELY. EROSION AND SEDIMENT CONTROL BMPS
SHALL BE MAINTAINED AND FUNCTIONAL FOR THE ENTIRE DURATION OF THE PROJECT.
7. INGRESS AND EGRESS VEHICLE ACCESS POINTS ONTO DISTURBED AREAS SHALL BE STABILIZED WITH VEHICLE TRACKING CONTROL PADS (VTC) AND SHALL BE CONSTRUCTED WITH ANGULAR ROCK, 3” TO 6” IN SIZE AND TO A DEPTH OF AT LEAST 9‐INCHES. THE USE OF RECYCLED ASPHALT OR CONCRETE IS NOT PERMITTED. THE VTC SHALL BE INSTALLED OVER A LINER OF NON‐WOVEN GEOTEXTILE WITH A WEIGHT OF AT LEAST 10 OZ/YD2 AND A GRAB TENSILE STRENGTH OF AT LEAST 250 POUNDS. NO DIRT OR OTHER MATERIALS SHALL BE PLACED ON PAVED SURFACES OR CURB FLOW LINES TO ACT AS CURB RAMPS. ONLY METAL RAMPS OR ROCK WATTLES MAY BE USED
IN THE CURB FLOW LINE.
8. FUGITIVE DUST EMISSIONS RESULTING FROM GRADING ACTIVITIES AND/OR WIND SHALL BE CONTROLLED USING
REASONABLY AVAILABLE CONTROL TECHNOLOGY AS DEFINED BY THE COLORADO DEPARTMENT OF PUBLIC HEALTH
AND ENVIRONMENT.
9. ALL POTENTIAL POLLUTION SOURCES ON‐SITE SHALL BE IDENTIFIED AND CONTROL MEASURES INSTALLED AND
PRACTICED TO MINIMIZE THE LIKELIHOOD OF A RELEASE. SPILL PREVENTION CONTROLS SHALL BE DEVELOPED FOR
THE SITE WITH BMPS IN PLACE TO RESPOND TO ANY SPILLS, LEAKS OR OTHER RELEASES.
10. HYDRAULIC MULCHING AS A MEANS TO COVER AND PROTECT SEEDING IS NOT AN ACCEPTABLE MEANS OF
APPLYING MULCH IN THE CITY OF AURORA UNLESS A PREVIOUSLY INSTALLED IRRIGATION SYSTEM IS USED TO AID GERMINATION AND GROWTH AND WHERE APPROVED THROUGH VARIANCE. HYDRAULIC SEEDING IS NOT
PERMITTED.
11. FOR ALL POROUS LANDSCAPE DETENTION FACILITIES, IN ORDER TO PREVENT CLOGGING OF FILTER MEDIUM, INSTALLATION OF THE FILTRATION SYSTEM MUST BE DELAYED UNTIL AFTER THE SITE IS FULLY LANDSCAPED.
12. IF STOCKPILES ARE LOCATED WITHIN 100 FEET OF A DRAINAGEWAY OR A PUBLIC STORM SEWER SYSTEM, ADDITIONAL SEDIMENT CONTROLS SUCH AS TEMPORARY DIVERSION DIKES, SILT FENCE, OR SEDIMENT BASIN
SHALL BE REQUIRED.
CITY OF AURORA STORMWATER MANAGEMENT STANDARD NOTES
1. CITY OF AURORA PLAN REVIEW IS ONLY FOR GENERAL CONFORMANCE WITH CITY OF AURORA DESIGN CRITERIA AND THE CITY CODE. THE CITY IS NOT RESPONSIBLE FOR THE ACCURACY AND ADEQUACY OF THE DESIGN, DIMENSIONS, AND ELEVATIONS WHICH SHALL BE CONFIRMED AND CORRELATED AT THE JOB SITE. THE CITY OF AURORA, THROUGH THE APPROVAL OF THIS DOCUMENT, ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS AND/OR ACCURACY OF
THIS DOCUMENT.
2. ALL MATERIALS AND WORKMANSHIP SHALL BE SUBJECT TO INSPECTION BY THE CITY. THE CITY RESERVES THE RIGHT TO ACCEPT OR REJECT ANY MATERIALS AND WORKMANSHIP THAT DOES NOT CONFORM TO THE CITY STANDARDS AND
SPECIFICATIONS.
3. THE CONTRACTOR SHALL NOTIFY THE CITY PUBLIC IMROVEMENT INSPECTIONS DIVISION, 303-739-7420, 24 HOURS PRIOR
TO THE BEGINNING OF CONSTRUCTION.
4. LOCATION OF EXISTING UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO ACTUAL CONSTRUCTION. FOR INFORMATION, CONTACT UTILITY NOTIFICATION CENTER OF COLORADO, 1-800-922-1987 OR 811.
5. THE CONTRACTOR SHALL HAVE ONE SIGNED COPY OF THE PLANS (APPROVED BY THE CITY OF AURORA), ONE COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS AT THE JOB SITE AT ALL TIMES, AND A COPY OF ANY PERMITS
AND EXTENSION AGREEMENTS NEEDED AT THE JOB SITE AT ALL TIMES.
6. IT IS THE CONSULTANT'S RESPONSIBILITY TO ACCURATELY SHOW EXISTING CONDITIONS, BOTH ON-SITE, AND OFF-SITE, ON THE CONSTRUCTION PLANS. ANY MODIFICATIONS NEEDED DUE TO CONFLICTS, OMISSIONS, OR CHANGED CONDITIONS EITHER ON-SITE OR OFF-SITE, WHICH ARISE IN THE FIELD, WILL BE ENTIRELY THE DEVELOPER'S RESPONSIBILITY. THE COST TO RECTIFY ANY ADVERSE SITUATION TO MEET THE CITY STANDARDS AND
SPECIFICATIONS AND THE CITY CODE SHALL BE BORNE SOLELY BY THE DEVELOPER.
7. THE OWNER/DEVELOPER MUST OBTAIN THE WRITTEN PERMISSION OF THE ADJACENT PROPERTY OWNER(S) PRIOR TO
ANY OFF-SITE GRADING OR CONSTRUCTION.
8. THE OWNER/CONTRACTOR MUST OBTAIN A C.D.P.S. STORM WATER DISCHARGE PERMIT FROM THE COLORADO
DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT, IF REQUIRED.
9. PROJECT SHALL COMPLY WITH UTILITY ENGINEERING INVESTIGATING AND DOCUMENTING REQUIREMENTS PER CRS 9-1.5-101 ET SEQ., AS AMENDED, WHEN THE PROJECT INCLUDES EXCAVATION. BY STAMPING THE PLAN THE ENGINEER OF RECORD IS CERTIFYING THE PLAN MEETS THE STANDARDS ESTABLISHED BY THE AMERICAN SOCIETY OF CIVIL ENGINEERS' ASCE 38 STANDARD, LATEST PUBLICATION, FOR DEFINING THE ACCURACY OF A FACILITY OR UTILITY.
PROJECT SHALL COMPLY WITH AURORA WATER STANDARDS AND SPECIFICATIONS, LATEST EDITION, WHEN THE PROJECT INCLUDES EXCAVATION, INCLUDING BUT NOT LIMITED TO INSTALLATION OF ELECTRONICALLY TRACEABLE MARKERS OR BEING TRACEABLE BY APPROVED ELECTRONIC METHODS FOR ALL SUBSURFACE UTILITIES.
CITY OF AURORA NOTES
APPROVED ON 11/16/2023
jfelling
EC02
E. 31ST PL.N
. D U
EQ
U
ES
N
E W
AY
E. 28TH AVE.
EA
TO
N
PA
R K
AV
E.
FLAT
RO
CK CIR.
EC04
WARM SPRINGS AVE.
EC01
EC03
26TH AVE.
M
AI
N S
T.
HIGHLAND CREEK
PARKWAY
EC05
E. 29TH PL.
X-1229-11-EX-Roads X-1229-11-PR-Parcels_PH1 X-1229-11-PR-Parcels_PH2 X-1229-11-PR-Roads_PH1
X-1229-11-TITLE BLOCK-SWMP
HORIZ.
VERT.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE DATE ISSUED: DRAWING No.
SEAL
FOR AND ON BEHALF OF
MATRIX DESIGN GROUP, INC.
PROJECT No.
PREPARED BY:
REFERENCE
DRAWINGS
FILE NAME:
CTB FILE:
PLOT DATE:
THIS DRAWING IS CURRENT AS OF PLOT DATE AND MAY BE SUBJECT TO CHANGE.
COMPUTER FILE MANAGEMENT
No. DATE DESCRIPTION BY
REVISIONS
SHEET
X-1229-11-EX-Roads X-1229-11-PR-Parcels_PH1 X-1229-11-PR-Parcels_PH2 X-1229-11-PR-Roads_PH1
X-1229-11-TITLE BLOCK-SWMP
SHEET No.
Know what's below.
before you dig.Call
R
STORMWATER MANAGEMENT
PLANS
This electronic plan is a facsimile of the signed and sealed PDF plan
JEFF KILLION PE #40736
08/22/23
N
SCALE: 1" = 200'
0200 400200
10/12/2023 10:09 AM
R:\22.1229.011 (The Aurora Highlands_Filing 7)\500 CADD\504 Plan Sets\Construction Plans\SWMP\ECX1.dwg
1" = 200'
4 ECX1
MAY 2023
N/AJK
JD
SK
CONSTRUCTION DOCUMENTS
CITY OF AURORA, COUNTY OF ADAMS, STATE OF COLORADO
THE AURORA HIGHLANDS FILING 7
22.1229.011
EROSION CONTROL INDEX PLAN
NOTES:
1. REFER TO THE CITY OF AURORA STANDARD
SPECIFICATIONS FOR EROSION CONTROL DETAILS AND
SPECIFICATIONS.
BENCHMARK:
CITY OF AURORA BENCHMARK 3S6636NE003 BEING A 3" DIAM.
BRASS CAP (COA BM, 19-020B, E-090A) ATOP THE S. WALL @ THE
S.E. COR. OF THE E. 26TH AVE. BRIDGE CROSSING OVER E-470.
BRASS CAP AT LOWER STEP ON WALL WHERE THE RAILING ENDS
ON THE E. END. AKA 19-020B.
ELEVATION = 5521.54 (NAVD88)
APPROVED ON 11/16/2023
jfelling
ST3-11
TSD
ST3-12
TSD
ST3-12
TSD
ST3-13
TSD
ST3-14
TSD
ST3-15
TSD
ST3-16
TSD
ST3-10
ST3-10
1.47 AC
ST3-11
1.95 AC
ST3-11
1.95 AC
SB3-0
23.6 AC
SB3-0
23.6 AC
SB3-0
23.6 AC
SB3-0
23.6 AC
SB3-0
23.6 AC
ST3-12
1.64 AC
SB3-1
24.6 AC SB3-1
24.6 AC
SB3-1
24.6 AC
SB3-1
24.6 AC
SB3-1
24.6 AC
ST3-12
1.64 AC
ST3-13
1.93 AC
ST3-14
1.65 AC
ST3-15
1.43 AC
ST3-15
1.43 AC
ST3-16
1.29 AC
SB3-2
12.0 AC
SB3-3
12.2 AC
SB3-2
12.0 AC
SB3-3
12.2 AC
ST3-17
1.97 AC
ST3-17
1.97 AC
SB3-5
20.1 AC
SB3-5
20.1 AC
SB3-6
44.9 AC
SB3-6
44.9 AC
SB3-6
44.9 AC
EATO
N
PAR
K AVE.
FLAT RO
CK
CIR.
WARM SPRINGS AVE.
HIGHLANDS CREEK PARKWAY
FILING NO. 9 RSN# 1467118
EDN# 222235
CASE # 2020-6029-00
(COLLECTOR 3-LANE)
E. 28TH AVE.
W
ARM
SPRING
S
AVE.
SB3-1
CONSTRUCTED WITH
AURORA HIGHLAND MASS
GRADING SWMP, FILING 1-
PHASE 3
EDN# 222094
SB3-2
CONSTRUCTED WITH
AURORA HIGHLAND MASS
GRADING SWMP, FILING 1-
PHASE 3
EDN# 222094
SB3-3
CONSTRUCTED WITH
AURORA HIGHLAND MASS
GRADING SWMP, FILING 1-
PHASE 3
EDN# 222094
SB3-0
CONSTRUCTED WITH
AURORA HIGHLAND MASS
GRADING SWMP, FILING 1-
PHASE 3
EDN# 222094
SB3-5
CONSTRUCTED WITH
AURORA HIGHLAND MASS
GRADING SWMP, FILING 1-
PHASE 3
EDN# 222094
E. 29TH PL.
E. 31ST PL.
N .D
U Q
U
ES
N E
W
AY
FILING NO. 9 RSN# 1467118
EDN# 222235
CASE # 2020-6029-00
(COLLECTOR 3-LANE)
X-1229-11-EX-Parcels X-1229-11-EX-Roads X-1229-11-PR-Roads_PH1 X-1229-11-PR-Roads_PH2
X-1229-11-TITLE BLOCK-SWMP
X-1229-11-PR-Parcels_PH1 X-1229-11-PR-Parcels_PH2
X-1229-11-PR-SWMP
X-1229-00-BO-Phase 3 SWMP
HORIZ.
VERT.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE DATE ISSUED: DRAWING No.
SEAL
FOR AND ON BEHALF OF
MATRIX DESIGN GROUP, INC.
PROJECT No.
PREPARED BY:
REFERENCE
DRAWINGS
FILE NAME:
CTB FILE:
PLOT DATE:
THIS DRAWING IS CURRENT AS OF PLOT DATE AND MAY BE SUBJECT TO CHANGE.
COMPUTER FILE MANAGEMENT
No. DATE DESCRIPTION BY
REVISIONS
SHEET KEY N
SHEET
X-1229-11-EX-Parcels X-1229-11-EX-Roads X-1229-11-PR-Roads_PH1 X-1229-11-PR-Roads_PH2
X-1229-11-TITLE BLOCK-SWMP
X-1229-11-PR-Parcels_PH1 X-1229-11-PR-Parcels_PH2
X-1229-11-PR-SWMP
X-1229-00-BO-Phase 3 SWMP
SHEET No.
Know what's below.
before you dig.Call
R
STORMWATER MANAGEMENT
PLANS
This electronic plan is a facsimile of the signed and sealed PDF plan
JEFF KILLION PE #40736
08/22/23
10/12/2023 10:15 AM
R:\22.1229.011 (The Aurora Highlands_Filing 7)\500 CADD\504 Plan Sets\Construction Plans\SWMP\EC01-EC06.dwg
1" = 30'
5 EC01
MAY 2023
N/AJK
JD
SK
CONSTRUCTION DOCUMENTS
CITY OF AURORA, COUNTY OF ADAMS, STATE OF COLORADO
THE AURORA HIGHLANDS FILING 7
22.1229.011
EROSION CONTROL PLAN INITIAL
N
SCALE: 1" = 100'
0100 200100
VTC
SF
IP
SSA
LEGEND
RS
CF
SILT FENCING OR ROCK SOCK
(SEE NOTE #5)
VEHICLE TRACKING CONTROL
CONSTRUCTION FENCE
INLET PROTECTION
STABILIZED STAGING AREA
ROCK SOCKS
STREET SWEEPING
CONCRETE WASHOUT AREA
SEDIMENT CONTROL LOG
STOCKPILE
DIVERSION DITCH
SEDIMENT BASIN
SS
CWA
SCL
SP
DD
SB
LIMITS OF CONSTRUCTION
(SHOWN OFFSET 10' FOR
CLARITY)
NOTES:
1. REFER TO THE CITY OF AURORA STANDARD SPECIFICATIONS
FOR EROSION CONTROL DETAILS AND SPECIFICATIONS.
2. STOCKPILES SHALL HAVE A MAXIMUM OF 3:1 SLOPES.
3. FINAL SIZES OF VTC, SSA, CWA, AND STOCKPILES TO BE
DETERMINED BY THE CONTRACTOR.
BENCHMARK:
CITY OF AURORA BENCHMARK 3S6636NE003 BEING A 3" DIAM. BRASS
CAP (COA BM, 19-020B, E-090A) ATOP THE S. WALL @ THE S.E. COR. OF
THE E. 26TH AVE. BRIDGE CROSSING OVER E-470. BRASS CAP AT
LOWER STEP ON WALL WHERE THE RAILING ENDS ON THE E. END.
AKA 19-020B. ELEVATION = 5521.54 (NAVD88)
LOC
LOC
LOC
LOC
SSA
VTC
CWA
1" = 1000'
APPROVED ON 11/16/2023
jfelling
W
W W W W W W W W W W W W W W W W W W W W W W s s s s s s s s s s s w s s s s s s ws s w w w w s ww ww ww w ww ww ww ww w w
SB1
SF
SF IP IP
IP
IP
LOC
LOC
LOC
RSRS
RSRS
RS
RSRS
RS
CF
CF
CF
SM
SM
RSRS
SM
SM
SM
SM
IP
E. 31ST PL.
N .D
U Q
U
ES
N E
W
AY
2.1%
0.
8%
1.1
2.1%
0.
8%
2.1%
1.
6%
6.1% 0.
5%
WARM SPRINGS AVE.
FILING NO. 9 RSN# 1467118
EDN# 222235
CASE # 2020-6029-00
(COLLECTOR 3-LANE)
PRIVATE DRAINAGE SWALE 10.00'
TEMPORARY EASEMENT
20.00'
DRAINAGE
EASEMENT
12.00'
TEMPORARY ACCESS
ROAD
06 55
NOTES:
1. REFER TO THE CITY OF AURORA STANDARD SPECIFICATIONS FOR EROSION
CONTROL DETAILS AND SPECIFICATIONS.
2. STOCKPILES SHALL HAVE A MAXIMUM OF 3=1 SLOPES.
3. FINAL SIZES OF VTC, SSA, CWA, AND STOCKPILES TO BE DETERMINED PER
THE CONTRACTOR.
4. MASS OVERLOT GRADING TO TAKE PLACE DURING FILING 1 PHASE 3
GRADING (EDN# 222094).
X-1229-11-EX-Parcels X-1229-11-EX-Roads X-1229-11-PR-Roads_PH1 X-1229-11-PR-Roads_PH2
X-1229-11-TITLE BLOCK-SWMP
X-1229-11-PR-Parcels_PH1 X-1229-11-PR-Parcels_PH2
X-1229-11-PR-SWMP
X-1229-11-EX-Utils X-1229-11-PR-Utils 200047 - 10_Pr Utility Export-MOD
HORIZ.
VERT.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE DATE ISSUED: DRAWING No.
SEAL
FOR AND ON BEHALF OF
MATRIX DESIGN GROUP, INC.
PROJECT No.
PREPARED BY:
REFERENCE
DRAWINGS
FILE NAME:
CTB FILE:
PLOT DATE:
THIS DRAWING IS CURRENT AS OF PLOT DATE AND MAY BE SUBJECT TO CHANGE.
COMPUTER FILE MANAGEMENT
No. DATE DESCRIPTION BY
REVISIONS
SHEET KEY N
SHEET
X-1229-11-EX-Parcels X-1229-11-EX-Roads X-1229-11-PR-Roads_PH1 X-1229-11-PR-Roads_PH2
X-1229-11-TITLE BLOCK-SWMP
X-1229-11-PR-Parcels_PH1 X-1229-11-PR-Parcels_PH2
X-1229-11-PR-SWMP
X-1229-11-EX-Utils X-1229-11-PR-Utils 200047 - 10_Pr Utility Export-MOD
SHEET No.
Know what's below.
before you dig.Call
R
STORMWATER MANAGEMENT
PLANS
10/12/2023 10:15 AM
R:\22.1229.011 (The Aurora Highlands_Filing 7)\500 CADD\504 Plan Sets\Construction Plans\SWMP\EC07-EC12.dwg
1" = 30'
6 EC02
MAY 2023
N/AJK
JD
SK
CONSTRUCTION DOCUMENTS
CITY OF AURORA, COUNTY OF ADAMS, STATE OF COLORADO
THE AURORA HIGHLANDS FILING 7
22.1229.011
EROSION CONTROL PLANS FINAL
N
VTC
SF
IP
SSA
LEGEND
RS
CF
SILT FENCING OR ROCK SOCK
VEHICLE TRACKING CONTROL
CONSTRUCTION FENCE
INLET PROTECTION
STABILIZED STAGING AREA
ROCK SOCKS
STREET SWEEPING
CONCRETE WASHOUT AREA
SEDIMENT CONTROL LOG
STOCKPILE
DIVERSION DITCH
SEDIMENT BASIN
SS
CWA
SCL
SP
DD
SB
LIMITS OF CONSTRUCTION
(SHOWN OFFSET 10' FOR CLARITY)
LOC
BENCHMARK:
CITY OF AURORA BENCHMARK 3S6636NE003 BEING A 3" DIAM. BRASS CAP (COA
BM, 19-020B, E-090A) ATOP THE S. WALL @ THE S.E. COR. OF THE E. 26TH AVE.
BRIDGE CROSSING OVER E-470. BRASS CAP AT LOWER STEP ON WALL WHERE
THE RAILING ENDS ON THE E. END. AKA 19-020B.
ELEVATION = 5521.54 (NAVD88)
SE
E
SH
EE
T
EC
1" = 1000'
040 8040
SCALE: 1" = 40'
This electronic plan is a facsimile of the signed and sealed PDF plan
08/22/23
JEFF KILLION PE #40736
APPROVED ON 11/16/2023
jfelling
W
W
W
W W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W w s w s w s w s w s w s w w w w w w w w s s s s s s s s w s w s ws s s s ww w ww s ws w s s w w ww s s s s ww w s s s s s w ww
SF
IP
IP
IP IP
LOC
LOC
LOC
LOC
RS
RS
RS
RS
RS
RS
RS
RS
IP
CF
CF
CF
IP
SM
SM
SM
EATO
N PARK AVE.
3.0%
2.2%
1.
7%
1.3%
1.3%
2.6%
FILING NO. 9 RSN# 1467118
EDN# 222235
CASE # 2020-6029-00
(COLLECTOR 3-LANE)
HIGHLANDS CREEK
PARKWAY
WARM SPRINGS AVE.
FILING NO. 9 RSN# 1467118
EDN# 222235
CASE # 2020-6029-00
(COLLECTOR 3-LANE)
1.9%
E. 31ST PL.
NOTES:
1. REFER TO THE CITY OF AURORA STANDARD SPECIFICATIONS FOR EROSION
CONTROL DETAILS AND SPECIFICATIONS.
2. STOCKPILES SHALL HAVE A MAXIMUM OF 3=1 SLOPES.
3. FINAL SIZES OF VTC, SSA, CWA, AND STOCKPILES TO BE DETERMINED PER
THE CONTRACTOR.
4. MASS OVERLOT GRADING TO TAKE PLACE DURING FILING 1 PHASE 3
GRADING (EDN# 222094).
X-1229-11-EX-Parcels X-1229-11-EX-Roads X-1229-11-PR-Roads_PH1 X-1229-11-PR-Roads_PH2
X-1229-11-TITLE BLOCK-SWMP
X-1229-11-PR-Parcels_PH1 X-1229-11-PR-Parcels_PH2
X-1229-11-PR-SWMP
X-1229-11-EX-Utils X-1229-11-PR-Utils 200047 - 10_Pr Utility Export-MOD
HORIZ.
VERT.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE DATE ISSUED: DRAWING No.
SEAL
FOR AND ON BEHALF OF
MATRIX DESIGN GROUP, INC.
PROJECT No.
PREPARED BY:
REFERENCE
DRAWINGS
FILE NAME:
CTB FILE:
PLOT DATE:
THIS DRAWING IS CURRENT AS OF PLOT DATE AND MAY BE SUBJECT TO CHANGE.
COMPUTER FILE MANAGEMENT
No. DATE DESCRIPTION BY
REVISIONS
SHEET KEY N
SHEET
X-1229-11-EX-Parcels X-1229-11-EX-Roads X-1229-11-PR-Roads_PH1 X-1229-11-PR-Roads_PH2
X-1229-11-TITLE BLOCK-SWMP
X-1229-11-PR-Parcels_PH1 X-1229-11-PR-Parcels_PH2
X-1229-11-PR-SWMP
X-1229-11-EX-Utils X-1229-11-PR-Utils 200047 - 10_Pr Utility Export-MOD
SHEET No.
Know what's below.
before you dig.Call
R
STORMWATER MANAGEMENT
PLANS
10/12/2023 10:15 AM
R:\22.1229.011 (The Aurora Highlands_Filing 7)\500 CADD\504 Plan Sets\Construction Plans\SWMP\EC07-EC12.dwg
1" = 30'
7 EC03
MAY 2023
N/AJK
JD
SK
CONSTRUCTION DOCUMENTS
CITY OF AURORA, COUNTY OF ADAMS, STATE OF COLORADO
THE AURORA HIGHLANDS FILING 7
22.1229.011
EROSION CONTROL PLANS FINAL
SEE SHEET EC04
N
SEE SH
EET EC
VTC
SF
IP
SSA
LEGEND
RS
CF
SILT FENCING OR ROCK SOCK
VEHICLE TRACKING CONTROL
CONSTRUCTION FENCE
INLET PROTECTION
STABILIZED STAGING AREA
ROCK SOCKS
STREET SWEEPING
CONCRETE WASHOUT AREA
SEDIMENT CONTROL LOG
STOCKPILE
DIVERSION DITCH
SEDIMENT BASIN
SS
CWA
SCL
SP
DD
SB
LIMITS OF CONSTRUCTION
(SHOWN OFFSET 10' FOR CLARITY)
LOC
BENCHMARK:
CITY OF AURORA BENCHMARK 3S6636NE003 BEING A 3" DIAM. BRASS CAP (COA
BM, 19-020B, E-090A) ATOP THE S. WALL @ THE S.E. COR. OF THE E. 26TH AVE.
BRIDGE CROSSING OVER E-470. BRASS CAP AT LOWER STEP ON WALL WHERE
THE RAILING ENDS ON THE E. END. AKA 19-020B.
ELEVATION = 5521.54 (NAVD88)
1" = 1000'
040 8040
SCALE: 1" = 40'
This electronic plan is a facsimile of the signed and sealed PDF plan
08/22/23
JEFF KILLION PE #40736
APPROVED ON 11/16/2023
jfelling
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w w s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s w
SB2
SP
SF
SF
LOC
LOC
LOC
LOC
RS
RS
RS
RS
CF
CFSM
SM
SM
SM
SM
SM
RSRS
RS
RS
IP
FLAT RO
CK
CIR.
EATO
N PARK AVE.
E. 29TH PL.
EATO
N
PAR
K AVE.
W
ARM
SPRING
S AVE.
FILING
NO
. 9 RSN# 1467118
EDN# 222235
CASE # 2020-6029-00
(CO
LLECTO
R 3-LANE)
16.1%
1.
7%
1.
2%
0.8%
2.
0%
1.1%
1.
0%
0.
6%
55255525
5527 55
E. 28TH AVE.
PRIVATE
DRAINAGE SWALE
10.00'
TEMPORARY EASEMENT
20.00'
DRAINAGE
EASEMENT
NOTES:
1. REFER TO THE CITY OF AURORA STANDARD SPECIFICATIONS FOR EROSION
CONTROL DETAILS AND SPECIFICATIONS.
2. STOCKPILES SHALL HAVE A MAXIMUM OF 3=1 SLOPES.
3. FINAL SIZES OF VTC, SSA, CWA, AND STOCKPILES TO BE DETERMINED PER
THE CONTRACTOR.
4. MASS OVERLOT GRADING TO TAKE PLACE DURING FILING 1 PHASE 3
GRADING (EDN# 222094).
X-1229-11-EX-Parcels X-1229-11-EX-Roads X-1229-11-PR-Roads_PH1 X-1229-11-PR-Roads_PH2
X-1229-11-TITLE BLOCK-SWMP
X-1229-11-PR-Parcels_PH1 X-1229-11-PR-Parcels_PH2
X-1229-11-PR-SWMP
X-1229-11-EX-Utils X-1229-11-PR-Utils 200047 - 10_Pr Utility Export-MOD
HORIZ.
VERT.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE DATE ISSUED: DRAWING No.
SEAL
FOR AND ON BEHALF OF
MATRIX DESIGN GROUP, INC.
PROJECT No.
PREPARED BY:
REFERENCE
DRAWINGS
FILE NAME:
CTB FILE:
PLOT DATE:
THIS DRAWING IS CURRENT AS OF PLOT DATE AND MAY BE SUBJECT TO CHANGE.
COMPUTER FILE MANAGEMENT
No. DATE DESCRIPTION BY
REVISIONS
SHEET KEY N
SHEET
X-1229-11-EX-Parcels X-1229-11-EX-Roads X-1229-11-PR-Roads_PH1 X-1229-11-PR-Roads_PH2
X-1229-11-TITLE BLOCK-SWMP
X-1229-11-PR-Parcels_PH1 X-1229-11-PR-Parcels_PH2
X-1229-11-PR-SWMP
X-1229-11-EX-Utils X-1229-11-PR-Utils 200047 - 10_Pr Utility Export-MOD
SHEET No.
Know what's below.
before you dig.Call
R
STORMWATER MANAGEMENT
PLANS
10/12/2023 10:15 AM
R:\22.1229.011 (The Aurora Highlands_Filing 7)\500 CADD\504 Plan Sets\Construction Plans\SWMP\EC07-EC12.dwg
1" = 30'
8 EC04
MAY 2023
N/AJK
JD
SK
CONSTRUCTION DOCUMENTS
CITY OF AURORA, COUNTY OF ADAMS, STATE OF COLORADO
THE AURORA HIGHLANDS FILING 7
22.1229.011
EROSION CONTROL PLANS FINAL
SEE SHEET EC05
SEE SHEET EC03
N
VTC
SF
IP
SSA
LEGEND
RS
CF
SILT FENCING OR ROCK SOCK
VEHICLE TRACKING CONTROL
CONSTRUCTION FENCE
INLET PROTECTION
STABILIZED STAGING AREA
ROCK SOCKS
STREET SWEEPING
CONCRETE WASHOUT AREA
SEDIMENT CONTROL LOG
STOCKPILE
DIVERSION DITCH
SEDIMENT BASIN
SS
CWA
SCL
SP
DD
SB
LIMITS OF CONSTRUCTION
(SHOWN OFFSET 10' FOR CLARITY)
LOC
BENCHMARK:
CITY OF AURORA BENCHMARK 3S6636NE003 BEING A 3" DIAM. BRASS CAP (COA
BM, 19-020B, E-090A) ATOP THE S. WALL @ THE S.E. COR. OF THE E. 26TH AVE.
BRIDGE CROSSING OVER E-470. BRASS CAP AT LOWER STEP ON WALL WHERE
THE RAILING ENDS ON THE E. END. AKA 19-020B.
ELEVATION = 5521.54 (NAVD88)
1" = 1000'
040 8040
SCALE: 1" = 40'
This electronic plan is a facsimile of the signed and sealed PDF plan
08/22/23
JEFF KILLION PE #40736
APPROVED ON 11/16/2023
jfelling
W
W
W w s w w s s
SSA
VTC
SF
SF
IP
IP
LOC
RS
RS
RS
RS
RS
RS
CF
CWA
SM
SSA
IP
E. 28TH AVE.
2.5%
1.8%
5512 5513
W
ARM
SPRING
S AVE.
FILING
NO
. 9 RSN# 1467118
EDN# 222235
CASE # 2020-6029-00
(CO
LLECTO
R 3-LANE)
PRIVATE TEMPORARY
DRAINAGE SWALE
10.00'
TEMPORARY EASEMENT
12.00'
TEMPORARY ACCESS
ROAD
NOTES:
1. REFER TO THE CITY OF AURORA STANDARD SPECIFICATIONS FOR EROSION
CONTROL DETAILS AND SPECIFICATIONS.
2. STOCKPILES SHALL HAVE A MAXIMUM OF 3=1 SLOPES.
3. FINAL SIZES OF VTC, SSA, CWA, AND STOCKPILES TO BE DETERMINED PER
THE CONTRACTOR.
4. MASS OVERLOT GRADING TO TAKE PLACE DURING FILING 1 PHASE 3
GRADING (EDN# 222094).
X-1229-11-EX-Parcels X-1229-11-EX-Roads X-1229-11-PR-Roads_PH1 X-1229-11-PR-Roads_PH2
X-1229-11-TITLE BLOCK-SWMP
X-1229-11-PR-Parcels_PH1 X-1229-11-PR-Parcels_PH2
X-1229-11-PR-SWMP
X-1229-11-EX-Utils X-1229-11-PR-Utils 200047 - 10_Pr Utility Export-MOD
HORIZ.
VERT.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE DATE ISSUED: DRAWING No.
SEAL
FOR AND ON BEHALF OF
MATRIX DESIGN GROUP, INC.
PROJECT No.
PREPARED BY:
REFERENCE
DRAWINGS
FILE NAME:
CTB FILE:
PLOT DATE:
THIS DRAWING IS CURRENT AS OF PLOT DATE AND MAY BE SUBJECT TO CHANGE.
COMPUTER FILE MANAGEMENT
No. DATE DESCRIPTION BY
REVISIONS
SHEET KEY N
SHEET
X-1229-11-EX-Parcels X-1229-11-EX-Roads X-1229-11-PR-Roads_PH1 X-1229-11-PR-Roads_PH2
X-1229-11-TITLE BLOCK-SWMP
X-1229-11-PR-Parcels_PH1 X-1229-11-PR-Parcels_PH2
X-1229-11-PR-SWMP
X-1229-11-EX-Utils X-1229-11-PR-Utils 200047 - 10_Pr Utility Export-MOD
SHEET No.
Know what's below.
before you dig.Call
R
STORMWATER MANAGEMENT
PLANS
10/12/2023 10:15 AM
R:\22.1229.011 (The Aurora Highlands_Filing 7)\500 CADD\504 Plan Sets\Construction Plans\SWMP\EC07-EC12.dwg
1" = 30'
9 EC05
MAY 2023
N/AJK
JD
SK
CONSTRUCTION DOCUMENTS
CITY OF AURORA, COUNTY OF ADAMS, STATE OF COLORADO
THE AURORA HIGHLANDS FILING 7
22.1229.011
EROSION CONTROL PLANS FINAL
SEE SHEET EC04
N
VTC
SF
IP
SSA
LEGEND
RS
CF
SILT FENCING OR ROCK SOCK
VEHICLE TRACKING CONTROL
CONSTRUCTION FENCE
INLET PROTECTION
STABILIZED STAGING AREA
ROCK SOCKS
STREET SWEEPING
CONCRETE WASHOUT AREA
SEDIMENT CONTROL LOG
STOCKPILE
DIVERSION DITCH
SEDIMENT BASIN
SS
CWA
SCL
SP
DD
SB
LIMITS OF CONSTRUCTION
(SHOWN OFFSET 10' FOR CLARITY)
LOC
BENCHMARK:
CITY OF AURORA BENCHMARK 3S6636NE003 BEING A 3" DIAM. BRASS CAP (COA
BM, 19-020B, E-090A) ATOP THE S. WALL @ THE S.E. COR. OF THE E. 26TH AVE.
BRIDGE CROSSING OVER E-470. BRASS CAP AT LOWER STEP ON WALL WHERE
THE RAILING ENDS ON THE E. END. AKA 19-020B.
ELEVATION = 5521.54 (NAVD88)
1" = 1000'
040 8040
SCALE: 1" = 40'
This electronic plan is a facsimile of the signed and sealed PDF plan
08/22/23
JEFF KILLION PE #40736
APPROVED ON 11/16/2023
jfelling
File details come from the government source that posted it. Updated .