This document is a Landscape Responsibility Plan for The Aurora Highlands Filing 7 and 25, prepared by Matrix Design Group for the Aerotropolis Area Coordinating Metropolitan District (AACMD) and associated regional districts. The plan details landscape construction and irrigation system installation for a new master-planned community located approximately three miles south of Denver International Airport in Adams County, Colorado. The project encompasses landscaping within specific designated areas of Filing 7 and Filing 25, totaling approximately 21.22 acres of district construction area and 5.51 acres of builder construction area. The landscape work includes installing an irrigation system, planting trees, shrubs, grasses, perennials, and adding amenities such as trash cans and pet waste stations.
The landscape responsibility plan is part of a larger development expected to reach approximately 41,823 residents at full build-out, covering roughly 3,884.9 total acres. The project involves multiple stakeholders, including The Aurora Highlands Community Authority Board, various metropolitan districts, the Aerotropolis Regional Transportation Authority, Aurora Highlands, LLC, the City of Aurora, Aurora Public Schools, and Adams County. The plan specifically delineates landscape responsibilities using color-coded areas, with purple indicating district construction areas and tan representing builder non-reimbursement areas. The document is dated July 17, 2023, and provides a detailed site map showing street layouts, landscaping zones, and construction boundaries.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 76 8 9 10111213 27
19202122
1 2 3 4 5 6
4041424344 s s s w s w ww s s ww ww s s s s s w s w ww w w w w w w w w s s s s s s s s s w w s s s s s s s s s s w w w w w w w w w w s w sw s w sw s s s s s s s s s s s w w w w w w w w w w w w w w w w w w w s s s s w s s s s s s w s w s s w w w w w w w w w w w w w w s s s s s s s s s s s s s s s s s s s s s ww ww ww s s s s s s ww s s w s s s s s s s s ww ww ww s w s w s w s w s s ww s s w s w s w s w s w s w s w sw s w sw s w sw s w s w sw sws sssws w sws wsws w sws w ww wws ww s s s w ww w ww ww ww w
1 10
11 12 1314151617189
19 242526272823
29 35
LOT 1
AL
LE
Y
WARM SPRINGS AVENUE
ALLEY
FUTURE HIGHLANDS CREEK PKWY
FLAT RO
CK CIRCLE
D U
Q U
ES
N
E
ST
R
EE
T EATON PARK STREET
EATO
N PARK STREET
28TH STREET
29TH STREET
ELK AVE
ELK AVE
AL
LE
Y
AL
LE
Y
ALLEY
AL
LE
Y
W
ARM
SPRING
S AVENUE
STREET A
NORTH
LANDSCAPE RESPONSIBILITY PLAN 0
U.S. SURVEY FEET
75 150 300
1" = 150'-0"
HORIZ.
VERT.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE DATE ISSUED: DRAWING No.
SEAL
FOR AND ON BEHALF OF
MATRIX DESIGN GROUP, INC.
PROJECT No.
PREPARED BY:
REFERENCE
DRAWINGS
FILE NAME:
CTB FILE:
PLOT DATE:
THIS DRAWING IS CURRENT AS OF PLOT DATE AND MAY BE SUBJECT TO CHANGE.
COMPUTER FILE MANAGEMENT
No. DATE DESCRIPTION BY
REVISIONS
SHEET KEY N
SHEET OF
Know what's below.
before you dig.Call
R
LEGEND
JP
1 7/20/2023 LANDSCAPE RESPONSIBILITY PLAN HV
HV
JP
1:150
7/17/2023
LS01
THE AURORA HIGHLANDS
FILING 7 AND 25
LANDSCAPE RESPONSIBILITY PLAN
DISTRICT CONSTRUCTION AREA
(924,366 SF, 21.22 AC)
BUILDER CONSTRUCTION AREA
NON-REIMBURSEMENT
(239,951 SF, 5.51 AC)
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
Roberts1, James Polygon
Roberts1, James Polygon
Roberts1, James Polygon
Highlight
Filing 7 - Landscaping
Filing 25 - Landscaping Plans
Filing 25 - Landscaping
Highlight
Highlight
Highlight
Highlight
Highlight
Highlight
Highlight
Highlight
Filing 25 - Landscaping Plans
Filing 7 Landscaping
KellyH1 Stamp
KellyH1 Callout Blue highlihgt and red delineation created by Hannah.
KellyH1 Callout 100 year flood line on Filing 25 landscaping plans. Patrick confirmed we could use this as the delineation point if we wanted.
KellyH1 Callout Patrick asked why we wouldn't change order in the rest of this area.