Attachment 1 - Past Performance Questionaire (PPQ).pdf
PDF 403 KB Posted
- Attached to
- A-E 35% Design to Replace the Existing VRF HVAC System with Chilled Water System ATCT B395
- Solicitation number
- F5F3CE5087A901
About this file
This document is a Past Performance Questionnaire issued by the 452nd MSG PK Contracting Squadron of the Air Force Reserve Command for a Streamline Acquisition Base Engineering Requirement A-E Services project. The specific requirement is for a 35% Design to Replace the Existing VRF HVAC System with Chilled Water System at ATCT B395 March ARB, CA. The questionnaire is designed to evaluate a potential contractor's past performance by soliciting detailed feedback from previous clients, with a response deadline of 18 Aug 2025.
The document provides a comprehensive evaluation framework with 24 performance criteria, including areas such as project management, quality control, problem-solving, schedule adherence, subcontractor management, and overall contract performance. The rating scale ranges from Exceptional (E) to Unsatisfactory (U), with space for supporting information for each criterion. The final sections include specific questions about small business subcontracting compliance and a recommendation for future contract awards, enabling a holistic assessment of the contractor's historical performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ B395 AE Amendment 0001_Final.pdf | ||
| RFQ B395 AE.pdf | ||
| SF330.pdf_safe.pdf | ||
| SOW_PDPG19-0109 A-E 35_ Design to Replace the HVAC System B395 28May25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled Unclassified Information When completed, this document is Source Selection Information IAW FAR 2.101 and 3.104.
Section L Attachment: Past Performance Questionnaire
Controlled Unclassified Information Page 1 of 7
The 452nd MSG PK Contracting Squadron of the Air Force Reserve Command is in the process of competitively selecting a source for a Streamline Acquisition Base Engineering Requirement A-E Services for PDPG 19-0109 35% Design to Replace the Existing VRF HVAC System with Chilled Water System ATCT B395 March ARB, CA.
One of the considerations in proposal evaluation is the verification of the offerors past performance on contracts or other work efforts which reflect the offeror's ability to perform on the proposed effort. We depend on information received from organizations such as yours, which have had first-hand experience with the offeror, for the evaluation of the offeror's performance on those contracts or work efforts.
Our areas of interest regarding the offeror are summarized in the enclosed questionnaire. To meet our acquisition milestones, we request your written response no later than 18 Aug 2025 after your receipt of this letter.
To assist you in preparing your response and expediting your reply, the questionnaire may be filled out electronically and submitted with your proposal. Please email marissa.lopez.5@us.af.mil if you have any questions. Your completed questionnaire will become a part of the official source selection records.
Your assistance is greatly appreciated, and your prompt response will be one of the keys to the successful and timely completion of this Source Selection.
Signed_________________________ Marissa E. Lopez (Contracting Officer)
1 Attachment Past Performance Questionnaire http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/02.htm#P10_602 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/03.htm#P41_5836
Controlled Unclassified Information Page 2 of 7
Section 1: Contract Identification
A. Contractor (Company/Division):
B. Contractor Cage Code:
C. Contract Number:
D. Contract Type (e.g., FFP, FPIF, CPIF, CPFF, etc.):
E. Program Title:
F. Brief Program Description:
G. Program Phase (e.g., Engineering & Manufacturing Development (EMD)):
H. Period of Performance
1. Original Schedule (assuming all options exercised):
Beginning Date _________ through ____________
2. Current Schedule (assuming all options exercised):
Beginning Date _________ through ____________
3. Reason for difference (if applicable):
I. Contract Dollar Value
1. Original maximum contract dollar value (assuming all options exercised): $
2. Current maximum contract dollar value (assuming all options exercised): $
3. Reasons for difference between original and current contract dollar value (if applicable):
J. Description of work performed:
K. Was this a competitively awarded contract? ☐ Yes ☐ No
L. Contractor’s Role: ☐ Prime Contractor ☐ Subcontractor ☐ Key Personnel
Note: If offeror holds or has held other contracts with your agency/organization in the last three (3) years, please complete separate Past Performance Questionnaire forms for those contracts as well.
Section 2: Customer or Agency Identification
A. Customer or agency name:
B. Customer or agency description (if applicable):
Controlled Unclassified Information Page 3 of 7
C. Geographic description of work performed under this contract (i.e., local, nationwide, worldwide, other Commands):
Section 3: Respondent Identification
A. Respondent’s name:
B. Respondent’s title:
C. Respondent’s phone/fax number/e-mail address:
D. Length of time (number of years/months) respondent worked on subject contract and description of responsibility/position/role:
E. Other suggested points of contact:
Section 4: Performance Information
In the table below, indicate your rating for the contractor’s performance by placing an “X” in the appropriate block to the right of each question. Provide supporting information for each response in the space provided. Attach additional pages if more space is needed. The performance rating scale is defined as follows:
Code Performance Rating
E EXCEPTIONAL – Performance meets contractual requirements and exceeds many requirements to the Government’s benefit. The contractual performance being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
V VERY GOOD – Performance meets contractual requirements and exceeds some requirements to the
Government’s benefit. The contractual performance being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
S SATISFACTORY – Performance meets contractual requirements. The contractual performance being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
M MARGINAL – Performance does not meet some contractual requirements. The contractual performance being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.
U UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Controlled Unclassified Information Page 4 of 7
N/A NOT APPLICABLE – Unable to provide a rating. Contract did not include performance for this aspect, performance was not observed, or information was not available. Do not know.
Note: The following are SAMPLE questions. Past Performance evaluation teams MUST construct a simple and concise Past Performance Questionnaire, tailored to seek out key information tied to the significant aspects of the planned acquisition. Avoid questions that can be answered with a “yes” or “no” but instead include probing and direct questions to draw out the required information desired.
The Contractor: E V S M U N/A
1. Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
SUPPORTING INFORMATION:
2. Demonstrated the ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.
3. Delegated authority to project managers and supervisors commensurate with contract requirements.
4. Home office participated in solving significant local problems.
5. Followed approved quality control plan.
6. Provided effective quality control and/or inspection procedures to meet contract requirements.
7. Corrected deficiencies in timely manner and pursuant to their quality control procedures.
Controlled Unclassified Information Page 5 of 7
8. Provided timely resolution of contract discrepancies.
9. Identified problems as they occurred.
10. Suggested alternative approaches to problems.
11. Displayed initiative to solve problems.
12. Developed realistic progress schedules.
13. Met established project schedules.
14. Provided timely resolution of warranty defects.
15. Was responsive to contract changes.
16. Provided adequate project supervision.
Controlled Unclassified Information Page 6 of 7
17. Obtained consent of surety for increases in bonding as work-in-progress increased.
18. Paid subcontractors/suppliers in a timely manner.
19. Provided accurate and complete line item cost proposals including all aspects of work required for each task.
20. Cooperated with Government personnel after award.
21. Met or exceeded small business and small disadvantaged business goals set forth in the approved subcontracting plan.
22. How would you rate the contractor's overall performance on this contract?
23. Was the contractor ever issued a cure or show cause notice under the referenced contract?
If yes, explain.
EXPLANATION:
☐ Yes
☐ No
24. Would you award another contract to this contractor? If not, explain.
EXPLANATION:
☐ Yes
☐ No
Controlled Unclassified Information Page 7 of 7
IF THIS WAS A GOVERNMENT CONTRACT:
Did this contract include FAR 52.219-9, Small Business Subcontracting Plan?
☐ Yes ☐ No
If yes, did the contractor comply with the clause? Please explain.
Did this contract include FAR 52.219-8, Utilization of Small Business Concerns?
☐ Yes ☐ No
If yes, did the contractor comply with the clause? Please explain.
Additional remarks:
[click and pick the date]
Respondent’s Signature Date
| 2025-08-08T14:14:27-0700 | |