Statement_of_Work.pdf

PDF 70 KB Posted

Attached to
Tree and Brush Removal
Solicitation number
F5B3234136A001
Issued by

View the file

Other files

File Type Posted
Revised_SOW_Drawings.pdf PDF
Initial_Site_Visit_Sign_in_Sheet.pdf PDF
Questions_and_Answers.pdf PDF
Revised_Statement_of_Work.pdf PDF
Seed_Blend.pdf PDF
Close_up_of_Utilities_in_Area.pdf PDF
Legend_for_Utilities.pdf PDF
Image_of_Removal_Area.pdf PDF
Site_Visit_Sign_in_Sheet.pdf PDF
Questions_and_Answers.pdf PDF
Required_SeedBlends.pdf PDF
UFC_3-260-01.pdf PDF
DARB_4_Form.pdf PDF
Wage_Determination.pdf PDF
Environmental_Requirements_Section_01560.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

AIR FORCE RESERVE COMMAND

STATEMENT OF WORK

PROJECT: FGWB 14-0013 AIRFIELD PRIORITY TREE REMOVAL

27 May 2014

1. Contractor to clear 3.4 acres of various size trees and bushes at Colonel Loop and the wooded area enclosed by Pond #6, Patrol Road, access roadway to building 1001, and the perimeter fence. This project will cut and remove all trees and bushes, including roots, and shall also clear, grub, and prepare the site for hydro seeding. Contractor shall perform hydro seeding function using fescue seeds: watering newly seeded area is responsibility of contractor, until grass grows and is established. Contractor shall dispose of all removed material off base, per attached Specification Section 01560 ENVIRONMENTAL REQUIREMENTS. Contractor shall meet all requirements in accordance with attached UFC 3-260-01Airfield and Heliport Planning Design and all other applicable regulations and codes.

2. The performance period associated with this project is 30 calendar days.