DEPARTMENT OF THE AIR FORCE
AIR FORCE RESERVE COMMAND
STATEMENT OF WORK
PROJECT: FGWB 14-0013 AIRFIELD PRIORITY TREE REMOVAL
27 May 2014
1. Contractor to clear 3.4 acres of various size trees and bushes at Colonel Loop and the wooded area enclosed by Pond #6, Patrol Road, access roadway to building 1001, and the perimeter fence. This project will cut and remove all trees and bushes, including roots, and shall also clear, grub, and prepare the site for hydro seeding. Contractor shall perform hydro seeding function using fescue seeds: watering newly seeded area is responsibility of contractor, until grass grows and is established. Contractor shall dispose of all removed material off base, per attached Specification Section 01560 ENVIRONMENTAL REQUIREMENTS. Contractor shall meet all requirements in accordance with attached UFC 3-260-01Airfield and Heliport Planning Design and all other applicable regulations and codes.
2. The performance period associated with this project is 30 calendar days.