Atch2_PWS_Fire_Equip_20180514.docx
DOCX document 200 KB Posted
- Attached to
- Amendment: Fire Equiment Maintenance Federal contract opportunity
- Solicitation number
- F4D3D48127AQ01
About this file
Performance Work Statement (PWS)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amended_2_Atch_1_RFQ_Fire_Equipment_Maintenace_20180709.xlsx | XLSX spreadsheet | |
| Amended_Atch_1_RFQ_Fire_Equipment_Maintenace_20180613.xlsx | XLSX spreadsheet | |
| Ques_Responses_20180629.docx | DOCX document | |
| Atch4_TO_35E1_2_13_1_manual.pdf | ||
| Atch3_WD_2015-5647_R5_20180110.pdf | ||
| Atch_1_RFQ_Fire_Equipment_Maintenace_20180613.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
30 CEF LIVE FIRE FACILITIES INSPECTIONS AND EQUIPMENT TESTING,
MAINTENANCE AND REPAIR
VANDENBERG AIR FORCE BASE, CALIFORNIA
14 May 2018
Table of Contents
Part 1: General Information Part 2: Specific Tasks Part 3: Contractor Furnished Items and Equipment Part 4: Government Furnished Items and Services Part 5: Definitions Part 6: Acronyms Part 7: Service Summary (SS) Items Part 8: Deliverables Schedule Part 9: Attachment Listing
Part 1 General Information
1. Description of Services: The contractor shall provide all supervision, personnel, equipment, transportation, materials and other items and services necessary to perform quarterly, annual and emergency testing, repairs and maintenance for 30 CES Fire Department’s (30 CEF) Aircraft Fire Training Facility (AFTF), fire training props and live fire training structural tower. The contractor shall also perform annual testing, repair and maintenance services for 30 CEF’s self-contained breathing apparatus (SCBA) units and their appurtenances, air source carts, breathing air compressor service, air sampling, bi-annual cartridge replacement for breathing air compressors, fire hose testing, Level “A” HAZMAT suit testing, ground ladder testing, HURST hydraulic and eDraulic rescue tool annual testing and maintenance, thermal imager cameras annual testing and maintenance, and small engine maintenance and repair on support equipment. The Dept. of Defense (DOD), Air Force Civil Engineering Center (AFCEC) Technical Order (T.O.) 35E1-2-13-1 and Air Force Instruction (AFI) 32-2001, Fire Emergency Services Program, require a rigorous and well documented maintenance and testing program on the above named trainers and equipment. The goal of this maintenance effort is to keep the live fire facilities, training props, and various firefighting equipment in complete working order at all times. The contractor shall provide all parts, labor and materials necessary to perform normally scheduled maintenance in accordance with industry standards, National Fire Protection Association (NFPA) USAF standards and manufacturer’s recommendations. Prior to performing any maintenance or repair work identified in this contract, the contractor shall provide proof of training, certification and appropriate professional credentials.
1.1. Background: 30 CEF’s live fire aircraft facility was built and has been in use since 1996. The four-story live fire tower facility with two level burn rooms was built circa 2000 and is approximately 3,100 SF. All nine (9) live fire systems and props were acquired circa 2005 and later. They are based upon Kidde 0-100 or G500 models. All work on these facilities and equipment shall be done and recorded as specified in AFCEC T.O. 35E1-2-13-1, NFPA 1403 standards and the manufacturer’s recommendations. After inspection, if repairs are necessary, an evaluation shall be made by the contractor to determine if the cost of repairs is reasonable compared to the cost of replacement. If the contractor determines that a prop must be removed from service and replaced, the base fire chief and CEF program manager shall be notified of such a situation in order to make the final determination and provide documentation to AFCEC. Vandenberg AFB’s Fire Department is comprised of five (5) separate fire stations located on North Base, South Base (2), Flight line (Airfield Road) and the main base cantonment area. Each station maintains an inventory of hoses, ladders, compressors and other essential fire-fighting tools, gear, and equipment which must be inspected, maintained, documented, and repaired or replaced on a regular basis to ensure 30 CEF’s firefighters are prepared at all times to protect VAFB space launch complexes and critical range assets from fire damage.
1.2. Period of Performance: The period of performance shall be for one base year and four option years.
1.3. Type of Contract: The Government will award a Firm-Fixed Priced Contract.
1.4. Hours of Operation: 30 CES/CEF conducts business, between the hours of 7:30 a.m. to 4:30 p.m., Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.5. Recognized Holidays: The contractor is not required to perform services on Federal holidays.
The holidays observed are:
New Year’s Day - 1 January Martin Luther King Day - 3rd Monday in January President’s Day - 3rd Monday in February Memorial Day - last Monday in May Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December
If these holidays fall on Saturday, the preceding Friday will be observed. If these holidays fall on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the contractor will be responsible for rescheduling services for the first day post the holiday observance.
1.6. Post Award Conference: The contractor agrees to attend any post award conference convened by the contracting activity in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer (CO), Contracting Officer’s Representative (COR), and other government personnel, as appropriate, may meet with the Contractor to achieve a clear and mutual understanding of all contract requirements, and identify and resolve potential problems. However, it is not a substitute for the contractor’s fully understanding the work requirements at the time offers are submitted, nor is it to be used to alter the final agreement arrived at in any negotiations leading to contract award. These meetings shall be held at no additional cost to the Government.
1.7. Key Personnel: The following personnel are considered key personnel by the Government: Civil Engineer Service Contracts personnel and Civil Engineer Requirements & Optimization personnel. The contractor shall provide a Contract Manager/Program Manager who shall be responsible for the performance of the work. The name of this person(s) and an alternate who shall act for the contractor when the Contract Manager/Program Manager is absent shall be designated in writing to the CO. The Contract Manager/Program Manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The Contract Manager/Program Manager or alternate shall be available between the hours of 7:30 a.m. to 4:30 p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
1.7.1. Performance Monitoring: The government shall evaluate the contractor’s performance under this Contract to ensure that the contractor has performed in accordance with the performance standards identified in this PWS. The government will evaluate the contractor’s performance by performing scheduled and unscheduled surveillance. The government will increase or decrease its surveillance as performance dictates. The government will also evaluate and validate customer complaints to ensure the contractor is meeting all contractual requirements. The CO or the COR may schedule progress meetings as required. At these meetings, the Contracting Officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
1.1.1.
Part 2 Specific Tasks
2. Specific Tasks:
2.1. Basic Services: The contractor shall be responsible for performing the tasks/contract line items (CLINs) listed below. 30 CEF Program Manager, ext. (805) 606-3670 or 606-3111, may be contacted to answer questions about the work effort and/or may accompany the contractor upon request as needed.
2.1.1. CLIN 0001 – Aircraft Fire Training Facility (AFTF) Semi-Annual Maintenance. The contractor shall provide maintenance, inspection, and certification on the AFTF to ensure it remains in serviceable, safe operating condition. This effort includes the aircraft body, the burners, pilot/ignitor and subsystems, all air, water, electrical and propane lines, raceways, conduits, ignition tower and control boxes, controllers, switches, relays and propane tanks. The contractor shall provide spare parts such as ignitors, spark plugs, wire pigtails, connectors, stainless steel pipe, Schedule #80 black iron pipe, each size used on site, switches and relays to keep the AFTF in serviceable working order at all times. All work performed shall be IAW AFCEC T.O. 35-E1-2-13-1, the manufacturer’s recommendations, and NFPA 1403 Live Fire standards. Maintenance personnel shall be certified by the manufacturer (WRG Fire Training Simulation Systems Inc.) to accomplish the work. A detailed report will be provided, after each visit within 21 working days, on all work accomplished and status of the trainer. Each visit will happen no later than the last business day in September and March of each year.
2.1.2. CLIN 0002 – Structural Burn Rooms Annual Maintenance and NFPA 1403 Inspection. The contractor shall provide all required maintenance, inspection, certification, repair work and periodic checks IAW manufacturers’ (KFT Fire Trainer) recommendations and NFPA 1403 standards as applicable to live fire training facilities and their appurtenances. The contractor shall conduct a minimum of four (4) scheduled quarterly visits and two (2) emergency visits, if required, at no additional cost to the Government. If a training prop breaks down and becomes unserviceable, the contractor shall schedule a visit as soon as practical. If the timing is conducive to combining efforts with a regularly scheduled visit the work shall be performed at that time, to reduce multiple visits. For the purpose of this effort repairs are considered to be normal wear and tear break-downs that do not require major repairs. Some examples of major repairs would be: extensive excavation, major structural repair or overhaul of the entire system. Overhaul of a subsystem is not considered to be a major repair. Maintenance personnel shall be certified by the manufacturer to accomplish the work. A detailed report will be provided, after each visit within 21 working days, on all work accomplished and status of the trainer. Each quarterly visit will happen no later than the last business day in September, December, March, and June of each year.
2.1.3. CLIN 0003 – Kidde 0-100 Burn Prop Maintenance for Nine (9) Live Fire Systems and NFPA 1403 Inspection. The contractor shall provide quarterly and annual maintenance on the props listed below. These props shall be maintained and tested by certified maintenance technicians without exception. Hoses, connections, service valves, propane tanks, remote pendants, power supply units, control cables, programmable logic computers and software are all considered to be part of the below listed items and shall be included in this work effort. The contractor shall provide spare parts as needed and also provide the Government with consumable parts for all other parts. All work shall be done and recorded as specified in the manufacturer’s recommendations and NFPA 1403 standards. The contractor shall also identify all systems or portions of a system within a prop that are nearing the end of their reasonable service life. This describes a prop that needs replacement and must be identified for evaluation to determine if the cost of repairs is reasonable compared to the cost of replacement. Further defined, this is to determine if maintenance is not guaranteed to extend the service life of a prop, then that prop shall be removed from service and identified for replacement. The base fire chief and 30 CEF program manager shall be notified of such a situation to make the final determination to AFCEC on all reports. The contractor shall schedule two (2) emergency repair visits, if required, at no additional cost to the government. Maintenance personnel shall be certified by the manufacturer (KFT Fire Trainer) to accomplish the work. A detailed report will be provided, after each visit within 21 working days, on all work accomplished and status of the trainers. Each quarterly visit will happen no later than the last business day in September, December, March, and June of each year.
2.1.3.1. Kidde NC-306/7 HazMat Live Fire Tanker
2.1.3.2. Kidde Railcar HazMat and High Pressure Leak/Fire Prop
2.1.3.3. Kidde T-500 Live Fire/Flashover Props (2 Each)
2.1.3.4. Kidde O-100 Pilot Boxes (10 each)
2.1.3.5. Kidde O-100 Car Trainer
2.1.3.6. Kidde O-100 Helo Prop
2.1.3.7. Kidde O-100 F-16
2.1.3.8. Kidde O-100 Flange (2 each)
2.1.3.9. Kidde O-100 Remote (2 each)
2.1.4. CLIN 0004 - Service and Maintenance on Thermal Imaging Cameras. The contractor shall perform annual maintenance and servicing to (8) Bullard T4-Max thermal imaging cameras. Maintenance personnel shall be certified by the manufacturer (Bullard) to accomplish the work. A detailed report will be provided, within 21 working days. Work will be accomplished no earlier than the first business day in September no later than the last business day in September.
2.1.5. CLIN 0005 – SCBA Equipment Testing and Certification. The contractor shall conduct annual testing and certification IAW established NFPA and manufacturer (Mine Safety Appliance) specifications on 140 SCBA units to include masks, regulators, backpacks, and 240 air cylinders. Maintenance personnel shall be certified by the manufacturer to accomplish the work. A detailed report will be provided, within 21 working days, IAW NFPA 1852, 2013 Edition. Work will be accomplished no earlier than the first business day in September no later than the last business day in September.
2.1.6 CLIN 0006 – Fire Hose Testing, Inspection, and Certification. The contractor shall inspect and test approximately 9,500 linear feet of 4-inch diameter fire hose, 14,000 linear feet of 2-1/2 inch fire hose, 12,000 linear feet of 1-3/4 inch fire hose, and 16 sections of 6-inch hard suction hose. The actual amount of hose to be inspected in any size mentioned above may vary due to normal wear and tear. All testing will be accomplished IAW with NFPA 1961, 2013 Edition. A detailed report will be provided, within 21 days, IAW with the NFPA standard. Work will be accomplished no earlier than the first day in November and no later than the last business day in November.
2.1.7 CLIN 0007 – Level “A” HAZMAT Suit Annual Inspection and Testing. The contractor shall perform annual inspections and testing on (12) level “A” HAZMAT suits. Contractor will be certified to meet the testing requirements in both NFPA 1991 and 1994, and the manufacturer’s (St. Gobin and Trellborg) recommendations. Suits will be tested to the manufacturers specifications and ASTM F 1052; using NFPA 1991 and 1994 as a guide. Reports will be provided in 21 days; suits will be identified on the reports by suit number and show beginning and ending pressures as outlined in NFPA 1991 and 1994. Work will be accomplished no earlier than the first business day in September no later than the last business day in September.
2.1.8. CLIN 0008 – Breathing Air Compressors Annual Servicing. The contractor shall provide annual servicing and repairs on four (4) Bauer breathing air compressors. Three (3) compressors are fixed Unicus type and one T-Com 25 mobile compressor. The servicing shall be IAW NFPA and manufacturers specifications. All parts and fittings shall be provided by the Contractor as part of the normal annual service schedule. Minor repairs shall be accomplished by the Contractor to ensure complete system operation on all compressors and appurtenances. Maintenance personnel shall be certified by the manufacturer to accomplish the work. A detailed report will be provided, within 21 working days, IAW NFPA 1989, 2013 Edition. Work will be accomplished no earlier than the first business day in September no later than the last business day in September.
2.1.9. CLIN 0009 – Ground Ladders Testing, Inspection and Maintenance. The contractor shall test and inspect 30 ladders IAW NFPA and industry standards. If a ladder fails, the contractor shall repair the ladder if repairs can be accomplished for less than 50% of the replacement cost of the ladder. Safety testing shall be performed by the contractor on each ladder the contractor repairs. The contractor shall provide documentation to describe each ladder by its assigned inventory number, its size and the fire station to which that ladder is assigned. The Contractor shall perform minor maintenance on all ground ladders as necessary. All testing will be accomplished IAW with NFPA 1931, 2015 Edition. A detailed report will be provided, within 21 days, IAW with the NFPA standard. Work will be accomplished no earlier than the first day in November and no later than the last business day in November.
2.1.10. CLIN 0010 – HURST Rescue Tools Testing, Maintenance and Repair. The contractor shall perform periodic and annual maintenance on Seven (7) sets of Hurst Hydraulic Rescue Tools and (1) set of Hurst eDraulic Rescue tools or their replacement items. The Contractor shall provide maintenance and service as required by the manufacturer’s specifications to include the power units, cutters, spreaders, rams, tips, hoses, attachments, chains, pins and locking devices associated with these tools. Non-destructive testing shall be accomplished on all tools IAW the manufacturer’s specifications Magnaflux testing (MPI/MPL) or the manufacturer’s specified process testing shall be performed for each tool. Maintenance personnel shall be certified by the manufacturer to accomplish the work. A detailed report will be provided, after each visit within 21 working days, on all work accomplished. Work will be accomplished no earlier than the first business day in November no later than the last business day in November.
2.1.11. CLIN 0011 – Small Engine Equipment Inspection, Maintenance and Repair. The contractor shall perform annual maintenance and repairs as required on approximately 45 small engines within the department’s equipment inventory. This inventory includes ten (10) STIHL chainsaws, seven (7) positive-pressure ventilation fans (PPV), eleven (11) generators, four (4) float pumps, four (4) rescue saws seven (7) rotary drills and hammers.. All maintenance and repairs shall be performed IAW the manufacturer’s specifications or industry standards if no other guidance exists. A detailed report will be provided, within 21 working days. Work will be accomplished no earlier than the first business day in September no later than the last business day in October.
2.1.12. CLIN 0012 - Reoccurring Maintenance and Repairs to Various Fire Department Equipment. The contractor shall provide maintenance or repair services that does not meet the specifications within the above CLINs. The contractor shall provide a quote of cost to the 30 CEF before repairs are conducted. Maintenance personnel shall be certified to conduct maintenance or servicing on the specific piece of equipment. Work will be accomplished as needed and scheduled by the 30 CES/CEF Program Manager.
2.2 Invoicing: The contractor shall invoice IAW Clause 252.232-7006 “Wide Area Workflow Payment Instructions” (see clause section of contract).
2.3 Personnel: contractor personnel shall present a professional appearance and be easily recognized as Contractor employees by the wearing of identification tag or company uniform that shall include the company’s name/logo and employee’s name. The contractor shall provide company identification tags or company uniform at no additional cost to the government. Upon completion of the Contract, or an individual employee’s employment, the contractor shall retrieve all identification media issued by the 30th Security Forces Squadron (30 SFS) and immediately surrender it to the government.
2.3.1 Contractor personnel shall comply with and ensure that any subcontractor personnel comply with current federal, state, local, Department of Defense (DoD), and Air Force regulations, plans, and policies including all applicable parts of the Air Force Occupational Safety and Health Standard (AFOSH) and United States Department of Labor Occupational Safety and Health Administration (OSHA).
2.3.2 The contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest, nor shall the Contractor employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and received approval in accordance with (IAW) DoD 5500.7-R, “Joint Ethics Regulations (JER),” “Standards of Conduct”.
2.3.3 The contractor shall not employ persons for work on this Contract if such employee is identified to the Contractor by the Contracting Officer as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
2.4. Security Requirements:
2.4.1. At all times on Vandenberg AFB premises, all Contractor employees shall comply with all base security requirements imposed by the Installation Commander. The contractor needs to be aware that entry requirements are subject to change due to installation and real-world situations. In regards to permanent base access/entry, all employees are subject to a Federal background check.
2.4.2. Main Base Access: Current security access restrictions at the Santa Maria Gate (base main entry point) require all Contractor vehicles which are the size of a standard bread delivery truck or larger, and have closed tool beds, tool boxes, etc. to enter through the Lompoc Gate only. Location is at the intersection of Santa Lucia Road and Pine Canyon Road. There is a vehicle check/pull-off area where the Contractor may be required to pull off and submit to a vehicle search prior to gaining entry to the base. The Contractor should plan to allow for delays as a result of in-place security procedures.
2.4.3. The contractor shall brief all personnel that they shall immediately leave any area upon notification by the Contracting Officer, COR, constituted authority, or Security Forces personnel when directed as occasional operational requirements, real world activities, or emergencies dictate.
2.5. Contractor Vehicles: Each contractor vehicle shall have the company name/logo prominently displayed on each side panel of the vehicle whenever vehicle is on Vandenberg AFB property. The Contractor shall provide company identification tags and vehicle identification at no additional cost to the Government.
2.6. Government Liability for Loss or Damage: The government will not be liable for any loss or damage to the contractor’s property (including stock) or for expenses incidental to such loss or damage unless caused by the Government.
2.7. Required Reports/Submittals: The contractor is required to provide documentation as indicated below.
2.9.1 Contract Start-Up: Material Safety Data Sheet (MSDS) for any potentially Hazardous Materials used by the contractor on Vandenberg AFB.
2.9.2 Upon Certification: Certificates verifying satisfactory completion of certification requirements for Live Fire Facilities and/or props.
2.10. Contractor Management Reporting (CMR): The contractor is required to report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the U.S. Air Force via a secure electronic data collection site. The Contractor shall fill in all required data fields using the following web address: http://www.ecmra.mil . Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs from October 1st through September 30th. While inputs may be reported at any time during the FY, all data shall be reported no later than October 31st of each calendar year. Contractors may direct questions to the ECMRA help desk.
Part 3 Contractor Furnished Items and Equipment
2. Contractor Furnished Items and Equipment:
3.1. The contractor shall furnish all supplies, equipment, facilities and services required to perform work under this Contract that are not listed under Part 4 of this PWS.
3.2. The contractor shall ensure their equipment is strictly maintained in functional and safe operating condition.
2.1.5.
Part 4 Government Furnished Items and Services
3. GOVERNMENT- FURNISHED SERVICES:
4.1 Base Police and Fire-Protection Services: The government shall provide police and fire protection services. In the event of a medical emergency, call “911” for transportation of an injured employee by civilian ambulance to a local hospital. The government shall provide emergency medical treatment for life-threatening emergencies only until civilian ambulance arrives.
4.2 Damage to Government Facilities and Property: The contractor shall reimburse the government if details of formal investigation of fire or other related or unrelated structural damage result in pecuniary liability assessed to the contractor. The contractor shall replace all damaged or lost Government Furnished Facilities, Government Furnished Equipment and Government Furnished Materials at no cost to the government.
Part 5 Definitions
4. DEFINITIONS: The following is a list of terms used within PWS that require further definition.
4.1. CONTRACTOR: A supplier or vendor awarded a Contract to provide specific supplies or service to the Government. The term used in this Contract refers to the prime.
4.2. CONTRACTING OFFICER: A person with authority to enter into, administer, and or terminate Contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
4.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR): An employee of the U.S. Government appointed by the Contracting Officer to administer the Contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the Contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the Contract.
5.4. DEFECTIVE SERVICE: A service output that does not meet the standard of performance associated with the Performance Work Statement.
5.5. DELIVERABLE: Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
5.6. KEY PERSONNEL: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a Contract by the Key Personnel listed in the PWS. When Key Personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
5.7. PHYSICAL SECURITY: Actions that prevent the loss or damage of Government property.
5.8. QUALITY ASSURANCE: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
5.9. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
5.10. QUALITY CONTROL: All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet Contract requirements.
5.11. SUBCONTRACTOR. One that enters into a Contract with a prime Contractor. The Government does not have private of Contract with the subcontractor.
5.12. WORK DAY: The number of hours per day the Contractor provides services in accordance with the Contract.
5.13. WORK WEEK. Monday through Friday, unless specified otherwise.
5.14. HAZARDOUS OR INCOMPATIBLE WASTE. For the purpose of this PWS, hazardous and incompatible wastes is considered to be but not limited to any oils, greases, flammables, chemicals, metals and other material that is listed or described in Article 3 (Discharge Prohibitions and Limitations) in VAFB’s Permit I-004 with the City of Lompoc.
Part 6
ACRONYMS
| AFCEC | Air Force Civil Engineer Center |
| AFFARS | Air Force Federal Acquisition Regulation Supplement |
| AFI | Air Force Instruction |
| AFOSH | Air Force Occupational Safety and Health Standard |
| BCE | Base Civil Engineer |
| BHPO | Base Historic Preservation Officer |
| CAER | Community Awareness and Emergency Response |
| CES | Civil Engineer Squadron |
| CCE | Contracting Center of Excellence |
| CFR | Code of Federal Regulations |
| CM | Corrective Maintenance |
| CO | Contracting Officer |
| CONS | Contracting Squadron |
| CONUS | Continental United States (excludes Alaska and Hawaii) |
| COR | Contracting Officer Representative |
| DCC | Disaster Control Center |
| DFARS | Defense Federal Acquisition Regulation Supplement |
| DFAS | Defense Finance Accounting System |
| DOD | Department of Defense |
| EIAP | Environmental Impact Analysis Process |
| EPA | Environmental Protection Agency |
| EPA-CPG | Environmental Protection Agency’s Comprehensive Procurement Guidelines |
| EPP | Environmental Protection Plan |
| FAR | Federal Acquisition Regulation |
| FSD | Fire Safety Deficiency |
| HAZMAT | Hazardous Materials |
HMI Human Man Interface
| HVAC | Heating, Ventilation and Air Conditioning (system) |
| IAW | In Accordance With |
| NATE | North American Technician Excellence |
| NEPA | National Environmental Policy Act |
| NOV | Notice of Violation |
| OCI | Organizational Conflict of Interest |
| OSHA | Occupational Safety and Health Administration |
| PM | Preventative Maintenance |
| POC | Point of Contact |
| PST | Pacific Standard Time |
| PWS | Performance Work Statement |
| QA | Quality Assurance |
| QASP | Quality Assurance Surveillance Plan |
| QC | Quality Control |
| QCP | Quality Control Program |
SCADA Supervisory Control and Data Acquisition
| SW | Space Wing |
| SFS | Security Forces Squadron |
| UFC | United Facilities Criteria |
| VAFB | Vandenberg Air Force Base |
| WAWF | Wide Area Work Flow |
| WFSM | Water and Fuels System Maintenance |
Part 7 Service Summary (SS) Items
The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
PERFORMANCE OBJECTIVE
| PWS REFERENCE |
| PERFORMANCE THRESHOLD |
| METHOD OF SURVEILLANCE |
SS#1
CLIN 0001 – Aircraft Fire Training Facility (AFTF) Semi-Annual Maintenance
PWS Section 2.1.1
No more than two COR write-ups per visit due to poor performance of work.
100% Inspection
· Validated
SS#2
CLIN 0002 – Structural Burn Rooms Annual Maintenance and NFPA 1403 Inspection
PWS Section 2.1.2
No more than two COR write-ups per visit due to poor performance of work.
100%
SS#3
CLIN 0003 – Kidde O-100 Burn Prop Maintenance for nine (9) Live Fire Systems and NFPA 1403 Inspection
PWS Section 2.1.3
No more than two COR write-ups per visit due to poor performance of work.
100%
SS#4
CLIN 0004 – Service and Maintenance on Thermal Imaging Cameras
PWS Section 2.1.4
No more than two COR write-ups per visit due to poor performance of work.
100%
SS#5
CLIN 0005 – Self-Contained Breathing Apparatus (SCBA) Equipment Testing and Certification
PWS Section 2.1.5
No more than two COR write-ups per visit due to poor performance of work.
Periodic
· Inspection
SS#6
CLIN 0006 – Fire Hose Testing, Inspection, and Certification
PWS Section 2.1.6
Periodic
· Inspection
SS#7
CLIN 0007 – Level “A” HAZMAT Suit Annual Testing and Inspection
PWS Section 2.1.7
No more than two COR write-ups per visit due to poor performance of work.
100%
SS#8
CLIN 0008 – Breathing Air Compressors Annual Servicing
PWS Section 2.1.8
No more than two COR write-ups per visit due to poor performance of work.
100%
SS#9
CLIN 0009 – Ground Ladders Testing, Inspection and Maintenance
PWS Section 2.1.9
100%
SS#10
CLIN 0010 – HURST Rescue Tools Testing, Maintenance and Repair
PWS Section 2.1.10
No more than two COR write-ups per visit due to poor performance of work.
100%
SS#11
SCLIN 0011 – Small Engine Testing, Maintenance and Repair
PWS Section 2.1.11
No more than two COR write-ups per visit due to poor performance of work.
100%
SS#12
CLIN 0012 – Reoccurring Maintenance and Repairs to Various Fire Department Equipment
PWS Section 2.1.12
No more than two COR write-ups per visit due to poor performance of work.
100%
Methods of Surveillance Definitions: 100 percent inspection is appropriate for tasks that occur infrequently. Inspect and evaluate performance each time task is performed.
Part 8 Deliverables Schedule
Deliverable
Frequency # of Copies
Medium/Format
Submit To
Material Safety Data Sheets (MSDS) for all hazardous materials used by the Contractor on VAFB
NLT 10 days after receipt of contract award
One electronic copy
Adobe PDF
COR
Trip Report, Quarterly Inspection Report and Annual Report
| For each live fire facility and prop inspection NLT 21 days after inspection |
| One electronic copies |
Adobe PDF
30 CEF Program Manager
Fire Equipment Inspection Certificate or Report
| As required for each CLIN NLT 21 days after inspection |
| One electronic copy |
Adobe PDF
30 CEF Program Manager
Part 9 Attachments
See Attachment 1 - AFCEC T.O. 35-E1-2-13-1.
image1.jpeg image10.jpeg
File details come from the government source that posted it.