Flooring Tiles 1.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
B284 Raised Flooring
Solicitation number
F3YTAG5133AW01
Issued by

About this file

The file is an Excel spreadsheet detailing flooring specifications for a raised computer floor replacement project at a Department of the Air Force facility. The document provides comprehensive room-by-room measurements and technical requirements for flooring tiles, with specific focus on rooms requiring utility cuts, power/network access, and varying cooling needs. Key rooms include OPS Floor (Phase 109), multiple 111-series rooms, and areas like storage, loading dock, and secure rooms, with tile heights ranging from 14 1/2" to 22" and varying square footage from 26 to 2,080 square feet.

The related federal contract opportunity (Solicitation Number F3YTAG5133AW01) is for replacing raised flooring in Building 284, with the primary purpose of elevating electronic components to facilitate airflow cooling and cable management for server and operational computer equipment. The project is being managed by the Department of the Air Force Materiel Command Air Force Sustainment Center, and the raised flooring is classified as computer support equipment rather than real property. The spreadsheet provides granular details about tile requirements, including ventilation needs, grounding requirements, and specific room configurations to support the overall raised flooring replacement initiative.

View the file

Other files

File Type Posted
BLDG 284 RFI Questions with Answers.docx DOCX document
Flooring phases.jpg JPG image
RFQ B284 Raised Flooring.pdf PDF
SOW B284 flooring.docx DOCX document
B284 Raised Flooring Floor Plan.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Room Sq Ft Floor Height Ventilated tiles PARKER, CHRISTOPHER M GS-11 USAF ACC 552 ACNS/DOR: Existing perforated floor tiles. Cooling for server racks with in-floor air flow.

Cut tiles Utility
PARKER, CHRISTOPHER M GS-11 USAF ACC 552 ACNS/DOR: Tiles that will require cuts for utilities. Most will be for power along the wall in the rooms.Cut tiles Network & Power

PARKER, CHRISTOPHER M GS-11 USAF ACC 552 ACNS/DOR: Tiles with access for power and network from the floor. These will be full size tiles, with holes present that can be arranged as needed.

Carpet over tilesGrounding RequiredSecure Room requiring escortNotesPhase
10914 1/2"301320noYESYESOPS Floor - has the most obsticles and cuts required for utilities3
1114212201310YESYESnoAt top of ramp. Ramp will remain2
111B

PARKER, CHRISTOPHER M GS-11 USAF ACC 552 ACNS/DOR: No under floor cooling PARKER, CHRISTOPHER M GS-11 USAF ACC 552 ACNS/DOR: Tiles that will require cuts for utilities. Most will be for power along the wall in the rooms.

PARKER, CHRISTOPHER M GS-11 USAF ACC 552 ACNS/DOR: Tiles with access for power and network from the floor. These will be full size tiles, with holes present that can be arranged as needed.

450220139YESYESYESNo under-floor cooling2
111C63122046noYESnoACNS Storage. No additional cooling requirements, but currently present and active.2
111D74922023noYESnoLoading Dock2
111E2622030nononoSingle toilet restroom with sink2
111F37022098YESYESYESSecure room, with everything cleared2
111G630220214YESYESnoUnder flooring cooling pressent and active2
111H33522070nononoHallway area2
111i3022040nononoaccess closet to ceiling2
11355414 1/2"070nononoHallway area. Includes staircase which will remain3
113A6314 1/2"030nononoHallway area3
113B29914 1/2"078YESYESno3
113C44814 1/2"0812YESYESno3
113D37114 1/2"0710YESYESno3
116127122201819noYESYESFIT - has the most obsticles and cuts required for utilities1
1172080420?20YESYESnoNo under-floor cooling.1

File details come from the government source that posted it. Updated .