Attachment 1 - Amended Salient Characteristics.pdf

PDF 283 KB Posted

Attached to
801 RHTS Concrete Batch Plant
Solicitation number
F3QCDK6132G004
Issued by

About this file

This document provides technical specifications and construction requirements for a mobile concrete batch plant to be procured by the Air Force.

The equipment must be a self-erecting mobile concrete batch plant capable of producing 180-250 cubic yards per hour of concrete with a maximum overall weight of 80,000 pounds and dimensions of 60 feet length (king pin to rear), 12 feet width, and 14 feet 6 inches height. Key components include a 10-12 cubic yard concrete tilt mixing drum, three aggregate bins with 47 cubic yard capacity (65-ton maximum), a cement silo with minimum 2,000 cubic foot capacity (57 tons), cement feeders, air/water/hydraulic systems, batching and discharge equipment, conveyor systems, and a fully equipped control station with HVAC. The concrete discharge height must be 14 feet 10 inches with a 10-inch butterfly valve, and the system requires truck and/or silo discharge scales. The prime carrier must meet Department of Transportation requirements with double or triple axles, ABS air braking, 10-hole wheels, and DOT lighting. Safety features include a minimum of twelve 2,000-lumen quartz halogen flood lights with red-light capability, eight integrated tie-down locations per side per ATTLA certification, and slip-resistant steps and handrails. Paint and corrosion protection must include automotive-grade primer, military-grade rustproofing compliant with MIL-PRF-16173 Grade 4 and MIL-C-83933, with minimum five-year life expectancy. The contractor must provide a 5-year warranty plan, conduct minimum 40-hour on-site initial operator and maintenance familiarization training, deliver complete parts and service manuals with diagnostic troubleshooting software compatible with Windows 10/11, and provide 24-month warranty service including 24/7 support with all software updates. Data plates with military markings must be affixed listing nomenclature, make/model, serial number, weights, and contract information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONCRETE BATCH PLANT

Basic specifications and construction (Standard Equipment)

This MOBILE CONCRETE BATCH PLANT is lightweight and can be towed into very remote job sites where the roads are very tight or hilly, or if space (area) requirements are minimal. His batcher dispenses sand, rock, cement, and water by weight (lb. or kg) for accuracy and ticket-able receipts.

NOTE: Picture are visual reference only; not meant to request specific brand

MINIMUM REQUIREMENTS

Must be capable of producing a minimum of 180-250 cu yds per hour of good quality concrete Overall collective weight: 80,000lbs Length from King pin to rear: 60 feet Travel Width: 12-feet Travel Height: 14 feet, 6 inches Must be a Self-Erecting Mobile Concrete Batch Plant

MAIN COMPONENTS

Concrete Tilt Mixing Drum Aggregate Bins (3 each) Cement Silo

Cement feeders Air / Water additive system Batcher / Discharge Scales Conveyors Control house / station

DRUM MIXER / CONCRETE TILT MIXER

10 to 12 cu yd mixer

AGGREGATE BINS

Overhead bins w/ 3 compartments foldable for travel Minimum capacity: 47 cu yds/65 ton MAX 12 cu yd aggregate weight batcher 40-foot x 30-inch Aggregate Conveyor (heavy duty belt) 12 horsepower minimum drive motor Batcher gates required to have 2 double clam type Dual aggregate vibrator

CEMENT SILO

Minimum capacity 2000 cu ft/57 tons 12 cu yd cement batcher – designed for easy flow of material Minimum discharge height – 12 feet – sufficient for material discharge into 8-10 cu yd concrete truck Repair/maintenance manhole access point

CEMENT FEEDERS

Multi flight (reversible & independently controlled) Twin 12-inch / 25hp / 240 CFM

AIR, WATER, HYDRAULIC

Water metering (piping to discharge 3” turbo) Minimum 20 horsepower/120-gallon air compressor (on-board – electric) providing sufficient pneumatic power to all components of batch plant – all piping included Minimum 3-inch water meters (turbine) with all plumbing to provide sufficient water to batch plant High-pressure washer system for cleaning machine – with pressure gun and 25-foot hose –

50 ft if applicable, please ensure multiple connection points are present At least one (1) ¾ inch hose connection with 25 ft hose included or 50 ft hose All air and water lines shall be covered and protected from possible damage during operation and/or movement of the batch plant 450-gallon (minimum) surge tank 120-gallon (minimum) hydraulic oil tank

BATCHER / DISCHARGE

Discharge height (steel clearance) 14-feet 10-inches 12-yards – 10,000 Lbs 10-inch butterfly Raisable (or directional) rubber boot must be included and controlled within the control house

WEIGHT SCALE FOR DISPENSED MATERIAL

Truck Scale and/or Silo/chute discharge scale

CONVEYOURS

Transfer belt conveyor 30-inches / 30 HP (380 FPM)

CONTROL STATION

Operator’s control station equipped to operate and monitor all functions of Mobile Concrete

Plant Station equipped with Heating, Ventilation, Air Conditioning (HVAC) Equipped with 125 VAC power Control panels for all functions of mobile concrete plant All controls clearly labeled, illuminated P/A System for contacting personnel

ELECTRICAL/ GAUGES

Prewired in EMT conduit

460V / 3PH / 60HZ

4-point load cell (3k each) Electrical lines sufficient to provide power to operate all batch plant components Controls conveniently located (ground level) and protected from weather and/or damage o Minimum One (1) -120 VAC outlet All electrical lines shall be covered and protected from possible damage during operation and/or movement of the batch plant Maximum gauge/metering package allowing operate to effectively mix material Material indication lights/meter/gauges Bin level indicator(s) system – prevent overfilling of material Single lubrication point – capable of lubricating entire batch plant from one location

(conveniently located for operator – ground level)

PRIME CARRIER

Carrier shall be engineered/designed to safely and efficiently transport the entire mixing plant across public roadways meeting all DOT requirements Dimensions of prime carrier shall be at the manufacturer engineer’s discretion but shall meet all the minimum capacity requirements o Heavy duty frame capable of carrying the batch plant o 5th wheel/king pin connected to prime mover o Front landing gear capable of supporting unit when not connected to prime mover o DOT lighting system with connections

CHASSIS

Complete mobile plant double axles as required by engineer design o Department of Transportation (DOT) lighting as required for movement on roadways o ABS air braking system o Triple axle o 10-hole wheel

All piping required to be operation after set-up o No additional parts required by end user for operation other than aggregate material, cement, and water Batch controls conveniently located and protected from damage and weather

SUSPENSION

Suspension o Heavy duty construction frame, shocks, springs, tires capable of handling entire unloaded weight of machine without putting undo strain on vehicle o Tires sized to meet vehicle performance requirements – as determined by manufacturer engineers o Duramax Radial E3/L3 (equal or greater) o Road rated, heavy-duty tires and wheels

Heavy fenders meeting DOT requirements

SAFETY

Optimum night lighting o A minimum of six (12) – 2000 lumen each quartz halogen flood lights with switch to red light night operations with integrated wiring harnesses mounted to mixer o Withstand up to 15.3 Grms vibration at 24-2000Hz / 4.65Grms at 12-2000Hz o Stop, Turn, Tail, Warning lights (rear) o Clearance and side marker lights

Minimum of 8 integrated tie down locations on each side as determined by ATTLA certification

Equipped with sufficient lifting points by use of crane; clearly labeled Lift Point All steps and ladders made of slip resistant material o Handrails for accessing work platforms made of slip resistant material o All major components must be accessible for inspection and maintenance o Catwalk running entire length of main feeder belt

PAINT/CORROSION PROTECTION

Manufacturer standard commercial color Maximum manufacturer’s factory rustproof/corrosion protection package throughout o Minimum 5-year life expectancy on rustproof/corrosion protection o Automotive grade primer/paint o Military grade rustproofing throughout machine Shall comply with Military Specifications: MIL-PRF-16173, Grade 4 and MIL-C-83933 Electrical/hydraulic lines covered/protected from damage during machine operation

Machines, including all parts and accessories, shall be constructed and finished thoroughly without blemish, flaws, defects and/or sharp edges/corners.

Welding and post heat treatment procedures shall be performed in accordance with American Welding Society (AWS) Welding Code. The surface parts to be welded shall be free from rust, scale, paint, grease, and other foreign matter. Welds shall be of sufficient size and shape to develop the full strength of the welded parts. Welds shall transmit stress without cracking or permanent distortion when the parts connected by the welds are subjected to test, proof, and service loadings

Machine shall be thoroughly cleaned. Loose, spattered, or excess welding slag; stray bolts, nuts, and washers; rust; metal particles; pipe compound; and other foreign matter shall be removed during and after final assembly

WARRANTY

5 Year Warranty Plan

TRAINING

Conduct initial set-up, tear-down, and operating training (minimum 40 hours – on site)

PARTS and SERVICE MANUALS Complete set of manuals available at time of delivery to the Air Force, No Exceptions Includes parts breakdown, service manual and schedule, repair processes for any and all parts/components of machine, No Exceptions Minimum of two complete sets of Operators, Parts and Service manuals to include drive engine, auxiliary engine (if equipped), transmission, and any/all mounted and/or attachments shipped with machine

Provide diagnostic troubleshooting software/devices to end users o Air Force vehicle maintenance personnel shall have capability to diagnose, troubleshoot, and service machine locally o Diagnostics capable of all components of machine, No Exceptions All software and firmware shall function as intended, and shall be free of vulnerabilities (i.e. defects, bugs, malware, etc.), either intentionally or unintentionally inserted as part of the software/firmware throughout the lifecycle.

All software must be compatible with Windows 10/11 (64-bit) operating system.

CALIBRATION AND MAINTENANCE

Within calendar year / Contractor can coordinate with user upon award Contractor must confirm the maintenance schedule and dates with the Government prior to equipment delivery Vendor provides 24-month warranty service for any/all components of machine regardless of manufacturer of prime mover, accessory, and/or attachments as delivered to the Air Force o 24-month warranty includes ALL software updates o 24-month warranty includes 24/7 warranty, troubleshooting, and engineering support

Standard Wear-Part replacement plan 24/7 technical support option Spare parts list with part numbers

MANUFACTURER/DEALERSHIP shall include Initial operator’s familiarization set-up (minimum 40 hours – on site)

Initial maintenance familiarization set-up (minimum 40 hours – on site) Military Marking / Data Plate(s) Data plates will include the following information, at a minimum

NOMENCLATURE: __________________________

MAKE AND MODEL: ________________________

MFR’S SERIAL #: (VIN_______________________)

REGISTRATION #:___________________________

NSN: ________________________________

VEHICLE CURB WEIGHT: __________LBS

PAYLOAD, MAXIMUM: ____________LBS

GROSS WEIGHT, MAX: ____________LBS

GROSS WEIGHT COMB MAX: ______LBS

DATE OF DELIVERY: _________________

WARRANTY: __________MO___________MILES

CONTRACT #: ______________________

SHIP TO: _____________________

MARK FOR: __________________

US PROPERTY