Questions_and_Answers_2.pdf

PDF 37 KB Posted

Attached to
Robotic Painter Amend 02 Federal contract opportunity
Solicitation number
F3QCCM8059A102
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Questions and Answers #2

View the file

Other files for this federal contract opportunity

Other files attached to Robotic Painter Amend 02, newest first.
File Type Posted
Borne_Primers.pdf PDF
2460T560_THREADED-STEM_SWIVEL_CASTER.SLDPRT —
Part2.SLDPRT —
Assem3.SLDDRW —
Assem3.SLDASM —
PD_L8WC11_4-27-18.pdf PDF
Part3.SLDPRT —
Questions_&_Answers_(Job_Walk).pdf PDF
PD_L8WC11_4-9-18.pdf PDF
CDRLs_A003-_COTS.pdf PDF
CDRLs_A002-_Mishap.pdf PDF
CDRLs_A006-_Acceptance_Test_Plan.pdf PDF
CDRLs_A004-_Chart.pdf PDF
Combined_Synopsis-Solicitation_-_Robotic_Painter.pdf PDF
Commercial-Item-Determination-Checklist.doc DOC document
CDRLs_A005-_Training.pdf PDF
CDRLs_A001-_Contractor's_SOP.pdf PDF
CDRLs_A007-_Acceptance_Test_Plan.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers #2

1. (a) Can you please provide the Technical/Product Data Sheet for the water borne primers? (b) Also, can you please confirm how the primer is currently being sprayed? (eg. manual air spray gun, HVLP gun, air mix, air assisted/airless etc.)

Answer: (a) Technical Data Sheets will be uploaded into FBO and labeled Borne Primers. (b) The type of spray gun currently used is a HVLP. This was not given in the PD. We are not requiring the same type of gun to be used. Revised PD dated 27 Apr 2018 will be uploaded in FBO to reflect changes in sections

Section 3.1.C.iii. Fluid Systems and Section 3.1.C.v. ‐ At a minimum the system shall be able accommodate all the coatings listed in Appendix C.

2. Is a model if the paint rack available for the requested simulation?

Answer: Documents are posted in FBO.

3. Does the attached Combined Synopsis‐Solicitation also need to be completed and filled out?

Answer: If there are fill‐ins in the RFQ, then those must be filled out with the exception of the WAWF clause (we will fill out). Contractors can submit the quotation on a company letterhead instead of in the

RFQ; however, be sure to look at all the attachments and price every CLIN. Fill out the CID checklist and submit with quotation.