Questions and Answers for RFQ F3QCCM0169A002.pdf
PDF 43 KB Posted
- Attached to
- Ultrasonic
- Solicitation number
- F3QCCM0169A002
About this file
This document contains questions and answers related to solicitation RFQ F3QCCM0169A002. The solicitation seeks a turnkey gantry-style ultrasonic non-destructive testing inspection system for the 402nd Commodities Maintenance Group at Robins Air Force Base. The system must utilize through transmission and pulse echo testing to create B and C scans to help operators identify internal flaws, water entrapment, delamination, and disbonds. An overhead bridge system is preferred over a dual floor mounted tower design. The contractor must provide all labor, materials, shipping, and travel to install the new system in Building 169 and retrofit the existing system in Building 323 with new motion and ultrasonic components. The contract also includes an option to retrofit the existing system in Building 323 for a five year period, and bidders may include annual inflation costs in their submission. Award will be made to the lowest priced technically acceptable offer based on total evaluated price.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for Solicitation
RFQ F3QCCM0169A002
1. Document "L0TC15+Ultrasonic+SSJ+Brand+Name+Components_RedactedFE.PDF" discusses the use of Rockwell Automation Logix 5000 products.
Will the government accept other motion control systems?
Yes
2. SOL RFQ F3QCCM0169A002 (RFQ)
First paragraph describes “Two Tower Gantry”.
Would the government prefer an overhead bridge system or a dual floor mounted dual tower design?
An overhead bridge system preferred
3. L0TC15+Ultrasonic+PD+15+Jun+20
Paragraph 1.1 – What type of construction dust barrier will be required for the removal of the existing floor. Hanging plastic or fully enclosed with air exchange to outside?
Any barrier that prevents contaminants from leaving the construction area. Outside exhaust system is not required
4. L0TC15+Ultrasonic+PD+15+Jun+20
Paragraph 2.2 - The government is asking to exercise this up-grade for a 5 year period.
Can the bidder add cost for annual inflation to this submittal?
Yes
5. What specific CLIN items will be used to determine the lowest bid price?
Lowest price technically acceptable based on total evaluated price.