RFI 3 432 CS UPS Battery Replacement.pdf
PDF 33 KB Posted
- Attached to
- 432 CS B64 UPS Battery Replacement
- Solicitation number
- F3G3JB6175AG01
About this file
This document is a Questions and Answers record addressing facility and logistics details for a UPS System installation project. The UPS System(s) are located in Building 64. AFB staff will not be responsible for transporting or staging batteries after delivery to Building 68; this responsibility falls to the contractor's technicians. Building 68 is situated directly across the street from Building 64, with a maximum distance of 50 yards between the two facilities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please confirm which building(s) the UPS System(s) are located in? Bldg 64
Also, after batteries are delivered to Building 68 will AFB staƯ transport/stage batteries near the UPS(s) or will our technicians be required to do so on the day of installation? No AFB will not transport! Transport should be the responsibility of the technicians. Bldg. 68 is directly across the street from Bldg 64. 50yds max
File details come from the government source that posted it. Updated .