RFI 3 432 CS UPS Battery Replacement.pdf

PDF 33 KB Posted

Attached to
432 CS B64 UPS Battery Replacement
Solicitation number
F3G3JB6175AG01
Issued by

About this file

This document is a Questions and Answers record addressing facility and logistics details for a UPS System installation project. The UPS System(s) are located in Building 64. AFB staff will not be responsible for transporting or staging batteries after delivery to Building 68; this responsibility falls to the contractor's technicians. Building 68 is situated directly across the street from Building 64, with a maximum distance of 50 yards between the two facilities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please confirm which building(s) the UPS System(s) are located in? Bldg 64

Also, after batteries are delivered to Building 68 will AFB staƯ transport/stage batteries near the UPS(s) or will our technicians be required to do so on the day of installation? No AFB will not transport! Transport should be the responsibility of the technicians. Bldg. 68 is directly across the street from Bldg 64. 50yds max

File details come from the government source that posted it. Updated .