Attachement 6 - Contractor Question and Answers.docx

DOCX document 33 KB Posted

Attached to
99 CES Reseal Windows and Frames
Solicitation number
F3G3CE5184A001
Issued by

About this file

The document is a Contractor Questions and Answers file for a federal contract opportunity to reseal windows and frames at the Air Traffic Control Tower at Nellis Air Force Base. Key details include clarification on four specific contractor inquiries: (1) rope access is not permitted, and boom lifts/man lifts with a minimum 135' workable height are required, (2) there are no roof tie-down points, (3) only the red-marked windows in an attached image need resealing (44 windows/frames, 4 vent louvers, and 6 curtain walls), and (4) the government will not share site walk attendee lists. The related solicitation (F3G3CE5184A001) is a Total Small Business set-aside under NAICS code 238150 for window installation, with a 45-day performance period at Nellis AFB, Nevada, involving a Firm Fixed Price contract for window resealing and replacement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1) Would rope access be permitted as an alternative to boom lifts for the exterior work? No, after reviewing the building plans and talking with the roofing shop, there are no tie down points on the roof.

2) Can you confirm if there will be access to the roof for rigging? That’s where we would descend from for the window work. Again, no, see answer #1. A man lift will be required, with a minimum workable height of 135’.

3) Please see the attached image of the ATC tower. We've marked the windows in red and blue to clarify the scope of the project. Could you please confirm whether the 72 windows we’re quoting for include only the red-marked windows, or should we also include the blue-marked windows in our proposal? The blue section has already been done, only the red section needs to be done. I have sent the revised SOO to Mr. Casis, with the updated requirements of resealing 44 windows/frames, 4 vent louvers w/ window panels/frames, & 6 curtain walls.

4) I will not be able to attend the site walk. Can you send me the list of attendees and put me on the RFI list? We cannot share the list of attendees.