Attachment 3_Price sheet.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- 99 CES Reseal Windows and Frames
- Solicitation number
- F3G3CE5184A001
About this file
The file is a Price Sheet for a federal solicitation (F3G3CE5184A001) issued by the Department of the Air Force Air Combat Command for resealing and window replacement at the Nellis AFB Air Traffic Control Tower (Building 2064). This is a Small Business set-aside contract under NAICS code 238150, with a total project duration of 45 days. The solicitation requires contractors to provide labor, equipment, materials, and supervision to reseal 72 windows and frames, with a site visit scheduled for 05 August 2025 and proposals due on 18 August 2025 at 2:00 PM PDT.
The contract will be awarded using a Lowest Priced Technically Acceptable (LPTA) evaluation method, with two primary evaluation factors: Price and Technical. Offerors must submit a technical proposal demonstrating understanding of the requirements, include a completed price sheet, and be registered in the System for Award Management (SAM). Electronic submissions via email are required, with a maximum of two company representatives allowed to attend the mandatory site visit. Proposals must include specific documentation such as product specifications, CAGE Code, SAM Unique Entity ID, and a Safety Data Sheet identifying the sealant type. The government intends to award a single firm-fixed-price contract without discussions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price
| 99 Civil Engineering Service | ORGANIZATION/WORK LOCATION | ||||||
| 99 CES | |||||||
| (3) CONTRACT FOR (Items to be purchased) | (4) PURCHASE ORDER NO. | (5) PROPOSED TOTAL CONTRACT PRICE | |||||
| Reseal 72 Windows & Frames Bldg 2024 Nellis AFB Air Traffic Control Tower | Requested Delivery Date: | ||||||
| COST | |||||||
| UNIT | Other | ||||||
| LINE | ITEM | OF | QUANTITY | Costs | LINE | ||
| NO. | MEASURE | UNIT COST | TOTAL | TOTAL | |||
| 0001 | Remove existing caulking and replace with new caulking for 72 windows and frames bldg 2064 (Air Traffic Control Tower). | EA | 1 | $0.00 | $0.00 | $0.00 | |
| 0002 | $0.00 | $0.00 | $0.00 | ||||
| 0003 | $0.00 | $0.00 | $0.00 | ||||
| 0004 | $0.00 | $0.00 | $0.00 | ||||
| 0005 | $0.00 | $0.00 | $0.00 | ||||
| 0006 | $0.00 | $0.00 | $0.00 | ||||
| 0007 | $0.00 | $0.00 | $0.00 | ||||
| 0008 | $0.00 | $0.00 | $0.00 | ||||
| 0009 | $0.00 | $0.00 | $0.00 | ||||
| 0010 | $0.00 | $0.00 | $0.00 | ||||
| 0011 | $0.00 | $0.00 | $0.00 | ||||
| 0012 | $0.00 | $0.00 | $0.00 | ||||
| 0013 | $0.00 | $0.00 | $0.00 | ||||
| TOTAL CONTRACT VALUE: | $0.00 |
File details come from the government source that posted it. Updated .