This Performance Work Statement (PWS) outlines requirements for oil/water separator (OWS), grease trap, lift station pumping & maintenance, and septic tank pumping services at Luke Air Force Base, Arizona for FY25-FY29. The contractor must provide bioremediation services, maintenance, and pumping for multiple systems: OWS units requiring monthly or quarterly service with microbe injection treatments; grease traps needing monthly maintenance with specialized bacteria treatments; four lift stations requiring monthly service for odor control; and four 6,000-gallon septic tanks requiring approximately seven pumpings annually.

The work includes providing all equipment, labor, and materials for maintaining these systems, including automated dosing systems (both electric and battery-operated), bacteria treatments, and pumping services. Key performance objectives include reducing pumping requirements below baseline levels, maintaining 85% operational equipment functionality, and ensuring 100% compliance with disposal regulations. Normal operating hours are 7:00 AM to 5:00 PM Monday through Friday. The contractor must maintain a quality control program and submit quarterly reports. The related solicitation indicates this is a 100% WOSB set-aside with proposals due January 27, 2025, and includes a base year plus four option years. Site visits are available January 14-16, 2025, with questions due by January 17, 2025 at 11:00 AM EST.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK

STATEMENT (PWS)

OIL/WATER SEPARATOR,

GREASE TRAP, LIFT STATION PUMPING & MAINTENANCE, SEPTIC TANK PUMPING

FY25-FY29

16 JAN 2025

LUKE AIR FORCE BASE, ARIZONA

PERFORMACE WORK STATEMENT

1. DESCRIPTION OF SERVICES: The work covered by this performance work statement consists of furnishing all plant, labor, equipment, appliances, and materials to maintain oil/water separators (OWS), grease traps, and lift stations, on Luke AFB in strict compliance with the specifications of this contract. The OWS, grease traps, and lift stations will remain operational during maintenance activities. Work also includes pumping of any OWS, grease trap, lift station, or holding tank, and septic tanks.

1.1. MAINTENANCE SERVICES:

1.1.1 Oil/Water Separators (OWS): The contractor shall provide bioremediation services to minimize OWS oil and sludge content. The OWS are listed in Appendix A. Some OWS will be serviced monthly and some quarterly, depending on their usage. The location of the OWS is shown on the Appendix C map. Primary treatment shall be performed through microbes injected into an OWS to break down petroleum products (suspended or dissolved) in the wastewater, floating oil, or sludge. The microbes shall be non-pathogenic, salmonella free bacteria that will survive temperatures exceeding 150 degrees. The treatment will occur by one of two methods depending on the availability of electricity:

Electricity available:

• Dosing pump that dispenses Bacteria in a constant 24/7-365 days a year method

• Fill bucket with easy-to-read “fill to” line

• Power cord & appropriate hose length.

Electricity not available:

• Auto Pail-Top Dispenser

• Fill bucket with easy-to-read “fill to” line

• Discharge hoses

• Battery Operated

The OWS will be monitored on a monthly/quarterly schedule to ensure the interior and exterior areas and surfaces are free from oily film. Maintenance will require residue to be scraped from the interior surfaces to ensure effective treatment and function of the OWS. All material injected will be tracked through the base Hazardous Material Authorization and Reporting system.

1.1.2 Grease Traps: The contractor shall provide bioremediation services to minimize Fat, Oil, and Grease (FOG) build-up from grease interceptors/traps. The grease traps are listed in Appendix B and will all be serviced monthly. Primary treatment shall be performed through automatic injection of microbes. The microbes shall be non-pathogenic, salmonella free bacteria that is heavily fortified to consume cooking oils, fats, grease, soap, detergents and sludge. The microbes approved for treatment must be a specialized hardened bacteria that will survive temperature’s exceeding 150 degrees and survive solutions of Sodium Hypochlorite 10% per milliliter. The following bacteria’s (or equivalents) are approved for treatment:

Bacillus subtilis sp. 1 Bacillus subtilis sp. 2 Bacillus megaterium Bacillus licheniformis Bacillus amyloliquefaceans sp. 1 Bacillus amyloliquefaceans sp. 2 Bacillus pumilus

The injected material must include a powdered stabilizer pre-mixed into the formula to ensure stability of the product and to prevent early termination of bacteria. This will also ensure that after the powder is dissolved into water, the final bacteria solution will remain stable for up to 60 days. The contractor will perform and provide initial start-up materials and subsequent maintenance services to ensure units are functioning properly. Following initial treatment, maintenance will occur by one of two methods depending on availability of electricity:

Electricity available:

• Dosing pump that dispenses Bacteria in a constant 24/7-365 days a year method

• Fill bucket with easy-to-read “fill to” line

• Power cord & appropriate hose length.

• Initial

Electricity not available:

• Auto Pail-Top Dispenser

• Fill bucket with easy-to-read “fill to” line

• Discharge hoses

• Battery Operated

Each grease trap will be monitored monthly to ensure the interior and exterior areas and surfaces are free from FOG. Maintenance will require residue to be scraped from the interior surfaces to ensure effective treatment and function of the grease traps. All material injected will be tracked through the base Hazardous Material Authorization and Reporting system.

1.1.3 Lift Stations: The contractor shall provide bioremediation services for odor control and to minimize Hydrogen Sulfide levels. The lift station are #798, Commissary, Kachina Housing and 912. The locations are shown on the Appendix D map. The lift stations shall be serviced monthly. Primary treatment shall be through automatic injection of microbes at the lift stations. The contractor shall clean lift stations to control grease cap using a floating lift station degreaser to keep grease from solidifying keeping floats free and clear of any debris.

1.2. OWS AND WASTEWATER PUMPING: The contractor shall provide pumping service, transportation, and disposal/recycling in case of system failure, overload, or at the request of Luke AFB. This may include an OWS, POL System Holding Tank, clarifier, basin, lift station, overflow area or drain. All pumping will need to be done on a monthly basis or quarterly basis depending on the function of the OWS. If the holding tank or separator is full of oil the separator will need to be pumped.

1.3. GREASE TRAP PUMPING: The contractor shall provide pumping service, transportation, and disposal/recycling at the request of Luke AFB. Grease trap pumping will need to be performed on a monthly or quarterly basis depending on the function of the grease trap. If the compartments are full the grease trap will need to be pumped.

1.4. OWS AND GREASE TRAP SUPPLIES: The contractor shall provide, on an as needed basis, necessary operational equipment and additional chemical supplies, including, but not limited to:

Bacteria, Free-Flow, agents to free up clogged piping, pump parts, equipment testing mechanisms, office supplies, filter mechanisms, chemicals/fish for algae treatment, repair parts and equipment. OWS and grease trap supplies will have independent CLINS.

1.5. SEPTIC TANK PUMPING: The contractor shall provide pumping service, transportation, and disposal of sewer waste at the request of Luke AFB Plumbing shop. Three tanks in the Ammunitions area and one tank near Building 1040, all 6000 gallons. Each serviced approximately 7 times annually.

1.6. NOTIFICATION: Contractor shall notify the Plumbing shop in Building 339, phone 623-856-6163, prior to performing any chemical treatment and/or pumping services for OWS or grease traps. Upon completion of work, the contractor will deliver a signed, legible inspection/service report to the Plumbing shop, identifying activities performed, condition of the OWS, and chemicals used.

2. SERVICE DELIVERY SUMMARY:

2.1 Oil Water Separators:

Performance Objective
Performance Threshold
Reduced or eliminated OWS pumping
Gallons pumped remains below baseline year

Provide all equipment needed for OWS dosing systems including replacement and maintenance

85% of equipment is functioning properly

Proper disposal or recycling of petroleum products and sludges from pumping

100% compliance with Codes and Regulations

Perform monthly/quarterly maintenance of OWSs and replenish product to dispensing units

Maintenance performed monthly/quarterly in accordance with Appendix A

2.2 Grease Traps:

Performance Objective
Performance Threshold
Reduced or eliminated grease trap pumping
Gallons pumped remains below baseline year

Provide all equipment needed for grease trap dosing systems including replacement and maintenance

85% of equipment is functioning properly

Proper disposal or recycling of grease from pumping

100% compliance with Codes and Regulations

Perform monthly maintenance of grease traps and replenish product to dispensing units

Maintenance performed in 30-day intervals for all grease traps

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES: None

4. GENERAL INFORMATION:

4.1. QUALITY CONTROL: Contractor shall develop and maintain a quality inspection program to ensure services are performed in accordance with the PWS and all regulatory standards and codes. The contractor shall develop and implement procedures to identify and prevent defective services from recurring. This will need to be performed on a quarterly basis and provided to the COR.

4.2. QUALITY ASSURANCE: The Government will periodically evaluate the contractor’s performance by monitoring performance to ensure services are received. The government representative will evaluate the contractor’s performance through intermittent on-site inspections of the contractor's performance. This will be performed at a minimum of quarterly by the COR to ensure contractor is performing all aspects of the contract.

4.3. HOURS OF OPERATION: Normal duty hours are 7:00 am to 5:00 pm, Monday through Friday. These hours are concurrent with the local Base Civil Engineer maintenance shops.

4.5. SECURITY REQUIREMENTS: The contractor shall ensure each employee obtains a contractor badge issued by the Security Forces Squadron.

5. APPENDIXES

A. OWS Listing and Maintenance Schedule B. Grease Trap Listing and Maintenance Schedule C. Map of OWSs D. Map of Lift Stations E. Septic Tanks locations F. Map of septic tanks