Firing Range QA.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Indoor Firing Range Maintenance and Inspections
- Solicitation number
- F2B3AQ5093AW02
About this file
The document is a Q&A spreadsheet related to an Indoor Firing Range Maintenance and Inspections contract for Hanscom Air Force Base. The solicitation (F2B3AQ5093AW02) requires a contractor to provide comprehensive maintenance and inspection services for firing range equipment in building 1725, including management, labor, tools, equipment, and incidentals necessary for annual maintenance.
Key details include the incumbent contractor being Action Target Inc., with multiple equipment manufacturers specified: Action Target for bullet traps, target systems, and conveyor systems; Camfil for DCU (Dust Collection Unit) filters. The contractor is responsible for providing and installing all filters, disposing of waste, and following manufacturer guidelines for maintenance. The contract involves maintaining equipment such as bullet traps, HVAC systems, conveyor systems, and DCU, with specific requirements for inspection, filter replacement, and equipment compliance. The contract is a recompete, indicating a continuation of previous service arrangements with Action Target Inc.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hanscom AFB OM Manuals Packet.pdf | ||
| B1725_Lead Filtration Device Tech Specs.pdf | ||
| Camfil DCU OM Manual v1.pdf | ||
| 2025 Firing Range PWS_v2.pdf | ||
| 2025 Bid Schedule Firing Range.xlsx | XLSX spreadsheet | |
| Wage Determination.pdf | ||
| Combined Synopsis Solicitation_Firing Range_Lodi Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Q# | Question | Answer |
| 1 | Who is the bullet trap manufacturer? This information is needed to keep the bullet trap in compliance. | Action Target |
| 2 | Is the Bullet Trap currently in compliance within the manufacturers’ specifications? | Yes |
| 3 | How wide is the Bullet Trap from left to right? | Unknown |
| 4 | Screw Auger | Unknown |
| 5 | Does the facility want the contractor to disassemble the auger to check and replace hanger bearings on every visit? Or only when our inspections see damage to the system? | Contractor to adhere to manufacturer's guidelines. |
| 6 | Please Provide the manufacturer of the Target System. | Action Target |
| 7 | Please Provide the manufacturer of the DCU along with manufacturer specifications. Can we get pictures of the DCU? | Camfil. Photos submitted within manuals. |
| 8 | Who is the HVAC System manufacturer? Can we get pictures of the HVAC system? | Unknown |
| 9 | Is the Contractor supplying all Camfil filters? If so, do they have to be Camfil or can they be equivalents? | Contractor to supply all filters and to install filters according to manufacturers guidelines. |
| 10 | Is the facility providing the DCU & HVAC Filters? | Contractor to provide all filters. |
| 11 | Is the contractor to dispose of the waste? | Yes |
| 12 | Is there any incumbent/recompete or this is a brand-new project? If yes, could you please provide us with their award number or even if the customer bought similar services in the past. | This is a recompete contract; the previous award was made to Action Target Inc. |
| 13 | Who is the manufacturer for the conveyor system? | Action Target |
| 14 | Would you be able to provide the manuals for the steel traps and conveyor systems? | Yes |
| 15 | Can we get pictures of the bullet trap? | Photos submitted within manuals. |
| 16 | ||
| 17 | ||
| 18 | ||
| 19 | ||
| 20 | ||
| 21 | ||
| 22 | ||
| 23 |
File details come from the government source that posted it. Updated .