This document is an Asbestos Sampling Tracker spreadsheet containing comprehensive asbestos testing data for multiple buildings (1245, 1345, 1794, and 1811) from 1984 to 2009. The spreadsheet records detailed sampling information including collection dates, sample numbers, specific locations within buildings, building numbers, types of materials tested, and asbestos content results.

Key observations include multiple instances of asbestos detection across various materials such as insulation, pipe elbows, wall materials, floor tiles, and ceiling materials. Asbestos percentages range from trace amounts to over 80% chrysotile, with some samples showing no asbestos detected. The data covers ambient air testing, mechanical rooms, basements, and various building components, providing a comprehensive historical record of asbestos presence in these facilities. The document was prepared by the 89th Medical Group and includes samples from locations like Air Force Base (AAFB) and Davidsonville Communication Site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS.XLS Page 1

COLLECTION DATE SAMPLE # LOCATION BLDG #

CASEFILE

# TYPE OF MATERIAL RESULTS

13-Jun-85 GM850281 AIR HANDLER DUCTWORK 1245 400A INSULATION 80% CHRYSOTILE

13-Mar-86 GM860064

MECHANICAL ROOM, PIPE

ELBOW 1245 400A INSULATION 1-5% AMOSITE

13-Mar-86 GM860064 MECH RM, PIPE ELBOW 1245 400A INSULATION 1-5% AMOSITE

13-Mar-86 GM860065 MECH RM, LG BOILER 1245 400A INSULATION >75% CHRYSOTILE

13-Mar-86 GM860066 MECH RM, PIPE ELBOW 1245 400A INSULATION 15-30% CHRYSOTILE

13-Mar-86 GM860067 UPPER PIPE 1245 400A PIPE INSULATION 5-15% CHRYSOTILE

13-Mar-86 GM860067 MECH RM, UPPER PIPE 1245 400A INSULATION 5-15% CHRYSOTILE

8-Dec-88 CONTRACTOR AAFB 1245 N/A AMBIENT AIR fibers/cc= 0.019

8-Dec-88 CONTRACTOR AAFB 1245 N/A AMBIENT AIR

BELOW DETECTION

LIMIT

8-Dec-88 CONTRACTOR AAFB 1245 N/A AMBIENT AIR VOID

8-Dec-88 CONTRACTOR AAFB 1245 N/A AMBIENT AIR VOID

8-Dec-88 CONTRACTOR AAFB 1245 N/A AMBIENT AIR N/A

8-Dec-88 CONTRACTOR AAFB 1245 N/A AMBIENT AIR N/A

4-Jul-89 CONTRACTOR AAFB 1245 N/A DEBRIS INSIDE DUCT 40% CHRYSOTILE

22-Jun-90 CONTRACTOR AAFB 1245 N/A BLUE FLOOR TILE 10% CHRYSOTILE

24-Jun-91 GM910229 LOBBY, BLUE FLOOR TILE 1245 N/A FLOOR TILE NO ASBESTOS FOUND

20-Mar-84 GY840064 BASEMENT OF 1345 1345 401H INSULATION <1% ASBESTOS

1-Aug-86 GM860503

BASEMENT, PIPE

INSULATION 1345 N/A PIPE INSULATION 30-50% CHRYSOTILE

24-Jan-97 GM970024 CEILING MATERIAL 1345 N/A CEILING MATERIAL 10-15% CHRYSOTILE

24-Jan-97 GT970017 CEILING MATERIAL 1345 N/A CEILING MATERIAL 10-15% CHRYSOTILE

22-Feb-97 CONTRACTOR AREA SAMPLE OFFICE #14 1345 006A AMBIENT AIR 0.0015 f/cc

22-Feb-97 CONTRACTOR AREA SAMPLE OFFICE #22 1345 006A AMBIENT AIR 0.0008 f/cc

22-Feb-97 CONTRACTOR BLANK 1345 006A AMBIENT AIR NONE DETECTED

19-Sep-86 GM860583 NW PIPE INSULATION 1794 400A PIPE INSULATION 50-75% CHRYSOTILE

19-Feb-90 CONTRACTOR TOP LAYER 1794 89 SVS WALL MATERIAL 15% CHRYSOTILE

19-Feb-90 CONTRACTOR BOTTOM LAYER 1794 89 SVS WALL MATERIAL NONE DETECTED

20-Aug-91 CONTRACTOR NOT SPECIFIED 1794 89 MXS FLOOR TILE 2-5% CHRYSOTILE

20-Aug-91 CONTRACTOR NOT SPECIFIED 1794 89 MXS FLOOR TILE TRACE - CHRYSOTILE

20-Aug-91 CONTRACTOR NOT SPECIFIED 1794 89 MXS ROOFING SHINGLE 25-30% CHRYSOTILE

20-Aug-91 CONTRACTOR BLACK TILE 1794 89 SVS FLOOR TILE W/MASTIC 2-5% CHRYSOTILE

20-Aug-91 CONTRACTOR BEIGE TILE 1794 89 SVS FLOOR TILE W/MASTIC CHRYSOTILE - TRACE

5-Aug-97 GM970470 ROOM 4 1794 89 CS WALL MATERIAL NONE DETECTED

5-Aug-97 GM970470 ROOM 4 1794 N/A WALL MATERIAL NO ASBESTOS FOUND

5-Aug-97 GM970471 SPRINKLER SHUT-OFF ROOM 1794 89 CS WALL MATERIAL 15-30% CHRYSOTILE

5-Aug-97 GM970471 ROOM 4 1794 N/A WALL MATERIAL 15-30% CHRYSOTILE

5-Aug-97 GM970472 ROOM 4 1794 89 CS WALL MATERIAL 10-15% CHRYSOTILE

5-Aug-97 GM970472 ROOM 4 1794 N/A WALL MATERIAL 10-15% CHRYSOTILE

5-Aug-97 GM970473 ROOM 4 1794 89 CS WALL MATERIAL NONE DETECTED

5-Aug-97 GM970473 ROOM 4 1794 N/A WALL MATERIAL NO ASBESTOS FOUND

17-Mar-04 GM044689 Mechanical Rm 1794 N/A Black floor tile Pending TEM Analysis

17-Mar-04 GM044690 Mechanical Rm 1794 N/A Gray floor tile Pending TEM Analysis

17-Mar-04 GM044691 Mechanical Rm 1794 N/A Sheet rock 20% ChRYSOTILE

17-Mar-04 GM044692 DOE Lab south corner 1794 N/A Sheet rock NONE DETECTED

17-Mar-04 GM044693 DOE Lab southeast corner 1794 N/A Sheet rock None DETECTED

30-Apr-85 CONTRACTOR

DAVIDSONVILLE COMM SITE,

ATTIC BACKGROUND 1811 777A AMBIENT AIR <0.01 f/cc

30-Apr-85 CONTRACTOR 1 RISER PROFO BAG 1811 777A AMBIENT AIR 0.08 f/cc

1-May-85 CONTRACTOR

DAVIDSONVILLE COMM SITE,

BX RETEST 1811 777A AMBIENT AIR <0.01 f/cc

20-May-09 GM090807 Wall 1794 N/A Insulation NONE DETECTED

20-May-09 GM090808 Wall 1794 N/A Mottled Grey Wall Layer 15% Chrysotile

20-May-09 GM090809 Wall 1794 N/A

Layered Drywall (Painted Surface Layer, Mottled Grey Wall Layer, Black Mastic, and

Brown Cardboard Looking Wall) 15% Chrysotile

20-May-09 GM090809M Wall 1794 N/A Black Mastic 3% Chrysotile

Prepared by 89th MDG Page 1

ASBESTOS.XLS Page 2

COMMENT

Prepared by 89th MDG Page 2