am_3.pdf

PDF 4 MB Posted

Attached to
RFP for Renewal of the Bird House at the National Zoological Park
Solicitation number
F18R010034
Issued by

About this file

Amendment 3--RFIs set 3

View the file

Other files

File Type Posted
Amendment_6.pdf PDF
Amendment_5.pdf PDF
Amendment_4.pdf PDF
04_Site_Visit_06_08_18.pdf PDF
02_Site_Visit_05_23_18.pdf PDF
03_Site_Visit_06.07_18.pdf PDF
am_2.pdf PDF
AM_1.pdf PDF
SIGN_IN_SHEET-BIRD_HOUSE.pdf PDF
NZP_Bird_House_2018_FINAL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

33330218RF0010034

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

OCON

Washington DC 20013-7012

MRC 1200

P.O. BOX 37012

OCON

OCON

Washington DC 20013-7012

MRC 1200

P.O. BOX 37012

SMITHSONIAN INSTITUTION

093310105/01/20180003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/01/2018

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Attached please find RFIs submitted as of May 31, 2018. This Amendment 3 incorporates the attached questions and responses thereto into the RFP.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Thomas Dempsey

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

SI RFI # QUESTION RESPONSE

33 Referencing Specification section 131300, page 26, 2.11, item A states that the basket strainers are to be rated for a minimum of 75 psi working pressure and be tested to 100 psi. The Fluidtrol ESW

Series basket strainer has a standard pressure rating of 50 psi. Please advise if indeed the higher pressure rating is desired.

The Oversized Basket Strainers serving the LSS should all be designed as specified for 75-psi working pressure and 100-psi test pressure. Fluidtrol can build to the specifications.

59 Specification 087100, par. 2.2 to 2.17: Please see attached request for acceptance of equal products.

See separate substitution requests document for requested substitutions.

All door hardware is acceptable except for:

2.2 Butt Hinges - Ives is not accepted. Accepted Substitute: Select

Products Limited.

2.2 Continuous Hinges - Ives is not accepted. Accepted Substitute:

Select Products Limited.

2.5 Electronic Key Management System - Schlage Sitemaster is not accepted. The KeyPER Systems Elite Series Electronic Key

Management system has been added to the approved list.

2.7 Electromechanical Locking Devices: Not enough information provided by Contractor. Schlage L Series would be accepted.

2.11 Conventional Exit Devices - Falcon is not accepted. Accepted

Substitute: Hager 4500 Series - Grade 1.

2.12 Door Closers: The Falcon SC70 is not accepted. LCN 4050

Series is accepted.

Renewal of the Bird House at the National Zoological Park

RESPONSES TO BIDDER QUESTIONS

RFP Solicitation No. F18R010034, dated June 12, 2018

RESPONSES TO BIDDER QUESTIONS, RFP Solicitation No. F18R010034 Page 1 of 8

60 Drawing TYD 1 01 – Security Demolition plan: Please confirm there will be no security demolition required for this project.

There are no existing security devices currently installed in the existing Birdhouse. Therefore Demolition Plan (TY101) and the

Demolition Notes on sheet TY001 may be disregarded.

79 Given the number of subcontractor qualifications required and the information that is being requested per trade including references and resumes, may this information be placed in an Appendix and not count toward the 50 total double-sided pages?

Yes.

80 RFP section L.2.b references sections L.3(B), (C), (D) and ( E). We cannot find these sections. Please provide or re-number.

Please see RFI 62.

81 Drawings TND 1 02, TND 1 03 and TND 1 04 do not show any work.

Please indicate if there will be any Telecomm demolition and if so, who will be responsible to perform this work? Owner or Contractor.

Response to follow.

82 What areas are to include the wave machines? How many will be required?

There is one Wave Machine. Located on sheet EX431 with keynote 5. It is located in aviary 1 habitat 104C.

83 Does the tile in Aviary 3 extend behind the donor board? No, the tile does not continue behind the donor wall.

84 On detail 2 sheet A-422, 9JJ & 9KK are called out for on the existing wall. Please clarify.

9KK is the typical partition type added to the face of the existing exterior wall. 9JJ is meant to be north of the wall with door 138.1 in it. The partition tag will be moved on an updated drawing provided to the successful bidder.

85 Is there a typical wall type at existing walls? Specifically in Holding

137 and behind 9F wall in Aviary 1 along grid line SA, there appears to be a furred finish but no call out.

The typical wall type at existing exterior walls is 9KK. An updated drawing will be provided to the successful bidder with the added partition tag.

86 Column enclosure on 1/A422 does not designate a wall type. Please clarify?

The wall type at column in the existing exterior walls is 9KK. An updated drawing will be provided to the successful bidder with the added partition tag.

87 It is assumed all wall types extend to underside of decking. Correct? All wall types extend to underside of decking unless otherwise noted.

88 4/A-421 indicates the curved wall to be type 9DD, floor plan A-102 shows this wall as 9F. Please clarify.

9DD on 4/A-421 remains as drawn. 9F on A102 will be moved along the curved wall south of partition 9D in Holding 140 on an updated drawing provided to the successful bidder.

RESPONSES TO BIDDER QUESTIONS, RFP Solicitation No. F18R010034 Page 2 of 8

89 Stairwell S1-1 appears to be hatched with an epoxy finish on A-132.

The finish schedule has this indicated as CONC-1. Please clarify?

Stairwell S1-1 is CONC-1. The extent of the epoxy finish hatch on

Sheet A-132 is correct.

90 On elevation 4/A-434, there is now finish to the front of the curved stair case. Is this correct?

The concrete wall will be painted dark to match the adjacent brown colored wall tile.

91 Is a full time dedicated QC Manager required to be part of our team?

If so what are the experience requirements for the position?

Yes. Capable of implementing and providing oversight of the requirements in Section 014000. Details shall be addressed in contractor’s technical submission.

92 What are the requirements for the Specialized CQC representatives? Capable of implementing and providing oversight of the requirements in Section 014000. Details shall be addressed in contractor’s technical submission.

93 Drawing L131 shows section 2/L310. This section, starting from the right and after the seatwall at the serpentine path, shows the 15”w mow strip and concrete paving surface per 1/L501. Please confirm that the surface at that area should be the unit paving per 10/L501.

See sheet L131. The current section 2/L310, cuts through the the concrete paving portion at the Pedestrian Path as drawn and noted. The Unit pavers occur in bands within the conc. Pedestrain path per detail 10/L501. Material Plan L131 shows extent of bands within pedestrain plath, see Sheet L401 for typical paving layout and dimensions.

94 Same as above, 2/L310 all the way to the left after the 6”w mow strip shows crushed stone surface. Please confirm this surface should be concrete paving, 1/L501.

See sheet L131, between the seatwall and the serpentine path the paving surface transitions from unit pavers adjacent to the seatwall, then crushed stone surface per detail 16/L501.

95 Specification section 102213, par. 2.5 mentions acrylic wall panels.

Please clarify, as this section specifies wire mesh partitions.

Sheets A-437, A-438 and similar animal holding details show acrylic panels within the wire mesh system.

96 Specification section 085113 and sheet A620. Please provide specification for the insulated metal panel of window Type A2.

The A2 frame type on A620 is to be composite metal panel which is in Section 07-4243. A620 will be updated and provided to the successful bidder.

RESPONSES TO BIDDER QUESTIONS, RFP Solicitation No. F18R010034 Page 3 of 8

97 Please reference drawings L166 and CD101. Note 12/CD101 calls for the removal of the 12”th concrete ponds and structures. The Legend on L166 calls for the Backfilling of existing concrete ponds with borrow fill. Please clarify the required work. Do the concrete ponds get demolished or left in place and backfilled?

Yes, concrete ponds and structures are removed per CD101. Note on L166 calls for backfill for soil where ponds have been removed.

The words "borrowed fill" will be removed on an updated drawing provided to the successful bidder. Backfill per noted planting soil profiles on L166 within the dashed lines of existing concrete ponds that have been removed by contractor. PA planting soil profiles are defined on L581. Backfill material found under paving areas per detail 1/L501. Refer to spec. section 329105 for planting soil types shown on site planting details.

98 Reference C112 Note "Rebuild Block Concrete Wall". Please provide the height of the wall.

48 inches above grade.

99 Reference RFP - L1.2.C (Work Plan). Please clarify what scope Work

Element 15 - Metal Shingle Façade is referring to.

Spec section 074215 Stainless Steel Wall Panels.

100 Reference Spec Section 044000 - Stone Assemblies and the Finish

Schedule on A601. Please confirm that the only stone on the project is the new granite base for the historic masonry arch.

Correct, the only stone on the project is the new granite base for the historic masonry arch.

101 Please see the attached door hardware submittals for exit devices and closers. Please clarify if these will be acceptable for this project.

See response to RFI #59.

102 Spec 087100 part 2.5B indicates that the keying system can only be provided by Corbin Russwin or Sargent. Will Schlage be acceptable as well considering they are listed as acceptable for the mechanical locks per spec section 087100 part 2.6A.

Schlage will be acceptable for the keying system.

103 Detail 1 / S803 for the seat walls shows a detail with a solid base and a square top typical for all seatwall conditions. The landscape details

1, 5 / L511 show the same footing getting a recessed top with cavities for the lighting equipment. Please clarify which details should apply and clarify the extent of each with the structural plans as this affects reinforcing, concrete, and production rates.

Landscape detail 1 & 5/L511 is to control the design. Space reinforcement around the cavity for the lighting equipment as required. Please see Sheets L512 and L513 for all locations for detail 1 and 5/L511 within the seat walls.

RESPONSES TO BIDDER QUESTIONS, RFP Solicitation No. F18R010034 Page 4 of 8

104 Drawing A650 Signage Schedule and Details indicated that the room signage is by Owner. Please confirm who is responsible for installation.

Drawing A650 Signage Schedule states that the SIGN TEXT will be provided by Owner. Contractor is to provide all signage and installation.

105 Detail 12 on S509 indicates that the stairs for holding rooms 137 and

138 are to be cast-in-place. Keynote 06-20 indicates a preformed FRP stair and is shown on A422 for these same stairs but is not shown on

A444. Please confirm that the holding stairs in rooms 137 and 138 are to be cast-in-place concrete.

The stair will be cast in place concrete. Architectural will remove keynote 06-20 and add a note indicating cast in place concrete on

Sheet A422 as well as add a note indicating cast inplace concrete on Sheet A444. The updated drawings will be provided to the successful bidder.

106 Please clarify the intent of, and difference between, the divisional breakdown that starts on page 30 of 165 and the one on page 33 of

165. Is the second one specifically for options?

Yes.

107 Can a manufacturer representative contact be provided for the

Vector Foiltec ETFE skylight system? Currently, general inquiries to the local New Jersey have gone unanswered.

Christina Borecki

55 Lane Road, Suite 110

Fairfield, NJ 07004 christina.borecki@vector-foiltec.com www.vector-foiltec.com telephone 862 702 8909 x101 fax 862 702 8907 mobile 973 597 8508

108 Please confirm that selective tree pruning under the supervision of an arborist is acceptable in order to properly stage the great flight aviary for painting.

Yes, this is acceptable.

109 Please reference SF1442 and the rest of the RFP. SF1442 identifies the solicitation number as F18R0100034. The rest of the RFP lists the number as F18R010034. Please clarify which number is correct.

The correct number is F18R010034.

110 Please provide the sign-in sheet from the second site walk. Please see attached.

111 Please provide the liquidated damages for the project. Liquidated damages will not be calculated for this project.

112 Please reference the bid form on page 33 of the RFP. Please revise the bid form to include divisions 12, 31, 32, and 33 and remove division 25.

Please see attached.

RESPONSES TO BIDDER QUESTIONS, RFP Solicitation No. F18R010034 Page 5 of 8

113 Please provide the bid forms B.3.1, B.4, and B.5 separate from the

RFP.

Please see attached.

114 Please reference B.4 Options on page 31 of the RFP. This section indicates that all options are adds. Please confirm that Option 2 is a deduct not an add.

Section B.4 erroneously states that all Options are Add's, not

Deducts. Options 1, 4 and 5 are Adds. Options 2 and 3 are

Deducts.

115 The RFP states a maximum page limit of 50 double-sided pages. In order to competitively bid the project, we will solicit bids from multiple subcontractors for each scope of work. If we submit a minimum of three subcontractors for each of the 18 scopes, it would result in nearly half of our proposal being subcontractor listings.

Additionally, in a hard bid procurement, bid submissions from subcontractors may not be received until 10-15 minutes prior to the

RFP bid deadline.

a. Can the subcontractor listings be submitted as an appendix and omitted from the page count?

b. Can the subcontractor listing be submitted electronically by 5 PM

EST on bid day with a hardcopy to follow within 24-hours?

a) Yes; b) Yes.

116 Based on the timing of the second site visit and to allow for adequate review and preparation:

a. Please allow a one (1) week extension on RFI submissions.

b. Please allow a one (1) week extension on RFP submissions.

a) We are continuing to monitor RFIs submitted after the deadline of May 31, 2018. We will answer additional questions in our discretion.

117 The RFP mentions peak and off-peak visitor seasons. Please provide the timeframes for peak and off-peak seasons.

Peak visitor season is March 15 – Sept 30; Off-peak visitor season is Oct 1 - March 14. Based upon the location of the project and construction access limited through the Hawthorn Street Gate, SI does not expect Zoo special events and public crowds to impact construction operations prior to substantial completion.

118 Please confirm all bird feces will be removed from the existing facility prior to turnover to the contractor for construction.

Once the building is unoccupied and turned over for construction, any bird feces related health concerns will be assessed and addressed by SI. For bids, Contractor to assume building meets

OSHA safety standards without requiring hazard control measures.

RESPONSES TO BIDDER QUESTIONS, RFP Solicitation No. F18R010034 Page 6 of 8

119 Per spec section 018113.13 Sustainable Design Requirements this project is intended to submit for LEED Gold certification based on the

2009 LEED credit system. To our knowledge you can no longer submit under LEED 2009 unless this project was registered with USGBC before 10/31/16. At this time LEED V4 would be the appropriate certification system. Please clarify the LEED goals for this project and update the scorecard provided as well as other specification section references to the outdated 2009 credits.

This project was registered under LEED 2009 prior to the deadline.

120 Please provide mix design information or photographs of samples for the terrazzo aggregates in the TZ-1 – TZ-4 terrazzo color selections.

Design Mix information is in Specification 096623 Resinous Matrix

Terrazzo Flooring, paragraph 2.4.

121 Please provide the RFI cut-off date? Please see RFI 116.

122 1/A444 indicates stair #4 treads are to be cast in place concrete per notes 03-12 and then polished as indicated per not 03-31 and the finish plan on A132. 12/S511 calls for a stained precast tread over cast in place concrete at the same stair #4 location. Please clarify intent.

Refer to 8/EX510 for design intent. The structure of the stair is

CIP concrete (1/A444) with polished (1/A132) precast treads

(12/S511). The risers are weathered steel (8/EX510 and 1/EX432).

RESPONSES TO BIDDER QUESTIONS, RFP Solicitation No. F18R010034 Page 7 of 8

123 In the solicitation part L.1C we are required to name certain subcontractors and provide qualification information. Because this is a cost-competitive award, typically we do not know which subcontractors we will be using until we receive their pricing on bid day when we can make our selections by balancing qualifications and price. A lot of this happens shortly before the bid is due, and usually there are subcontractors who are cost-competitive but who have not yet provided qualification information at the time of bid. In order to react to this inevitable event, we either quickly produce qualification information under pressure of submitting a responsive bid on time

(including printing new qualifications on site at the place the bid is due), or sometimes we decide that even though the subcontractor is cost-competitive we cannot produce adequate qualification information and we don’t include them in our bid. We request that SI allow the list of subcontractors and their qualification to be submitted separate from the bid 48 hr. after the initial submission.

This will allow bidders to separate the subcontractor selection process critical for competitive bidding from the distraction of creating or modifying qualifications packages at the last minute.

Please see RFI 56.

124 Spec section 042200, 1.2 B, #2 refers to a related section 071900

“Water Repellents”. This spec section (071900) is not part of the specifications provided. Please provide this specification section.

The reference to 071900 does not apply to this project and will be removed in an updated specification provided to the successful bidder.

125 Please confirm intent for removal and replacement of sheds/run enclosure in area B4. Is it acceptable to disassemble/store/reassemble the structures? If so can they be stored temporarily in one of the unoccupied enclosures? If they must be demolished and replaced with new please provide specification for replacement.

See response to RFI #16. In addition, yes, it is acceptable to disassemble/store/reassemble the structures. Bids are to reflect that Contractors will not be able to store sheds in one of the unoccupied enclosures. All materials must remain within the construction Limits of Work or stored off site.

RESPONSES TO BIDDER QUESTIONS, RFP Solicitation No. F18R010034 Page 8 of 8

BASE COST PROPOSAL SUBMISSION FORM – Lump Sums per Division

Division Division Subtotal

Div. 1 General Conditions

Div. 2 Existing Conditions $

Div. 3 Concrete $

Div. 4 Masonry $

Div. 5 Metals $

Div. 6 Wood, Plastics and Composites $

Div. 7 Thermal and Moisture Protection $

Div. 8 Openings $

Div. 9 Finishes $

Div. 10 Specialties $

Div. 11 Equipment $

Div. 12 $

Div. 14 Conveying System $

Div. 21 Fire Suppression $

Div. 22 Plumbing $

Div. 23 HVAC $

Div. 26 Electrical $

Div. 27 Communications $

Div. 28 Electronic Safety & Security $

Div. 31 $

Div. 32 $

Div. 33 $

SUBTOTAL $

Overhead and Profit $

Performance Bond $

Other – specify $

BASE COST PROPOSAL TOTAL $

B.4. Options: The option prices shall include all related costs (including but not limited to supervision, labor, materials, coordination, overhead, profit, and bonds). The Contractor shall hold the Option price for a period of sixty

(60) calendar days from the date of award. All Options are “Add’s,” not “Deduct’s.” Please see Project No.

0933101 Specifications Volume 1, Division 012300 for full description of each Option. Options shall be performed within Contract Time for Completion.

B.4.1A Option 1 (ADD) – Great Flight Aviary Netting Replacement:

1. Base Bid related to Option 1. Great Flight Aviary (GFA) netting replacement is not included in

Base bid.

2. Option 1. Replace existing Great Flight Aviary netting as indicated in Structural and Architectural drawings SD701, S701, S702, S703, AD701 and A701, and Specification Section 055000 “Metal

Fabrications”, section 2.2.C..

(Express in Words and Figures)

B.4.2 Option 2 (DEDUCT) – Wall Tile in Aviary 3:

1. Base Bid related to Option 2: Furnish and install custom printed wall tile and blended wall tile in

Aviary 3 (tile types T-5, T-6A, T-6B and T-7) as indicated in Architectural drawings and specifications including Specification Section 093000 and Appendix “Aviary 3 Wall Tile Layout -

Base Bid”.

2. Option 2: Replace custom printed wall tile and blended wall tile in Aviary 3 (tile types T-5, T-6A, T-6B and T-7) with repetitive gradient wall tile (tile type T-10) as indicated in Architectural drawing A434, and as specified in Specification Section 093000 “Tiling”, Section 2.3.E and

Specification Appendix “Aviary 3 Wall Tile Layout – Bid Option 2”.

B.4.3 Option 3 (DEDUCT): 3a - Exterior Wall at Discovery Classroom; 3b - Exterior Guardrails; 3c -

Exterior Plants.

1. Base Bid:

a. Base bid related to Option 3a: Furnish and install sliding storefront system with fixed door at east elevation of Discovery Classroom (room 109) as indicated in Architectural drawings and specification 084115 “Sliding Storefront System”.

b. Base bid related to Option 3b: Furnish and install exterior mesh infill guardrails with pickets as indicated in Landscape drawings and Specification Section 057050 “Weathering

Steel Rails and Planters”.

c. Base bid related to Option 3c: Furnish and install planting as indicated in Landscape drawings.

2. Option 3 is comprised of three parts: 3a, 3b and 3c as follows:

a. Option 3a: Replace sliding storefront system and fixed door at east elevation of Discovery

Classroom (room 109) with a fixed curtainwall system and door as indicated in

Architectural drawings A624 and A626.

b. Option 3b: Omit pickets within exterior mesh infill guardrail frames as indicated in

Landscape details #7 and #9 on sheet L522 as well as drawings L303, L304, L305, and

Specification Section 057050 “Weathering Steel Rails and Planters”.

c. Option 3c: Furnish and install a 10% reduction in quantity for non- bioretention plantingshrubs, grasses, and perennials as indicated in Landscape drawing L163.

B.4.4 Option 4 (ADD) – AHU Filters

1. Base Bid related to Option 4: Furnish and install standard AHU outside air and return air prefilters

(Type PF) and final filters (Type FF) as indicated in Mechanical drawings and Specification

Section 234100 “Particulate Air Filtration”.

2. Option 4: Replace standard AHU outside air and return air prefilters (Type PF) and final filters

(Type FF) with electronic AHU air cleaning system (Type AEF) as indicated in Mechanical drawings M503, M601, M802, and in Specification Section 234100 "Particulate Air Filtration".

B.4.5 Option 5 (ADD) – Building Information Modeling (BIM)

1. Base Bid related to Option 5: Building Information Modeling (BIM) is not included in Base bid.

2. Option 5: Provide Building Information Modeling (BIM) as indicated in Specification Section

013250 “BIM Requirements”.

COST PROPOSAL SUBMISSION FORM – Lump Sums per Division

Division Division Subtotal

Div. 1 General Conditions

Div. 2 Existing Conditions $

Div. 3 Concrete $

Div. 4 Masonry $

Div. 5 Metals $

Div. 6 Wood, Plastics and Composites $

Div. 7 Thermal and Moisture Protection $

Div. 8 Openings $

Div. 9 Finishes $

Div. 10 Specialties $

Div. 11 Equipment $

Div. 12 $

Div. 14 Conveying System $

Div. 21 Fire Suppression $

Div. 22 Plumbing $

Div. 23 HVAC $

Div. 26 Electrical $

Div. 27 Communications $

Div. 28 Electronic Safety & Security $

Div. 31 $

Div. 32 $

Div. 33 $

SUBTOTAL $

Overhead and Profit $

Option 1

Option 2

Option 3

Option 4

Option 5

COST PROPOSAL WITH OPTIONS $

B.5. Multi-year Funding Stream.

The funding stream for contract award is $5.00M in FY18, $12.00M in FY2019, and the balance in FY2020.

FY 2018 APPROPRIATED FUNDING INCREMENT: ($5.00M available this FY 2018)

General Conditions $___________________

Historic Building Protection, Separation of construction zones, Demolition, Temporary offices $_______________

Building utilities $___________________

Structural concrete, substructure, Site work, concrete (except finish systems), structural modifications, foundations

(including excavation and dewatering) $___________________

Mechanical, Electrical and Plumbing rough-in $______________

Submittals and shop drawings $___________________

SUBTOTAL $___________________

Termination Cost (Cancellation Charge) $___________________

Other – Offerors shall clearly and completely describe items deleted/added to FY2018 Funding Phase

(Attach pages as necessary)

TOTAL-FY2018____________________________________________________$___________________

FY2019 FUNDING INCREMENT: ($12.00M) obligated by 1/31/20 or sooner from FY2019 appropriation

General Conditions (12 months $___________________

Remainder of Structural systems (Concrete fill, Steel framing) $___________________

Partitions, Rough Carpentry, Doors and Windows, Long-lead purchases, etc $__________________

Remainder of MEP rough-in $ ______________

MEP $___________________

Fire Suppression $_______________

Roofing $__________________

Other – Offerors shall clearly and completely describe items deleted/added to FY2019 Funding Phase $___________________

TOTAL-FY2019____________________________________________________$___________________ (Express in Words and Figure

FY2020 FUNDING INCREMENT: Balance of funding obligated by 1/31/21 or sooner from FY2020 appropriation)

General Conditions (12 8 months) $___________________

Interior systems – Walls, doors, balance of partitions $___________________

Fire Protection $___________________

Balance of finish sitework $___________________

Specialties and finishes $___________________

Commissioning $___________________

O&M $___________________

As-built documents $___________________

Project Close-out $___________________

Other – Offerors shall clearly and completely describe items deleted/added to FY2020 Funding Phase

TOTAL-FY2020____________________________________________________$___________________ (Express in Words and Figure

Request for Acceptance of equal products: Specification Section 087100.

2.2 HANGING DEVICES

BUTT HINGES

Approved: a. Bommer Industries (BO). b. Hager Companies (HA). c.

McKinney Products (MK).

Requesting Acceptance: d. Ives (IV)

CONTINOUS HINGES:

Approved: a. Bommer Industries (BO). b. McKinney Products (MK). c.

Pemko Manufacturing (PE).

Requesting Acceptance: d. Ives (IV) Note: Two of the three brands listed are from ASSA ABLOY.

2.3 POWER TRANSFER DEVICES:

Approved: a. McKinney Products (MK) - QC (# wires) Option.

Requesting Acceptance: d. Von Duprin Note: The only brand approved is an ASSA ABLOY company

2.3 ELECTRIC DOOR WIRE HARNESS:

Approved: a. McKinney Products (MK) – QC-C Series.

Requesting Acceptance: b. Allegion Connect

Note: The only brand approved is an ASSA ABLOY company

2.4 DOOR OPERATING TRIM:

Approved: a. Burns Manufacturing (BU). b. Rockwood Manufacturing (RO).

c. Trimco (TC).

Requesting Acceptance: d. Ives (IV)

2.4 COORDINATORS:

Approved: a. Burns Manufacturing (BU). b. Rockwood Manufacturing (RO).

c. Trimco (TC).

Requesting Acceptance: d. Ives (IV)

2.4 DOOR PUSH PLATES & PULLS:

Approved: a. Burns Manufacturing (BU). b. Rockwood Manufacturing (RO).

c. Trimco (TC).

Requesting Acceptance: d. Ives (IV)

2.5 CYLINDERS AND KEYING:

Approved: a. Sargent Manufacturing (SA) - Degree Series. b. Corbin Russwin (RU) – Access 3 Series.

Requesting Acceptance: c. Schlage Lock Co (SC) - Everest.

Note: The only brands approved are ASSA ABLOY companies

2.5 ELECTRONIC KEY MANAGEMENT SYSTEM:

Approved: a. Medeco (MC). b. Traka (TA).

LevanN Text Box Renewal of the Bird House at the National Zoological Park Substitution Requests RFP Solicitation No. F18R010034, dated June 12, 2018

Requesting Acceptance: c. Schlage Lock Co (SC) – Sitemaster Note: The only brand approved is an ASSA ABLOY company

2.7 ELECTROMECHANICAL LOCKING DEVICES:

Approved: a. Corbin Russwin Hardware (RU) - ML20900 Series. b. Sargent Manufacturing (SA) – 8200 Series.

Requesting Acceptance: c. Schlage Lock Co (SC) Note: The only brands approved are ASSA ABLOY companies

2.10 ELECTROMAGNETIC LOCKING DEVICES:

Approved: a. Securitron (SU) – M680 Series.

Requesting Acceptance: c. Schlage Lock Co (SC).

Note: The only brand approved is an ASSA ABLOY company

2.11 CONVENTIONAL EXIT DEVICES:

Approved: a. Corbin Russwin Hardware (RU) - ED4000 / ED5000 Series. b.

Sargent Manufacturing (SA) - 80 Series. c. Von Duprin (VD) - 35A/98 XP Series.

Requesting Acceptance: d. Falcon Hardware (FA) Note: Extra unequal parts have been added to the non-ASSA ABLOY brand to create an unfair advantage. Two of the three brands listed are from ASSA ABLOY. See attached sheet for further comparisons.

2.12 DOOR CLOSERS:

Approved: a. Corbin Russwin Hardware (RU) – DC6000 Series. b. LCN Closers (LC) - 4040 Series.

c. Sargent Manufacturing (SA) - 351 Series. d. Norton Door Controls (NO) - 7500 Series.

Requesting Acceptance: e. LCN 4050 Series, Falcon SC70 Series Note: Three of the four brands listed are ASSA ABLOY companies. See attached sheet for further comparisons.

2.13 AUTOMATIC DOOR OPERATORS:

Approved: a. Besam Automated Entrance Systems (BM) - SW100 Series. b.

Norton Door Controls (NO) - 6000 Series.

Requesting Acceptance: c. LCN Benchmark Series Note: The only brands approved are ASSA ABLOY companies.

2.14 ARCHITECTURAL TRIM:

Approved: a. Burns Manufacturing (BU). b. Rockwood Manufacturing (RO).

c. Trimco (TC).

Requesting Acceptance: d. Ives (IV)

2.15 DOOR STOPS AND HOLDERS:

Approved: a. Burns Manufacturing (BU). b. Rockwood Manufacturing (RO).

c. Trimco (TC).

Requesting Acceptance: d. Ives (IV)

2.15 Overhead Door Stops and Holders:

Approved: a. Rixson Door Controls (RF). b. Rockwood Manufacturing (RO). c.

Sargent Manufacturing

(SA).

Requesting Acceptance: d. Glynn Johnson Note: The only brands approved are ASSA ABLOY companies.

2.16 ARCHITECTURAL SEALS:

Approved: a. National Guard Products (NG). b. Pemko Manufacturing (PE).

c. Reese Enterprises, Inc.

(RE).

Requesting Acceptance: d. Zero (ZE)

2.17 ELECTRONIC ACCESSORIES:

Approved: a. Securitron (SU) - MK Series.

Requesting Acceptance: b. Schlage Electronics (SC).

Note: The only brand approved is an ASSA ABLOY company.

Specified Approved Approved Proposed Equal

ASSA-Abloy ASSA-Abloy Allegion Allegion

Product Feature C/R ED5000 Sargent 80 Von Duprin 98/99 Falcon 25

Mechanism Case Material (1) Stainless Steel Roll Form Stainless Steel Roll Form Aluminum Extrusion (.140") Aluminum Extrusion

Pushpad Material (1) (3) Coated Metal Sub-Assembly STS Roll Form With

Plastic Insert

Aluminum Extrusion Base with STS

Touchpad (.140")

Aluminum Extrusion Base with STS

Roll Form Cover

ANSI Grade 1 Certified a a a a Standard Flush & Sloped End Cap, Die-Cast or Forged (2) (3)

- - a a

Stainless Steel Latch Bolt a a a a

All-Metal Latch Retraction Mechanism (3) - a a a

Roller Strike Available on All Devices (4) a - a a

Available Deadlatching (5) a a a a

All-Metal Dogging Mechanism (3) a - a a

Latch Return Compression Spring (6) - - a a

Dual Lever Trim Compression Springs (6) - - a a

Escutcheon (7) Brass Casting Cast Brass, Plated Finish Forged Brass, Plated Finish Stainless Steel or Brass

Available Security Trim (8) a a a a

Hydraulic Sound Dampening (9) - - a -

Independently Tested Cycles (10) 500,000 500,000 5,000,000 500,000

Warranty 5 Years 5 Years 3 Years 10 Years

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(10) Only tests that are performed by (not just witnessed by) independent testing agencies will give a true indication of expected performace, since they are the only tests that are guaranteed to be conducted on random production line samples.

A roller strike reduces friction ensuring positive latching. It also reduces the force necessary to latch and unlatch the door.

Deadlatching prevents latchbolt manipulation, resulting in greater security.

Compression springs are less likely to suffer from metal fatigue than torsion or tension springs. The use of two compression springs per trim is even less likely to fail, and will maintain more consistent tension through its life cycle.

Forged escutcheons are much more durable than cast or wrought.

Security trim greatly reduces the ability to force entry by the use of break-away lever trim.

Hydraulic sound dampening eliminates noises associated with touchpad operation.

REQUEST FOR APPROVAL

Aluminum extrusion is much stronger than stainless steel roll form.

A die-cast flush mounted and sloped end cap will deflect impact and prevent the end cap from being damaged or torn off. Stamped, overlapping end caps are industry-standard, and are prone to

Plastic parts used for the Touchpad, End Cap, Dogging Mechanism, or Latch Retraction can compromise safety, security, lifespan, and aesthetics of the exit device.

Specified Proposed Equal Proposed Equal

ASSA-Abloy ASSA-Abloy ASSA-Abloy Allegion Allegion Allegion

Product Feature C/R DC6200 Sargent 351 Norton 7500 4040 Falcon SC70 LCN 4050

ANSI/BHMA 156.4, Grade (1) Grade 1 Grade 1 Grade 1 Grade 1 Grade 1 Grade 1

Cylinder Material (2) Cast Iron Aluminum Aluminum Cast Iron Aluminum Aluminum

Piston Diameter (3) 1-3/8" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2"

Warranty 25 Years 25 Years 25 Years 30 Years 10 Years 25 Years

UL10C Certified a a a a a a ANSI 117.1 ADA Compliant a a a a a a Full Rack and Pinion Construction a a a a a a Double Heat Treated Pinion (4) - - - a a a Fully Adjustable Spring Sizes 1 - 6 a a ** a a a

Separate Adjusting Valves (Closing/Latch Speeds, Back Check) a a a a a a

Free of Pressure Relief Valve (PRV) (5) a - a a a a Standard Forged Steel Arm Construction - - - a - -

Full Complement Bearings (6) - - - a - a Standard Powder Coat Finish (7) - a - a - a Standard All Weather Fluid (8) a a a a a a Extra-Duty Arms Available a a a a a a

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

* LIFETIME warranty does NOT cover "ordinary wear and tear"

* Stanley Limited lifetime warranty covers manufacturing defects at the the "sole discretion of Stanley", and does not cover wear and tear.

There are three forms of cycle testing (as described below). Because of potential variance in testing standards, only testing results performed by independent testing labs on randonly selected devices are used in this comparison, as it gives the most accurate indication of "real-world" performance.

- Internally Tested: Manufacturer tests their own selected product according to their own testing standards.

- Witnessed by Independent: Manufacturer tests their own selected product. Independent testing lab verifies the testing procedures only. As the manufacturer hand selects the test subject, this may not be an accurate representation of typical product quality.

- Independently Tested: Independent lab tests randomly selected product according to independently accepted testing standards. This testing most accurately represents typical performance that can be expected from the item product.

Double heat treated pinions are harder than single heat treated, and offer superior protection against wear and abuse.

A pressure relief valve (PRV) is designed to protect the door closer from damage, and sacrifices safety in the process. In abusive situations the closer releases control of the door, allowing it to swing freely and uncontrolled, thus increasing the risk of personal injury.

Full compliment needle bearings provide 33% greater surface area than caged bearings, resulting in longer closer life and an increased ability to withstand abuse.

Powder coating provides superior protection against the effects of corrosion and weathering, and provides a durable, chip resistant finish.

All-weather fluid requires less seasonal adjustments as the fluid maintains a stable viscosity throughout a wide temperature range.

ANSI cycle testing requirements as follows: 2 Million cycles for Grade 1, 1 Million cycles for Grade 2, and 500,000 cycles for Grade 3

Cast iron is superior to aluminum body closers due to strength and longevity, and it wears better with a forged steel piston.

A larger piston / cylinder reduces the amount of hydraulic pressure per square inch in operation, reducing the occurance of damage and leaking.

Approved

REQUEST FOR APPROVAL

SUBSTITUTION REQUEST FORM

Project: NZP Renew Bird House Facility.

To: Whom it may concern.

Re: Resinous Matrix Terrazzo Flooring.

Substitution Request Number: 001

From: Doyle Dickerson Terrazzo. / Jenifer Carballo

Date: 5/29/2018

A/E Project Number:

Contract For: Terrazzo Floor Installation.

Specification Title: Resinous Matrix Terrazzo Flooring Description: Products and Manufacturers

Section: 09 6623 Page: 4 Article/Part: 2, 2.2, A-1,2 a-c.

Proposed Substitution: Terrazzo Brand Products by Concord Terrazzco Company

Manufacturer: Concord Terrazzo Co. Address: 1818 University Commercial Pl Charlotte NC 28213 Phone: 704-921-4928

Trade Name: Model No.:

Installer: Doyle Dickerson Terrazzo, Inc. Address: 1709 University Commercial Pl Charlotte NC 28213 Phone: 704-921-4940

History: New product 2-5 years old 5-10 years old More than 10 years old

Differences between proposed substitution and specified product: Please see attached comparison table.

Point-by-point comparative data attached

Reason for not providing specified item: Please see the attached reasons for the request.

Similar Installation:

Project: Please see attached list of references. Architect:

Address: Owner:

Date Installed:

Proposed substitution affects other parts of Work: No Yes; explain

Savings to Owner for accepting substitution: Pricing is competitive, and the saving is up to 15% on the price material.

Proposed substitution changes Contract Time: No Yes [Add] [Deduct] days.

Supporting Data Attached: Drawings Product Data Samples Tests Reports other

SUBSTITUTION

REQUEST

(Continued)

The Undersigned certifies:

• Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.

• Same warranty will be furnished for proposed substitution as for specified product.

• Same maintenance service and source of replacement parts, as applicable, is available.

• Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.

• Cost data as stated above is complete. Claims for additional costs related to accepted substitution which may subsequently become apparent are to be waived.

• Proposed substitution does not affect dimensions and functional clearances.

• Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.

• Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete in all respects.

Submitted by: Jenifer Carballo/ Doyle Dickerson Terrazzo, Inc.

Signed by:

Firm: Doyle Dickerson Terrazzo, Inc.

Address: 1709 University Commercial PL

Charlotte, NC 28213

Telephone: 704-921-4940

Attachments: References, Comparison Table, Reasons for Request, NTMA Concord Membership.

A/E’s REVIEW AND ACTION

Substitution approved - Make submittals in accordance with Specification Section 01330.

Substitution approved as noted - Make submittals in accordance with Specification Section 01330.

Substitution rejected - Use specified materials.

Substitution Request received too late - Use specified materials.

Signed by: Date:

Additional Comments: Contractor Subcontractor Supplier Manufacturer A/E

Doyle Dickerson Terrazzo, Inc. is a NTMA Member

Date: May 29, 2018.

Project: NZP Renew Bird House Facility.

Location: Washington, DC.

Proposed Manufacturer/ Product: Concord Terrazzo Co., Inc./ Terrazzco Brand Products Reasons for not using specified items

• TERRAZZCO® Epoxy Resin Matrix has yielded test results that comply and exceed the NTMA guidelines.

o Utilizing Terrazzco EZpour will provide the owner with an equal or superior product when compared to terrazzo system currently specified with the opportunity to save up to 15% on the price material.

• TERRAZZCO® Epoxy Resin incorporates rapidly renewable materials.

o Other products on the market do not.

o There are more LEED credits possible if LEED certification is being sought.

• Concord Terrazzo Co., Inc., the proposed manufacturer, is able to supply precast products using the same material as the poured-in-place terrazzo floor if it is part of the spec.

o There will be better quality control than having to outsource the precast fabrication to another manufacturer.

o There will be less lead time required for fabrication.

o The precast epoxy terrazzo product will match the poured-in-place floor since both the floor and precast will be fabricated from the same material.

o All materials would be coming from one central source.

• There will be more competition during the bid process.

o Approval of another manufacturer during the bid process will cause more competition in pricing of materials.

• There is possible expedition of schedule due to close proximity of proposed manufacturer.

o Concord Terrazzo Company is located 395 miles away from the jobsite as the crow flies/drive.

o There will be less time required for shipment and delivery of material with the use of

Terrazzco Brand Products by Concord Terrazzo Company.

Date: May 29, 2018

Project Name: NZP Renew Bird House Facility.

Proposed Product: TERRAZZCO® Brand Products/ Concord Terrazzo Company.

Re: Comparison Table of Physical Properties.

Tensile

Strength without aggregates.

Compressive

Strength without aggregates.

Flammability with aggregates.

Thermal

Coefficient of Linear

Expansion with aggregates.

Bond Strength with aggregates.

TERRAZZCO®

Brand

Products

9,890 psi 13,200 psi Self-

Extinguishing

˂25”

17.4x10-6 in./in./°F

400 psi (100% concrete failure)

Standard

Market

Specification

Guidelines

Min. 3,000 psi

Min. 10,000 psi

Self-

Extinguishing

˂25”

25x10-6 in./in./°F maximum

Min. 300 psi (100% concrete failure)

Project-

Specific

Specification

Guidelines

3,000 psi 10,000 psi Self-

Extinguishing.

Extent of burning 0.25 inch max.

0.0025 in./in./°F maximum

Not Specified.

VOC free for a healthier environment

Contributes toward LEED® credits

Manufactured and Supplied from Southeast United States

Lowest life-cycle costing flooring system available

Extensive color capabilities allow for unlimited design variations

Self-priming, no primer needed

CONSIDERATIONS

Substrate temperature must be between 55° and 90° F before, during and 72 hours after installation. The surface temperature of the concrete must be 5° above the dew point to ensure proper curing of the terrazzo floor

Substrate must be free of dirt, waxes, curing agents, and other foreign materials.

The concrete surface must be prepared by shot blasting or by grinding

All control joints and expansion joints in the substrate must be revealed with the appropriate divider strips in the terrazzo topping

An active vapor barrier must be present under concrete slab

Materials should be allowed to acclimate to controlled application environmental conditions prior to being mixed

Material is not designed to be used as a moisture vapor barrier

TYPICAL USES

TERRAZZCO® EZpour Epoxy 158 is perfect for almost any surface where a uniformly even, highly durable product is desired. TERRAZZCO® EZpour Epoxy 158 provides the best in aesthetic value and innovation making it ideal for commercial, industrial, and institutional uses. TERRAZZCO® EZpour Epoxy 158, when integrated with marble or granite aggregate resists heavy industrial wear and chemical corrosion making it perfect for pharmaceutical and chemical plants. TERRAZZCO® EZpour Epoxy 158 is the superior decision for educational institutions, medical centers, sports facilities, and institutions because of its hygienic, smooth surface that is effortless to clean.

APPLICATION

Surface Preparation: All work should be performed by trained and experienced contractors or maintenance personnel. Concrete surface and air temperature must be a minimum of 55°F during installation and cure. Concrete surface temperature must be 5° above the dew point to ensure proper curing of the terrazzo floor. Consult installer for job specific slab conditions for TERRAZZCO® epoxy terrazzo flooring system installation. Installation of TERRAZZCO® EZpour Epoxy 158 should be performed under end-user like conditions. Concrete surface must be free of dirt, waxes, curing agents, and any other foreign materials. Surfaces should be prepared by grinding or shot blasting and any repairs to concrete must be made prior to applying this product. An active vapor barrier under the concrete slab is required. Concrete slabs receiving resinous terrazzo flooring must be tested for relative humidity according to ASTM F-2170 (Relative Humidity in Concrete Floor Slabs using in situ probes).

TERRAZZCO® EZpour Epoxy 158

DESCRIPTION

TERRAZZCO® EZpour Epoxy 158 is a pigmented, 100% solid (VOC free), two-component epoxy resin system. When combined with an extensive variety of decorative aggregates and poured in place to 1/4” or 3/8” nominal thickness, it yields a highly decorative terrazzo flooring system. TERRAZZCO® EZpour

Epoxy 158 provides incredible sustainability and high resistance to wearing while also being resistant to bacterial growth. The product also has the lowest life cycle cost of any flooring system available. Crack-resistant installations of

TERRAZZCO® EZpour Epoxy 158 can be achieved when installed in conjunction with a TERRAZZCO® moisture vapor mitigation MMS 950 and flexible membrane FM 528. This epoxy resin system contains rapidly renewable raw materials, derived from a proprietary soy-based formula.

ADVANTAGES

Rev. 05/10/16

Measurements must be made using Wagner Electronics Rapid RH® 4.0 Smart Sensor and Rapid RH® Easy Reader.

RH reading below 75% do not require the application of a vapor moisture mitigation system. 75% or higher requires the use of Moisture Mitigation System MMS 950. A record sheet should be filled out that includes the ambient temperature and humidity during testing along with the substrate temperature and relative humidity. The test must be conducted at end user environmental conditions. Any deviation from this procedure will result in the warranty being voided.

TECHNICAL DATA

Cured Resin Properties:

Property Test Method Result NTMA Requirement

Hardness ASTM D-2240 using

Shore D Durometer

83.5 60 – 85

Tensile strength

ASTM D-638

Specimen made using "C" die listed in ASTM D-412

9,890 psi 3,000 psi min.

Compressive Strength ASTM D-695 Specimen

B cylinder 13,200 psi 10,000 psi min.

Flexural Strength ASTM D-790 4,500 psi NA

Chemical Resistance ASTM D-1308

No Deleterious Effects:

Distilled Water

Mineral Water

10% Sodium Hydroxide

Isopropanol

10% Hydrochloric Acid

.025 Detergent Solution

5% Acetic Acid

Ethanol

1% Soap Solution

30% Sulfuric Acid

No Deleterious Effects:

Distilled Water

Mineral Water

10% Sodium Hydroxide

Isopropanol

10% Hydrochloric Acid

.025 Detergent Solution

5% Acetic Acid

Ethanol

1% Soap Solution

30% Sulfuric Acid

System Performance:

Property Test Method Result Requirement

Flammability ASTM D-635 Self-extinguishing <.25" Self-extinguishing

.25" max. burning

Bond Strength

ACI COM 403

Bulletin 59-43 (pages 1139 - 1141)

400 psi

(100% concrete failure)

300 psi

(100% concrete failure)

Thermal Coefficient of Linear Expansion ASTM-D-696 17.4 x 10-6 / 0F 25 x 10-6 / 0F max.

WORKING DATA

Working (Pot) Life 40 - 50 min. @ 75°F

Full Set Time 18 - 24 hours @ 75°F

Full Cure & Maximum

Performance 5 -10 days

COVERAGE

TERRAZZCO® EZpour Epoxy 158 Thickness Coverage area per mixed gallon

3/8 in 9 – 10 sq.ft.

1/4 in 11 – 12 sq.ft.

Rev. 05/10/16

MATERIALS NEEDED

Mineral spirits or isopropyl alcohol for cleaning equipment.

Mixing equipment appropriate for work site.

MIXING & APPLICATION

Premix TERRAZZCO® EZpour Epoxy 158 resin part A before using. Mix five (5) parts of TERRAZZCO® 158 resin part

A with one (1) part of TERRAZZCO® hardener 158 Part B by volume with a slow speed drill until liquids are completely blended. Introduce the appropriate amount of aggregate and continue to mix.