AM_1.pdf
PDF 435 KB Posted
- Solicitation number
- F18R010034
About this file
Amendment 1 adds RFI set 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_6.pdf | ||
| Amendment_5.pdf | ||
| Amendment_4.pdf | ||
| am_3.pdf | ||
| 04_Site_Visit_06_08_18.pdf | ||
| 02_Site_Visit_05_23_18.pdf | ||
| 03_Site_Visit_06.07_18.pdf | ||
| am_2.pdf | ||
| SIGN_IN_SHEET-BIRD_HOUSE.pdf | ||
| NZP_Bird_House_2018_FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
33330218RF0010034
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
OCON
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
SMITHSONIAN INSTITUTION
093310105/01/20180001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/01/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Attached please find RFIs submitted as of May 8, 2018 and dated May 25, 2018. This
Amendment 1 incorporates the attached questions and responses thereto into the RFP.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Thomas Dempsey
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
SI RFI # QUESTION RESPONSE
1 “A. Projects – Provide three projects of similar size and complexity where the Offeror was the Prime Contractor. Referenced projects should be less than five years old.” Could this time period be extended to the last 8 years?
Due to the extremely demanding nature of this project we cannot extend the relevant time period.
2 Please provide the wage scale. The wage scale for this project is dictated by the requirements of the Davis Bacon Act. The location and type of project dictates use of Wage Decision DC180002 dated 05/11/2018. Offerors are hereby put on notice that the Smithsonian, in compliance with relevant federal law, will update the wage decision in the event that WD DC180002 dated 05/11/2018 is superseded during the bid period and if superseded prior to award. Please monitor www.wdol.gov for updates.
3 Please advise if the AE Team has modeled the project? If so? Can the model be made available to “Bidders” as soon as possible?
The project has been modeled. The model isn’t part of the construction contract documents, but will be made available to the
Contractor that is awarded the contract.
4 In Specification Section 131300, section 2.20. Please clarify if it is the intent of this section that all the Pool Style Pump motors, fractionator injector pump motor, regenerative blower parts (motor, housing, intake filter, intake silencer & pressure relief valve) are to have the factory coatings removed, blast cleaned, and a new High Solids Epoxy coating which complies with 2.20, G, 1 a/b applied?
Pool Style Pump motors, Fractionator Pump motors, Blowers and
Blower system components should all follow the specifications under each specific equipment section. Selections should follow brand requirements.
Renewal of the Bird House at the National Zoological Park
RESPONSES TO BIDDER QUESTIONS
RFP Solicitation No. F18R010034, dated May 25, 2018
RESPONSES TO BIDDER QUESTIONS, RFP Solicitation No. F18R010034 Page 1 of 2
5 The LSS Process Flow Diagram on Drawing sheets LS-603 to LS-607, please provide further information and/or a detail on the aeration fittings shown on the bottom of several of the ponds.
Please refer to detail 6 on drawing LS505 for specific information related to the aeration fittings in the ponds.
6 Please confirm the following items on Drawings A302,A500,A520 are a part of the contract: Mural in the Aviary; Natural sand at beach
(Aviary areas); Pelican shell mulch; Painting of shotcrete rockwork
It is the A/E teams' understanding that the A sheets listed in this question are actually referring to the EX series drawings and have been responded to with this understanding.
1.) The Aviary mural wall noted on sheet A302 as "by other" is the graphic wallpaper image and will be by others. The mural wall structure and finishes are part of the base building and identified in the architectural drawing sheets.
2.) The natural sand at the beaches in the aviary areas is part of the contract as noted on sheet EX520 and EX431.
3.) There is no reference to Pelican Shell mulch on these sheets or in the documents to the best of our knowledge. Please provide detail reference for us to better respond to your question.
4.) All painting and texturing of shotcrete is part of the contract.
See shotcrete spec. 033713.
7 In the Specifications there is a specification section 225201 “Fog
Production System”, section 2.4A.3 calls for a skid mount pump. The pump for the Fog Production system is not indicated on the plumbing schedule on Drawing P601. Please provide location for the fog production system pump.
The fog production system Skid mount pump and controls equipment is located in room Mech 017 along the east wall. Refer to note 14 on drawing P402. The RO system associated with the
Fog Production system is located in Dirt Room 027 notated as "Fog production RO system and tank" on Drawing 1/P402.
8 On Drawing P501 Detail 6 does not show the fog production machine but does show the brine tank and water softener. On the isometric plumbing drawing P601 the fog production machine is shown next to the water softener and brine tank. Please confirm the location of the fog production machine.
The water softener and brine tank detail on drawing P-501 is meant to be only for that system. The Fog production machine, while it is one of the items served by the softened water (TRW), is a separate entity and is physically located on plan adjacent to the water softener system.
RESPONSES TO BIDDER QUESTIONS, RFP Solicitation No. F18R010034 Page 2 of 2
File details come from the government source that posted it.