Project Statement of Work Jones Hole National Fish Hatchery Vernal County, Utah

REHAB SEWER MAIN

DATE: May 3, 2017

United States Fish and Wildlife Service Division of Engineering 134 Union Blvd.

Lakewood CO 80228

JONES HOLE NATIONAL FISH HATCHERY

SEWER MAIN REHAB

(17-019)

INDEX

No. of Pages

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01010 SUMMARY OF WORK 7

SECTION 01300 SUBMITTALS 2

SECTION 01400 QUALITY CONTROL 2

SECTION 01600 MATERIALS AND EQUIPMENT 1

SECTION 01700 PROJECT CLOESOUT 2

DIVISION 2 – SITE WORK

SECTION 02220 EXCAVATION, TRENCHING AND BACKFILLING

FOR UTILITIES 4

SECTION 02710 PRIME COAT 2

SECTION 02720 AGGREGATE BASE COURSE 2

SECTION 02740 BITUMINOUS CONCRETE PAVEMENT 4

DIVISION 15 - MECHANICAL

SECTION 15060 SEWER PIPES AND PIPE FITTINGS 4

ATTACHMENTS

1. DRAWING 6F-UT-601-17-019 (4 SHEETS)

2. CCTV REPORT -

https://fileshare.fws.gov/?linkid=KZi4zr6VWWUGK1WFXLlKnJTqZjIVHc8t8YDO DS6ncAGbVD1ePXqdLQ

DIVISION 1 SECTION 01010

GENERAL REQUIREMENTS SUMMARY OF WORK

01010-1

PART 1 GENERAL

1.01 WORK INCLUDED

A. The Contractor shall provide all incidental design, labor, material, and equipment necessary to replace approximately 325 feet of 8-inch diameter sewer pipeline with 8” PVC sewer pipe shown in the attached drawings.

B. Summary of Work

1. Clearing, excavation, trenching, dewatering, 8” PVC pipeline assembly and placement with bedding, backfill and compaction, and grading of the pipeline alignment.

a. The approximate location of the existing collapsed, broken, or blocked sewer pipeline is shown on Sheet 2 and 3 of Drawing No.

6F-UT-601-17-019 (attached drawing).

b. Confirmation of each collapsed, broken or blocked section of sewer pipeline must be done before excavation by referring to the CCTV report -https://fileshare.fws.gov/?linkid=KZi4zr6VWWUGK1WFXLlKnJ TqZjIVHc8t8YDODS6ncAGbVD1ePXqdLQ

c. Possible damage or contamination of domestic water collection pipeline will be repaired by the contractor at no additional cost to the government.

2. Demolition, removal and disposal of the existing 8-inch diameter sewer pipeline to a disposal site off government property.

3. Resurfacing of all excavation locations (approximately five 10’x30’ sections of asphalt) which shall match existing road profile.

4. Contractor shall obtain permit and coordinate site specific requirements with County Sanitarian, if required.

5. The Contractor shall have all licenses required by law for the execution of the work and shall comply with all Federal, State, or local laws, ordinances or rules and regulations relating to performance of the work.

6. All design and construction shall comply with all applicable Federal, State, and local codes, regulations, and requirements. In the absence of specific regulation or code, design and construction shall be executed according to commonly acceptable industry standard practice.

1.02 LOCATION AND INSPECTION OF SITE

A. The site of the work is at Jones Hole National Fish Hatchery, located approximately 45 miles northeast of Vernal, Utah.

01010-2

B. Contractors are urged to visit the site and become familiar with existing conditions. Failure of the Contractor to ascertain the nature, location, and conditions which affect the work will not relieve him from the responsibility for successfully performing the work without additional expense to the Government.

Prospective bidders may inspect the site by making arrangements with the Jones Hole National Fish Hatchery, 24495 East Jones Hole Hatchery Road, Vernal, Utah 84078, Contacts: Kip Bottomley, phone (435) 789-4481.

1.03 APPLICABLE CODES, STANDARDS AND SPECIFICATIONS

A. All work shall comply with codes and standards applicable to each type of work as listed in individual Sections of these specifications.

1. Conform to all regulations and statutes of the State of Utah, First District

Health Unit and to all Federal regulations which apply.

2. Materials, applications, and tests specified by reference to published standards of a society, association, code, or other published standards are included in the specifications as if written in their entirety.

3. Where referenced documents are not specified by date, the applicable version of the document shall be the version current as of the date established for receipt of bids.

4. Where a conflict occurs between referenced documents, the document containing the most stringent requirements governs.

1.04 PERMITS AND FEES

A. The Contractor shall be responsible for obtaining all necessary local, state, and federal permits and licenses, and payment of related fees, per the Contract Clauses.

1.05 ABBREVIATIONS

A. Abbreviations used throughout the specifications and the organization or document represented:

ANSI American National Standards Institute

1430 Broadway New York, NY 10018 ASTM American Society for Testing and Materials

01010-3

1916 Race Street Philadelphia, PA 19103

ASA American Standards Association (now USAS)

IBC International Building Code IECC International Energy Conservation Code IMC International Mechanical Code IPC International Plumbing Code

IRC International Residential Code 5203 Leesburg Pike, Suite 708 Falls Church, VA 22041-3401

NEC National Electric Code Batterymarch Park Quincy, MA 02269

NEMA National Electrical Manufacturers' Association 2101 L Street, N.W.

Washington, DC 20037

OSHA Occupational Safety and Health Administration (U.S. Department of Labor) Government Printing Office Washington, DC 20402

UL Underwriters Laboratories 333 Pfingston Road Northbrook, IL 60062

B. Additional abbreviations will be defined as they appear in the specification.

1.06 MANUFACTURER'S SPECIFICATIONS

A. Products and processes shall conform to the manufacturer's latest published specifications.

B. At the request of the Contracting Officer, the Contractor shall provide a sworn affidavit from the manufacturer certifying that material, products, and processes delivered and used on the project meet the industry standard requirements. This affidavit shall not relieve the Contractor from his responsibility for full compliance with the requirements of the specifications.

01010-4

1.07 MEANS AND METHODS

A. Means and methods of construction shall be such as the Contractor may choose;

subject, however, to the Contracting Officer's right to reject means and methods proposed which:

1. Constitute a hazard to the work, persons, or property.

2. Will not produce finished work in accordance with terms of the contract.

3. Are contrary to specified means or methods included in the contract.

B. The right to reject means and methods of the Contractor or subcontractor shall not be construed or interpreted as acceptance of control of means and methods by the Contracting Officer.

C. The Contracting Officer's approval of means and methods or failure to exercise right to reject means and methods shall not relieve the Contractor of the obligation to complete the work required by the contract.

D. Total responsibility for control of all means and methods lies with the Contractor for all work.

1.08 COORDINATION

A. In the event that other contracts are in progress concurrently with this contract, the Contractor shall coordinate his work so as not to disrupt progress of other work, and shall cooperate to facilitate orderly progress of all work.

1.09 ENVIRONMENTAL PROTECTION

A. Pollution Control

1. The Contractor shall abate and control all environmental pollution arising from construction activities by complying with all applicable Federal, State, and local laws and regulations concerning environmental pollution control and abatement, as well as the specified requirements in this contract.

a. Compliance with this requirement by subcontractors will be the responsibility of the Contractor.

B. Fossils and Cultural Materials

01010-5

1. Should the Contractor discover any fossils or cultural materials during construction operations, such objects shall become the property of the Government. The Contractor shall cease construction operations in the area of the "find," and immediately notify the Contracting Officer of such discovery. Construction operations may proceed in other areas not affected by this clause. Care shall be exercised by the Contractor so as not to damage or collect fossils or cultural materials uncovered during excavation operations.

2. If the Contractor uses soil materials obtained from a non-government source to perform work that is required under this project, and a new borrow site is opened, or an existing borrow area is expanded in order to obtain such materials, the Contractor shall be required to comply with Section 106 of the National Historic Preservation Act.

3. Failure to comply with this requirement may be considered a violation of the Archeological Resources Protection Act of 1979 as amended.

Destruction of historic and prehistoric sites and/or unauthorized collection of cultural materials can result in criminal and/or civil penalties. Penalties can include fines, prison sentences, and/or confiscation of equipment.

C. Prevention of Water Pollution

1. The Contractor shall be responsible for implementing the terms and requirements of the Utah storm water discharge permit, as issued to the State under the National Pollution Discharge Elimination System (NPDES), by the Environmental Protection Agency (EPA). The Contractor shall apply for and execute all permits as required by the State of Utah regarding storm water discharge from the construction site. The Contractor shall submit to the Contracting Officer all permit applications and all approvals from the State. Allow the Government 10 days for review of the application package prior to submission to the State.

2. During construction the Contractor shall comply with all applicable

Federal, State, and local laws and regulations concerning the control and abatement of water pollution.

3. The Contractor's construction activities shall be performed by methods that will prevent entrance or accidental spillage of solid matter, contaminants, debris, and other objectionable pollutants and wastes into streams, flowing or dry water-courses, lakes, ponds, and underground water sources. All debris and construction waste shall be taken off-site to a jurisdictionally accepted waste management facility.

01010-6

D. Abatement of Air Pollution

1. The Contractor shall comply with applicable Federal, State, and local laws and regulations concerning the prevention and control of air pollution.

2. Construction activities shall be performed in such a manner that air pollution is held to a minimum.

3. Burning of materials, trees and brush, combustible construction materials, and rubbish will not be permitted. All debris and construction wasted shall be taken off-site to a jurisdictionally accepted waste management facility.

E. Environmental Litigation

1. Time lost due to work stoppage because of failure of the Contractor to comply with these requirements may not be the subject of a claim for extension of time or for costs or damages.

F. Aquatic Invasive Species

1. In order to prevent introduction of New Zealand Mudsnails (NZMS) or other aquatic invasive species, the contractor shall ensure all boots, clothing and equipment shall be thoroughly washed at a site and in a manner approved by the Hatchery Manager prior to entering the hatchery production area. This requirement is especially important for equipment and employees that have been in the vicinity of Jones Hole Creek, the visitor parking and public access areas and trail and the current drying beds (as shown on Sheet No. 1 of Drawing No. 6F-UT-601-17-019).

G.

1.10 SAFETY

A. Contractor Responsibility.

1. The Contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and local regulations pertaining to the protection of workers, visitors to the site, and persons occupying areas adjacent to the site, including the provisions of 29CFR1910 and 29CFR1926 of the Code of Federal Regulations. The Contractor shall hold harmless the Government for failure to comply with any applicable safety or health regulation on the part of himself, his employees, or his subcontractors.

01010-7

2. The Contractor shall be responsible for providing medical examinations and maintaining medical records of personnel as required by the regulations.

B. Provide and maintain a basic first aid kit for use of workers.

1. Provide first aid supplies commensurate with size of project with items necessary for first aid treatment of all injuries.

2. Advise all workers of the location of first aid supplies.

C. Barricades

1. Provide and maintain temporary barricades as required for safety.

D. Provide at least one nonfreezing-type fire extinguisher at the worksite. Place in location readily accessible to workers.

END OF SECTION 01010

DIVISION 1 SECTION 01300

GENERAL REQUIREMENTS SUBMITTALS

01300 – 1

PART I GENERAL

1.01 SUBMITTALS

A. Refer to the technical specifications for all product submittals required.

B. All submittals shall be accompanied by a Government-furnished submittal form for each specification section, which shall be used as the document for approving or disapproving the material. The Government is to retain two (2) copies of all submittals. Contractor shall submit additional copies as needed to complete work.

C. Make all submittals of data, items, materials, and samples after receipt of the Notice to Proceed. Submittals shall be provided in sufficient detail to ensure conformity with contract requirements and specifications. Submittals on component parts forming a system, or that are interrelated, shall be submitted at one time as a single submittal.

D. Where more than one product, option, or feature is described in the submittal, clearly mark the specific item proposed for use. Selection of unmarked items or options will be made by Government.

E. The Contractor shall not perform work for which submittals are required prior to receipt of the submittals or samples, approved by the Fish and Wildlife Service.

1.02 CONSTRUCTION PROGRESS SCHEDULES

A. Submit construction schedule for approval within ten (10) calendar days after Notice to Proceed, including the following:

1. Breakdown of work activities by construction phase and in categories, as necessary, to allow monitoring of work progress during construction.

2. Sequence of construction by activity with start dates, duration, and finish dates.

B. Submit updated schedules monthly or sooner, if necessary.

DIVISION 1 SECTION 01300

GENERAL REQUIREMENTS SUBMITTALS

01300 – 2

1.03 SHOP DRAWINGS AND MANUFACTURERS' LITERATURE

A. Prior to the use or installation of any item specified as requiring submittal, the Contractor shall submit manufacturers' literature containing detailed specifications and performance data, or shop drawings, fully describing the items.

B. The Contractor shall not perform work related to shop drawings or samples prior to obtaining the required shop drawings or samples approved by the Government.

Shop drawings shall be in sufficient detail compatible with the complexity of the project to adequately illustrate the relationship of major components.

C. Shop drawings used at the site must bear approval stamp of the Contracting

Officer Technical Representative. The Contractor shall check shop drawings for conformity to the contract documents and mark them to this effect before submitting to the Contracting Officer.

1.04 RECORD (AS-BUILT) DRAWINGS

A. Provide and maintain at the project site, one complete set of Record (As-built) Drawings. The drawings shall be kept in good, clean, and readable condition.

B. The Record (As-built) Drawings shall have neatly inscribed all changes in work, including location of lines, fixtures, and changes in type of material; including depth, size, and location of existing underground utilities encountered during construction. Changes shall be noted with red pencil or red ink.

C. Submit these corrected Record (As-built) Drawings at time of final acceptance.

Note all data and changes on these Record (As-built) Drawings in sufficient detail and clarity and provide information necessary for preparation of final Record (As-built) Drawings.

1.05 GUARANTEES, WARRANTIES, AND CERTIFICATES

A. Submit all guarantees, warranties, and certificates prior to application for final payment.

END OF SECTION 01300

DIVISION 1 SECTION 01400

GENERAL REQUIREMENTS QUALITY CONTROL

01400 – 1

1.01 TESTS BY INDEPENDENT TESTING LABORATORY

A. Testing Laboratory

1. Independent testing laboratory shall be selected by the Contractor and the name of the proposed laboratory submitted for approval prior to the start of any testing.

2. Qualifications for Service Agencies: Engage testing service agencies, including independent testing laboratories, that are pre-qualified as complying with the American Council of Independent Laboratories' "Recommended Requirements for Independent Laboratory Qualification" and that specialize in the types of tests to be performed. Each independent testing agency engaged on the Project shall be authorized by authorities having jurisdiction to operate in the state where the Project is located.

B. Contractor's Responsibilities

1. It shall be the Contractor's responsibility to provide for all tests included in these specifications. Failure to provide a specified test shall be considered the same as a test with a failed result.

2. Make available to testing laboratory, at no cost, all materials to be tested.

3. Provide labor necessary to supply samples and assist testing laboratory in making tests.

4. Advise laboratory of the identity of material sources and instruct suppliers to allow inspections by the laboratory.

5. Submit written reports promptly, covering each inspection and test.

6. After initial tests have been performed, and if sampling, method, or workmanship does not comply with these specifications, the Contractor shall pay for any additional testing necessary to ensure compliance.

1.02 TEST STANDARDS

A. Tests shall be conducted in accordance with the requirements of the specifications designated or, where not specified, the latest standards of the ASTM.

DIVISION 1 SECTION 01400

GENERAL REQUIREMENTS QUALITY CONTROL

01400 – 2

1.03 TESTS AND LABORATORY SERVICES REQUIRED

A. Aggregate Base Course

1. Compaction Tests: Conduct required density tests during compaction operations in accordance with the appropriate tests listed:

AASHTO T 238 – Density of Soil and Soil-Aggregate in Place by Nuclear

Methods (Shallow Depth)

B. Bituminous Concrete Pavement

1. Compaction Tests: Conduct required density tests during compaction operations in accordance with the appropriate tests listed:

ASTM D2950 – Standard Test Methods for Density of Bituminous

Concrete in Place by Nuclear Method

PART 2 MATERIALS

NOT USED

PART 3 EXECUTION

3.01 TEST REPORTS

A. Submit two copies of each test report to the Contracting Officer, with copy to the Contractor, within the following time frame:

Aggregate Base Course Verbal report to Contracting Officer’s Compaction Test Representative at conclusion of test Written report within 4 days of test

Bituminous Concrete Verbal report to Contracting Officer’s Pavement Compaction Representative at conclusion of test Test Written report within 4 days of test.

END OF SECTION 01400

DIVISION 1 SECTION 01600

GENERAL REQUIREMENTS MATERIALS AND EQUIPMENT

01600 – 1

1.01 STORAGE AND PROTECTION

A. Protect all materials, work, and equipment against damage at all times.

B. Refer to Section 01500 for requirements for storage of materials. Store all materials that might be damaged in storage sheds, or under weather tight coverings.

C. Prefabricated components, and other manufactured items, shall be delivered and stored in such a manner that they will not be damaged or deformed. Material shall be stacked on platforms or pallets and covered with tarpaulins or other suitable weather tight, ventilated covering.

END OF SECTION 01600

DIVISION 1 SECTION 01700

GENERAL REQUIREMENTS PROJECT CLOSEOUT

01700 – 1

1.01 FINAL INSPECTION

A. The Contractor shall request a final inspection, in writing, at least ten (10) days prior to the anticipated date of completion.

B. Work will not be considered ready for final inspection until all the work has been completed and the Contractor has certified that all items are properly installed and in strict compliance with all contract terms and conditions.

C. The Contractor or his project supervisor shall be at the job site during the final inspection.

1.02 SUBMITTALS

A. Submit all written guarantees, warranties, and certificates required under Section 01300 to the Contracting Officer prior to final payment.

1. Guarantee or warranty periods shall extend the full period of the required guarantee period after:

a. Work has been found to be defective during the guarantee or warranty period and therefore the work is replaced.

2. The new guarantee or warranty period shall commence when the work or item has been properly repaired or replaced, as appropriate, and has been accepted by the Contracting Officer. The new guarantee or warranty period shall be equal to the original guarantee or warranty period provided for the work or item under the basic contract.

B. Prior to final payment, submit required Record (As-built) Drawings to Contracting

Officer. Refer to Section 01300.

C. Submit reports of all tests to the Contracting Officer prior to final payment. Refer to Section 01400.

DIVISION 1 SECTION 01700

GENERAL REQUIREMENTS PROJECT CLOSEOUT

01700 – 2

1.03 CLEANUP

A. All work and storage areas shall be kept clean and free from paper, garbage, and trash. Such materials shall be removed by the Contractor and disposed of off site at dumping facilities equipped to handle said materials.

B. Fuels, lubricants, petroleum products, chemicals or other waste materials shall be disposed of in properly designated areas off Government premises.

C. No burning of rubbish on Government premises will be allowed.

D. Tools, equipment, and temporary facilities shall be removed when no longer required for execution of the work.

E. After all work is completed according to the specifications of this contract; the

Contractor shall clean the work site areas and perform all other work incidental to site restoration.

END OF SECTION 01700

END OF DIVISION 1

DIVISION 2 SECTION 02220

SITE WORK EXCAVATION, TRENCHING AND BACKFILLING FOR UTILITIES

02220-1

A. Work for this Section includes excavation, trenching, backfilling and compaction for the repair of 8” sewer pipeline shown on the attached drawings.

B. Excavation in this Section is unclassified. Unclassified excavation may include common and rock excavation.

1.02 JOB CONDITIONS

A. Bidders are expected to examine the site to determine the character of material to be encountered.

B. All stockpiles shall be located according to the directions of the Contracting Officer or designated site representative.

1.03 SAFETY AND PROTECTION

A. Trenches and excavations shall be sloped, benched, sheeted, shored, and/or braced where required in a manner consistent with established safe practices and in accordance with all applicable safety regulations.

B. Barricade open excavations occurring as part of this work.

C. Protect excavations from freezing. If frost action occurs, compact ground after thawing as specified herein.

D. All earthwork shall be conducted in sites which have been dewatered.

1.04 SURVEY DATA

A. Contractor shall be responsible for all construction surveys and staking required for performance of all work.

B. Contractor shall locate all buried utilities and site infrastructure before excavation.

02220-2

C. The information provided is the best available in reference to the location of existing underground utilities, structures, and facilities. The Contractor shall be responsible for all field verification and shall repair any damaged utilities resulting from construction activities.

PART 2 PRODUCTS

2.01 MATERIALS

A. Initial Backfill: Select earth material taken from the excavation. Material shall not contain any rock larger than ½ inch in greatest dimension, any trash, lumber, large clods, or other harmful debris.

B. Subsequent Backfill: Excavated material free from rocks larger than 6 inches in the largest dimension, frozen earth, clods, debris, or material with and exceptionally high void content.

C. Special Bedding: Rounded or angular stones or gravel or other angular material with a general size range of from 1/4 inch to ½ inch. One hundred percent of the material shall pass a ½ -inch sieve. No more than 5 percent shall pass a No. 8 sieve. Where only rounded stone is available, the size range shall be 1/4 inch to ¾ inch.

D. Crushed Rock Backfill: Shall consist of aggregate mixtures that conform to the requirements for aggregate surfacing as set forth in the Utah Department of Transportation Standard Specifications for Road and Bridge Construction. The material shall be selected to include a sufficient quantity of natural cementitious or binding material such that the surfacing will bond readily under the action of compaction.

3.01 PREPARATION

A. Identify required lines, levels, contours, and datum. Minimum depth of earth cover for the PVC pipe is frost depth.

B. Identify known below grade utilities. Stake and flag locations.

C. Identify and flag above grade utilities.

D. Maintain and protect existing utilities remaining which pass through the work area.

02220-3

E. Upon discovery of unknown utility or concealed conditions, discontinue affected work and notify the Contracting Officer.

3.02 EXCAVATION

A. Maintain excavation free of water at all times.

B. Trenches shall be sufficiently wide to permit installation and inspection of pipelines.

Slope or shore trench walls as required for safety.

C. The trench bottom shall be properly excavated to ensure adequate bearing of the pipe barrel along its entire length.

D. The trench bottom shall be free of sharp rocks and debris that may damage the pipe.

E. Excavation in rock and water-bearing earth shall be carried to a depth of not less than four (4) inches below the normal trench bottom elevation. Backfill this 4 inches with special bedding and compact to a density at least equal to that of surrounding earth.

F. Except where special bedding is required, care shall be taken not to excavate below the trench bottom elevation as shown in the typical trench detail on the drawings.

G. If unauthorized over excavation occurs, the excess depth shall be backfilled with moist earth or sand and tamped to a density at least equal to that of the surrounding earth at the Contractor's expense.

H. Unusable excavated material shall be removed from the site.

3.03 BACKFILLING

A. Prior to placing pipe in the trench and backfilling, the trench bottom at pipe joints shall be trimmed to insure adequate bearing of the pipe barrel along its entire length.

B. As soon as possible after individual pipe is jointed and placed in the trench, sufficient initial backfill material shall be placed along each side of the pipe to offset conditions that might tend to move the pipe off line and grade.

C. Backfill shall not be completed until pressure and/or leakage tests have been performed and the pipeline is approved by the Contracting Officer. Sufficient backfill shall be placed to prevent pipe movement during pressure tests. All joints, etc., shall remain uncovered for inspection purposes during testing.

02220-4

D. The initial backfill around the pipe shall be placed and tamped. It shall be placed in two 6-inch compacted layers (total of 12 inches) and each layer compacted to the density at least equal to that of the surrounding earth.

E. Subsequent backfill shall be deposited and carefully compacted in layers not to exceed twelve (12) inches in thickness. Each layer shall be compacted to a density at least equal to that of the surrounding earth.

F. In areas not in traveled roadways, excess material from the trench shall be mounded over the trench not to exceed four (4) to six (6) inches above the surrounding ground.

G. Excessive settlement or other evidence of improper backfill shall be corrected by reopening the trench to the depth required for proper compaction and then shall be refilled and compacted.

H. Puddling or water flooding for consolidating the backfill will not be allowed. The addition of water shall be limited to that needed for increasing the moisture content of the backfill material.

I. Filling and backfilling will not be permitted when either the fill material or sub grade are frozen.

3.04 DISPOSAL

A. Boulders and rocks larger than 6 inches shall be removed from the site and disposed of as directed by the Contracting Officer.

B. Surplus excavated material remaining on the site upon completion of backfilling shall be removed from the site and disposed of by the Contractor.

END OF SECTION 02220

DIVISION 2 SECTION 02710

SITE WORK BITUMINOUS PRIME COAT

02710 – 1

A. The work of this section consists of applying, bituminous material on a prepared base course for bituminous concrete pavement.

B. Related Sections

1. Aggregate Base Course Section 02720

2. Bituminous Concrete Pavement Section 02740

A. Submit in accordance with Section 01300.

B. Submit manufacturer’s product data for each load of asphaltic material delivered to the project showing compliance with the requirements of this specification.

1.03 QUALITY ASSURANCE

A. Standards as established by American Association of State Highway and Transportation Officials (AASHTO), as amended, latest editions, and Standard Specifications for Road and Bridge Construction, Utah Department of Transportation (UDOT), latest edition govern the work of this section.

1.04 JOB CONDITIONS

A. All areas identified as full depth patch repair on the contract drawings shall be primed with a bituminous coat.

B. Apply prime coat only during daylight hours, when surface is dry, atmospheric temperature is above 40o F., and weather is not foggy or rainy.

2.01 BITUMINOUS MATERIAL

A. Bituminous Material shall be Type and Grade MC-70, Cutback Asphalt conforming to the requirements of AASHTO M-82. The application temperature shall be between 80o and 150o F.

DIVISION 2 SECTION 02710

SITE WORK BITUMINOUS PRIME COAT

02710 – 2

2.02 BLOTTER

A. Blotter material shall be either sand or screenings, free from vegetable matter, clay or other deleterious matter. The material shall be of such size that 100 percent of the material will pass through a 3/8-inch sieve, the fraction passing the No. 4 sieve shall be from 85-100 percent and the fraction passing the No. 200 sieve shall not be greater than 20 percent. The plastic index shall not exceed 6.

3.01 PREPARATION OF SURFACE

A. The surface to be primed shall be shaped to the required grade and section, free from objectionable material, free from all ruts, corrugations, segregated material, or other irregularities and be uniformly compacted.

3.02 APPLICATION OF PRIME

A. Bituminous material shall be applied by means of a pressure distributor in a uniform, continuous spread, at a rate of 0.35 gallons per square yard, at specified temperature. Hand sprayers may be used in lieu of pressure distributors.

B. Care shall be taken that the application of bituminous material at the junctions of spreads is not in excess of the amount specified.

C. Do not spatter or mar surfaces of adjacent structures or trees during application.

3.03 APPLICATION OF BLOTTER

A. If the prime coat fails to penetrate and the roadway must be used by traffic, blotter material shall be spread as required to absorb any excess bituminous material.

3.04 CURING

A. After applying a prime coat to the compacted aggregate base, the prime coat shall be cured for 1 day before placing hot bituminous pavement.

END OF SECTION 02710

DIVISION 2 SECTION 02720

SITE WORK AGGREGATE BASE COURSE

02720 – 1

A. The work of this section consists of constructing a roadway base coarse composed of crushed stone or gravel on prepared sub-grade to lines, grades, and typical cross sections indicated.

1. Quality Control Section 01400

B. Submit manufacturer’s product data certifying materials for aggregate base course meet requirements of these specifications.

C. Submit laboratory and field test results in accordance with Section 01400.

Transportation Officials (AASHTO), and Standard Specifications for Road and Bridge Construction, Utah Department of Transportation, UDOT, as amended, latest editions, govern the work of this section.

PART 2 MATERIALS

2.01 AGGREGATE

A. The aggregate shall be clean, hard, durable fragments or particles of stone or gravel, with at least one fractured face, crushed to required size with filler of sand.

Composite base course material shall be free from vegetable matter and clay lumps.

1. Fraction passing No. 40 sieve shall have a liquid limit not to exceed 25 and a plasticity index of not more than 6, as determined by AASHTO T-39 and T-90, respectively.

DIVISION 2 SECTION 02720

SITE WORK AGGREGATE BASE COURSE

02720 – 2

2. Materials when prepared for compaction shall meet the following screen analysis requirements by weight:

Passing a 3/4-inch sieve 100 percent Passing a 3/8-inch sieve 78 to 92 percent Passing a No. 4 sieve 55 to 67 percent Passing a No. 200 sieve 7 to 11 percent

2.02 FILLER

A. The filler shall be finely divided mineral matter such as rock or slag dust, hydrated lime, hydraulic cement, or other suitable mineral matter free from organic impurities.

3.01 CONSTRUCTION METHODS

A. The maximum compacted thickness of any layer shall not exceed 6-inches.

B. The moisture content of the material at the time of compaction shall be within plus 2 or minus 4 percentage points of optimum moisture content.

3.02 COMPACTION

A. Use a smooth steel plate compactor, which will give a minimum rolling pressure of 200 pounds per inch of width with weight applied uniformly over entire width.

B. The surface shall be maintained during the compaction operations so that a uniform texture and surface is produces and the aggregate are firmly keyed.

Water shall be uniformly applied over the material during compaction in the amount necessary for proper consolidation and as specified.

C. Compaction of aggregate base course shall be not less than 95 percent of the maximum density. Compactions or field-in-place densities will be determined by

AASHTO T 238.

END OF SECTION 02720

DIVISION 2 SECTION 02740

SITE WORK BITUMINOUS CONCRETE PAVEMENT

02740 – 1

A. This work shall consist of roadway patching of bituminous mixture constructed on a prepared foundation.

1. Quality Control Section 01400

2. Bituminous Prime Coat Section 02710

3. Aggregate Base Course Section 02720

B. Submit laboratory testing results certifying materials mix compliance within specification requirements. Submit results prior to manufacturer of plant mix asphalt.

C. Furnish weight slips, to on-site inspector, at time of delivery, for each load of asphalt mixture delivered and placed at the project site.

B. Bituminous concrete shall be produced, placed, and compacted by a Contractor regularly engaged in the bituminous concrete surfacing for a minimum period of 5 years prior to the letting of this contract.

A. Apply only when existing surface is dry, temperature is above 40o F., and weather is not foggy or rainy.

B. Traffic shall be directed through the project with such signs, barricades, devices, and flagmen as may be necessary to provide maximum safety for the public and the workmen with minimum interruption of the work.

SITE WORK BITUMINOUS CONCRETE PAVEMENT

02740 – 2

2.01 BITUMINOUS PAVING MATERIALS

A. The type and grade of asphalt cement for the paving mixture shall be viscosity grade AC-10, AASHTO M- 226. The Contractor may use asphalt cement of penetration grade 120 - 150, complying with AASHTO M-20. In either case the grade may be changed one step by the Contracting Officer at no change in the unit price. Mixing temperature shall be from 280o to 300o F.

2.02 AGGREGATES FOR PAVING MIXTURE

A. The aggregate shall be free from vegetable matter, lumps, or balls of clay, adherent films of clay of other matter that would prevent thorough coating with bituminous material and shall be free of excessive flat or elongated pieces.

Course Aggregate shall be crushed stone or crushed gravel. Fine aggregate shall consist of crushed stone, crushed gravel, or natural sand.

B. Gradation requirements are as follows:

Sieve Designation Percent Passing 1" 100 3/4" 100 3/8" 75-91 #4 46-62 #50 11-23 #200 5-9

Minimum of 50 percent by weight of particles retained on No. 4 sieve shall have 1 fractured face.

2.03 ASPHALT AGGREGATE MIXTURE

A. Master Range

1. Aggregate gradation within the limits as specified

2. Asphalt Content: 4 -10 percent by weight of total mix.

3. Stability: 750 lbs.

4. Flow: 0.08 - 0.18 in.

5. Air Voids: 3 - 5 percent

6. Percent Voids in Mineral Aggregate: 14

7. Mixing Temperature: 280o – 300o F

SITE WORK BITUMINOUS CONCRETE PAVEMENT

02740 – 3

B. Job-Mix

1. The Contractor shall submit for approval a job-mix. The job-mix along with the allowable tolerances shall be within the master range specified.

The job-mix formula shall establish a single percentage of aggregate passing each required sieve size, a single mixing temperature, and a specific asphalt content.

2. The job-mix formula shall be developed by the Marshall Method of Mix

Design, ASTM D 1559. The optimum asphalt content shall be the numerical average of the asphalt contents for those mixes which produces;

maximum stability, maximum unit weight, and median for percent air voids while satisfying master range limits.

3. After the job-mix formula is established, all plant mixtures furnished for the project shall conform thereto within the following ranges of tolerances:

Passing No. 4 and larger sieves +/- 5 percent Passing No. 8 to No. 100 sieves +/- 5 percent Passing No. 200 sieve +/- 3 percent Bituminous Material +/- 0.5 percent Mixing Temperature +/-20o F

4. When unsatisfactory results, change in source of materials, or other conditions make it necessary, a new job-mix formula may be submitted.

3.01 PREPARING AREA TO BE PATCHED

A. The area to be paved shall be substantially true to line and grade. It shall have a dry, firm, and properly prepared surface before paving operations begin. All loose and foreign material shall be removed.

B. The compacted base on which the asphalt base is to be placed shall be primed asphalt priming material designated in Bituminous Prime Coat - Section 02710.

C. Surfaces of curbs, gutters, vertical faces of existing pavements, and all structures to be in actual contact with the asphalt-aggregate mixture including repaired areas shall be given a thin, even coating of asphalt tack material. Care shall be taken to prevent splattering, with asphalt, surfaces that will not be in contact with the asphalt-aggregate mixture.

SITE WORK BITUMINOUS CONCRETE PAVEMENT

02740 – 4

3.02 PLACING THE MIX

A. The mixture shall be placed in one uniform lifts to provide a nominal compacted thickness as specified on the drawings. Placing the mixture shall be a continuous operation. If any irregularities occur, they shall be corrected before final compaction of the mixture.

B. The temperature of the mix at lay-down shall be a minimum of 230o F when the ambient temperature is above 60o F and 250o F when ambient temperature is below 60o F.

C. Until bituminous mixture is compacted, no hauling over placed surface will be permitted.

3.03 COMPACTING THE MIX

A. The mix shall be compacted immediately after placing. Initial rolling with a steel-wheeled tandem or steel-wheeled vibratory roller shall follow paver. If needed, rolling with a pneumatic-tired roller shall be done immediately behind the initial rolling. Final rolling with a steel-wheeled roller shall eliminate all rolling marks. In small areas a vibrating plate compactor or a hand tamper shall be used to achieve thorough compaction.

B. Final rolling and density of the hot plant mix bituminous pavement shall be obtained prior to the mixture reaching a minimum temperature of 185 degrees F.

C. The patching mixture shall be compacted to produce a tight surface conforming to the adjacent pavement area.

END OF SECTION 02740

DIVISION 2 SECTION 02785

SITE WORK HOT POUR CRACK SEALANT

02785 – 1

A. This work shall consist of preparing and placement of hot pour crack sealant along roadway.

B. Submit Manufacturer's product data fully describing the product along with product specifications, limitations and manufacturer's installation instructions.

A. Apply only when existing surface is dry, temperature is above 40o F., and weather is not foggy or rainy.

B. Traffic shall be directed through the project with such signs, barricades, devices, and flagmen as may be necessary to provide maximum safety for the public and the workmen with minimum interruption of the work.

2.01 BITUMINOUS MATERIALS

A. Shall be bituminous material complying to hot-poured joint sealants of the AASHTO Standard Specifications conforming to M301-85, Standard Specifications for Joint Sealants, Hot-Poured, for Concrete and Asphalt Pavements.

DIVISION 2 SECTION 02785

SITE WORK HOT POUR CRACK SEALANT

02785 – 2

3.01 CRACK SEALING

A. Cracks greater than 1/8 inch and less than 1 inch in width shall be cleaned and sealed. Cracks greater than 1 inch in width shall be filled with asphalt-aggregate patching material.

B. Immediately prior to sealing, the crack and surface adjacent to the crack shall be cleaned of foreign matter and loosened particles with either a HCA (hot compressed air) heat lance or other industry accepted standard. Cleaning and sealing shall extend across the full width of the existing bituminous surface.

C. The crack or routed crack shall be filled flush or may be overfilled and squeegeed.

D. Crack sealing shall be done only when the cracks are cleaned and dry.

END OF SECTION 02785

END OF DIVISION 2

DIVISION 15 SECTION 15060

MECHANICAL SEWER PIPES AND PIPE FITTINGS

15060−1

A. Furnishing and installing 8” polyvinyl chloride (PVC) gravity and pressure sewer pipe and fittings, and connections to existing lines, and testing, as specified and as shown on the drawings.

1.02 RELATED WORK

A. Section 01600 - Materials and Equipment

B. Section 02220 - Excavating, Trenching, and Backfilling for Utilities

1.03 PROJECT RECORD DOCUMENTS

A. Accurately record location of repaired sewer piping, by horizontal dimensions.

B. Submit documents under provisions of Section 01300.

1.04 PRODUCT HANDLING

A. Delivery: Handle pipe and fittings to ensure delivery in a sound, undamaged condition.

B. Storage: do not store materials on the ground. Use covers to protect materials from direct sunlight.

C. Do not lay pipe when trenches or weather conditions are unsuitable for such work.

D. Do not solvent weld joints when atmospheric temperature is below 40 degrees F., or above 90 degrees F., when it is raining, or if pipe is exposed to direct sunlight.

E. When work is not in progress, securely close ends of pipe and fittings.

1.05 STORAGE AND PROTECTION

A. Protect all material, work, and equipment against damage and theft at all times.

B. Replace or repair to the satisfaction of the Contracting Officer all items damaged or stolen because of the failure of the Contractor to properly protect during

15060−2 transportation, handling and storage.

1.05 CODES AND STANDARDS

A. All work shall comply with the latest edition of the International Plumbing Code, State of Utah Regulations.

B. The Contractor shall make arrangements with the County Sanitarian, for a final inspection before backfilling, once sewage pipe repair is complete.

2.01 MATERIALS

A. Gravity Pipe and Fittings:

1. Polyvinyl chloride (PVC) ASTM D3034, schedule 40 or 80, meeting ASTM 1785.

Joints shall be integral bell and spigot joint with rubber elastomeric gasket or solvent cement joist. When using ASTM d 3034, rock free bedding must be provided.

3.01 INSTALLATION

A. Pipe in storage shall have ends plugged or capped, and shall be stored off the ground.

Prior to fabrication in the shop or field, scale, or any foreign material shall be blown or swabbed from the interior of the pipe. After fabrication, all open ends shall again be plugged, capped, or otherwise sealed.

B. Full lengths of pipe shall be used where possible and extra joints shall be avoided. Piping shall be installed to provide for and control movement due to expansion and contraction.

Pipe sections shall be joined securely with appropriate fittings, couplings and connections as shown on the drawings and as recommended by the manufacturer. Pipes must be run in straight lines wherever possible and have a uniform grade. Bends should be limited to 45 degrees or less wherever possible. If 90 degree bends cannot be avoided, they should be made with two 45 degree elbows, or a long sweep quarter circle of bends.

C. Utilize pipe and fittings of the sizes indicated. Lay to lines and grades shown in accordance with pipe manufacturer's specifications. Take up and re-lay any length that has its line, grade, or joint disturbed after laying. Thoroughly clean pipe interiors of foreign matter before lowering into trench. Replace with new pipe any laid section of

15060−3 pipe found damaged or defective. Install the new pipeline on a straight grade between the connection points.

D. Pipe Cutting: Square cut pipe with fine tooth saw, cutter, or knife designed for use with plastic pipe. Remove burrs by smoothing edges with a knife, file or sandpaper. Cutting for closure or other reasons shall be done neatly by methods which will not damage pipe.

E. The gravity sewer line shall have a uniform slope of 1 – 2 %.

3.02 FLUSHING

A. Flush and clean sewer lines and remove water and debris before final connection to the existing sewer line is made.

3.03 TESTING

A. Refer to Section 02741 - Testing of Sewer System.

END OF SECTION 15060

Project Statement of Work
SECTION C index
01010 - Summary of Work
01300 - Submittals
A. Refer to the technical specifications for all product submittals required.
B. All submittals shall be accompanied by a Government-furnished submittal form for each specification section, which shall be used as the document for approving or disapproving the material. The Government is to retain two (2) copies of all submitta...
C. Make all submittals of data, items, materials, and samples after receipt of the Notice to Proceed. Submittals shall be provided in sufficient detail to ensure conformity with contract requirements and specifications. Submittals on component parts...
D. Where more than one product, option, or feature is described in the submittal, clearly mark the specific item proposed for use. Selection of unmarked items or options will be made by Government.
E. The Contractor shall not perform work for which submittals are required prior to receipt of the submittals or samples, approved by the Fish and Wildlife Service.
A. Submit construction schedule for approval within ten (10) calendar days after Notice to Proceed, including the following:
1. Breakdown of work activities by construction phase and in categories, as necessary, to allow monitoring of work progress during construction.
2. Sequence of construction by activity with start dates, duration, and finish dates.
B. Submit updated schedules monthly or sooner, if necessary.
A. Prior to the use or installation of any item specified as requiring submittal, the Contractor shall submit manufacturers' literature containing detailed specifications and performance data, or shop drawings, fully describing the items.
B. The Contractor shall not perform work related to shop drawings or samples prior to obtaining the required shop drawings or samples approved by the Government. Shop drawings shall be in sufficient detail compatible with the complexity of the projec...
C. Shop drawings used at the site must bear approval stamp of the Contracting Officer Technical Representative. The Contractor shall check shop drawings for conformity to the contract documents and mark them to this effect before submitting to the Co...
A. Provide and maintain at the project site, one complete set of Record (As-built) Drawings. The drawings shall be kept in good, clean, and readable condition.
B. The Record (As-built) Drawings shall have neatly inscribed all changes in work, including location of lines, fixtures, and changes in type of material; including depth, size, and location of existing underground utilities encountered during constru...
C. Submit these corrected Record (As-built) Drawings at time of final acceptance. Note all data and changes on these Record (As-built) Drawings in sufficient detail and clarity and provide information necessary for preparation of final Record (As-bui...
A. Submit all guarantees, warranties, and certificates prior to application for final payment.
01400 - Quality Control
A. Testing Laboratory
1. Independent testing laboratory shall be selected by the Contractor and the name of the proposed laboratory submitted for approval prior to the start of any testing.
2. Qualifications for Service Agencies: Engage testing service agencies, including independent testing laboratories, that are pre-qualified as complying with the American Council of Independent Laboratories' "Recommended Requirements for Independent ...
B. Contractor's Responsibilities
1. It shall be the Contractor's responsibility to provide for all tests included in these specifications. Failure to provide a specified test shall be considered the same as a test with a failed result.
2. Make available to testing laboratory, at no cost, all materials to be tested.
3. Provide labor necessary to supply samples and assist testing laboratory in making tests.
4. Advise laboratory of the identity of material sources and instruct suppliers to allow inspections by the laboratory.
5. Submit written reports promptly, covering each inspection and test.
6. After initial tests have been performed, and if sampling, method, or workmanship does not comply with these specifications, the Contractor shall pay for any additional testing necessary to ensure compliance.
A. Tests shall be conducted in accordance with the requirements of the specifications designated or, where not specified, the latest standards of the ASTM.
A. Aggregate Base Course
1. Compaction Tests: Conduct required density tests during compaction operations in accordance with the appropriate tests listed:
B. Bituminous Concrete Pavement
1. Compaction Tests: Conduct required density tests during compaction operations in accordance with the appropriate tests listed: