Amendment 6 Answers to Vendor's Questions and Drawing for Trailers

View the file

Other files

File Type Posted
amendment 10 with attachments.pdf PDF
Amendment 00009.pdf PDF
Amendment 00008.pdf PDF
Amendment 00007.pdf PDF
Amendment 5 - F10SOL10052.pdf PDF
Amendment 00004.pdf PDF
CHNDM pre-bid site visit list.pdf PDF
CHNDM Amendment 3.pdf PDF
CHNDM Amendment 1and 2.pdf PDF
F11SOL10032 CHNDM-Mansion RFP.pdf PDF
Section J - Attachments.pdf PDF
F11SOL10032 CHNDM-Mansion RFP.pdf PDF
Cooper-Hewett FY 11 Grant.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

F11SOL10032

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

OCON

Washington DC 20013-7012

MRC 1200

P.O. BOX 37012

OCON

OCON

Washington DC 20013-7012

MRC 1200

P.O. BOX 37012

SMITHSONIAN INSTITUTION

06/08/2011000006

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/08/2011

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This is amendment number six to Solicitation Number F11SOL10032.

I. Request for Proposal F11SOL10032 is hereby amended as follows:

A. Section J. shall be amended by the inclusion of:

J.2.b. Partial Revision to GOO6B Construction Staging Plan Trailer Notation - July 7, 2011.

B. Answers to Interested Vendors' Questions Attached hereto.

II. The deadline for receipt of proposals has not changed.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Dorothy A. Leffler

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

F11SOL10032/000006

IV. All remaining aspects of RFP F11SOL10032 shall remain unchanged.

The above-referenced attachments are incorporated by this amendment into the original solicitation.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

RESPONSES TO PROSPECTIVE VENDORS’ QUESTIONS

Cooper Hewitt National Design Museum – Carnegie mansion Renovation

Solicitation No. F10SOL10032

1. Drawing S-104 appears to be missing from the drawing set. It is indicated on the Title Sheet (G-001), but S-104a appears in duplicate rather than S-104. Kindly provide.

ANSWER: SEE ATTACHED

2. Specification section 096724 – 1.2.A, calls for “…the installation of resinous flooring at concrete slab and curbs under mechanical equipment in Attic and at any other locations shown…” The finish schedule (A-621) does not refer to resinous flooring. And drawing A-117 shows this at Room 503. Please clarify the locations of the resinous flooring.

ANSWER: The resinous flooring is only required under unit AC-4M which is in the Attic. The Attic and Room 503 are the same space.

3. Specification sections 028200 – 1.2.A and 028300 – 1.2.1.2.2 refer to a “Hazardous

Materials Report (Limited Hazardous Materials Evaluation – Asbestos and Lead Paint by Jenkins Environmental, May 2008) submitted under separate cover.”

Kindly provide this report. Additionally, sections 028200 – 1.2.D and 028300 –

1.2.1.2.2 refer to the contractor making a site visit to make its own determination about quantity values. Will the site be available during the bidding period for this to be accomplished or shall the bid proposals be based upon the quantities given in the documents?

ANSWER: The report will not be provided at this stage. Site visits have been scheduled. If a vendor was unable to attend a site visit, a request can be made for additional visits; however, given scheduling all requests may not be honored.

4. We respectfully request an extension to the RFI deadline of July 1, 2011; noted at the pre-bid walk-thru on June 20, 2011 to allow all bidders ample time to thoroughly review the bid documents.

ANSWER: The deadline will not be extended. Vendors may submit questions after July 1, 2011; however, questions submitted after July 1, 2011 may not produce an answer.

5. Specification section 010000 – 3.1.3. refers to reimbursing the Smithsonian Institution in the event security and inspection services are required to be completed outside the specified working hours, in certain instances. Please provide the rates at which the GC will be charged for these services in the event they are required.

ANSWER: $31.00 per Hour.

6. We request an additional site walk-through, preferably July 12th or 13th.

ANSWER: An additional site walk-through was provided on July 1, 2011.

Another site walk-through is not planned.

7. Please provide contact information for the security vendor.

ANSWER: There is no security vendor. The security system is maintained by Smithsonian Staff. Refer to Division 28 for all security requirements.

8. Kindly clarify the tax status for this project. Is it tax exempt? Fully taxable?

ANSWER: This project may be exempt from sales and use tax; however the successful vendor shall bear all responsibility in obtaining the necessary waivers from the appropriate taxing authority. Smithsonian makes no statement or guarantee that tax exempt status will be obtained.

9. Page 88 of the RFP (L.16.3) indicates the submission of a detailed Schedule of Values. Is this requirement in addition of the breakdown proposed in Exhibit ‘J’ or does Exhibit ‘J’ satisfy section L.16.3?

ANSWER: Exhibit J.3 as amended satisfies the request in section 16.3 for a detailed breakdown of pricing.

10. Please provide information regarding dimensions per the attached detail G-007E

ANSWER: Temporary protection needs to be developed by Contractor. Detail is for indicating a feasible solution, plywood thickness is indicated, spacing of posts needs to be developed in response to field conditions and the General Contractor’s means and methods.

daulatanip Callout Width of Plywood ?

daulatanip Line daulatanip Callout Spacing of Post ?

daulatanip Line daulatanip Callout Width of plywood ?

daulatanip Text Box These questions apply to the Detail 4/G007e (Ceiling )of this drawings.

File details come from the government source that posted it. Updated .