[F]_Reese_St_Plans-R2023-09-28.pdf
PDF 12 MB Posted
- Attached to
- Reese Street Caisson Treatment
- Solicitation number
- 2023-IFB-219
- Issued by
- Allegheny County, Philadelphia City, Pennsylvania
About this file
The document is a comprehensive set of engineering and design plans for the Reese Street Landslide Mitigation Project, prepared by the City of Pittsburgh's Department of Mobility and Infrastructure. The project involves landslide mitigation at the Reese Street site in Pittsburgh's 19th Ward, with a focus on caisson treatment, rock scaling, and mine grouting to stabilize a steep slope area. The plans, dated May 19, 2023, include detailed drawings for caisson installation, erosion and sedimentation control, rock scaling, and site surveying. The project scope includes installing 42-inch diameter drilled caissons, performing rock scaling, implementing mine grouting, and managing erosion and sediment control measures across multiple property parcels owned by the City of Pittsburgh, Grandview Towers Association, and private entities.
The project is funded through a FEMA Project (PDMC-P5-03-PA-2019-019(0)) and has a city project number DOMI 200025. The engineering plans detail precise technical specifications, including caisson treatment with perforated thermoplastic pipes, No. 57 coarse aggregate filling, and specific reinforcement requirements. The site involves complex terrain with significant elevation changes, existing retaining walls, and potential underground mine workings. The design includes comprehensive erosion control measures, temporary construction easements, and specific guidelines for rock removal, grout stabilization, and site restoration. The project aims to mitigate landslide risks and stabilize the slope while maintaining environmental protection standards and minimizing potential geological hazards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REESE STREET SITE
MOUNT WASHINGTON LANDSLIDE MITIGATION
DEPARTMENT OF MOBILITY AND INFRASTRUCTURE
CITY OF PITTSBURGH
VICINITY MAP LOCATION MAP
4000 FEET20000 400 FEET2000
DEPARTMENT OF MOBILITY AND INFRASTRUCTURE
CITY OF PITTSBURGH
ALLEGHENY COUNTY, PENNSYLVANIA
19TH WARD - CITY OF PITTSBURGH
REESE STREET LANDSLIDE MITIGATION
TITLE SHEET
DATE: MAY 19, 2023
SCALES: AS SHOWN
1 OF
SHEET NO.
CASE NO.
ACCESSION NO.
CITY OF PITTSBURGH
APPROVAL DATE
CHIEF ENGINEER
DIRECTOR
PREPARED BY:
REGISTERED PROFESSIONAL ENGINEER
P.E. NUMBER
DATE
PITTSBURGH, PA 15220
730 HOLIDAY DRIVE,
FOSTER PLAZA 8, SUITE 400
REVISIONS
DATECHARACTER
CROSS SECTIONS
EROSION AND SEDIMENTATION PLAN
EROSION AND SEDIMENTATION DETAILS
EROSION AND SEDIMENTATION NOTES
TABULATION OF QUANTITIES
SUMMARY OF QUANTITIES
PLANTING PLAN
ROCK SCALING PHOTOMOSAIC
MINE GROUTING PLAN
STRUCTURE BORINGS
NOTES & QUANTITIES
CAISSON TREATMENT GENERAL
SECTION AND DETAILS
CAISSON TREATMENT TYPICAL
PLAN & ELEVATION
CAISSON TREATMENT GENERAL
PROJECT PLAN
INDEX AND GENERAL NOTES
TITLE SHEET
SHEET NO.
1.
INDEX OF DRAWINGS
LIST OF PUBLIC UTILITIES
SERIAL NO. 20230172094
FINAL DESIGN
SERIAL NO. 20220400926
PRELIMINARY DESIGN
PA ONECALL SYSTEM
412-393-7812
MR. RUSTY HUGHES
PITTSBURGH PA. 15233
2825 NEW BEAVER AVENUE
DUQUESNE LIGHT COMPANY
JAUGE@PGH20.COM
412-255-2997
MR. JASON AUGE
PITTSBURGH, PA. 15222
1200 PENN AVENUE
PENN PLAZA 1
SEWER AUTHORITY
PITTSBURGH WATER AND
PROJECT SITE
PROJECT SITE
S A
W M I L
R U
N
B
V D
L I
N C
O
H I
G H
W A
Y
G R E E
N L E
A F
S T
R E E T
B R I
D G
E
E
D
W E
S T
OHIO RIVER
GRANDVIEW AVE
R E
E S
E
S
T
F I L
E p w
\g f n e t-p w
.b e n tl e y .c o m
:g f n e t-p w
\D o c u m e n ts
\P r o je c ts
\6 \O
U T
P U
T \C
O M
P \C
I V
I L
\R O
A D
\P L
O T
\6 T it le s h e e t.
d g n
T
IM
E
:5
:5
A
M
D A
T E
/1
/2
P L
O T
T E
D
FEMA PROJECT PDMC-P5-03-PA-2019-019(0)
DOMI PROJECT # 200025
REFERENCE: ALLEGHENY COUNTY DIVISION OF COMPUTER SERVICES GEOGRAPHIC INFORMATION SYSTEMS GROUP. DATE OF PHOTOGRAPHY: 2017 REFERENCE: PITTSBURGH WEST, PA QUADRANGLE 7.5 MINUTE SERIES PRODUCED BY THE UNITED STATES GEOLOGIC SURVEY (USGS) 2022
19-
1514-
2825-
97-
MUNICIPAL TRAFFIC ENGINEER
ASSISTANT DIRECTOR, PLANNING POLICY & PERMITTING
5/31/2023
06/02/2023
6/1/23
06/01/2023
PURPOSES ONLY AND DO NOT IMPLY PRECISION BEYOND TWO (2) DECIMAL PLACES.
FOUR (4) PLACE COORDINATES ARE USED FOR COMPUTATIONAL
NOTE:
6+45.00
5+00.00
END STA.
BEGIN STA.
411768.6822
411712.9991
1335173.3348
1335307.2168
C O
N S
T R
S U
R V
E Y
P
R O
JE
C
T
SUMMARY OF PROJECT COORDINATES
STATION POINT
COORDINATES
NORTHING EASTING
BEARING
N67°25'01"W
LEGEND
PLAN 1 PARCEL IDENTIFICATION - NO TAKE
PARCEL IDENTIFICATION - TAKE1
THIRD DESCRIBED
VB-S1 ASSETS, LLC
FIRST AND SECOND DESCRIBED
VB-S1 ASSETS, LLC
RAJ A. NARAYAN, UNMARRIED
GRANDVIEW TOWERS ASSOCIATION
GRANDVIEW TOWERS ASSOCIATION
CITY OF PITTSBURGH
PROPERTY OWNERS
0 FEET25 25 50
PROJECT SURVEY & CONSTR. �
R E E S E S
T R E E T
U N
N A
M E D C
IT
Y S
T R E E T
GRANDVIEW AVENUE (UNOPENED)
REESE STREET
INDEX AND GENERAL NOTES
GRANDVIEW AVENUE
R E
PU
B
LI
C S
TR
E E T
CITY OF PITTSBURGH
CITY OF PITTSBURGH
SHEET
REV
NO
REVISIONS DATE BY APPD
F
IL
E p w
\g fn e t-p w
.b e n tl e y .c o m
:g fn e t-p w
-0
\D o c u m e n ts
\P ro je c ts
\6
\O
U T
P U
T \C
O M
P
\C
IV
IL
\R
O A
D \P
L O
T \6
I n d e x a n d
G e n N o te s .d g n
T
IM
E
:5
:5
P
M
D A
T E
/3
/2
P L O
T T
E D
OF
P
E N N S Y L V A
N I
A
C O
M
M
ONWEALTH
O
F
PE079465
ERIC R. HOLLAND
N67°25'01"W
THERE ARE NO NAVIGABLE STREAMS LOCATED WITHIN THE PROJECT.
ONLY UNTIL THE CONSTRUCTION OR WORK INDICATED BY THE PLAN IS COMPLETED, UNLESS SOONER RELINQUISHED IN WRITING BY THE CITY.
TEMPORARY CONSTRUCTION EASEMENT. AN EASEMENT TO USE THE LAND AS NECESSARY DURING CONSTRUCTION OF THE PROJECT. THE EASEMENT IS REQUIRED
ACCESS TO ALL COMMERCIAL AND RESIDENTIAL DRIVEWAYS SHALL BE MAINTAINED AT ALL TIMES.
ALL CURVE DATA IS BASED ON ARC DEFINITION UNLESS OTHERWISE NOTED.
VERTICAL CONTROL IS BASED ON THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88).
HORIZONTAL CONTROL FOR THIS PROJECT IS BASED ON THE PENNSYLVANIA STATE COORDINATE SYSTEM (SOUTH ZONE) NAD 83.
DOES THE CITY GUARANTEE THAT ALL SUBSURFACE STRUCTURES ARE SHOWN.
THE CITY OF PITTSBURGH DOES NOT GUARANTEE THE ACCURACY OF THE LOCATIONS OF EXISTING SUBSURFACE UTILITY STRUCTURES SHOWN ON THE PLANS, NOR
AMENDED OCT. 30, 2017).
DAMAGED, OR PREVIOUS DAMAGE IS DISCOVERED AS REQUIRED BY PENNSYLVANIA'S UNDERGROUND UTILITY LINE PROTECTION LAW ACT 50 (P.L.852, NO. 287 PUBLIC UTILITY COMMISSION THROUGH THE PA ONE CALL SYSTEM, WWW.PA1CALL.ORG, WITHIN TEN (10) BUSINESS DAYS AFTER A UTILITY LINE IS STRUCK, THE CONTRACTOR IS REQUIRED TO NOTIFY THE CITY OF PITTSBURGH FIELD REPRESENTATIVE AND SUBMIT AN ALLEGED VIOLATION REPORT (AVR) TO THE PA
ADDITIONAL INFORMATION IS AVAILABLE AT HTTPS://WWW.PA1CALL.ORG/PA811/PUBLIC/.
INC., PHONE 1-800-242-1776, SERIAL NO __________ FOR THE CITY OF PITTSBURGH - 19TH WARD.
THREE TO TEN WORKING DAYS PRIOR TO EXCAVATION, BASED ON THE COMPLEXITY OF THE PROJECT, THE CONTRACTOR MUST CONTACT THE PA ONE CALL SYSTEM, CONSTRUCT PROJECT IN ACCORDANCE WITH PENNDOT PUBLICATION 408 SPECIFICATIONS, DATED 2020, CHANGE NO. 6.
GENERAL NOTES
PUBLICATION 72M AND PUBLICATION 219M STANDARD DRAWINGS:
DETAILS OTHER THAN THOSE INDICATED, ARE ON THE FOLLOWING PENNDOT
NO. DATE:
RC-92M
RC-91M
RC-77M
RC-75M
RC-73M
RC-70M
RC-30M
RC-12M
RC-11M
RC-10M BC-736M
NO. DATE:
JUN. 1, 2010
DEC. 17, 2019
DEC. 17, 2019
JUN. 1, 2010
FEB. 8, 2019
FEB. 8, 2019
FEB. 27, 2023
NOV. 1, 2022
JUN. 1, 2010
JUN. 1, 2010 NOV. 23, 2022
INDICATES SLOPE LIMITS
CUT FILL
GRANDVIEW TOWERS ASSOCIATION
PBV102 PG 133
GRANDVIEW TOWERS ASSOCIATION
6-B-93
DBV 7654 PG 439
RAJ A. NARAYAN, UNMARRIED
6-B-140 & 142
DBV 14628 PG 437
VB-S1 ASSETS, LLC
6-B-150
DESCRIBED
FIRST AND SECOND
DBV 18076 PG 267
VB-S1 ASSETS, LLC
6-B-153
THIRD DESCRIBED
DBV 18076 PG 267
CITY OF PITTSBURGH
CITY OF PITTSBURGH
CITY OF PITTSBURGH
GRANDVIEW TOWERS ASSOCIATION
PBV102 PG 133
GRANDVIEW TOWERS ASSOCIATION
6-B-93
DBV 7654 PG 439
RAJ A. NARAYAN, UNMARRIED
6-B-140 & 142
DBV 14628 PG 437
VB-S1 ASSETS, LLC
6-B-150
DESCRIBED
FIRST AND SECOND
DBV 18076 PG 267
VB-S1 ASSETS, LLC
6-B-153
THIRD DESCRIBED
DBV 18076 PG 267
40'
20'
30'
FOR CITY STREET
LEGAL R/W LINE
FOR CITY STREET
LEGAL R/W LINE
FOR CITY STREET
LEGAL R/W LINE
FOR CITY STREET
LEGAL R/W LINE
FOR CITY STREET
LEGAL R/W LINE
FOR CITY STREET
LEGAL R/W LINE
F O
R C
IT
Y S
T R E E T
L E G
A L R /W L
IN
E
F O
R C
IT
Y S
T R E E T
L E G
A L R /W L
IN
E
F O
R C
IT
Y S
T R E E T
L E G
A L R /W L
IN
E
F O
R C
IT
Y S
T R E E T
L E G
A L R /W L
IN
E
F O
R C
IT
Y S
T R E E T
L E G
A L R /W L
IN
E
F O
R C
IT
Y S
T R E E T
L E
G A L R /W L
IN
E
24"
GAZEBO
FM
W B Z Z
OF ROCK OUTCROP
APPROXIMATE LOCATION
ROCK OUTCROP
LOCATION OF
APPROXIMATE
WALL
WALL
WALL
W A
LL
W A
LL
CONC
W A
LL
W A
LL
W A
LL
10 STORY BRICK STRUCTURE
ASPHALT PARKING
ASPHALT PARKING
SHED
CITY OF PITTSBURGH
SHEET
REV
NO
REVISIONS DATE BY APPD
F
I L
E p w
\g f n e t-p w
.b e n tl e y .c o m
:g f n e t-p w
\D o c u m e n ts
\P r o je c ts
\6 \O
U T
P U
T \C
O M
P \C
I V
I L
\R O
A D
\P L
O T
\6 C o n s tr
.d g n
T
IM
E
:5
:4
P
M
D A
T E
/3
/2
P L
O T
T E
D
N S Y L V
C O
M
M
NWEALTH
PE079465
ERIC R. HOLLAND
N67°25'01"W
T O R
E M
A
IN
2 STORY FRAME
TEMPORARY CONSTRUCTION EASEMENT
TEMPORARY CONSTRUCTION EASEMENT
TEMPORARY CONSTRUCTION EASEMENT
EASEMENT
CONSTRUCTION
TEMPORARY
1140' 1150'
R E E S E S
T R E E T
R E P U
B L
IC
S
T R E E T
GRANDVIEW AVENUE
RUTLEDGE STREET
LEGEND
LIMITS OF CONTRACTOR ACCESS
BORING LOCATION
RS-1
RS-3
RS-2
0 FEET25 25 50
PROVIDE SHIELDING AS NECESSARY, SEE SPECIAL PROVISIONS.
LIMITS OF ROCK SCALING
EMERALD VIEW TRAIL
SITE FROM REESE STREET
CONTRACTOR SHALL NOT ENTER OR EXIT PROJECT
TO REMAIN AND BE PROTECTED
EXISTING WALLS AND EQUIPMENT
PROTECTION) AS PART OF THE CONTRACTOR'S MEANS AND METHODS OF CONSTRUCTION.
INCIDENTAL TO ITEM 4201-0001 (CLEARING AND GRUBBING, INCLUDING BOUNDARY STAKING AND
REPLACE IN ACCORDANCE WITH PENNDOT PUB 408 SECTION 605. THIS WORK WILL BE CONSIDERED
REMOVE, STORE AND RESET INLET AND CONCRETE TOP UNIT, IF REMOVAL IS NECESSARY. IF DAMAGED, AND PROTECTION) AS PART OF THE CONTRACTOR'S MEANS AND METHODS OF CONSTRUCTION.
CONSIDERED INCIDENTAL TO ITEM 4201-0001 (CLEARING AND GRUBBING, INCLUDING BOUNDARY STAKING
FOR A LOCAL ROAD (MAINTENANCE FUNCTIONAL CODE E), IF REMOVED OR DAMAGED. THIS WORK WILL BE
REPLACE ASPHALT PAVEMENT AND SUBBASE IN ACCORDANCE WITH PENNDOT PUB. 242, CHAPTER 9 CRITERIA
TO REMAIN
EXISTING GATE
POINT #1
POINT #13
POINT #12
POINT #11
POINT #10
POINT #9
POINT #8
POINT #7
POINT #6
POINT #5
POINT #4
POINT #2
POINT #3
CONTRACTOR'S MEANS AND METHODS OF CONSTRUCTION.
STAKING AND PROTECTION) AS PART OF THE
0001 (CLEARING AND GRUBBING, INCLUDING BOUNDARY
WORK WILL BE CONSIDERED INCIDENTAL TO ITEM 4201-
ACCORDANCE WITH PENNDOT PUB 408 SECTION 624. THIS
REMOVAL IS NECESSARY. IF DAMAGED, REPLACE IN
REMOVE, STORE AND RESET EXISTING CHAIN LINK FENCE, IF
INCLUDING BOUNDARY STAKING AND PROTECTION).
THIS WORK WILL BE CONSIDERED INCIDENTAL TO ITEM 4201-0001 (CLEARING AND GRUBBING, BOUNDARY. CONTRACTOR IS NOT PERMITTED TO CROSS THIS BOUNDARY DURING CONSTRUCTION.
CORNERS AND AT A MAXIMUM SPACING OF 100' TO PROVIDE A VISIBLE MARKING OF THE
PLACE STAKES/FENCE AROUND PERIMETER OF CONTRACTOR ACCESS LIMITS BOUNDARY AT
ITEM 0615-0021 (4" SUBSURFACE DRAIN OUTLETS).
PROJECT SURVEY & CONSTR. �
SEE NOTE 1 FOR TREE REMOVAL ITEM LIMITS
SUPPORT AND PROTECTION SYSTEM".
IN ACCORDANCE WITH THE SPECIAL PROVISION TITLED "TEMPORARY EXCAVATION
2. PROVIDE TEMPORARY SHORING AS NECESSARY FOR CONSTRUCTION ACTIVITIES
INCLUDING BOUNDARY STAKING AND PROTECTION).
OUTCROP TO BE INCIDENTAL TO ITEM 4201-0001 (CLEARING AND GRUBBING,
0050 (SELECTIVE TREE REMOVAL, AS DIRECTED). TREE REMOVAL ABOVE ROCK
1. TREE REMOVAL BELOW ROCK OUTCROP TO BE AS DIRECTED UNDER ITEM 4810-
NOTES:
WALL #2
WALL #1
U N
N A
M E D C
IT
Y S
T R E E T
GRANDVIEW AVENUE (UNOPENED)
SPACED CAISSONS SEE SHEET OF
APPROXIMATE LOCATION OF CLOSELY
4 28
REESE STREET
PROJECT PLAN
POINT
NORTHING
411768.8195
411787.4144
411845.9811
411747.7951
411738.2040
411732.6133
411713.5648
411717.5563
411694.7360
411701.7740
411669.2480
411643.0867
411631.1871
1335354.7031
1335330.0438
1335165.1349
1335130.2646
1335151.5702
1335147.3520
1335173.0664
1335176.0780
1335206.8840
1335212.1920
1335255.8885
1335236.3586
1335252.3616
EASTING
LIMITS OF CONTRACTOR ACCESS
CONTROL POINTS FOR
5 0 5 10 FEET
DEVELOPED ELEVATION
LINE AT F.F.
FINISHED GROUND
AND EXISTING
(TYP.)
EL. 1111.00
TOP OF ROCK
APPROX.
EL. 1131.00
TOP OF CAISSON TREATMENT
C1 C17C10
MEASURED ALONG CAISSON TREATMENT �
16 SPA. @ 5'-6" = 88'-0"
T O
V A
R
IE
S
THERMOPLASTIC PIPE, GROUP VIP,
36" DIA. PERFORATED
CAISSON
42" DIA.
SHAFT IN SOIL)
TO 42" DRILLED CAISSONS,
AGGREGATE (TYP.) (INCIDENTAL
FILLED WITH NO. 57 COARSE
EL. 1130.00
EL. 1129.00
EL. 1128.00
C2 C3 C4 C5 C6 C7 C8 C9 C11 C12 C13 C14 C15 C16
SSR
SSS
CITY OF PITTSBURGH
SHEET
REV
NO
REVISIONS DATE BY APPD
F
IL
E p w
\g fn e t-p w
.b e n tl e y .c o m
:g fn e t-p w
-0
\D o c u m e n ts
\P ro je c ts
\6
\I
N P
U T
\C O
M P
\C
IV
IL
\S T
R C
\C A
D \D
E S
IG
N
\R E
E S
E S
T
P L
A N
E
L
T
IM
E :5
:5
P
M
D A
T E
/3
/2
P L O
T T
E D
N I
A
C O
M
PE079465
ERIC R. HOLLAND
N67°25'01"W
GRANDVIEW TOWERS
CITY STREET
LEGAL R/W LINE FOR
(RADIO STATION)
WBZZ-FM PITTSBURGH
1130 6
ROCK OUTCROP
LOCATION OF
APPROXIMATE
CAISSON (TYP.)
42" DIA.
AGGREGATE (TYP.)
NO. 57 COARSE
GROUP VIP, FILLED WITH
THERMOPLASTIC PIPE,
36" DIA. PERFORATED
42" DIA. CAISSON
� CAISSON TREATMENT,
5 0 5 10 FEET
W.P. 1
W.P. 3
WALLS (TO REMAIN)
EXISTING RETAINING
PVC PIPE
EXISTING 4" DIA.
LEGEND:
1130 PROPOSED CONTOURS
RS-1
RS-3
BORING LOCATION
TREATMENT
R.F. CAISSON
F.F. CAISSON TREATMENT
EXISTING CONTOURS
EASTINGNORTHING
NUMBER
BORING
STRUCTURE BORING
411748.8950 1335207.9965
411738.2601 1335275.4851
RS-1
RS-3
SUPPLEMENTAL DRAWINGS
DWG. NO.APP. DATE
BACKFILL AT STRUCTURES
DESCRIPTION
CLASSIFICATION OF EARTHWORK FOR STRUCTURES
REINFORCEMENT BAR FABRICATION DETAILS
RC-12M
RC-11M
BC-736M
11/01/22
06/01/10
11/23/22
13 SPA. @ 5'-6" = 71'-6"
W.P. 2
W.P. 4
5'-6" = 11'-0"
2 SPA @
5'-6
NORTHING EASTING
COORDINATES
WORK POINT
SUMMARY OF WORK POINT COORDINATES
411722.7228 1335271.7319
411730.8436 1335264.3122
411758.3012 1335198.2945
411758.0723 1335192.7993
25°00'00" 24°58'06"
GAZ
EB
O
WALL
WALL
CONC
WALL
WALL
WALL
& CONSTR. �
PROJECT SURVEY
GENERAL PLAN & ELEVATION
CAISSON TREATMENT
REESE STREET
FRONT FACE
REAR FACE
F.F.
R.F.
- ITEM NUMBER 5006-1010
CAISSONS, SHAFT IN SOIL
INDICATES 42" DIAMETER DRILLEDSSS
- ITEM NUMBER 5006-1055
CAISSONS, SHAFT IN ROCK
INDICATES 42" DIAMETER DRILLEDSSR
PLAN
N67°25'01"W
STA. AHEAD
FOR BORING LOGS, SEE SHEETS TO3.
FOR CAISSON TREATMENT NOTES, SEE SHEET2.
FOR TYPICAL SECTION AND DETAILS, SEE SHEET1. 5
7 9
NOTES:
SECTION A-A
4" CLR
@ 12" SPA
#5 STIRRUP
AT EQUAL SPACING
20 - #10 BARS
#5 LAP SPLICE
42"
DIA. CAISSON
� TREATMENT, 42"
1 0 1 2 FEET
� 42" DIA. CAISSON
SPACING
5'-6"
42" DIA. CAISSON
� CAISSON TREATMENT,
FOR ADDITIONAL DETAILS.
SHOWN) SEE SECTION A-A
(REINFORCEMENT NOT
42" DIA. CAISSON, TYP.
CAISSONS, SHAFT IN SOIL)
(INCIDENTAL TO 42" DRILLED
UNIFORM CONTACT WITH CAISSONS.
AGGREGATE. PLACE TO ACHIEVE
FILLED WITH NO. 57 COARSE
THERMOPLASTIC PIPE, GROUP VIP,
36" DIA. PERFORATED
REESE STREET PARTIAL PLAN VIEW
1 0 1 2 3 FEET
CAISSON (TYP.)
� 42" DIA.
TREATMENT
F.F. CAISSON
TREATMENT
R.F. CAISSON
90 D
EG
. (TYP.)
1.75
FINISHED GROUND LINE R.F.
CL CAISSON TREATMENT, 42" DIA. CAISSON
V A
R
IE
S
T
O
GROUND LINE F.F.
FINISHED
EXISTING &
S
T
IR
R U
P S
S P
A
CAISSON
42" DIA.
M A
X
TYPICAL SECTION
TOP OF CAISSON EL. VARIES
M
IN
DRILLED CAISSON
V A
R
IE
S
T
O
C L A
S S
A S
C C
SSS
SSR
(THIS SHEET)
PARTIAL PLAN VIEW
SEE REESE STREET
TREATMENT
R.F. CAISSON
TREATMENT
F.F. CAISSON
#10 REINFORCEMENT BARS
A A
1 0 1 2 3 FEET
APPROX. TOP
OF ROCK
EL. 1111
M A
X
EXISTING GROUND LINE
C L
R
S T
IR
R
U P
S
(T Y
C L R
B
A R
S
(T Y
P
CITY OF PITTSBURGH
SHEET
REV
NO
REVISIONS DATE BY APPD
F
IL
E p w
\g fn e t-p w
.b e n tl e y .c o m
:g fn e t-p w
-0
\D o c u m e n ts
\P ro je c ts
\6
\I
N P
U T
\C O
M P
\C
IV
IL
\S T
R C
\C A
D \D
E S
IG
N
\R E
E S
E S
T
T Y
P
S E
C T
IO
N
.d g n
T
IM
E :5
:0
P
M
D A
T E
/3
/2
P L O
T T
E D
N I
A
C O
M
PE079465
ERIC R. HOLLAND
LEGEND:
- ITEM NUMBER 5006-1010
CAISSONS, SHAFT IN SOIL
INDICATES 42" DIAMETER DRILLEDSSS
- ITEM NUMBER 5006-1055
CAISSONS, SHAFT IN ROCK
INDICATES 42" DIAMETER DRILLEDSSR
NOTES:
- #5 BAR = 2'-9"
MINIMUM REINFORCEMENT LAP SPLICE LENGTHS:2.
CITY. SUBMIT DETAILS FOR ACCEPTANCE.
OF THE CAISSON AT NO ADDITIONAL COST TO THE
AND SHRINKAGE STEEL FOR THE FULL HEIGHT
CAGE FOR A W24x176 PILE WITH TEMPERATURE
CONTRACTOR MAY SUBSTITUTE REINFORCEMENT1.
REESE STREET
TYPICAL SECTION AND DETAILS
CAISSON TREATMENT
REAR FACER.F.
FRONT FACEF.F.
TYPICAL EXCAVATION SECTION
N.T.S.
� CAISSON
� CAISSON TREATMENT,
R.F. CAISSON TREATMENT
1.75*
EXISTING WALL
EXISTING GROUND LINE
FINISHED GROUND LINE
F.F. CAISSON TREATMENT
*TYPICAL AS SHOWN, SEE CROSS SECTIONS.
LEGAL R/W LINE FOR CITY STREET
CLASS 1 EXCAVATION
EMBANKMENT MATERIAL
CITY OF PITTSBURGH
SHEET
REV
NO
REVISIONS DATE BY APPD
F
IL
E p w
\g fn e t-p w
.b e n tl e y .c o m
:g fn e t-p w
-0
\D o c u m e n ts
\P ro je c ts
\6
\I
N P
U T
\C O
M P
\C
IV
IL
\S T
R C
\C A
D \D
E S
IG
N
\R E
E S
E S
T
G E
N E
R A
L N
O T
E S
.d g n
T
IM
E :5
:0
P
M
D A
T E
/3
/2
P L O
T T
E D
N I
A
C O
M
PE079465
ERIC R. HOLLAND
ESTIMATED QUANTITIES
TREATMENT NOTES:
TO CONSTRUCTION.
PROTECTION SYSTEM. CONTRACTOR TO SUBMIT MEANS AND METHODS FOR APPROVAL PRIOR
PER PROJECT SPECIAL PROVISIONS, ITEM 9203-0101 TEMPORARY EXCAVATION SUPPORT AND
PROVIDE PROPOSED TEMPORARY EXCAVATION SUPPORT DESIGN, SEQUENCE, AND LAYOUT.7
CHAMFER EXPOSED CONCRETE EDGES 1" X 1" EXCEPT AS NOTED.6.
PROVIDE STRUCTURAL STEEL CONFORMING TO AASHTO M270 (ASTM A709) GRADE 36 OR 50.5.
BARS IS INDICATED.
DO NOT USE RAIL STEEL ASTM A 996 WHERE BENDING OR WELDING OF THE REINFORCEMENT
A 996, OR A 706. DO NOT WELD GRADE 60 REINFORCING BARS UNLESS SPECIFICED.
PROVIDE GRADE 60 REINFORCING BARS THAT MEET THE REQUIREMENTS OF ATSM A 615,4.
CONCRETE AT NO ADDITIONAL COST TO THE CITY.
A HIGHER CLASS CONCRETE MAY BE SUBSTITUTED FOR A LOWER CLASS
USE CLASS A SCC FOR CAST-IN-PLACE CONCRETE. 3.
BY DESIGN MANUAL PART 4, STRUCTURES.
DESIGN SPECIFICATIONS: AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS AS SUPPLEMENTED2.
408/2020, AASHTO/AWS D1.5 BRIDGE WELDING CODE AND THE SPECIAL PROVISIONS.
PROVIDE MATERIALS AND PERFORM WORK IN ACCORDANCE WITH SPECIFICATIONS PUBLICATION 1.
DESCRIPTION
TIP AND CSL
IN SOIL, WITHOUT
SHAFT SECTION
DRILLED CAISSONS,
42" DIAMETER
ITEM 5006-1010
DRILLED CAISSONS
PIPE, GROUP VIP
36" DIA. PERFORATED THERMOPLASTIC
UNIT
INFORMATIONAL QUANTITIES, INCIDENTAL TO ITEMS 5006-1010 AND 5006-1055 ABOVE
TIP AND CSL
IN ROCK, WITHOUT
SHAFT SECTION
DRILLED CAISSONS,
42" DIAMETER
ITEM 5006-1055
LF
LF
CY
CY
LB
NO. 57 COARSE AGGREGATE
CLASS A SCC
REINFORCEMENT BARS (1)
334 391
139 0
37 0
121 140
34,000 39,100
CITY. SEE NOTE 1 ON SHEET .
(1) REINFORCEMENT BARS MAY BE SUBSTITUTED WITH A W24X176 SECTION AT NO ADDITIONAL COST TO THE
REESE STREET
GENERAL NOTES & QUANTITIES
CAISSON TREATMENT
cvollmer Text Box
8. USE EPOXY COATED REINFORCEMENT IN THE CAISSON TREATMENT.
9. GALVANIZE STRUCTURAL STEEL IN ACCORDANCE WITH PUBLICATION 408, SECTION 1105.02(s).
cvollmer Text Box
EPOXY COATED
cvollmer Cloud cvollmer Cloud cvollmer Text Box cvollmer Polygon cvollmer Text Box cvollmer Polygon cvollmer Text Box
ADDED EPOXY AND GALVANIZING NOTES 9/27/23 CTV
SHEET
REV
NO
REVISIONS DATE BY APPD
F
I L
E p w
\g f n e t-p w
.b e n tl e y .c o m
:g f n e t-p w
\D o c u m e n ts
\P r o je c ts
\6 \O
U T
P U
T \C
O M
P \C
I V
I L
\R O
A D
\P L
O T
\6 C o n s tr
.d g n
T
IM
E
:5
:1
P
M
D A
T E
/3
/2
P L
O T
T E
D
C O
M
M
PE079465
ERIC R. HOLLAND
N67°25'01"W
24"
LEGEND
BEGIN/END BASELINE
VERIFICATION LOCATION
GROUTING LOCATION
CAISSON NUMBER
FOR WRITTEN APPROVAL PRIOR TO DRILLING.
ADJUSTED LOCATIONS TO THE CITY REPRESENTATIVE
THE CITY REPRESENTATIVE. PROVIDE ANY FIELD
4. FIELD ADJUST BOREHOLE LOCATIONS AS DIRECTED BY
ELEVATION 1065 AND 1075.
3. ESTIMATED MINE INTERVAL VARIES BETWEEN
COMPLETION OF GROUTING PROGRAM AS DIRECTED.
2. CONDUCT GROUT VERIFICATION TEST BORINGS AFTER
OWNED BY THE CITY OF PITTSBURGH.
NECESSARY TO REMAIN WITHIN LIMITS OF PROPERTY
OFFSET AND ANGLE TO THE LOCATION SHOWN AS
1. BOREHOLE LOCATION SHOWN AT THE DEPTH OF MINE.
GROUTING NOTES:
5 0 5 10 FEET
DEVELOPED ELEVATION
LINE AT F.F.
FINISHED GROUND
AND EXISTING
(TYP.)
EL. 1088.00 (TYP.)
BOTTOM OF CAISSON
EL. 1131.00
TOP OF CAISSON TREATMENT
THERMOPLASTIC PIPE, GROUP VI,
36" DIA. PERFORATED
CAISSON
42" DIA.
AGGREGATE (TYP.)
FILLED WITH NO. 57 COARSE
5 0 5 10 FEET
PLAN
GRANDVIEW TOWERS
WALL
WALL
WALL
ROCK OUTCROP
LOCATION OF
APPROXIMATE
CONC
0 WALL #1
WALL #2
WALLS (TO REMAIN)
EXISTING RETAINING
CITY STREET
LEGAL R/W LINE FOR
(RADIO STATION)
WBZZ-FM PITTSBURGH
PVC PIPE
EXISTING 4" DIA.
& CONSTR. �
PROJECT SURVEY
GAZ
EB
O
42" DIA. CAISSON
� CAISSON TREATMENT,
TYP. SPACING
11'
GRANDVIEW AVENUE (UNOPENED)
SHOWN WITH THIS SYMBOL .
AT CAISSON LOCATIONS AS
LOCATE MINE GROUTING BOREHOLES SHOWN WITH THIS SYMBOL .
AT CAISSON LOCATIONS AS
LOCATE VERIFICATION BOREHOLES
C17
C16
C15
C14
C13
C12
C11
C10
C9
C8
C7
C6
C5
C4
C3
C2
C1
SUMMARY OF MINE GROUTING LOCATIONS
NUMBER
CAISSON
X
X
X
X
X
X
X
X
X
BOREHOLE
GROUTING
MINE
X
X
X
BOREHOLE
VERIFICATION
C2
C1
C2
C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16
C17
MINE VOID ELEV 1065
APPROX. BOTTOM OF
MINE VOID ELEV 1075
APPROX. TOP OF
TEST BORING (TYP.)
GROUT VERIFICATION
GROUT STABILIZATION -
GROUT INJECTION (TYP.)
INJECTION HOLE WITH
GROUT STABILIZATION -
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12
C17 C16
C15 C14C13
GROUT INJECTION (TYP.)
11.5' DIAMETER
BOTTOM GROUT
1.5' DIAMETER
TOP GROUT
(TYP.)
EL. 1128.00
TOP OF CAISSON TREATMENT
REESE STREET
MINE GROUTING PLAN
REV
NO
REVISIONS DATE BY APPD
F
I L
E p w
\g f n e t-p w
.b e n tl e y
.c o m :g f n e t-p w
\D o c u m e n ts \P r o je c ts
\6
\O
U T
P U
T \C
O M
P
\C I V
I L
\R O
A D
\P L
O T
\6
R o c k
S c a li n g
.d g n
T
IM
E
:5
:1
P
M
D A
T E
/3
/2
P L
O T
T E
D
C O
M
M
PE079465
ERIC R. HOLLAND
RUTLEDGE STREET
REMOVE APPROX. 25 CY OF MATERIAL
ROCK SCALING AREA 1
REMOVE APPROX. 5 CY OF MATERIAL
ROCK SCALING AREA 3
REMOVE APPROX. 5 CY OF MATERIAL
ROCK SCALING AREA 4
REMOVE APPROX. 5 CY OF MATERIAL
ROCK SCALING AREA 2
WALL #2
WALL #1
NO SCALE
ROCK SCALING PHOTOMOSAIC
CITY OF PITTSBURGH
CITY OF PITTSBURGH
GRANDVIEW TOWERS ASSOCIATION
PBV102 PG 133
GRANDVIEW TOWERS ASSOCIATION
6-B-93
DBV 7654 PG 439
RAJ A. NARAYAN, UNMARRIED
6-B-140 & 142
DBV 14628 PG 437
VB-S1 ASSETS, LLC
6-B-150
DESCRIBED
FIRST AND SECOND
DBV 18076 PG 267
VB-S1 ASSETS, LLC
6-B-153
THIRD DESCRIBED
DBV 18076 PG 267
40'
20'
30'
FOR CITY STREET
LEGAL R/W LINE
FOR CITY STREET
LEGAL R/W LINE
FOR CITY STREET
LEGAL R/W LINE
FOR CITY STREET
LEGAL R/W LINE
FOR CITY STREET
LEGAL R/W LINE
FOR CITY STREET
LEGAL R/W LINE
F O
R C
IT
Y S
T R E E T
L E G
A L R /W L
IN
E
F O
R C
IT
Y S
T R E E T
L E G
A L R /W L
IN
E
F O
R C
IT
Y S
T R E E T
L E G
A L R /W L
IN
E
F O
R C
IT
Y S
T R E E T
L E G
A L R /W L
IN
E
F O
R C
IT
Y S
T R E E T
L E G
A L R /W L
IN
E
F O
R C
IT
Y S
T R E E T
L E
G A L R /W L
IN
E
24"
GAZEBO
FM
W B Z Z
OF ROCK OUTCROP
APPROXIMATE LOCATION
ROCK OUTCROP
LOCATION OF
APPROXIMATE
WALL
WALL
WALL
W A
LL
W A
LL
CONC
W A
LL
W A
LL
W A
LL
10 STORY BRICK STRUCTURE
ASPHALT PARKING
ASPHALT PARKING
SHED
CITY OF PITTSBURGH
SHEET
REV
NO
REVISIONS DATE BY APPD
F
I L
E p w
\g f n e t-p w
.b e n tl e y
.c o m :g f n e t-p w
\D o c u m e n ts \P r o je c ts
\6
\O
U T
P U
T \C
O M
P
\C I V
I L
\R O
A D
\P L
O T
\6
L a n d s c a p in g
P la n .d g n
T
IM
E
:5
:1
P
M
D A
T E
/3
/2
P L
O T
T E
D
C O
M
M
PE079465
ERIC R. HOLLAND
N67°25'01"W
T O R
E M
A
IN
2 STORY FRAME
TEMPORARY CONSTRUCTION EASEMENT
TEMPORARY CONSTRUCTION EASEMENT
TEMPORARY CONSTRUCTION EASEMENT
EASEMENT
CONSTRUCTION
TEMPORARY
1140' 1150'
R E P U
B L
IC
S
T R E E T
GRANDVIEW AVENUE
RUTLEDGE STREET
CLOSELY SPACED CAISSONS
APPROXIMATE LOCATION OF
0 FEET25 25 50
ROCK SCALING
LIMITS OF
EMERALD VIEW TRAIL
SITE FROM REESE STREET
CONTRACTOR SHALL NOT ENTER OR EXIT PROJECT
0006 PLANTINGS, AS DIRECTED).
808. THIS WORK WILL BE CONSIDERED PART OF ITEM 9000-
RESTORATION STANDARDS AND PENNDOT PUB 408 SECTION
WITH THE CITY OF PITTSBURGH NATURAL AND WOODED AREA
REPLACEMENT WITH THE CITY FORESTER AND IN ACCORDANCE
REMOVAL IS NECESSARY OR IF DAMAGE OCCURS, COORDINATE
ALLEY/UNNAMED CITY STREET DURING CONSTRUCTION. IF
LINK FENCE ALONG THE EASTERN EDGE OF THE
PROTECT EXISTING SHRUBS/TREES ADJACENT TO THE CHAIN
AND SOIL SUPPLEMENTS
LIMITS OF TOPSOIL AND SEEDING
LIMITS OF CONTRACTOR ACCESS
LEGEND
PERMITTED TO CROSS THIS BOUNDARY DURING CONSTRUCTION.
LIMITS OF CONTRACTOR ACCESS. CONTRACTOR IS NOT
PROJECT SURVEY & CONSTR. �
R E E S E S
T R E E T
U N
N A
M E D C
IT
Y S
T R E E T
GRANDVIEW AVENUE (UNOPENED)
PLANTING PLAN
REV
NO
REVISIONS DATE BY APPD
F
I L
E p w
\g f n e t-p w
.b e n tl e y .c o m
:g f n e t-p w
\D o c u m e n ts
\P r o je c ts
\6 \O
U T
P U
T \C
O M
P \C
I V
I L
\R O
A D
\P L
O T
\6 Q u a n ti ty S h e e ts
.d g n
T
IM
E
:5
:2
P
M
D A
T E
/3
/2
P L
O T
T E
D
OFTABULATION OF QUANTITIES 14
ROADWAY
C O
M
M
PE079465
ERIC R. HOLLAND
REV
NO
REVISIONS DATE BY APPD
F
I L
E p w
\g f n e t-p w
.b e n tl e y .c o m
:g f n e t-p w
\D o c u m e n ts
\P r o je c ts
\6 \O
U T
P U
T \C
O M
P \C
I V
I L
\R O
A D
\P L
O T
\6 Q u a n ti ty S h e e ts
.d g n
T
IM
E
:5
:3
P
M
D A
T E
/3
/2
P L
O T
T E
D
OFTABULATION OF QUANTITIES 15
MISCELLANEOUS
C O
M
M
SOIL EROSION / SEDIMENTATION CONTROL:
COMPLETION AND FINAL ACCEPTANCE OF THE PROJECT.
MAINTAIN, IN GOOD CONDITION, ALL EROSION AND SEDIMENT POLLUTION CONTROL MEASURES UNTIL
SPECIFIC ITEM OF WORK COVERED AND SHALL BE STRICTLY ADHERED TO, AND THE CONTRACTOR SHALL
SHALL BE IMPLEMENTED PRIOR TO COMMENCEMENT OF AND/OR DURING CONSTRUCTION OF ANY
TO RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITIES. THE REQUIREMENTS SET FORTH IN THIS PLAN
INSTRUCTIONS OR DIRECTIONS RELATIVE TO THE EXECUTION OF THIS PLAN SHALL IN NO WAY OPERATE
OF A FIELD DECISION. HOWEVER, FAILURE OF THE ACCD AND/OR DEP AREA REPRESENTATIVE TO ISSUE
DEP'S AREA REPRESENTATIVE INVOLVING EROSION AND SEDIMENT POLLUTION CONTROL AS A RESULT
THE CONTRACTOR SHALL BE RESPONSIBLE TO FOLLOW ANY INSTRUCTIONS FROM THE ACCD AND/OR
COUNTY CONSERVATION DISTRICT.
PLAN. ANY ALTERNATE PLAN MUST BE APPROVED BY THE REPRESENTATIVE AND THE ALLEGHENY
TO SUBMIT AN ALTERNATE EROSION AND SEDIMENTATION CONTROL PLAN IN LIEU OF THE APPROVED
PLAN REVISIONS MUST BE APPROVED BY THE REPRESENTATIVE. THE CONTRACTOR SHALL BE PERMITTED
BE MADE WITHOUT APPROVAL OF DEP AND THE ALLEGHENY COUNTY CONSERVATION DISTRICT. OTHER
WHICH DO NOT CHANGE THE CONTROL MEASURES AND FACILITIES OR THE POINTS OF DISCHARGE MAY
CONTRACTOR PERFORMING THE WORK AS A FUNCTION OF CONSTRUCTION TECHNIQUE. ONLY REVISIONS
WITH REGULATIONS PERTAINING TO SOIL EROSION AND SEDIMENTATION CONTROL BELONGS TO THE
BY THE REPRESENTATIVE AND THE ACCD. IN ADDITION, THE ULTIMATE RESPONSIBILITY FOR COMPLIANCE
TO ADJUST TO CHANGING SITE CONDITIONS SHALL NOT BE MADE WITHOUT PRIOR WRITTEN APPROVAL
TO CONTROL SEDIMENTATION. MODIFICATIONS OF THE REQUIREMENTS HEREIN OR ON THE DRAWINGS
PREVENT THE CONTRACTOR FROM UTILIZING ADDITIONAL MEASURES TO PREVENT SOIL EROSION AND
STANDARDS. NOTHING CONTAINED WITHIN THESE PROVISIONS OR ON THE DRAWINGS IS INTENDED TO
THE REQUIREMENTS CONTAINED HEREIN AND/OR SHOWN ON THE DRAWINGS ARE MINIMUM
GENERAL EROSION CONTROL AND SEDIMENT CONTROL NOTES: GENERAL EROSION CONTROL AND SEDIMENT CONTROL NOTES:
OFF-SITE BORROW OR SPOIL AREAS:
CLEAN FILL AND ENVIRONMENTAL DUE DILIGENCE
SOLELY RESPONSIBLE FOR OBTAINING SUCH APPROVAL.
RECEIVE APPROVAL FROM THE ALLEGHENY COUNTY CONSERVATION DISTRICT. THE CONTRACTOR WILL BE
ANY VARIATION FROM THE APPROVED EROSION AND SEDIMENTATION POLLUTION CONTROL PLAN MUST 39.
ACHIEVES FINAL GRADE DURING ANY UNFAVORABLE SEEDING SEASON.
DETAIL) WILL BE APPLIED IN ALL AREAS WHERE ACTIVITIES CEASE TEMPORARILY OR IF ANY DISTURBED AREA
TEMPORARY SEEDING WILL BE USED AS NEEDED. TEMPORARY SEED AND MULCH (IN ACCORDANCE WITH 38.
PENALTIES, AND UP TO $25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.
PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL
PA DEP AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW
E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE
THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF
FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING 37.
SCHEDULE A FINAL INSPECTION.
DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE ACCD AND/OR PA DEP TO
UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL 36.
REMOVAL/CONVERSIONS ARE TO BE DONE ONLY DURING THE GERMINATING SEASON.
CONVERSION OF THE BMPS. IN ORDER TO ENSURE RAPID RE-VEGETATION OF DISTURBED AREAS, SUCH
TO PERMANENT PCSM BMPS. IMMEDIATELY STABILIZE ALL AREAS DISTURBED DURING THE REMOVAL OR
AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, REMOVE TEMPORARY E&S BMPS OR CONVERT THEM 35.
INSPECTION PRIOR TO REMOVAL/CONVERSION OF THE E&S BMPS.
DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE ACCD AND/OR PA DEP FOR AN
UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL 34.
STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE ACCD AND/OR PA DEP.
ENSURE THAT E&S BMPS REMAIN FUNCTIONAL UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY 33.
EROSION.
OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED
PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR 32.
ACCORDING TO THE STANDARDS OF THIS PLAN.
FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED
CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50
ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. 31.
WITH THE PERMANENT STABILIZATION SPECIFICATIONS.
PROVISIONS. STABILIZE THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR IN ACCORDANCE
REACTIVATED WITHIN 1 YEAR, IN ACCORDANCE WITH THE TEMPORARY STABILIZATION TECHNICAL
BLANKETING AS DESCRIBED IN THE PLAN. STABILIZE AREAS NOT AT FINISHED GRADE, WHICH WILL BE
RATE OF 3.0 TONS PER ACRE. DURING NON-GERMINATING MONTHS, APPLY MULCH OR PROTECTIVE
THROUGH THE USE OF HYDROSEEDING TECHNIQUES OR CONVENTIONAL SEEDING AND MULCHING AT THE
SUFFICIENT TIME TO GERMINATE BY OCTOBER 15 OF EACH YEAR. SEEDING WILL BE ACCOMPLISHED
OR SUBAREA OF THE PROJECT. AREAS UTILIZING VEGETATIVE STABILIZATION MUST BE SEEDED/ PLANTED IN
STABILIZE ALL DISTURBED AREAS IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA 30.
MINIMUM OF 2 INCHES OF TOPSOIL.
MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL HAVE A
INCHES ON COMPACTED SOILS) PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A
AREAS WHICH ARE TO BE TOPSOIL SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES (6 TO 12 29.
FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES. 28.
INTO FILLS.
FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED 27.
INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS.
VEGETATION, ORGANIC MATERIALS, LARGE STONES, AND OTHER OBJECTIONABLE MATERIALS THAT WOULD
FILL MATERIAL SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD OR OTHER WOODY 26.
LAYERED LIFTS AT 95% DENSITY.
ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES OF LOOSE STATE 25.
CODES.
STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR
SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, OTHER MOVEMENTS. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, ENSURE THAT CUT AND FILL SLOPES ARE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR 24.
ASSESSMENTS OR AUDITS, AND ANALYTICAL TESTING.
ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, PHASE ENVIRONMENTAL SITE
BASE SEARCHES, REVIEW OF OWNERSHIP AND USE HISTORY OF PROPERTY, SANBORN MAPS,
TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA
4. THE FILL MANAGEMENT DOCUMENT DEFINES ENVIRONMENTAL DUE DILIGENCE AS INVESTIGATIVE
DEMOLITION WASTE” (“HISTORIC FILL”).
WOOD AND COAL, INCINERATOR ASH, COAL ASH, SLAG, DREDGE MATERIAL AND CONSTRUCTION AND CONGLOMERATION OF SOIL AND RESIDUALS, SUCH AS ASHES FROM THE RESIDENTIAL BURNING OF
INCLUDE "MATERIAL USED TO BRING AN AREA TO GRADE PRIOR TO 1988 THAT IS A
THAT IS SEPARATE FROM OTHER WASTE AND RECOGNIZABLE AS SUCH. “CLEAN FILL” DOES NOT MATERIAL, USED ASPHALT, AND BRICK, BLOCK OR CONCRETE FROM CONSTRUCTION AND DEMOLITION DECOMPOSABLE INERT SOLID MATERIAL”). THE TERM INCLUDES SOIL, ROCK, STONE, DREDGED MANAGEMENT DOCUMENT DEFINES “CLEAN FILL” AS (“UNCONTAMINATED NON-WATER SOLUBLE, NON FOLLOWING DEP MANAGEMENT OF FILL POLICY INCLUDING ANY SAMPLING AND TESTING. THE FILL
3. CONTRACTOR TO ENSURE ALL EXCESS EXCAVATED MATERIAL REMOVED FROM THE SITE IS HANDLED
ASSOCIATED WITH THIS PROJECT QUALIFIES AS CLEAN FILL.
2. CONTRACTOR MUST USE ENVIRONMENTAL DUE DILIGENCE TO ENSURE THAT THE FILL MATERIAL
“CLEAN FILL”.
EXPORTED TO AN OFFSITE LOCATION MUST MEET DEP'S DEFINITION OF
PROJECT QUALIFIES AS CLEAN FILL. ALL FILL DEPOSITED ON SITE OR
1. CONTRACTOR TO ENSURE ALL FILL MATERIAL ASSOCIATED WITH THIS
DEFINITION OF CLEAN FILL.
MATERIAL MUST MEET THE PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTIONS' (PA DEP) SAMPLE LOCATIONS AND FREQUENCY OF SAMPLING WITH THE TEST RESULTS. ALL FOREIGN BORROW FOR POLLUTION EXISTS, THE CONTRACTOR SHALL PERFORM OVERBURDEN ANALYSIS AND PROVIDE PA 15219 (412-241-7645) SHOULD ANY OFF SITE BORROW AND/OR WASTE SITES BE USED. IF POTENTIAL COUNTY CONSERVATION DISTRICT (THE HIGHLINE 317 EAST CARSON STREET SUITE 119, PITTSBURGH, THE SELECTED CONTRACTOR IS RESPONSIBLE FOR OBTAINING APPROVAL FROM THE ALLEGHENY
STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE 23.
SHOWN IN THE PLANS.
SEDIMENT POLLUTION CONTROL PROGRAM MANUAL” (MARCH 2012 INCLUDING LATEST REVISIONS) AND AS ACCELERATED EROSION AND SEDIMENTATION AND IN ACCORDANCE WITH THE PA DEP’S “EROSION AND EARTH MOVING OPERATIONS SHALL BE CONDUCTED IN SUCH A MANNER AS TO MINIMIZE THE POTENTIAL FOR 22.
WOODY DEBRIS, ACCUMULATED SEDIMENT, EXCESS VEGETATION, AND CONSTRUCTION MATERIAL/WASTES.
ALL CHANNELS SHALL BE KEPT FREE OF OBSTRUCTIONS INCLUDING BUT NOT LIMITED TO FILL, ROCKS, LEAVES, 21.
REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS.
CASE SHALL IT BE ALLOWED TO ENTER ANY SURFACE WATERS OR GROUNDWATER SYSTEMS. ALL SEDIMENT CONCRETE WASH WATER SHALL BE HANDLED IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS. IN NO 20.
UNDISTURBED VEGETATED AREAS.
EXCAVATION REQUIRING DEWATERING NEEDS WILL BE CONVEYED TO A PUMPED WATER FILTER BAG OVER PUMP WATER FROM WORK AREA(S) ACCORDING TO THE PROCEDURE DESCRIBED IN THIS PLAN. ALL 19.
SURFACE WATER.
SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION 18.
REPRESENTATIVE PRIOR TO STARTING WORK.
408/2020 AND LATEST SUPPLEMENTS, SECTION 105.14. PROVIDE A COPY OF THIS APPROVAL TO THE POLLUTION CONTROL PLAN FOR OFFSITE BORROW AND / OR WASTE AREAS AS PER PENNDOT PUBLICATION THE CONTRACTOR WILL BE RESPONSIBLE FOR DEVELOPING AND SUBMITTING AN EROSION AND SEDIMENT 17.
BOUNDARIES SHOWN ON THE PLAN DRAWINGS.
BEGIN. CONSTRUCTION VEHICLES ARE NOT PERMITTED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE CLEARLY MARK AND/OR FENCE THE LIMIT OF DISTURBANCE BEFORE CLEARING AND GRUBBING OPERATIONS 16.
AGENCY OFFICIALS AT THE TIME OF INSPECTION.
DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE 15.
SHOWN ON THE PLANS.
VEHICLES AND EQUIPMENT SHALL ONLY ENTER OR EXIT THE SITE FROM THE ROCK CONSTRUCTION ENTRANCE 14.
THOSE INSTALLED WILL BE REQUIRED.
IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY. 13.
RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.
FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. 12.
MATERIALS AT THE SITE.
SEQ. DO NOT BURN, BURY, DUMP OR DISCHARGE ANY BUILDING MATERIALS, WASTES OR UNUSED BUILDING THE PA DEP’S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET.
ALL BUILDING MATERIALS AND WASTES FROM THE SITE AND RECYCLE OR DISPOSE OF IN ACCORDANCE WITH 11.
AND/OR REGIONAL OFFICER OF THE PA DEP.
PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE ACCD EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED 10.
CONTROLS AND PERMITTING FOR THE SITE.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND FOR EROSION AND SEDIMENT POLLUTION TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT A LOCATION OFF SITE. 9.
WITHIN.
NARRATIVE AND CONSTRUCTION DRAWINGS, AND WILL BE REQUIRED TO COMPLY WITH ALL ITEMS ADDRESSED THE CONTRACTOR WILL BE PROVIDED A DIGITAL COPY OF THE EROSION AND SEDIMENT POLLUTION CONTROL 8.
FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.
DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF 7.
E&S PLAN.
SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH 6.
VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.
AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, 5.
THE ACCD AND/OR BY THE DEPARTMENT OF ENVIRONMENTAL PROTECTION PRIOR TO IMPLEMENTATION.
PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE CONSTRUCTION SEQUENCE 4.
FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES.
PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 AT LEAST 10 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA 3.
CONSTRUCTION MEETING.
STAGES OF IMPLEMENTATION OF THE PCSM PLAN AND A REPRESENTATIVE FROM THE ACCD TO AN ON-SITE PRE- (PCSM) PLAN PREPARER, THE LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF THE CRITICAL MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE POST CONSTRUCTION STORMWATER MANAGEMENT GRUBBING) THE OWNER/OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE AT LEAST 10 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES (INCLUDING CLEARING AND 2.
WRITTEN SUBMITTAL OF THOSE CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION.
APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY REQUIRE A SHOWN WITHIN THESE DRAWINGS. THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED BY THE ALLEGHENY COUNTY CONSERVATION DISTRICT (ACCD) SHALL SUPERSEDE AN CONFLICTS STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY, AT THE PROJECT SITE AT ALL TIMES. THE PLANS IN ACCORDANCE WITH THE APPROVED E&S PLAN. KEEP A COPY OF THE LATEST APPROVED DRAWINGS, ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE 1.
REESE STREET
NOTES SHEET 1 OF 3
EROSION AND SEDIMENTATION
CITY OF PITTSBURGH
SHEET
REV
NO
REVISIONS DATE BY APPD
F
IL
E p w
\g fn e t-p w
.b e n tl e y .c o m
:g fn e t-p w
-0 \D o c u m e n ts
\P ro je c ts
\6 \O
U T
P U
T \C
O M
P \C
IV
IL
\E R
O S
\P L O
T \6
E
S G e n N o te s
.d g n
T
IM
E
:5
:0
P
M
D A
T E
/3
/2
P L O
T T
E D
N I
A
C O
M
CONSTRUCTION REQUIREMENTS:
MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.
WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET. SEQ., 271.1 AND 287.1 ET. SEQ. NO BUILDING
ALL BUILDING MATERIALS AND WASTES NOT RECYCLED, SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE
MATERIALS, CONCRETE WASH WATER, SANITARY WASTES, ETC.
RECYCLE, TO THE EXTENT PRACTICABLE, WASTE MATERIALS, INCLUDING CONSTRUCTION WASTES, EXCESS SOIL MATERIALS, BUILDING
F. RECYCLING AND DISPOSAL OF CONSTRUCTION MATERIAL:
2. REGULATED FILL IS REQUIRED TO BE DISPOSED OF IN A REGULATED FILL LANDFILL.
FROM SUCH FACILITIES. FACILITIES SHOULD BE CHECKED AND SEDIMENT REMOVED AFTER EACH RUNOFF PRODUCING STORM.
1. THE CONTRACTOR IS RESPONSIBLE FOR THE MAINTENANCE OF EROSION CONTROL FACILITIES AND THE PROPER DISPOSAL OF SEDIMENT
E. NOTES:
PLANS.
MAINTAIN THE BMP'S AS PER THE DEP EROSION AND SEDIMENT POLLUTION CONTROL MANUAL, MARCH 2012 AND AS DESCRIBED IN THESE
D. MAINTENANCE PROGRAM
FINAL ACCEPTANCE OF THE WORK.
VEGETATIVE COVER, FOR ANY REASON, SHALL BE RE-SEEDED WITH THE ORIGINAL MIXTURE. SUCH RE-SEEDING SHALL BE MAINTAINED UNTIL
ANY RE-SEEDING OR RE-GRADING SHALL BE AT THE CONTRACTOR'S EXPENSE. ANY AREAS WHICH FAIL TO SHOW UNIFORM 70%, PERENNIAL
TEMPORARY GRASS MIXTURES AS SHOWN IN THE TECHNICAL PROVISIONS SHALL BE PLACED ON ALL TEMPORARY STOCKPILE AREAS.
LOW MAINTENANCE GRASS MIXTURE AS SHOWN IN THE TECHNICAL PROVISIONS SHALL BE PLACED AT ALL LOCATIONS REQUIRING SEEDING.
UNTIL A PERMANENT COVER IS ESTABLISHED.
TEMPORARY GRASS MIXTURES AS SHOWN IN THE TECHNICAL PROVISIONS SHALL BE USED AS A SEDIMENT AND EROSION CONTROL MEASURE
MATTING UNTIL SEEDING IS EFFECTIVE.
IF SEEDING IS NOT POSSIBLE, SWALES AND ALL OTHER DISTURBED AREAS THAT WOULD NORMALLY BE SEEDED, MUST BE COVERED WITH JUTE
ACCORDANCE WITH THE PROVISIONS OF THE CONTRACT.
THE CONTRACTOR SHALL FERTILIZE, SEED, AND MULCH IMMEDIATELY UPON COMPLETION OF CONSTRUCTION IN ALL DISTURBED AREAS IN
BE FREE FROM UNSIGHTLY VARIATIONS.
RECEIVING LOW MAINTENANCE GRASS SEEDING MIXTURES. THE PLANTABLE SOIL SHALL BE RAKED AND TRIMMED TO TRUE LINES AND SHALL
THE CONTRACTOR SHALL PLACE PLANTABLE SOIL, TO A MINIMUM OF 4-INCHES, IN THOSE AREAS WHICH HAVE BEEN DISTURBED BY WORK
C. FINE GRADING AND SEEDING
STREET AREAS ADJACENT TO THE CONSTRUCTION SITE SHALL BE SWEPT AT THE END OF EACH WORK DAY.
PUBLIC STREETS, HIGHWAYS, SIDEWALKS, OR OTHER PUBLIC THOROUGHFARES BY VEHICLES IN TRANSIT TO AND FROM THE WORK AREA.
MATERIAL SPILLED, DUMPED, OR OTHERWISE DEPOSITED ON
UNDERCARRIAGES WHEN LEAVING THE WORK AREA. THE CONTRACTOR SHALL REMOVE ALL SOIL, MISCELLANEOUS DEBRIS, OR OTHER
THE CONTRACTOR SHALL INSTRUCT THE DRIVERS OF ALL VEHICLES TO REMOVE SOIL AND LOOSE MATERIALS FROM THEIR WHEELS AND
LENGTH.
THE EXISTING GRADE WITH SUBBASE NO. 2A OR PLATE TRENCH AT THE END OF EACH WORK DAY. OPEN TRENCHES ARE LIMITED TO 50' IN
DUST AT THE CONSTRUCTION SITE SHALL BE KEPT WITHIN TOLERABLE LIMITS. THE CONTRACTOR MUST BACKFILL ALL TRENCHES TO MATCH
B. CONSTRUCTION IN PAVED AREAS
8. SEED AND MULCH ALL STOCKPILES IMMEDIATELY.
TO PREVENT SUCH DAMAGES;
IS RESPONSIBLE FOR ANY AND ALL DAMAGES TO DOWNSTREAM PROPERTIES AS A RESULT OF HIS FAILURE
7. DO NOT PERMIT MUD OR SILT-LADEN WATER TO LEAVE THE CONSTRUCTION SITE AND THE CONTRACTOR
CONSTRUCTION SITE;
6. SPRINKLE OR SUPPLY DUST SUPPRESSORS TO KEEP DUST WITHIN TOLERABLE LIMITS AT THE
5. RETARD THE RATE OF RUNOFF FROM THE CONSTRUCTION SITE AND CONTROL THE DISPOSAL THEREOF;
AS IS CONSISTENT WITH CONSTRUCTION SCHEDULES;
THE ESTABLISHMENT OF PERMANENT VEGETATION AND COMPLETING DISTURBED AREAS OF WORK AS RAPIDLY
4. PROTECT SOILS BY USE OF TEMPORARY VEGETATION, OR BY SEEDING AND MULCHING, OR BY ACCELERATING
3. REDUCE THE AREA AND DURATION OF EXPOSURE OF READILY ERODIBLE SOILS;
BEEN SUSPENDED;
2. UTILIZE TEMPORARY MEASURES TO CONTROL EROSION ON CONSTRUCTION OPERATIONS THAT HAVE
CARRYING RUNOFF FROM ENTERING ANY STORMWATER CONVEYANCE FACILITY;
1. CONSTRUCT FILTER BARRIERS ACCORDING TO THE PLAN TECHNICAL PROVISIONS TO PREVENT SEDIMENT
DURING CONSTRUCTION, THE CONTRACTOR SHALL:
CONSTRUCTION.
AREAS TO BE DISTURBED BY CONSTRUCTION SHALL BE SURROUNDED BY COMPOST FILTER SOCK AS INDICATED OR AS DIRECTED PRIOR TO
408/2020 FOR TECHNICAL PROVISIONS.
POLLUTANTS ON A SITE WITHIN THE VICINITY OF THE STREAM OR ITS FLOODPLAIN IS PROHIBITED. SEE SECTION 105.14(a) IN PENNDOT PUB. NO.
PROVIDE NECESSARY PROTECTION AGAINST DISCHARGE INTO THE STREAM OR ONTO THE FLOODPLAIN THEREOF. STORAGE OF POTENTIAL
OR DRAINAGE CHANNEL. STORE AND USE POTENTIAL POLLUTANTS SUCH AS CHEMICALS, FUEL, LUBRICANTS, ETC. IN SUCH A WAY AS TO
ALL CONSTRUCTION DEBRIS, EXCAVATED MATERIAL, ROCKS, AND REFUSE INCIDENTAL TO THE WORK SHALL BE KEPT OUT OF ANY GUTTER LINE
BEGINNING CONSTRUCTION OF THE SUBJECT PROJECT. THIS PLAN MUST BE ON THE CONSTRUCTION SITE AT ALL TIMES.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO BE AWARE OF AND UNDERSTAND THE EROSION AND SEDIMENT CONTROL PLAN BEFORE
RATES.
STOPPED, AS DIRECTED BY THE REPRESENTATIVE. DURING NON-GERMINATING PERIODS, MULCH MUST BE APPLIED AT THE RECOMMENDED
TO EXCEED A PERIOD OF FOUR (4) DAYS, THE CONTRACTOR SHALL SEED ALL DISTURBED SOIL AREAS LEFT EXPOSED WHEN THE WORK IS
CONTROL FACILITIES IN GOOD CONDITION DURING THE SUSPENSION OF WORK. ADDITIONALLY, WHEN THE SUSPENSION OF WORK IS EXPECTED
IF WORK ON THIS PROJECT IS SUSPENDED FOR ANY REASON, THE CONTRACTOR SHALL MAINTAIN THE SOIL EROSION AND SEDIMENT POLLUTION
A. GENERAL
REMOVE ALL BMPS UTILIZED ON THE PROJECT.
ONCE 70% PERENNIAL VEGETATION COVER HAS BEEN ACHIEVED ON ALL DISTURBED AREAS, 12.
COORDINATE WITH THE CITY FORESTER AND COMPLETE TREE/SHRUB PLANTINGS.11.
AREAS WITHIN 24 HOURS.
TOPSOIL, SEED AND MULCH FINISHED SLOPE WITHIN 24 HOURS. STABILIZE OTHER DISTURBED 10.
REMOVE TEMPORARY SHORING AND GRADE TO FINAL SLOPE CONDITION.9.
COMPLETE THE INSTALLATION OF THE CAISSON SYSTEM.8.
COMPLETE MINE GROUTING ACTIVITIES.7.
THE MINE GROUTING AND INSTALLATION OF THE CAISSON SYSTEM.
CONSTRUCT TEMPORARY SHORING AND TEMPORARY GRADING AS REQUIRED FOR COMPLETING 6.
COMPLETE ROCK SLOPE SCALING AS SHOWN IN THE CONSTRUCTION PLANS.5.
INSPECT, MAINTAIN AND REPAIR BMPS DURING CONSTRUCTION.4.
PUMP ANY TRAPPED WATER THROUGH A PUMPED WATER FILTER BAG.
INSTALL CONSTRUCTION ENTRANCE RC-1. REMOVE AND STORE ANY EXCAVATED TOPSOIL. 3.
SURFACE OF THE GROUND.
ACTIVITIES. THIS WORK INCLUDES REMOVAL OF TREES, VEGETATION, AND BRUSH ABOVE THE
COMMENCE CLEARING AND GRUBBING ACTIVITIES ASSOCIATED WITH THE CONSTRUCTION 2.
INSTALL COMPOST FILTER SOCK AND INLET FILTER BAGS AT LOCATIONS SHOWN.1.
CONSTRUCTION
DRAINAGE FEATURES ARE PROTECTED.
IS PROTECTED AS SHOWN ON THE CONSTRUCTION DRAWINGS AND ALL NATURAL
EARTH DISTURBANCE ACTIVITY, THE CONTRACTOR WILL ENSURE THAT THE SITE
INSTALL ALL PERIMETER BMPS PRIOR TO ANY OPERATIONS. PRIOR TO ANY 10.
REQUIRED FOR THE REMOVAL AND CONSTRUCTION OF THE PROJECT.
IMPLEMENT THE MAINTENANCE AND PROTECTION OF ALL TRAFFIC 9.
BY THE ALLEGHENY COUNTY CONSERVATION DISTRICT (ACCD) IS ON SITE AT ALL TIMES.
ENSURE A COPY OF THE MOST CURRENT E&S PLAN AND PCSM PLAN APPROVED 8.
PROJECT BOUNDARIES, AND LIMITS OF DISTURBANCE.
PRIOR TO THE START OF ON SITE CONSTRUCTION, DELINEATE ALL WORK AREAS, 7.
SITES PRIOR TO ANY EARTHMOVING ACTIVITY.
SEDIMENTATION CONTROL PLAN FOR ALL OFF-SITE WASTE/BORROW AND TOPSOIL STOCK PILE
THE SELECTED CONTRACTOR IS RESPONSIBLE FOR HAVING AN APPROVED EROSION AND 6.
AN OFF SITE AREA FOR TOPSOIL STOCK PILES.
DUE TO THE EXISTING SITE CONDITION, THE SELECTED CONTRACTOR IS RESPONSIBLE TO FIND 5.
ALLEGHENY COUNTY CONSERVATION DISTRICT.
PROPOSED CHANGES TO THE E&S PLAN DOCUMENTED AND COORDINATED WITH THE
IMPLEMENTATION. IT IS THE RESPONSIBILITY OF THE SELECTED CONTRACTOR TO HAVE ALL
MUST FIRST BE APPROVED BY THE ALLEGHENY COUNTY CONSERVATION DISTRICT PRIOR TO
ALTERNATIVES TO THE STAGING OR SPECIFICATIONS AS PROVIDED IN THE APPROVED PLAN 4.
BE KEPT ON-SITE AT ALL TIMES.
PRIOR TO THE START OF CONSTRUCTION. COPIES OF PERMITS, PLANS AND APPROVALS SHALL
ALL APPLICABLE PERMITS AND APPROVALS REQUIRED FOR THIS PROJECT SHALL BE SECURED 3.
AND LOCATE ALL UTILITIES IN THE PROJECT AREA, AND PROTECT AS NECESSARY.
AT LEAST 10 DAYS PRIOR TO STARTING WORK, INITIATE PA-ONE CALL (1-800-242-1776) VERIFY 2.
SCHEDULE A PRE-CONSTRUCTION CONFERENCE.
THE CONTRACTOR SHALL CONTACT THE ALLEGHENY COUNTY CONSERVATION DISTRICT TO 1.
PRE-CONSTRUCTION
ACTIVITY, OR ANY STAGE THEREOF, THE PROJECT SITE SHALL BE IMMEDIATELY STABILIZED.
INITIATED. UPON COMPLETION OR TEMPORARY CESSATION OF THE EARTH DISTURBANCE
CONSTRUCTION SEQUENCE. EACH STEP SHALL BE COMPLETED BEFORE A SUBSEQUENT STEP IS
ALL CONSTRUCTION ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE FOLLOWING
CONSTRUCTION SEQUENCE
REESE STREET
NOTES SHEET 2 OF 3
EROSION AND SEDIMENTATION
CITY OF PITTSBURGH
SHEET
REV
NO
REVISIONS DATE BY APPD
F
I L
E p w
\g f n e t-p w
.b e n tl e y .c o m
:g f n e t-p w
\D o c u m e n ts
\P r o je c ts
\6 \O
U T
P U
T \C
O M
P \C
I V
I L
\E R
O S
\P L
O T
\6 E
S G e n N o te s
.d g n
T
IM
E
:5
:0
P
M
D A
T E
/3
/2
P L
O T
T E
D
C O
M
M
BMP MAINTENANCE PROGRAM
REPAIRS ARE NEEDED TO THE EROSION AND SEDIMENT CONTROL BMPS.
MATERIALS SHALL BE STOCKPILED ON SITE TO BE USED IN THE EVENT THAT EMERGENCY
SCHEDULE. AN ADEQUATE SUPPLY OF ADDITIONAL EROSION AND SEDIMENT CONTROL
LIMIT OF ONE WORKING DAY IS PERMITTED FOR MAKING REPAIRS NOTED ON THE IMR
OWNER SHALL COMMENCE WEEKLY INSPECTIONS OF THE PERMANENT FACILITIES. A TIME
AND REPAIR (IMR) SCHEDULE UNTIL STABILIZATION IS ACHIEVED. AT THIS POINT, THE
ACCORDANCE WITH THE MAINTENANCE PROGRAM AND BMP INSPECTION, MAINTENANCE,
THE SITE CONTRACTOR WILL INSPECT BOTH TEMPORARY AND PERMANENT BMPS IN
WITHIN 24 HOURS.
WHICH ARE DAMAGED OR IN NEED OF MAINTENANCE SHALL BE CLEANED OR REPAIRED
EVENT PRODUCING AT LEAST 0.25 INCHES OF RAINFALL. EROSION CONTROL FEATURES
EROSION CONTROL FEATURES AND INSPECTION WITHIN 24 HOURS AFTER ANY RAIN
THE CONTRACTOR'S MONITORING PROGRAM SHALL INCLUDE WEEKLY INSPECTION OF
BE PERFORMED AS FOLLOWS:
INSPECTIONS OF THE PERMANENT, TEMPORARY, AND NON -STRUCTURAL CONTROL WILL
ENVIRONMENTAL PROTECTION, EROSION AND SEDIMENT POLLUTION CONTROL MANUAL.
MAINTENANCE FOR EACH ITEM IS SPECIFIED IN THE PENNSYLVANIA DEPARTMENT OF
PERFORMANCE BOTH DURING AND AFTER CONSTRUCTION. THE APPROPRIATE
ALL EROSION AND SEDIMENT CONTROL ITEMS WILL REQUIRE MAINTENANCE TO ENSURE
RUNOFF WILL NOT DAMAGE SLOPES OR OTHER GRADED AREAS.
BMPS (EXCEPT COMPOST FILTER SOCK) TO ENSURE THAT POTENTIAL STORMWATER
GRADING OPERATIONS TO SAFELY CONDUCT SURFACE RUNOFF TO OTHER INSTALLED
AT THE END OF EACH DAY, EQUIPMENT OPERATORS SHALL PERFORM TEMPORARY LAND
CLEANING, AND LITTER CONTROL.
MINIMIZE EROSION AND PREVENT POLLUTION SUCH AS DUST CONTROL, ROADWAY
THE CONTRACTOR SHALL PERFORM OTHER ROUTINE STANDARD DAILY OPERATIONS TO
3800-FM-BCW0271D
- COMMENTS AND ACTION TAKEN
- EXCEPTIONS NOTED
- CAUSE FOR INSPECTION
- BMP DESCRIPTION
- INSPECTED BY
- DATE THAT E&S BMP WAS INSPECTED
AT THE TIME OF INSPECTION AND MUST CONTAIN THE FOLLOWING INFORMATION:
AN INSPECTION LOG MUST BE MADE AVAILABLE TO THE REGULATORY AGENCY OFFICIAL
FOR ALL E&S INSPECTIONS.
USE THE PADEP *VISUAL SITE INSPECTION REPORT*
AND DISPOSED OF IN A LEGAL MANNER.
CONSTRUCTION WASTE MATERIALS WILL BE REMOVED FROM THE OWNER'S PROPERTY
WILL BE SEPARATED FROM OTHER WASTE AND HANDLED FOR RECYCLING.
THE SURROUNDING AREA IS ENCOURAGED, WHENEVER POSSIBLE. REUSABLE WASTES
LITTERING BY CONSTRUCTION CREWS IS PROHIBITED; HOUSEKEEPING OF THE SITE AND
REDISTRIBUTED ONTO ANY TEMPORARY SOIL STOCKPILES OR REMOVED FROM THE SITE.
ACCUMULATED SEDIMENT THAT IS REMOVED FROM CONTROL STRUCTURES WILL BE
REESE STREET
NOTES SHEET 3 OF 3
EROSION AND SEDIMENTATION
STEEP SLOPE NATIVE SEED MIX - APRIL 1 TO JUNE 30 AND OCTOBER 1 TO NOVEMBER 30.
TEMPORARY SEED MIXTURE - MARCH 15 TO OCTOBER 15.
INDICATED. SPREAD SEEDS WITHIN THE FOLLOWING DATES, OR AS OTHERWISE INDICATED OR DIRECTED.
(A) GENERAL SPREAD SEEDS WHERE INDICATED AND AT THE RATES SPECIFIED IN THE SEED TABLES, OR AS OTHERWISE
* RECOMMENDED 10% HARDSEED AND 70% NORMAL SPROUTS.
TEMPORARY SEED MIXTURE SPECIES
CEREAL RYE (SECALE CEREALE) (FALL)
OATS (AVENA SATIVA) (SPRING)
FORMULA AND SPECIES
HEATH ASTER, PA ECOTYPE
NEW ENGLAND ASTER, PA ECOTYPE
WRINKLELEAF GOLDENROD, PA ECOTYPE
COMMON MILKWEED
WILD BERGAMOT, FORT INDIANTOWN GAP-PA ECOTYPE
BLACKEYED SUSAN
LANCELEAF COREOPSIS
OXEYE SUNFLOWER, PA ECOTYPE
PARTRIDGE PEA, PA ECOTYPE
PURPLE CONEFLOWER
DEERTONGUE, TIOGA
SWITCHGRASS, 'SHAWNEE'
AUTUMN BENTGRASS, ALBANY PINE BUSH-NY ECOTYPE
VIRGINIA WILDRYE, MADISON-NY ECOTYPE
CANADA WILDRYE
BIG BLUESTEM, 'SOUTHLOW'-MI ECOTYPE
ANNUAL RYEGRASS
INDIANGRASS, NY4 ECOTYPE
STEEP SLOPE NATIVE SEED MIX
WEIGHT
% BY
SEED
WEED
MAX %
GERMINATIONPURITY (LBS/1000 SY)
RATE
SEEDING
(LBS/ACRE)
RATE
SEEDING
TEMPORARY SEED MIXTURE
PERMANENT SEED MIX
SEEDING
NON-ASPHALTIC EMULSION IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION.
MULCH CLEAN OAT OR WHEAT STRAW AT THE RATE OF 3 TONS/ACRE (3 BALES PER 1000 SQUARE FEET) APPLIED WITH
* PULVERIZED AGRICULTURAL LIMESTONE 800 LB/1000 SY
*…